Вы находитесь на странице: 1из 1

m

o
.c

!
r o P l ot P r o

z a ti o n

W
O
N
y
bu
to
cad

k
lic
Ac

w.

C
w

w
hydraulic coupling
cooler
high level oil box
hydraulic coupling motor
gear box
exhauster
bought-in
bought-in
10.throttle bought-in
valve DN25. bought-in
9.pressure bought-in
gauge bought-in
8.explosion-
proof electric
Oil station contact
pressure
gauge.
technical requirement
7.butt clamp
1.Besides the parts shown in the drawing, others should
check valve.
purchased by user.
6.stop valve.
2.One orifice(dia-2.5)on the valve clack of check valve .
5.pressure
3.Main return pipe to the oil station should have a slope with
gauge
1:100.
switch.
4.The oil pope should be done pressure test with 0.392MPa(G)
4.sight glass.
after welding and cleaning,and keeping for five minutes without
3.sight glass.
leakage.
2.sight glass.
1.sight glass.
m o
.c
!
r o P l ot P r o

z a ti o n
W
O
N
y
bu
to

cad
k
lic
Ac

w.
C

w
w

Вам также может понравиться