PROJECT DIRECTORY
PROJECT ENGINEERS:
OWNER: AUBURN UNIVERSITY
AUBREY SHARP
AUSTIN BROWN
PROJECT ENGINEERS:
ROSIA ROWE
AUBURN CAMPUS ROAD AUSTIN BROWN
AUBURN, LEE COUNTY, AL 36849 ROSIA ROWE
AUBREY SHARP
ZONED: HD (HOLDING DISTRICT)
SHEET INDEX :
AUBURN UNIVERSITY
BUILDING UTILITIES C-08
AUBURN, ALABAMA
COMPOSTER DETAILS A-01
COMPOSTER DETAILS A-02
COMPOSTER DETAILS A-03
UTILITY DETAILS D-01
GENERAL DETAILS D-02
VICINITY MAP LOCATION MAP
NOT TO SCALE NOT TO SCALE
COVER PAGE
ALPHA & OMEGA ENGINEERING A&O OFFICES
AUSTIN BROWN 1(800)-320-2019
ROSIA ROWE ISSUED:
AUBREY SHARP MARCH 20TH 2019
SHEET 1 of 15
G - 01
GENERAL NOTES: 8.1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AN NPDES FOR STORM WATER DISCHARGE GENERAL NOTES - SITE, PAVING, GRADING, DRAINAGE,
FROM THE CONSTRUCTION SITE(S) FOR ALL WORK DESCRIBED IN THESE SPECIFICATIONS AND
1. UTILITIES: THERE MAY BE ADDITIONAL EXISTING UTILITIES NOT SHOWN ON THESE PLANS. EXISTING UTILITIES ARE
SHOWN ON THE DRAWINGS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MEET ALL
& UTILITY PLAN C-1:
SHOWN IN AN APPROXIMATE MANNER ONLY AND THE ENGINEER ASSUMES NO RESPONSIBILITY FOR 1. . CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND VERTICAL
REQUIREMENTS AND OBLIGATIONS OF THE PERMIT. THE CONTRACTOR SHALL BE RESPONSIBLE
LOCATIONS SHOWN. FIELD VERIFY THE LOCATION OF ALL EXISTING UTILITIES WITHIN THE LIMITS OF ALIGNMENT OF ALL TIES BETWEEN PROPOSED AND EXISTING PAVEMENTS, CURB
FOR ALL COSTS ASSOCIATED WITH MAKING APPLICATION FOR THE PERMIT AND FOR MEETING THE
PROJECT ENGINEERS:
THAT WILL AFFECT THE CONSTRUCTION PROJECT. PROTECT ALL EXISTING UTILITIES.
8.2. AFTER STABILIZATION OF THE DISTURBED AREA HAS BEEN ACHIEVED, THE CONTRACTOR SHALL 2. MAXIMUM CUT OR FILL SLOPES IS 3H:1V
AUBREY SHARP
2. TEMPORARY PROVISIONS: SEQUENCE THE WORK AND PROVIDE TEMPORARY MEASURES AS NEEDED TO MAINTAIN
AUSTIN BROWN
REMOVE AND DISPOSE OF ALL TEMPORARY BMP'S AND DRESS OUT THOSE AREAS TO THE 3. IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF EXISTING CONDITIONS,
ROSIA ROWE
ACCESS TO THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING CONSTRUCTION. TEMPORARY
PROPER LINE AND GRADE UNLESS OTHERWISE NOTED, THE CONTRACTOR SHALL FULLY AND COMPLETELY
PROVISIONS MAY INCLUDE, BUT ARE NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
9. PRE-CONSTRUCTION PHASE - EROSION CONTROL NOTES:
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE.
REMOVE AND LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
9.1. PRIOR TO THE LAND DISTURBING CONSTRUCTION, THE CONTRACTOR SHALL SCHEDULE A
3. . NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS IN THE FIELD NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED CONCRETE, ASPHALT
PRE-CONSTRUCTION MEETING WITH THE AUBURN UNIVERSITY CONSTRUCTION PROJECT
AND THE SURVEY SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW CONSTRUCTION DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER DELETERIOUS MATERIAL. THE
MANAGER AND DESIGN ENGINEER
4. COMPLY WITH ALL APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY INSTALLATION CODES. ALL SUBGRADE TO REMAIN SHALL BE COMPACTED TO 95% STANDARD PROCTOR
9.2. THE CONTRACTOR SHALL FOLLOW THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR
MATERIALS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH THESE PLANS AND MAXIMUM DRY DENSITY FOLLOWING FULL REMOVAL OF THESE MATERIALS.
SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT THE LAND
SPECIFICATIONS UNLESS DEPARTMENT OF TRANSPORTATION STANDARDS OR LOCAL MUNICIPAL STANDARDS 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN QUALIFIED PROFESSIONAL
STRIPPED OF ITS NATURAL COVER IS EXPOSED ONLY IN SMALL QUANTITIES.
ARE MORE STRINGENT.
9.3. THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER ADVICE WHEN QUESTIONS ARISE CONCERNING DESIGN AND EFFECTIVENESS OF
5. DO NOT DEVIATE FROM THESE PLANS AND SPECIFICATIONS WITHOUT PRIOR WRITTEN APPROVAL FROM THE
CONSTRUCTION ACTIVITY EROSION CONTROL DEVICES.
ENGINEER OF RECORD.
9.3.1. TYPE "A" SILT FENCE SHOULD BE INSTALLED ON THE PERIMETER OF THE DISTURBED AREA 5. STORM WATER MANAGEMENT SHALL BE IN ACCORDANCE WITH COUNTY, STATE, AND
6. AUBURN UNIVERSITY UTILITIES SHOULD BE NOTIFIED TO LOCATE AND GPS ALL NEW OR EXPOSED UTILITIES.
AS SHOWN ON THE PLAN. THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE OTHER APPROPRIATE ORDINANCES AND REGULATIONS IN EFFECT AT TIME OF
LOCATES ARE GOOD FOR FOURTEEN (14) DAYS ONLY. LOCATE REQUIRES MINIMUM OF FOURTY-EIGHT (48)
AUBURN UNIVERSITY DESIGN AND CONSTRUCTION STANDARDS. THE SILT FENCE SHOULD BE
HOURS (BUSINESS DAYS) NOTICE. ALL NEW UTILITIES SHALL BE GPS AND PICTURES TAKEN BY UTILITY
CONSTRUCTION PLAN APPROVAL.
KEPT ERECT AT ALL TIMES AND REPAIRED WHEN REQUESTED BY THE SITE INSPECTOR OR
SERVICES PRIOR TO COVERING. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AND MAINTENANCE OF
THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD BE REMOVED WHEN
EROSION AND SEDIMENTATION CONTROLS DURING CONSTRUCTION.
GENERAL NOTES-EXISTING CONDITIONS C0: ACCUMULATION REACHES ONE HALF THE HEIGHT OF THE BARRIER. THE PERIMETER SILT
7. ALL CONSTRUCTION PARKING AND SITE LAYDOWN MUST BE WITHIN THE CONFINES OF
1. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION. FENCE SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID FENCING
SHOULD BE REPAIRED IMMEDIATELY
THE JOB FENCE UNLESS OTHERWISE AUTHORIZED BY AUBURN UNIVERSITY
2. ALL CONSTRUCTION RELATED PERMITS DURING THE CONSTRUCTION PHASE OF THIS PROJECT ARE THE
9.3.2. SEDIMENT PONDS AND DIVERSION SWALES SHALL BE INSTALLED AS SHOWN ON THE FACILITIES MANAGEMENT.
RESPONSIBILITY OF THE CONTRACTOR.
3. ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH APPLICABLE STATE, FEDERAL, LOCAL BUILDING, PRE-CONSTRUCTION PLAN.
GENERAL NOTES - BUILDING DESIGN
AND AUBURN UNIVERSITY CODES. 9.3.3. SEDIMENT AND EROSION CONTROL MEASURES SHOULD BE CHECKED AFTER EACH RAIN
1. A CONTRACTOR AND/OR STRUCTURAL ENGINEER WILL CHOSE DETAILS FOR THE THE
AUBURN UNIVERSITY
REMOVE EXCESS EXCAVATION, DISPLACED MATERIAL AND TRIMMINGS AND LEGALLY DISPOSE OF OFF THE
AUBURN, ALABAMA
OWNER'S PROPERTY.
7. ALL GAS AND WATER METERS ARE TO BE RETURNED TO UTILITY SERVICES.
COMPOSTING
UNIVERSITY'S
1. EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO ANY CLEARING OR EARTHWORK OPERATIONS AND
SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT GROUND COVER IS
ESTABLISHED IN ALL DISTURBED AREAS.
2. ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY THE ENGINEER OR OTHER INSPECTORS AS
DETERMINED BY FIELD CONDITIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER MANAGEMENT OF ALL CONSTRUCTION AND DEMOLITION
DEBRIS GENERATED BY THIS PROJECT. PROPER MANAGEMENT OF ALL C&D WASTE SHALL BE IN STRICT
ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS AND TO AN ADEM APPROVED DISPOSAL
FACILITY
4. THE EROSION CONTROL MEASURES SHOWN ARE A REQUIRED MINIMUM. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE PREVENTION OF SEDIMENT TRANSPORT FROM THIS PROPERTY IN ACCORDANCE WITH ALL FEDERAL,
STATE AND LOCAL REGULATIONS DURING CONSTRUCTION. THE CONTRACTOR SHALL INSTALL ADDITIONAL
DEVICES AND IMPLEMENT ADDITIONAL PRACTICES IF WARRANTED BY FIELD CONDITIONS.
5. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND PRACTICES. INSPECTIONS
SHALL BE PERFORMED AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF 21" GREATER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL EROSION CONTROL MEASURES EXCEPT
CHANNEL LINING AND OUTLET PROTECTION AFTER SITE STABILIZATION. THE CONTRACTOR SHALL DRESS ALL
AREAS TO THE LINE AND GRADE SHOWN ON THESE PLANS.
7. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
THE CONTRACTOR SHALL CONTACT ALABAMA ONE CALL (811) A MINIMUM OF 48 HOURS PRIOR TO
EXCAVATION AND AUBURN UNIVERSITY (334-844-4357) A MINIMUM OF 5 DAYS PRIOR TO EXCAVATION IN ORDER
TO GIVE BOTH ENTITIES ENOUGH TIME TO MARK UTILITIES. IF NO PAINT IS VISIBLE, CONTRACTOR SHALL NOT
PERFORM EXCAVATION UNTIL VERIFYING WITH AUBURN UNIVERSITY FACILITIES MANAGEMENT DEPARTMENT
THAT WORK SITE IS CLEARED FOR EXCAVATION.
8. EROSION CONTROL BEST MANAGEMENT PRACTICES (BMP'S):
NOTES
G - 02
SHEET 2 of 15
SITE NOTES:
1.) CURRENT SITE IS 1.6 AC. +/-
2.) CURRENT SITE STORM RUNOFF DRAINS TOWARDS THE
PARKERSON MILL CREEK.
PROJECT ENGINEERS:
4.) EXISTING ELECTRICAL POWER IS LOCATED NORTH OF
AUBREY SHARP
AUSTIN BROWN
THE SITE.
5.)EXISTING SEWER LINE IS LOCATED WEST OF SITE NEAR
ROSIA ROWE
THE CREEK.
6.) 50 FT BUFFERS ARE GIVEN TO THE CREEK AND
ABANDONED WELL TANKS.
EXISTING OVERHEAD 3 PHASE POWER
EXISTING FENCE LINE
SHU
AUBURN UNIVERSITY
AUBURN, ALABAMA
EXISTING CONTOURS
AY
CONDITIONS
0 50 100 200 FT
SHEET 3 of 15
EXISTING
C - 01
N
AD
AUBURN CAMPUS RO
OPEN FACE OF
BUILDING
R45'
PROPOSED DRIVEWAY
(8" CONCRETE SEE SHEET C-11)
PROPOSED DRIVEWAY
(GRAVEL SEE SHEET C-11)
R45'
24' 8
66'
3
4"
12'
55' 2 34"
50'
R45'
42'
15'
N
(CHAIN LINK 8')
PROPOSED FENCE
(SEE SHEET C-07)
0
COMPOSTING BUILDING
20
40
80 FT
SLOPE DOWNHILL.
A 2% SLOPE DOWNHILL.
N
0
20
40
BIO-SWALE IS 50' LONG WITH WITH 3:1 SLOPED BANKS WITH A 2%
DRAINAGE DITCH HAS A 2' WIDE BASE WITH 2:1 SLOPED BANKS WITH
80 FT
CO
BU MP
ILD OS
IN TIN
G G
EXIT PAD
CONSTRUCTION
N
SODDED AREA (SEE SHEET C-11)
0
20
40
80 FT
PERMANENT SEEDING (SEE SHEET C-11)
PROJECT ENGINEERS:
EXISTING PRIMARY ELECTRIC OVERHEAD AWAY FROM THE BUILDING ON PROPOSED SIDE.
AUBREY SHARP
AUSTIN BROWN
ROSIA ROWE
3.) SANITARY SEWER LINE IS 12" CONCRETE LINED
PIPING.
PROPOSED UNDERGROUND ELECTRIC 4.) POTABLE WATER LINE IS 12" DUCTILE IRON PIPING.
AUBURN UNIVERSITY
AUBURN, ALABAMA
N
COMPOSTING
UNIVERSITY'S
COMPOSTING BUILDING
PKW
Y
SITE UTILITIES
UNDERGROUND ELECTRIC
SHEET 7 of 15
C - 05
0 50 100 200 ft
N
AD
EXISTING WATER MAIN AUBURN CAMPUS RO
DESIGN BY ALPHA & OMEGA ENG.
ISSUE DATE : 3.21.2019
PROJECT ENGINEERS:
AUBREY SHARP
AUSTIN BROWN
ROSIA ROWE
SKID STEER PARKING (8'x12')
MECHANICAL AUGER
AUBURN UNIVERSITY
AUBURN, ALABAMA
COMPOSTING
UNIVERSITY'S
CURING BIN (12'x24')
COMPOST STORAGE
DOOR (2.5')
OFFICE/ BATHROOM (12'x23') DOOR (2.5') BIN (15'x12')
GARAGE DOOR (12')
DOOR (2.5')
FOOD WASTE STORAGE BIN (8'x6')
0 5 10 20 FT
STORAGE AREA (5'x12') NOTE:
BUILDING HAS 10' TALL STEEL SIDEWALLS
ALL BINS ARE 5' TALL
ALL WALLS OF BINS ARE 8" THICK
EXCEPT WALLS ON SIDE OF AUGER
BUILDING
THEY ARE 16" THINK
LAYOUT
SHEET 8 of 15
C - 07
10'
6'
12' X 8'
66'
GARAGE DOOR
20 FT
PROJECT ENGINEERS:
CONNECTED BY 8'' SDR35 PVC PIPING.
AUBREY SHARP
AUSTIN BROWN
4.) ELECTRICAL WIRING SHALL BE 6'' AND WILL TRAVEL WITH THE WALL.
ROSIA ROWE
IT IS OFFSET IN THE DRAWING TO BE VISIBLE AND WILL ALSO TRAVEL
TO THE CONTROL PANEL.
5.) WATER LINE IS 8'' DI PIPING AND IS OFFSET FROM FACILITY TO BE
VISIBLE
10 FT
12.5 FT
8 FT
AUBURN UNIVERSITY
DRAINAGE INLET
AUBURN, ALABAMA
COMPOSTING
UNIVERSITY'S
20 FT CONTROL PANEL
12.5 FT
DRAINAGE INLET
14 FT
WATER SPOUT
LEGEND:
0 5 10 20 FT UNDERGROUND ELECTRIC
BUILDING
UTILITIES
MUNICIPAL WATER LINE CONNECT
SHEET 10 of 15
C - 08
NOTES
1.) REINFORCED WALLS MADE OF CMU
PROJECT ENGINEERS:
3.) LATCH & BOLD MANUFACTURED SEPARATELY
AUBREY SHARP
AUSTIN BROWN
ROSIA ROWE
4.) COMPOSTER BUILT AT A 2% GRADE TOWARDS EXIT
END
AUBURN UNIVERSITY
METAL GATE: EXIT END OF COMPOSTER
AUBURN, ALABAMA
LENGTH : 9.5'
HEIGHT : 5'
COMPOSTER
SHEET 11 OF 15
A - 01
DETAILS
0 5 10 FT
13'-4.00"
0
5
10
20'
5' TALL
16" THICK
15 FT
CONCRETE WALL
NOTE:
SUPPORTS.
5' TALL
8" THICK
CONCRETE WALL