Вы находитесь на странице: 1из 8

Ontrack Audit Summ

Total Action Items 12


Total completion 9
% Completion 75%

Label Area Picture Problem Statement

1 Front of tool Edge of tool corroded

Need
2 Beside loading area greasing/lubricant

White spot
3 Beside loading area contamination

Brownish powder
4 Beside processing area contamination

Brownish powder
5 Beside dryer contamination
Brownish powder
5 Beside dryer contamination

Brownish powder
6 Beside dryer contamination

Brownish powder
7 Beside dryer contamination

The part changed to


8 Unloading area brown color

The part changed to


9 Unloading area brown color

The part changed to


10 Unloading area brown color
rack Audit Summary

Action Plan PIC Commit Date Status Remark

Facilities will conduct PM Facilities will conduct PM on CR100.


on CR100. Area of focus Muz 26/7/13 Open Area of focus will be Ontrack and
will be Ontrack and exhaust system
exhaust system

This will be done


internally and need help This will be done internally and need
JY TBD Open
from vendor to unlock the help from vendor to unlock the panel
panel

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech
Weekly wiping by CR100 Madavan 17/7/13 Close
Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech

Weekly wiping by CR100 Madavan 17/7/13 Close


Tech
Rusty parts in Ontrack

Вам также может понравиться