PROJECT SYNOPSIS

on
HOSTEL BUILDING

B. TECH. CIVIL ENGINEERING

BY
SARAFARAZ AHMAD (1536300065)
SOURABH KUMAR (1536300066)
SUHEL KHAN (1536300079)

Under the guidance of


MR. R.S. MISHRA (HOD)

AMBALIKA INSTITUTE OF MANAGEMENT AND


TECHNOLOGY
2018

1
CONTENTS

 PROJECT DETAIL
 INTRODUCTION
 SCOPE OF PROJECT
 METHOD OF DESIGN
 HOSTEL DIMENTIONS
 HOSTEL COMPRISES OF
 DESIGN PROCESS
 METHODOLOGY
 CONCLUSION
 REFERENCE.

2
PROJECT DETAIL:-
 Title: Planning & design of hostel construction,
 Domain: Construction engineering,
 Category: Civil project

INTRODUCTION:
A exact plan and design of construction is the major task in engineering
studies. This hostel was developed based on the requirement.It will
perfectly match to the both boys and girls living style.Naw-a-days
constructing the hostel for students is a major thing for college
management.Because the students are coming from various places like
city and villages.So it is a must have facility.Reduce the current
accommodation of crisis at the university.

Material used for this construction are brics, sand, cement, stone,
timber, metal, plastic, water and more.

The hostel will provide the following:


• Appropriate environment for living as well as studying.
• Opportunities for informal acadmic and social interchange.
• Privacy and quite place where people are living in close proximity
and are sharing facilities- most students will not have the
opportunity to choose their neighbors.

Scope of project:-
• Site selection,
• Climate condition detail,
• Soil condition report,
• Surroundings detail,
• Building specifications,
• Type of construction mechanism,

3
• Foundation,walls,floors & roofs,
• Material used for construction,
• Foundation &roofing specification,

• Structural design like one way slab and its calculations,


• Bar bending schedule of beam,
• Abstract of cost & quantity, Drawing.

METHOD OF DESIGN:-
• The detail of all structural member are carried out by LSM.
• Limit state of design is a method of designing structers based on
statistical concept of safety & associated statistical probability of
failure.

Hostel:-
 Area : 255m^2
 Capacity :50
 Construction cost: 15 lakh Rs,
 Place-(Football ground) AIMT, Lucknow.

Hostel comprises of:-


 Office Room,
 Bathroom & toilet,
 First aid room

Design process:-
 Funding
 Talk to city planner
 Rough sketch some ideas
 Integrated design process
 Find builder & subs
 Architect draws up schematics for consideration

4
 3D model(use sketchup)
 Develop drawing

Permit process- Processing take 10 days for new construction, then


another 10 days for corrections.
 Permits.

Construction process:-
 Break ground
 Exacavation
 Foundation
 Utilities(sewer, water,electrical)
 Framing(windows,stairs)
 Roofing
 Rough plumbing
 Lighting & electrical
 Air sealing
 Drywall
 Flooring
 Tiling
 Painting
 Finish plumbing
 Finish electrical & lighting
 Certificate of occupancy

 Modifications

 Moving in.

Deviding prject management efforts into these five phases can help give
efforts structure and simplify them into a series of logical and
manageable steps;

5
 Project initiation
 Project planning
 Project execution
 Project monitoring and control
 Project closure.
METHODOLOGY:
 SITE SELECTION
(Football ground AIMT)
 PREPRATION OF LAYOUT

(Done by autocad)
 HOSTEL PLAN

(Done by autocad)
 HOSTEL ELEVATION

(Done by autocad)
 DESIGN

(Manually using IS 456-2000).

CONCLUSION:-
 The design of hostel building components such as walls,
slabs,beams,columns,staircase are carried out carefully
to give an idea for preparing the detailed planning and
designing.
 All concrete members will be design as per IS code
provisions.

REFERENCE:-

6
Mr. R.S. Mishra (HOD) & other associated faculty
members for giving their valuable thoughts and ideas
regarding the project.

 Google, Wikipedia.

 From several books

 Design of Reinforced Concrete Structures by


N. Subramaniam

 Building Materials by S.K. Duggal.