The critical tasks obtained from CTI is subjected to Task Hazard Analysis using following methodology
Brick Laying 1. Manual handling issues, H 1. Conduct daily Tool Box Talk. L
strains 2. Proper lifting positions to be practiced.
2. Cuts and abrasions 3. Training to be provided in manual
3. Crush or Pinch injuries handling and general hygiene safety.
4. Fall from height 4. Proper working platform to be arranged.
5. Skin contact with 5. Suitable PPE to be provided.
cementious materials, 6. Proper communication shall be carried
wet mortars. between the team.
6. Hit by falling objects 7. Hard hats to be worn around scaffolding.
7. Ergonomics issues 8. No one to be worked under worked
scaffolding or ladder.
Hot Work H M
Cutting 1. Noise 1. Conduct daily Tool Box Talk.
2. Fumes and gases 2. Provide dedicated Supervisor
3. Sparks 3. Competent person to be deployed for
4. Cuts and Injuries work.
5. Flying objects/debris 4. Provide appropriate training.
6. Electric Shocks 5. Earplugs to be provided in case of high
noise area.
6. Proper PPE’s to be given.
7. Proper GHK to be maintained.
8. Inspect the equipment before startup of
work.
Project Risk Assessment
This Risk Assessment takes into account only those potential hazards that exist at the time it conducted. A revised Risk Assessment will be required if there is a
significant change in working conditions, at critical stages during construction, or when High Risk Construction Work performed.