PERFIL CAPA+ALGEROZ

LEGENDA PERFIL ALGEROZ+CAPA +RUFO PINGADEIRA


L1 LAJE 1 IMPERMERMEABILIZADA COM MANTA (e= 4mm) + A1a A4 A7 Ap2 .20 .20
PEDRA BASALTO SERRADO TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm)

L2 LAJE 2 IMPERMERMEABILIZADA COM MANTA (e= 4mm) + A1b A5 A8a EXTRAVASOR

.04

.04
PEDRA BASALTO SERRADO TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm)

L3 LAJE 3 IMPERMERMEABILIZADA COM MANTA (e= 4mm) + A2 A6a A8b RALO FOFO (200x200mm)
PEDRA BASALTO SERRADO TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm)
L4 LAJE 4 IMPERMERMEABILIZADA COM MANTA (e= 4mm) + A3 A6b Ap1

.74
TELHAS ALUZINCO, e= 0,5mm) TELHAS ALUZINCO, e= 0,5mm)

TELHADO

.05
.26
EXTRAVASOR EXTRAVASOR EXTRAVASOR .04

.20
DETALHE 01

.10
DETALHE 05 DETALHE 05 DETALHE 05

.0
TQP

4
i: 1% i: 1% i: 1% i: 1% i: 1% i: 1% .24

DETALHE 01 DETALHE 02
Esc: 1/20 Esc: 1/20
DETALHE 02
i: 11.8 %
DETALHE 02

PERFIL CAPA+RUFO
A6b PERFIL CALHA
TOPO DENTADO
.20
TELHADO

.10
.26

.04
.04

.10
.05
A6a .26

DETALHE 03 DETALHE 04
Esc: 1/20
Esc: 1/20

DETALHE EXTRAVASOR
i: 1% i: 1% i: 1% i: 1%

EXTRAVASOR EXTRAVASOR

1.16
1.18

DETALHE 05 DETALHE 05
L1 L2

0.20
0.20

DETALHE 02
3.13 5.45 5.35 2.72
1.80 5.80 5.55 3.15
0.20 0.20 0.20
0.20 0.20 0.20

EXTRAVASOR TELHADO

i: 1%
L4

.05
TQP TQP

.05
.20
.04

.10
.48
DETALHE 07 .24

0.20 0.20 0.20

i: 1%
0.20 0.20
1.90 5.52 5.73 0.55 0.20
3.10 5.55 5.28 2.72
DETALHE 03
0.20

EXTRAVASOR

7.60
0.20
DETALHE 05
1.21

L3

1.06
EXTRAVASOR
DETALHE 05

i: 1% i: 1%

DETALHE 03

A5 DETALHE 01

i: 11.79 %
i: 12.3 %
DETALHE 06

i: 1%
DETALHE 02
A8a
DETALHE 05
Esc: 1/20 Esc: 1/20

A7
TELHADO EXISTENTE
DETALHE 01
i: 1%
DETALHE LAJE COBERTURA
i: 1% i: 1% 2.35

i: 12 % .20 1.95 .20


PEITORIL EXISTENTE
DETALHE 02 IMPERMEABILIZANTE (4mm)
A8b

LAJE
DETALHE 03 DETALHE 03
IMPERMEAB. i: 11.79 %

i: 1%
LAJE

3.60
i: 1% i: 1%
i: 1%

EXTRAVASOR
DETALHE 01 DETALHE 05
i: 1%

EXTRAVASOR
DETALHE 01 i: 12.08 % i: 29.40 % i: 29.40 % i: 11.8 % DETALHE 05

TELHADO EXISTENTE Ap1 Ap2 A4


DETALHE 07
Esc: S/E
A3
DETALHE 01

i: 1%
LAJE
IMPERMEAB.

i: 11.2 % DETALHE 02
DETALHE 03 DIRINFRA
DETALHE 01
DETALHE 04 A2 EXTRAVASOR
DETALHE 05 DT-INFRA CO
i: 1% i: 1% i: 1% i: 1%

DETALHE 06

TELHADO EXISTENTE
LAJE A2
IMPERMEAB.

DETALHE 03 i: 11.2 % i: 11.2 %


DETALHE 02

TELHADO EXISTENTE DETALHE 03 A1b

LAJE TELHADO
IMPERMEAB. EXISTENTE

A1a

i: 11.2 %

i: 1% i: 1% i: 1% i: 1%

EXTRAVASOR EXTRAVASOR
DETALHE 05 DETALHE 01 DETALHE 05

COMAER HACO
DIRINFRA
Destacamento de Infraestrutura REFORMA DA COBERTURA
de Canoas
DT-INFRA CO
UNIDADE DATA ESCALA
VISTO RODRIGO PRADO DOS SANTOS - MAJ QOENG IES CREA DF 18.751
METRO DEZ/2017 INDICADA
CONFERIDO CAU A32530-9

PROJETO CREA PE 059.200


RS013.13-05.A002
DESENHO 2S SDE PALOMO
PLANTA DE COBERTURA SUBSTITUI A:

Esc: 1/100