AZZAWIYA OIL REFINING

COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

‫نموذج القراءات خالل العطلة األسبوعية‬


Weekend & Holiday Report
Date:06/01/2018
TOPPING UNITS (10&110)
ITEM Old New
Unit Capacity ( m³/hr ) 386 / 100% 398 / 103%
FEED TYPE (VOL %) Tank (1/4 ) 94%shararah , 6% Hamada
Heater inlet temp. (°C) 209 215
Heater outlet temp. (°C) 327 323
Max Heater skin temp. (°C) 383 394
Reboiler temp. (°C) 159 162
L.P.G production ( Ton/hr ) 3.0 3.0
Mix gas oil viscosity Cst 5.04 5.10
Mix gas oil recovery @ 350 C 88 /75 87 /88
Residue viscosity Cst 14 17.16
Kerosene end point / flash point (°C) 258/44 245 / 38
10-V 4 chlorides /iron ( PPM) 3.55/ 0.29 1.78/ 2.5

ASPHALT PLANT (40)

Unit Capacity ( % ) S/D


Reduced crude tank ( NO) S/D
Heater outlet temp. (°C) S/D
Flash zone temp. (°C) S/D
Penetration S/D

L.P.G Treatment Unit ( PK170)

Unit Capacity Lab result


( Ton/hr ) C1 C2 C3 iC4 nC4 iC5 nC5
6 0.05 1.65 23.01 19.53 55.36 0.40 -

R/D Tanks Lab. Results


Mix gas oil Recovery @ 350 /Flash point (°C) Contaminated sample
Fuel oil viscosity (Cst) / water content (%) 13.86 / 0.05
Kerosene freezing point (°C) -53
Asphalt penetration S/D

ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 1 of 3
AZZAWIYA OIL REFINING
COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

Naphtha Hydrotreating Units (20&120)

ITEM Old New


Unit Capacity (m³/hr) 72.8 S/D
Reactor inlet temp. (°C) 291 S/D
Reactor outlet temp. (°C) 307 S/D
Reboiler temp. (°C) 231 S/D
Light naphtha flow (m³/hr) 18 S/D
Light naphtha R.V.P 1.377 S/D

Kerosene Hydrotreater Units (30&130)

ITEM Old New


Unit Capacity ( m³/hr ) / run down 76 /73.9 71/68
Reboiler temp. (°C) 276 260

Plat forming Units (21&121)

ITEM Old New


Unit Capacity (m³/hr) 52.5 S/D
1st Reactor inlet temp. (°C) 515 S/D
1st Reactor outlet temp. (°C) 464 S/D
2nd Reactor inlet temp. (°C) 515 S/D
2nd Reactor outlet temp. (°C) 508 S/D
3rd Reactor inlet temp. (°C) 515 S/D
3rd Reactor outlet temp. (°C) 524 S/D
Octane number 93.8 check = 95.4 S/D
L.P.G flow (m³/hr) 5.5 S/D
Deb bottom R.V.P 0.612 S/D

Utility Area
Boilers

ITEM A B C D W.H.B
Production ( ton /hr ) 29 24 35 10 -
Fuel Type Mix F.o Mix 1 F.Gas -

ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 2 of 3
AZZAWIYA OIL REFINING
COMPANY INC
‫شركة الزاوية لتكرير النفط‬
TECHNICAL DEPARTMENT ‫اإلدارة الفنية‬

Steam Turbines

ITEM A B C
Production (MWH) 2.64 2.58 2.62

Gas Turbines 1.02

Production (MWH ) :
Income Feeder (MWH)

A S/By B -

DESALINATION UNITS
ITEM 6 7 8
Production (MWH)new
24 26 27.8
Sea water old unit

Water Tanks Levels

ITEM A B T10
Level (m) Full M.T.C Full

Notes:

 05/01/2018 At 10:00Pm Switch tank of crude oil from TK(1- 4) to TK(1- 6).
 Transfer the kerosene product from tank (3-6) to tank (1-2)
 Octane R/D tank = 94.0
 At 11:35am We ask the operation to adjust operation condition in unit (21) and then
take check sample ,octane = 95.4
 At 8:45am We take check sample WISM of kerosene product from(unit30) = 91
&unit(130) = 94
 We ask the operation to adjust flash point of kerosene in unit 110
 We ask the operation to adjust iron content in110 v4
 operate the desalination unit(7) 05/01/2018 at 2:00pm
 The boilers (D) still operate just One burner

PROCESS ENGINEERING DIVISION


Process Engineer: Signature:
Amer
ARC-823-FM-35 :‫نموذج رقم‬ 0000-00-00 / 2013-08-28:‫ التعديل‬/‫تاريخ اإلصدار‬ 0-1 :‫رقم اإلصدار‬
Page 3 of 3