Академический Документы
Профессиональный Документы
Культура Документы
Contents:
1 Drive Test Procedure & Methodology ............................................................................................................. 3
2 Test Area ......................................................................................................................................................... 6
2.1 Site Information .............................................................................................................................. 6
2.2 Functionality Test ............................................................................................................................ 7
3 RF Drive Test Plots – For Information Only ................................................................................................... 10
4 OMC Trend – For Information Only .............................................................................................................. 17
5 Optimization Changes ................................................................................................................................... 18
DT Route
Drive-test Route shall be proposed to Vietnamobile for approval. No DT shall be conducted not
unless there is an approval from VNM. DT route should be detailed as possible to capture the full
coverage and quality of the network. Identify the route per clutter type: DU, U, SU, R
Procedure
a) Input entire network sites list, digital map and cluster border into MapInfo.
b) Create a map layer on digital map.
c) In the new layer, indicate the test start and draw the folded line with an arrow to
indicate the test route, indicate the test end.
d) Keep the design and agree with customer.
A test route KPIs shall be selected as much as possible based on covered all the scenarios in this
test area, all the cells as much as possible, considered the actual conditions, one day working
load.
If the customer has a predefined DT route, the DT route of KPIs shall cover the predefined DT
route. If the predefined DT route is not covered due to some objective factors, you need to
describe this case in time.
.
.
DT Tool Setup
All UEs are placed in the middle of the car. No UE shall be placed near the windows (front or
side). No external antenna shall be used.
The Drive Test will be done with TEMS (or any approved DT tool by VNM). The maximum speed
of the drive-test car is 40 km to 50 km per hour. Binning (10m x 10m in city, 50x50m out of city) shall be
used for coverage and quality DT KPIs.
Stationary
Test
Activity / Process Test case Name Sample/sector Procedure
Methodology
CSFB MO/MT test for 3 times*3 1. Attach network
CS Fall back CS call
each sector sectors 2.Make CS call from UE to UE
Initial Access PS access test for each 3 times*3
Initial Access 1.Attach network
Success Rate sector sectors
1. Attach network
Ping 60 times*3 Ping 32byte to
Ping delay Ping test for each sector 2.Ping FTP server with 32 bytes
sectors FTP server
until reach the ping times.
3 times*3 sectors 1.Attach network
Last more than 2.Locate in suitable RF condition
FTP Upload FTP Upload test for each 90s Per time point
FTP upload
Throughput sector
3. .upload 1 files from FTP server
(1GB), (single-threaded upload)
DT Legend
RSRP
0 to -75 dBm
-75 to -85 dBm
-85 to -95 dBm
-95 to -105 dBm
-105 to -120 dBm
<-120 dBm
>20
15 to20
10 to 15
2 to 10
0 to 2
<0
2 Test Area
2.1 Site Information
Site Name: L308074
Site configuration: S111 (3 MHz)
Site Coordinate: Long/Lat: 106.7808/10.9207
Antenna model: MB800/900-65-18DE14
Antenna Tilt (E/M) E: 1/1/1; M:2/2/2
Antenna Height(m): 24/24/24
Sector azimuth: 80/180/260
Date: 29/3/2018
Iub Bandwidth 100M(Share with U2100)
MB800/900-65-
Site Name L308074 longitude 106.7808 Antenna Type
18DE14
Hardware Check
Hardware Check
BBU OK
RRU OK
Antenna OK
link OK
Alarms OK
Base parameter
Cell ID PCI Bandwidth ULCenter-F DLCenter-F TAC MCC MNC Comments
Antenna Parameter
Antenna
Cell ID Azimuth Mtilt Etilt verification Result Comments
Height
1 24m 80 2 1 OK
2 24m 180 2 1 OK
3 24m 260 2 1 OK
Service Test
Actual Value
Activity / Process Target Value Test Result Comments
Cell 1 Cell 2 Cell 3
PS call setup success rate (%) 100% 100% 100% 100% Pass
1.Ping authorization
server 60 times and
record the average RTT
Ping Delay <=30ms 21.13 21.60 19.50 Pass
value
2.Stationary test with
RSRP>-80dBm,SINR>23dB
Intra-
—— OK OK OK Pass PS Long Call
eNodeB
Handover
Inter-
—— OK OK OK Pass PS Long Call
eNodeB
PCI Plot:
SINR Plot
LTE DL Throughput
LTE UL Throughput:
MIMO Plot
5 Optimization Changes
Sector M-Tilt E-Tilt RS power Other Parameter
Cluster Site Remarks Date
ID Exist New Exist New exist new