Observation Noted
It was noticed that EGYPSCO team is using steel hammer for the ass
considered a bad practice as it caused deformations and sharp notc
plate and aluminium connecting clamp beams as seen in the attach
(Observation#1A&1B).
The shown Electrical torque wrench gun was used with no referance
watts or calibraton certificate
During installation of 2nd Rim Plate, it was noticed that EGYPSCO te
foam dam to be able to install the bolt nut of item 6-8 at (check pict
dam to bend (sheet deformed) and its inclination angle to vary alon
Such bend is not accepted as it will not grantee the spread of the sp
seal, it will drop over the foam dam.
EPROM team notified EGYPSCO that the supplied materials don't in
connecting beams with the 1st outer rim plate, as shown in the draw
equally sized as one side is longer than the other side and shall be fa
connecting beam side.
EGYPSCO team advised that the normal corner angles used for fixing
connecting beams will be used to connect the them with the outer
lenght and number of fixation bolts as shown in the pictures).