Вы находитесь на странице: 1из 5
ane2o1s Ce ee Peete Se nC ry cc ieee eee Plastoring Tools & Plastering Werks Method Statement moa! ‘Supply Cement Production Process Various Equipment Plastering Tools & Plastering Works Method Statement Below aro the plastering tools or | sang eipment vowed i Paster ‘works that should be ranges vefore staring the plastering woes. Best Cement Wahine Manette Civil Engineering Masonry Structural Design Software Free Trial Demo + Wood Moat + Straight edge + Steel Brush + Aluminum Section + Mobile seafols [SAFETY & HEALTH REQUIREMENTS. + Allemployees sabe provided wth complete personal Protection equipment PPE, + All employees shall tloné Safty icon and Waring Course to ieniy all Hazards fezociate wth he werk + Atworkers sate provided with proper tools and equipment to execute the work sate, «MSDS (materia safety cata sheet shal be payed at work lation a8 appropriate iptv methodstatemertha.comiplastering works-methed-statement ml Subecnbe “we recommend these Project Management Templates fll your projects succestuly.” =n POPULAR METHODSTATEMENTS Download Method Statement for Installatio Structured Cabling System ‘August Mh 2015 Doan Motnod Ststeart for stallion OF Stcied Cat ovens package coca (.) Download Method Statement for “| Resistance Cable for Fire Alarm & Emorgorty Lighting Systems Augat 1 2015 Arm & Erergney (1 Commissioning Of UPS System Aaguat 1 2015 Doub Metnod Statement for Testing & Commissonng Ot Download Method Statement for Testing & Is Doweoad package cota.) Download Method Statement for Testing & Commissioning Of Diesel Genorator Set Dovnbed Method Ssterart fo Testing & Conmssioning Of cise! Ganeralr Set Download package [.) List Of Mandatory Tests For Transformers he folowing etn tests sea 26 aa became List Of Common Tests For agiat 8h 2015 ane2o1s Download Method Statement For Plast Works Gonorat Requirements + Ensure that materi, samples and method Statement have been submited and approved byte consutant + Ensure that plastering took & accessones are approves «Ensure proper worn platform and ightng arrangement provides + Surfaces to receive plasierng shall be ary brushed Io remove all oose paties, dus Initance,eMforescence, ele, and ay projecing fi on concrete suaces shal be hacked of + Where surfaces er out of in, they anal brought to level by necking or dubbing out proe to commencement of fishing + All requires openings for mechanical & eleieal servces, cond pipes, plugs shall be Inetalled and teste prior to plasterng + uring arrangements shall be provide for three days ‘Surface Preparation and Installation of Pastor Accassore + Allsufaces tobe pastored 0° rendere shal be sprayed with water, which shall be alowed to ry out before rush coat apa, + Masonry work appl with scratch coat pir o plastering + Concrete uraces where plaster to be applied shalbe made rough + Alundercosts shal be arated o fom an adequate kay forthe next coat, + Level Guces shale provided upto requres thickness. + Al junctons between eierent materials and also over the embedded condus shall be reinforced wih expanded metal weich shall be plugged naled or stapled as requred at raqured terval. + Allnoraontl an verteal and verteal extemal and internal angles of plastered wats shal be proleciod wih galvarized mela comer beads and shal be securely plugged, nied of Staple as required at proper tervals. + Plastering accessories suchas plate stops shall be used wher plastering terminates and is not covered by other frsh at wal. cling, door, weeow frame junctions and to al wall openings and comers. + Plastering shall proceed only when ihe masonry block works are compte Mixing of Rush Coat and Application + Surface must be sound, clan dy and foe fom any materials which may impair the + Pre.wel& saturate the surface wih potable water before applying rush coat + Thoroughly mc MPS (rush cot) wth poteble water at erate of approx. 101 of water 150 Kg, bag using a plaster machine f adjusted to obtain the consistent mix of wet mora. + Moing and appleaton shall be done by mechanical mer 36 approved by the material + Moc esch bate separately. Clean out mer between he batches + The wet mixed mortar prayed onthe walluing he pay gun a the machine. + Apply the Rush coat uslg spray gun on the prepared surface in One or wo os 2-Smm thie ough ext + Cure tho applied Rush Coat wth potable water fo minimum of 3 days Download Method Statement For Plastering Works Mixing of Final Coat and Application + Wet ush coal evenly jut Before appeaton of fish coat + In apptzaion using spray machine water flow'igaghustd obtain the consistent mix of wet ‘morta. The wot mixed mortars sprayed onthe walls using the spray gun ofthe mache, iptv methodstatemertha.comiplastering-works-method-statement hem Plastering Tools & Plastering Werks Method Statement Method Statement For Testing And Commiffsic Of Laboratory Air Flow Control System & Flim: Hood Monitoring hy 27,20 Beli ne method slatemealcetoion fe patamsing te ting anmisinng af abot 1 ane2o1s Plastoring Tools & Plastering Werks Method Statement + Incase of manual ising thorough mx MP19 wth polable wale al the rate of approx 7 L of wateriS0 kg bag usng an elect'cl padee mixer attachment. The wet med mart” Is {hen app onthe wal using owe. Any cake! and set mortar should rot be appli. + Apply the M13 dzecty over the concrete masonry block wal single coat at ineral 1 On the prepored intemavexteral concrete suraoes (castinehy or precast) MPY3 le appted in singe coat (10-200), + The plaster shal be appfed tothe requis thickness ana adequate dying te shal Be slowed fr each undercoat ror to he applleation ofthe flowing coat, + Finish tne render plate to meshum fe fish using lastehoaden trove, Over towelng and eaoting of the renderilaste surface tobe avoise nthe fal fishing + Fina coat shouldbe made in are pane using an Aduminum sight edge, + Alla f9c88 fh shall be made plane and tue fo ne al ectons and that al angles ae staigt, ue and plumb. + era cae salle taken fr plastering to be made neatly good upto wood ‘rames, skirting + Cute the apliod M13 wih potable water for minimum of twee days + Dutng te application exiting work wil be protected agains slag saning and other damages. + On wal plaster work shalloe terminate at 100 mm above false cling elevation. + Gelling surace shale plasteres wih 10-12 mm thick + Praser sallonly be stopped at comer bead or plaster stops at an nauced grove + ner pasta ate any metal em whi eset in the plaster angi han wth the ned Plaster surtace, provide raked vee Joint at uncon fas dete by the consutan, + Point up ana ish surtaces around atures, out boxes, piping, lings, te and other work flash wh ajacen plaster + Each coat ofall plasterers fo be mahntahned in a most conten for at last three aye ier the pater, + Finishes work wl be protected auing progress of ptiserng work + Detective work shal 9 removed and replaced wth new, + plaster hiekness mote than 2 em, than we have to do double coat appeation, feat coats apples ae epatar coat of 210mm. Cure te fst at for min, 2 day before overcoating + Ensure that metal lath is stright, secured to substrate joint and surface perimeter socessoras are in pace, + 00mm wae stip meta ath centred over junctons of dssmier backing materials and ‘easing beads @ terminations of plaster Fish shal be installed. + Corner beads shall be in One fngt> up to 3000mm and no length shall be Tess than 209mm and) has o set n oder to form tue ages and neat rs, sacue at ange and not more that 300mm apart wt gakarized stapes, gaharized we tis of concele nal Staggered instal at al vertcal & norzonal paste exrior comers and to provae corner beads extension ss where i requked, + Horizontal beads shall be lve, vertical beads, phmb, straight and tue, assuming proper Plastorhcenoss + Praser Stop enallbe used where calles for o as requted to stp plaster surface aganat a Alesina to form 8 nest and defi join. + oiner mesh shallbe provised on alintenal corner pie o plaster, + ALall contol join loclions instal back o back squae noted casing beads + Mockup shall be provided showing the execuons systemic of the works in order to obtain he tal approval accoraingly cutting, Patching & Repaiting + Gut out & reper all damaged plaster and al fe cracks, pis, checks waves, bers and cater defects whlch nthe opinion ofthe consutant wil Impairthe appearance andthe Ite and uses ofthe frish suriaces, + Alropai shallbe done by using approved mato + The areas where plaster hekness ig expected to exceed 20mm, a multiple eoat of plaster ‘must be apples n receding thicknes. A bate coat of 15-20mm thickness shou be applied and cure or two days. Aer te base course Becomes hard and ty, then epPY te second coat nl coat of plaster wh a thekress of 10-15mm, + Wherever thickness is Alri, &can be apple nwo coats (20mm frst coat, 20/mm second coat) + ithe expected tekness to exceed 4anm, her mesh reinforcement should be given ater the second coat in wet conftion, When the pater is wet, fx the mesh, Aer Wo days of curing, na oat can be apple to achieve @ maximum thickness of 60mm. ‘esting of Plastor Mat iptv methodstatemertha.comiplastering works-method-statement hm

Вам также может понравиться