Вы находитесь на странице: 1из 7

S.No. Description Nos.

Length Breadth Height Quanity Unit Grade


Dry stone
3 1 15 6.5 0.2 19.5
soling Cum
Total 19.5
Concreting 1 5 6.5 1.8 58.5
Deduct volume
14.25
of hume pipe
Total 44.25
Total Concrete 44.25 M20
8 Humepipe 6 @1.1 ext dia
9 Gabion works 2 5 1.5 1 15 cum
Total 15
Cement Sand Aggregate
(bags) (m3) (m3)

357 18.59 37.17


S.No. Description Nos. Length Breadth Height Quanity

Dry stone
3 1 15 6.5 0.2 19.5
soling
Total 19.5
Concreting 1 5 6.5 1.8 58.5
Deduct volume of hume pipe 14.25
Total 44.25
Total Concrete(60%) 26.55
8 Humepipe 6 @1.1 ext dia
9 Gabion works 2 5 1.5 1 15
Total 15
Aggreg
Cemen Sand
Unit Grade ate
t (bags) (m3)
(m3)

Cum

M20 0 0 0

Cum
Total No. Length Of
Member Bar Mark Size Spacing
of bars Each Bar

Top main Bar B1 20 114 5700 200


weight
Weight Traverse
Bar Shape per unit Remarks
of Steel length
length
4500

200 2.466 1.60 7400

1000
1000
Vented causeway (18m Span)
S.N Description Quantity Unit Rate Amount Remarks
1 Earthwork excavation Err:509 cum 300 300
2 Backfilling Err:509
3 Soling 19.5 cum 3200 62400
4 PCC M10 Err:509 cum 15000 15000
5 RCC M25 Err:509 22000 22000
6 Humepipe 900mm 9 Nos 57000 513000
5 Humepipe 600mm 6 Nos 37470 224820
6 Plum Concrete 44.25 cum 12000 531000
7 Formwork Err:509 sqm 200 200
8 Gabion works 15 cum 4500 67500
9 Reinforcement 936 kg 20 18720
Total 1454940