As per your request during our interview today, this are my duties and

responsibilities from my previous experience as piping engineer:


 Compliance with the site's health and safety regulations
 Supervie the fabrication and erection of piping systems
 Check the work progress status and assure that the work conforms to all technical
requirements.
 Provide support to all purchase activities and evaluate all vendor submittals.
 Provide support to all expense projects and maintain accuracy in all piping project
and ensure compliance to all piping material specifications and maintain
knowledge on all orders.
 Interpret all codes and maintain overall performance of all piping activities.
 Coordinate with various teams to administer all assignments.
 Supervise subcontractor labour/supervisors to assure that safety regulation is
observed and that safety equipment is available and ready for use.
 Perform the inspection of items, if required and prepare inspection/ test reports.
 Assisting for walk down, punch and hydro test of piping loops
 Monitoring the installation of pipes to ensure the work agrees with the project's
design.
 Inspection work progress to identify challenges, mitigate risks and guarantee the
safety of piping staff.
 Ensuring compliance with the Occupational and Safety and Health Administration’s
guidelines on use of construction materials with asbestos.
 Perform kick start meetings with subcontractor to fulfill prerequisites of related
construction activity (i.e required method statements, check list of required
equipment & tools).
 Supervise subcontractor labour/supervisors to assure that safety regulation is
observed and that safety equipment is available and ready for use.
 Performing reinstatement inspection and release for pre-commissioning
activities.

Also regarding my previous work in Iraq:
 Compliance with the site's health and safety regulations
 Supervie the fabrication and erection of LPG spherical tanks
 Attend meetings with owner/contractor representatives for project time schedule
and to overcome any obstacles that will jeopardize schedule
 Ensuring that all work done according to project standards
 Dimensional check for all tank prior to welding start with continuous supervision of
all process parameters till finishing all works according to project standards
 Witnessing all Preheat, PWHT and all NDT required according to relevant
standards
 Final walk down with owner representative after finishing all works