Stunning, slitting and bleeding area.

Chickens are slaughtered


Scalding tank. Tank with boiling water.
Plucking. Defeathering of chickens.
Holding tanks. Defeathered chickens are placed.
Eviscerating table. Internal organs in the abdominal and thoracic cavities are removed.
Offals processing area. Where internal organs and other by products will be clean.
Chilling tanks. Where clean dress chicken will be placed to maintain its quality.
Holding area. Allotted space for delivery trucks.

Dressing house floor plan

Dressing house perspective view


BILL OF MATERIALS

PRODUCTION UNITS

Item
No. Item Quantity Price/unit(PESOS) COST

1 G.I pipe 95 pcs. 861/ piece 81,795


2 Galvanized iron-plain 4’ 115 pcs. 215/ piece 24,725
X 10’
3 Galvanized iron- 1029 pcs. 269/ piece 276,801
corrugated 3’ X 12’
4 2” X 3” X 12’ Wood 1512 pcs. 80/ piece. 120,960
5 2” X 5” X 12’ Wood 567 pcs. 100/ piece. 56,700
6 Cement 154 bags 255/ bags 53,900
7 Sand 9 m3 700/ m3 6,300
3 3
8 Gravel 18 m 700/ m 12600
9 Garden net 30m X 5m 46 pcs. 403/ piece 18,538
10 Bamboo 20m 86 pcs. 120/ pcs. 10,320
11 10 mm reinforced bars 378 105/piece 39,690
12 2” X 1” X 12’ wood 5 pcs. 33/piece 165
13 2” X 2” X 12’ wood 10 pcs. 65/piece 650

TEMPORARY COST Php. 703,144

LABOR COST (40% OF Php. 281,257.6


THE COST)

TOTAL COST Php. 984,401.6


DRESSING HOUSE

Item
No. Item Quantity Price/unit(PESOS) COST

1 Cement 233 255/ bags 59,415


2 G.I pipe 7 pcs. 861/ piece 6,027
3 Galvanized iron-plain 2 pcs. 215/ piece 430
4’’ X 10’’
4 Galvanized iron- 34 pcs. 269/ piece 9,146
corrugated 3’ X 12’
5 2’’ X 3’’ X 12’ wood 93 pcs. 80/ piece. 7,440
6 2’’ X 5’’ X 12’ wood 38 pcs. 100/ piece. 3,800
7 10 mm Steel bars 56 pcs. 105/piece 5,880
8 Sand 13 m3 700/ m3 9100
9 Gravel 26 m3 700/ m3 18,200
10 2” X 1” X 12’ wood 4 pcs. 33/ piece. 132
11 2” X 2” X 12’ wood 10 pcs. 65/ piece 650
12 Mahogany Door 4 pcs. 4,000/piece 16,000
13 Sliding Glass Window 1m 8 pcs. 1500/ piece 12,000
x 1m
14 Garden net 30m X 5m 1 piece 403/ piece 403
16
TEMPORARY COST Php. 148,623

Php. 59,449.2
LABOR COST (40% OF
THE COST)

Php. 208,072.2
TOTAL COST