Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
1. Identify three i. Procedure of site visit and 12 hours Lecture i. Wiring route and
phase wiring evaluation/survey inspection fitting and
specifications and ii. Technique to produce accessories corrected
procedures layout drawing ii. Correct polarity and
iii. Various type of conductor: connection determined
Copper
Aluminum
iv. Various types of cable:
XLPE/SCT/PVC
PVC/PVC
PVC/SWA/PVC
XLPE/SWA/PVC
v. Cable colour coding
according to MS IEC 60364
Standard
vi. Various type of protection
devices:
MCB,MCCB
RCCB/ELCB
Fuse
vii. Types of three phase wiring
Surface wiring
Conceal wiring
Conduit wiring
Conceal conduit Wiring
Ducting wiring
Trunking/Casing
Cable tray
Underground
viii. Suitable fitting and
accessories
Switches
Power Point (S/S/ 13A)
20
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
i. Determine procedure to 24 Hours Demonstration,
carry out site visit and Observation &
evaluation Practical
ii. Determine location of
the wiring route
iii. Determine types of
wiring
iv. Determine types of
protection devices
v. Determine types of
conductor
vi. Determine types of
cable
vii. Determine suitable
fitting and accessories Attitude:
viii. Determine Authorisation i. Meticulous
requirement to access site ii. Housekeeping
Safety:
i. Use appropriate
PPE during carry
out wiring
practical
ii. Safety tools &
equipment in
proper order
21
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
2. Identify three i. Three phase Wiring 12 hours Lecture i. Correct various type of
phase wiring tools, procedure tools used
equipment and ii. Three phase Wiring ii. Correct devices cable
preparation used
materials
iii. Three phase Wiring
inspection
iv. Wiring tools, equipment
and materials
22
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
i. Setup safe working 24 hours Demonstration, frame earthing
area Observation & correctly
ii. Conduct three phase Practical
wiring according layout plan
and location wiring line
iii. Identify cable marking
iv. Identify cable size &
polarity
v. Check all fitting & Attitude:
accessories connected to i. Ensure no
earthing wastage of cable
Safety:
i. Use appropriate
PPE during
wiring activities
ii. Ensure safety
tools &
equipment in
proper order
4. Carry out three i. Types of earthing 12 hours Lecture i. Three phase earthing
phase earthing ii. Function of earthing system conducted
system installation iii. Earthing procedure ii. Earthing system tested
iv. Electrical symbol
v. Building structure
vi. Electrical hand tools
vii. Electrical equipment &
materials
viii. Electrical earthing
accessories & fitting
ix. Earthing layout
23
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
i. Determine types of 24 hours
earting
ii. Determine function of
earthing
iii. Install Distribution Fuse
Board (DFB) consumer unit
to earth rod
iv. Connect main frame
electrical equipment to earth
v. Test earthing system Attitude:
vi. Construct earthing i. Ensure no wastage
layout of cable
Safety:
i. Use appropriate
PPE during wiring
activities
Ensure safety tools
& equipment in
proper order
5. Carry out three i. Distribution Board 12 hours Lecture i. Neatness of
phase Distribution (metallic or insulated) wiring checked
Board (DB) ii. Tools and equipment for ii. Cable terminated
three phase Distribution consumer unit
(metallic or
Board (metallic or insulated) iii. Cable terminated
insulated) installation to fitting and
installation iii. Various method of accessories
Consumer surface three iv. Continuity,
phase wiring polarity, insulation
Domestic Surface wiring resistance tested
Concealed wiring
Conduit wiring
Trunking wiring
24
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
iv. Wiring drawing
v. Standard Operating
Procedures (SOP) for testing
instrument
vi. Types of electrical
system testing, such as:-
Insulation resistance test
Polarity test
Continuity test
25
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
6. Carry out fitting i. Three phase wiring drawing 12 hours Lecture i. Cable terminated
and accessories ii. Types of electrical to fitting and
installation accessories accessories
iii. Types of electrical fittings
iv. Procedure to terminate
cables, accessories and
fittings
i. Determine location for 24 hours Demonstration,
fitting and accessories Observation &
installation Practical
ii. Select and fix electrical
accessories
iii. Select and fix electrical
fittings
iv. Terminate cables,
accessories and fittings Attitude:
i. Housekeeping
working area
after wiring
activities
Safety:
i. Use appropriate
PPE during carry
out installation
works
ii. Ensure safety
tools &
equipment in
proper order
26
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
7. Carry out wiring i. Visual inspection 8 hours Lecture i. Visual inspection
system visual ii. Wiring drawing according conducted
inspection to SOP ii. Fault identified
iii. Wiring connection
i. Execute visual 16 hours Demonstration,
inspection on wiring system Observation &
ii. Identify fault on visual Practical
inspection
iii. Carry out housekeeping
activities Attitude:
i. Housekeeping
working area
after wiring
activities
Safety:
i. Use appropriate
PPE during carry
out installation
works
ii. Ensure safety
tools &
equipment in
proper order
27
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
8. Carry out dead i. Types of 4 hours Lecture i. Continuity, polarity,
circuit test circuit/connection insulation resistance
ii. Electrical Testing and earthing tested
Insulation resistance test
(IRT)
Polarity test
Earthing continuity test
Earthing test
o Earth resistance test
o Earth loop
impedance test
iii. Testing instrument
standard operating
procedures (SOP)
iv. Procedure to interpret
testing result
i. Determine 8 hours Demonstration,
circuit/connection Observation &
ii. Execute electrical Practical
testing on wiring system
iii. Interpret testing result Attitude:
i. Handle testing
equipment with
care
9. Carry out live i. ELCB/RCB functioning 4 hours Lecture i. ELCB/RCB
circuit test testing functioning testing
ii. Supply voltage test determined
28
Attitude / Safety / Training Delivery
Work Activities Related Knowledge Applied Skills Assessment Criteria
Environmental Hours Mode
iii. Determine ELCB/RCB 8 hours Demonstration, ii. Supply voltage
functioning testing Observation & tested
iv. Test Supply voltage Practical
Attitude:
i. Handle testing
equipment with
care
10. Prepare single i. Procedure to produce 6 hours Lecture i. Procedure to
phase work three phase wiring produce three phase
activities report ii. Procedure to submit wiring submitted
three phase wiring for ii. Procedure of
approval three phase wiring
iii. ‘As built’ drawing reported
preparation
iv. Test result
v. Regulatory bodies and
tender requirements (Form G
and Form H)
iii. Determine procedure to 16 hours Demonstration,
produce three phase wiring Observation &
iv. Determine procedure to Practical
submit three phase wiring
for approval to superior
v. Prepare as built
drawing
vi. Check test result
vii. Follow regulatory
bodies and tender Attitude:
requirements i. Meticulous in
writing report
Employability Skills
29
Core Abilities Social Skills
References
REFERENCES
1. Undang-Undang Malaysia. 2005. Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan Elektrik 1994, Pindaan sehingga 2005 . MDC Publisher Sdn Bhd
Malaysia.
2. Suruhanjaya Tenaga Malaysia. Standard Pendawaian Malaysia (Electrical Installations Of Buildings - MS IEC 60364) Jabatan Standard Malaysia
3. The Institution of Electrical Engineers, 1998, Peraturan-Peraturan bagi Pemasangan Elektrik, Edisi 16 . Golden Books Centre Sdn Bhd
4. Giesecke, F. E. et. Al. 2002. Technical Drawing. Prentice Hall
5. BS 7671: 2001 Requirements for Electrical Installations (IEE Wiring Regulations, Sixteenth Edition) Institution of Electrical Engineers
31