Contract Document
Test Description SPLN K6.005.2015 Load No
ESDM Test38
Book 5 of 12
Running in program N/A 7.2.5.2 Load test 50 Th
%N/A
at MCR
2018
Load Rejection N/A 50%, 75%, 100% load 75 % at
100% MCR
Load Test + RR 24 100 % at MCR
N/A N/A1 hour
Jam Bonafide test : 360 50
hrs% for
including 96 hrs
RR 15 hari N/A 75100%
% for load
2 hour Min 80% load
Uji keandalan
50 % at MCR
Perfomance Test 100 % for 1 hour N/Amin
24 hrs
75 % at MCR
110 % for 1 hour 80% load
100 % at MCR
100 % for 3 hour
Appendix IV MAN Performance
Test Procedure for Multiple
Engine
FK4278
FK 4262, 100%
Load test 100% load for 4hrs
FK4275
FK 4211 No.FK4276
9 page 13 of 14
follow contract requirment
Guarantee
TESTING DESCRIPTION Value

Load Rejection

Testing Schedule

Engine output 100% load (or alternate power output according to grid)

Before load rejection

Speed (RPM)

Voltage (kV)

During load rejection

Speed (RPM)

Voltage (kV)

After load rejection

Speed (RPM)

Voltage (kV)

Reliability Run 15 days

Testing Schedule

4 days (96 hours) 100% MCR

11 days depend on load dispatcher

Internal Fault (less than 3 hours or total 11 hours)


No re-run required, faulty hours shall be added
Internal Fault (over 3 hours or total 11 hours)
Re-run required

Performance Test

Testing Schedule

Site condition
Ambient temperature (degC) 26

RH (%) 89

Barometic pressure (bar) 1

Wind velocity (m/s) 11.3

Power Factor 0.85

Gross Power output

50% MCR for 1 hour 3444.5

75% MCR for 2 hour 5166.75

100% MCR for 4 hours 6889

Fuel oil consumption

Lube oil consumption


ENGINE ENGINE ENGINE ENGINE ENGINE
A B C D E

2-May-19 7-May-19 8-May-19 16-May-19 22-May-19

9-May-19 10-May-19 13-May-19 23-May-19 24-May-19

27-May-19 28-May-19 29-May-19 14-Jun-19 15-Jun-19


Estimated Gross Power Output during Realibility Test Run
Energy Meter (KWh)
NO. Description Tag Number Electrical Power (KW) Pe Duration (s)
Start (b) End (a)
Note:
1 Engine A (from incoming generator 1) 20 3600 200 180
1. All data is taken on field.
2 Engine B (from incoming generator 2)

3 Engine C (from incoming generator 3)

TOTAL

Estimated Fuel Consumption during Realibility Test Run


Fuel Oil Meter (kg) Corrected Fuel Oil Pressure (bar) Temperature (C) Air Temperature (C)
Flowrate of Fuel Flowrate of Fuel Leakage (kg) Consumption to LCV Electrical Power LCV during
NO. Description Tag Number Consumption (kg/h) Bh Qleak Duration (s) (KW) Pe Test (kJ/kg) Corrected Fuel Oil Consumption to Actual Test (g/KWh) Br
(g/KWh) Bx Actual Ambient Actual Ambient Actual Ambient Reference Ambient
Start (b) End (a) (Px) Reference Ambient (Pr) (Tx) Reference Ambient (Tr) (Tbax) (Tbar)
1 Fuel Oil Forwarding Pump to Engine A (Flowmeter) FT/FI CF521 0.5 0.5 3600 800 799 25 20 10 2 1 32 28 32 30 23.29
Note:
2 Fuel Oil Forwarding Pump to Engine B (Flowmeter) FT/FI CF522 18 0 1800 899 890 1440 25 20 3 2 30 28 30 28 1343.28 1. All data from point 1 to 6 are taken
on DCS/HMI.
3 Fuel Oil Forwarding Pump to Engine C (Flowmeter) FT/FI CF523 19.95 0.05 3600 890 870 2. All data from point 7 to 11 are taken
on field.
4 Engine to Fuel Oil Forwarding Pump A (Flowmeter) FT/FI CF516

5 Engine to Fuel Oil Forwarding Pump B (Flowmeter) FT/FI CF517

6 Engine to Fuel Oil Forwarding Pump C (Flowmeter) FT/FI CF518

7 Pilot Oil Supply Pump to Engine A (Flowmeter) Temporary FM

8 Pilot Oil Supply Pump to Engine B (Flowmeter) Temporary FM

9 Pilot Oil Supply Pump to Engine C (Flowmeter) Temporary FM

10 Clean Oil Drain Tank and Pump Block 1 LS/LA CL501

11 Dirty Oil Drain Tank and Pump Block 1 LS/LA CL503

TOTAL

Estimated Lube Consumption during Realibility Test Run

Volume of Lube Oil Contained (m3)


Density at 15 C (kg/m3) P15c Lube Oil Consumption
(kg/h) Mass of Lube Oil
NO. Description Tag Number Density (kg/m3) Poil Temperature (C) Toil
Bh10 Leakage (kg) Bleak Duration (h)
Initial (V1) Final (V2)

FI CF602 with solenoid


1 Lube Oil Transfer Pump to Engine A (Flowmeter) 41.7574363635 20 11 3749169.27271557 150 200 5 2
AA180
Note:

FI CF603 with solenoid


2 Lube Oil Transfer Pump to Engine B (Flowmeter) 34.9212665792 18 10 3133913.99212919 150 200 5 2 1. All data from
AA181 point 1 to 3 are
taken on
DCS/HMI.

FI CF604 with solenoid 2. All data from


3 Lube Oil Transfer Pump to Engine C (Flowmeter) 24.4831028182 15 9 2194479.25364158 150 200 5 2 point 4 is taken on
AA182
field.
LG CL523
4 LO Drain Tank 24.5270887078 17 12 2198437.98369853 150 200 5 2
LT CL524

TOTAL

Net Plant Power Output


Block Gross Power Output Quantity
NO. Description Tag Number Net Plant Power Output (kW) Pe Trafo Losses (kW) Parasitic Load Engine (kW) BOP Load (kW) Duration (h)
Block Engine
1 Block A Engine A, B, C 7 20 11 1 1 1 1
2 Block B Engine D, E 6 18 10 1 1 1 1
TOTAL

Net Block Heat Rate


NO. Description Tag Number Net Block Heat Rate Gross Heat Rate (kJ/kWh) Gross Power Output (kW) Pe Engine Quantity Net Power Output Duration (h)
1 Block A Engine A, B, C 31.4285714286 20 11 1 7
2 Block B Engine D, E 30 18 10 1 6
TOTAL
12