Вы находитесь на странице: 1из 84

OPEN COMPLAINTS TILL 4th MAR-19

Plumbing&STP 174
Electrical&Meter Issues 30
Cable&IO Socket Issues 11
Security Related Issues 26
Safety&Lift Related Issues 10
Seepage&Leakages 109
False ceiling Sheet Related 9
Housekeeping&External Window Cleaning 22
Carpentry&DB Lock Issues 26
Door&Window(Aparna) related Issues 13
Communication(Internet speed) Issues 15
AC Drain&Inlet Issues 18
Civil Works 90
Common Area&Vendor service related Issues 23
TOTAL 576
Create
Sl.no. ID Last update Category Flat Owner /Tenant
Date
2018-09- 4 days, 7 hours Block 18-
1 2858 Plumbing Rimpy Arora
21 ago 604
2018-12- Block 2-
2 2158 1 month ago Plumbing Lalith
11 906
2018-12- 2 months, Block 7-
3 1905 Plumbing Vijay Kumar Rojra
07 2 weeks ago 1703
2018-10- 2 months, Block 4-
4 4719 Plumbing Rajesh Chopra
20 2 weeks ago G004
Mrs.
2018-12- 1 month, 1 week Block 1-
5 2043 Plumbing Prathibha/Manish
09 ago 305
Amlathe
2018-12- 2 months, 1 week Block 8-
6 2171 Plumbing
11 ago 605
2018-12- 2 months, Block 16-
7 2137 Plumbing
11 2 weeks ago 105
2018-09- 2 months, Block 20- Sreekanth
8 2061 Plumbing
12 2 weeks ago G002 Papishetty
2018-09- 2 months, Block 17-
9 2863 Plumbing Jaya T
21 2 weeks ago 1102
2018-10- 1 week, 3 days Block 12-
10 3754 Plumbing Y SrinivasaRao
05 ago 304
2018-08- 2 months, 1 week Block 10-
11 716 Plumbing Avi Mathur
24 ago 302
Mr. Vijay Kumar
2018-10- 2 months, 1 week Block 7-
12 4960 Plumbing Bommena/Anup
25 ago 602
Mayank
2018-09- 4 days, 8 hours Block 18-
13 2126 Plumbing Rimpy Arora
12 ago 604
2018-11- 2 months, 1 week Block 1-
14 5479 Plumbing Kalyan Vadlamani
03 ago 606
Mr. Paruchuri
2018-11- 2 months, 1 week Block 6- Suhas
15 1380 Plumbing
30 ago 501 Kiran/Pratyusha
Meduri
2018-12- Block 2-
16 2586 5 minutes ago Plumbing Nitesh Misra
18 1502
2018-12- 1 month, 1 week Block 20-
17 2690 Plumbing Pallepati C Rao
20 ago 1406
Mr. Paruchuri
2018-12- 2 months, 1 week Block 6- Suhas
18 2784 Plumbing
22 ago 501 Kiran/Pratyusha
Meduri
2018-12- 2 months, 1 week Block 12-
19 2777 Plumbing Sarthak Vasudeva
22 ago 105
2018-12- 3 weeks, 5 days Block 1-
20 2783 Plumbing Kavita Vadlamani
22 ago 605
2018-12- 2 months, 1 week Block 8- K Suresh/satish
21 2839 Plumbing
22 ago 1001 manne
2018-12- 4 days, 10 hours Block 8-
22 1658 Plumbing Boda Phanendar
03 ago 806
2018-09- 1 week, 6 days Block 8-
23 2911 Plumbing Ranjan Rai
21 ago 103
Mr. Sai Krishna
2018-12- 2 months, 1 week Block 6-
24 2900 Plumbing Anantha/J
23 ago 906
Sudharshan
2018-10- 1 month, 2 weeks Block 20- Thasari Raja
25 4508 Plumbing
16 ago 703 Rajeswara Rao

2019-01- Block 19- Mr.Praveen


26 3405 2 months ago Plumbing
01 1103 Bachu/jay mehta

2019-01- 1 month, 4 weeks Block 3-


27 3451 Plumbing priyanka samar
02 ago 706
2019-01- 3 weeks, 1 day Block 8-
28 3576 Plumbing Ranjan Rai
05 ago 103

2019-01- 2 weeks, 4 days Block 8-


29 3579 Plumbing Ranjan Rai
05 ago 103

Mr.Amit
2019-01- 1 month, 1 week Block 1-
30 3596 Plumbing Gorantiwar/Shwet
05 ago 401
a Choudhary
Block 4-
2019-01- 3 weeks, 4 days Dhruva Jyoti
31 3741 Plumbing 1605
07 ago Dasgupta
1705
2019-01- 6 days, 22 hours Block 3-
32 4115 Plumbing priya gupta
12 ago 1006
2019-01- 1 month, 3 weeks Block 17-
33 3979 Plumbing Gayathri J
10 ago 906
2019-01- Block 2-
34 3972 6 minutes ago Plumbing Nitesh Misra
10 1502

2019-01- 4 days, 8 hours Block 18-


35 3983 Plumbing Rimpy Arora
11 ago 604

2019-01- 1 month, 2 weeks Block 19-


36 4089 Plumbing
12 ago 101
2019-01- 1 month, 1 week Block 13-
37 4038 Plumbing
11 ago 501
Mrs.
2019-01- 1 week, 3 days Block 1-
38 4063 Plumbing Prathibha/Manish
12 ago 305
Amlathe
2019-01- Block 2-
39 4058 6 minutes ago Plumbing Nitesh Misra
12 1502
2019-01- Block 2-
40 3974 6 minutes ago Plumbing Nitesh Misra
10 1502
2019-01- Block 2-
41 4195 1 week ago Plumbing Ram
13 504

2019-01- Block 19-


42 4239 4 weeks ago Plumbing Narasimhan
14 802

2019-01- 3 weeks, 4 days Block 20-


43 4480 Plumbing
18 ago 1403
2019-01- 4 days, 8 hours Block 18-
44 4499 Plumbing Rimpy Arora
18 ago 604
2019-01- 1 month, 1 week Block 7-
45 4652 Plumbing Viswa
21 ago 1401

2019-01- Block 20-


46 4688 1 month ago Plumbing
21 1002
2019-01- 1 month, 1 week Block 7-
47 4752 Plumbing Ashay Raut
22 ago 1407

2019-01- Block 15- Mr. Pragyan


48 4805 2 days ago Plumbing
22 103 Ojha/Manisa Dash

2019-01- 2 weeks, 5 days Block 17-


49 4862 Plumbing anurag
23 ago 405

2019-01- 4 weeks, 1 day Block 14-


50 4905 Plumbing Saumye Rastogi
24 ago 702

2019-01- 1 month, 1 week Block 17-


51 4929 Plumbing Vani Singireddy
25 ago 603

2019-01- 1 month, 1 week Block 17-


52 4925 Plumbing Vani Singireddy
24 ago 603

2018-11- 1 month, 1 week Block 16-


53 5370 Plumbing
01 ago 105

2019-01- 3 days, 5 hours Block 9-


54 5017 Plumbing Tushar Gupta
26 ago 801

2019-01- Block 10-


55 5033 1 month ago Plumbing Jayant Modi
27 1102
Ms.Pallavi
2019-01- 6 days, 22 hours Block 3-
56 5262 Plumbing Jain/Sanchit
30 ago G004
Kumar
Block 7-
2019-01-
57 5267 1 week ago Plumbing 1606 / Anusha Shankar
30
1706
2019-01- Block 14-
58 5275 1 month ago Plumbing
31 202
2018-07- 4 days, 8 hours Block 18-
59 480 Plumbing Rimpy Arora
30 ago 604
2019-02- Block 2-
60 5427 4 weeks ago Plumbing Preeti Gaur
03 905
2019-02- 1 week, 6 days Block 7-
61 5647 Plumbing Vijay Kumar Rojra
07 ago 1703
2019-02- 3 weeks, 1 day Block 16-
62 5656 Plumbing
07 ago 1004
2019-02- Block 12-
63 5666 2 weeks ago Plumbing Y SrinivasaRao
07 304
2019-02- 1 week, 5 days Block 2-
64 5726 Plumbing Premnath Kamana
09 ago 1401
2019-02- 6 days, 6 hours Block 17-
65 5733 Plumbing Supriya
09 ago 901
2019-02- 6 days, 6 hours Block 7- Manikandan/Mani
66 5736 Plumbing
09 ago 103 kandan
2019-02- 4 days, 7 hours Block 7-
67 5815 Plumbing megha dixit
10 ago G005
2019-02- 6 days, 22 hours Block 6-
68 5796 Plumbing Madhuri Mettu
10 ago G001
2019-02- 2 weeks, 6 days Block 20-
69 5826 Plumbing Shweta Gupta
11 ago 1103
2019-02- 2 weeks, 2 days Block 4-
70 5872 Plumbing Vani Jain/nishit
11 ago 904
2019-02- 2 weeks, 5 days Block 14-
71 5877 Plumbing Richa Mittal
12 ago 806
2019-02- 2 weeks, 5 days Block 20-
72 5901 Plumbing RRChaitanya
12 ago 1401
2019-02- 6 days, 6 hours Block 4-
73 5822 Plumbing Vipul Srivastava
11 ago 1105

2019-02- 2 weeks, 2 days Block 15-


74 6021 Plumbing
15 ago 805

2019-02- 2 weeks, 1 day Block 17- bharat kumar


75 6043 Plumbing
15 ago 1303 chittanuru
Block 14-
2019-02- 1 week, 1 day kalyan
76 6066 Plumbing 1306/140
16 ago tripuramallu
6
2019-02- 1 week, 1 day Block 7-
77 6089 Plumbing
16 ago 1102
2019-02- 1 week, 1 day Block 4-
78 6086 Plumbing Vani Jain/nishit
16 ago 904
2019-02- Block 10- Mr. Moti Lal
79 6118 2 weeks ago Plumbing
17 705 Pandita/Nisha
2019-01- 1 week, 6 days Block 7-
80 5201 Plumbing
29 ago 906

2019-02- Block 10-


81 6165 1 week ago Plumbing Meghan Gandra
18 1003

2019-02- 1 week, 6 days Block 17- Bandi Sudhakar


82 6172 Plumbing
18 ago 704 Reddy
Venkateswarlu
2019-02- 1 week, 2 days Block 19-
83 6196 Plumbing Tedla/Rahul
18 ago 1406
Tandon
Block 19-
2019-02- 1 week, 5 days Harleen/Karan V S
84 6220 Plumbing 1302 -
19 ago Bagga
1402

2019-02- 1 week, 5 days Block 10-


85 6225 Plumbing Shanmughan T
19 ago 1405
2019-02- 1 week, 6 days Block 7-
86 6182 Plumbing Viswa
18 ago 1401

2019-02- 4 days, 10 hours Block 8-


87 6253 Plumbing Boda Phanendar
19 ago 806

2019-02- 6 days, 5 hours Block 3-


88 6204 Plumbing
18 ago 202
2019-02- 1 week, 4 days Block 11-
89 6271 Plumbing
20 ago 1105
Mr. Vijay Kumar
2019-02- 1 week, 3 days Block 7-
90 6291 Plumbing Bommena/Anup
20 ago 602
Mayank

2019-02- 1 week, 3 days Block 14-


91 6323 Plumbing Saumye Rastogi
21 ago 702

2019-02- 1 week, 2 days Block 5-


92 6335 Plumbing N.Sreedhar
22 ago 1202
2019-02- 6 days, 6 hours Block 4-
93 6339 Plumbing Vipul Srivastava
22 ago 1105
2019-02- 6 days, 22 hours Block 6-
94 6364 Plumbing
22 ago 1203
2019-02- Block 14-
95 6400 1 week ago Plumbing
23 1204
2019-02- 3 days, 9 hours Block 17- K S VARA
96 6392 Plumbing
23 ago 106 PRASAD REDDY

2019-02- Block 2-
97 6407 1 week ago Plumbing Preeti Gaur
23 905

Block 1-
2019-02- 1 week, 1 day
98 6393 Plumbing 1605 sahitya
23 ago
1705
2019-02- 6 days, 22 hours Block 12-
99 6459 Plumbing Swarna Latha
24 ago 1206
2019-02- 6 days, 15 hours Block 12- Kiran
100 6451 Plumbing
24 ago G001 Kanakadandi
Mr.Surya
2019-02- 6 days, 23 hours Block 11-
101 6453 Plumbing Mohan .G/Winston
24 ago 106
Roy Veigas
2019-02- 5 days, 23 hours Block 7-
102 6460 Plumbing Biswanath Muduli
24 ago 501
2019-02- 6 days, 2 hours Block 1-
103 6482 Plumbing Amit Gupta
25 ago 1404
2019-02- 5 days, 23 hours Block 16-
104 6490 Plumbing Parameswari
25 ago 801
Vinod
2019-02- 5 days, 23 hours Block 7-
105 6492 Plumbing Tipparaju/Vinod
25 ago 403
Tipparaju
2019-02- 6 days, 2 hours Block 19-
106 6483 Plumbing shanku vuppala
25 ago 1401
2019-02- 6 days, 1 hour Block 5- P Venkata
107 6488 Plumbing
25 ago 904 Srikanth Reddy

2019-02- Block 12-


108 6442 1 week ago Plumbing Ramalinga Reddy
24 301

2019-02- 6 days, 1 hour Block 1-


109 6486 Plumbing Aparna
25 ago 103
2019-02- Block 2-
110 5664 1 week ago Plumbing Ram
07 504
2019-02- 5 days, 20 hours Block 17-
111 6500 Plumbing smriti singh
25 ago 605
2019-02- 5 days, 18 hours Block 13-
112 6509 Plumbing J P Acharya
25 ago 801
Block 16- Mr.Rishi
2019-02- 4 days, 22 hours
113 6544 Plumbing 1305 - Dhand/Rajeshwar
26 ago
1405 Rao
2019-02- 3 days, 15 hours Block 12- Kiran
114 6554 Plumbing
27 ago G001 Kanakadandi
2019-02- 3 days, 21 hours Block 2- Ramesh Babu
115 6585 Plumbing
27 ago 1505 Boppana

2019-02- 3 days, 20 hours Block 5-


116 6587 Plumbing N.Sreedhar
27 ago 1202

2019-02- 3 days, 8 hours Block 20-


117 6600 Plumbing Shweta Gupta
28 ago 1103
2019-02- 3 days, 9 hours Block 6-
118 6599 Plumbing
28 ago 1004
2019-02- 3 days, 7 hours Block 13- shwetha
119 6604 Plumbing
28 ago 202 Shashidhar
2019-02- 3 days, 7 hours Block 19-
120 6605 Plumbing Mukund Parihar
28 ago 1306
2019-02- 2 days, 4 hours Block 1-
121 6606 Plumbing Aparna
28 ago 103
Mr. P.V.V.S.
2019-02- 2 days, 4 hours Block 2- Mallikharjuna
122 6610 Plumbing
28 ago 1601 Rao/Sameer
Dubey
Mr. Srinivasan
2019-02- 2 days, 4 hours Block 15-
123 6609 Plumbing Sampathkumar/An
28 ago 801
kur
Malahal
2019-03- 2 days, 7 hours Block 4-
124 6627 Plumbing naineni/malalahal
01 ago 302
rao naineni
2019-03- 2 days, 8 hours Block 7-
125 6623 Plumbing megha dixit
01 ago G005
2019-03- 2 days, 3 hours Block 2-
126 6635 Plumbing Premnath Kamana
01 ago 1401
2019-03- Block 9-
127 6642 2 days ago Plumbing
01 1404
2019-03- 1 day, 20 hours Block 20- Thasari Raja
128 6647 Plumbing
01 ago 703 Rajeswara Rao
2019-03- 1 day, 22 hours Block 2-
129 6645 Plumbing
01 ago 602
2019-03- 1 day, 18 hours Block 7- Monika
130 6650 Plumbing
01 ago G004 Muddamshetty
2019-02- 3 days, 19 hours Block 17-
131 6593 Plumbing Sanjay Gupta
27 ago 1204
2019-03- 1 day, 9 hours Block 17- Abhishek
132 6658 Plumbing
02 ago 1006 chowdhury

2019-03- 1 day, 9 hours Block 18-


133 6659 Plumbing Rimpy Arora
02 ago 604

2019-03- 1 day, 7 hours Block 18- Vinay Kumar


134 6668 Plumbing
02 ago 201 Boinepally
Mr.M.Rama
2019-03- 1 day, 8 hours Block 17- Krishna, M
135 6663 Plumbing
02 ago 506 Madhavi/sasi
Rekha
2019-03- 1 day, 7 hours Block 17-
136 6665 Plumbing Vani Singireddy
02 ago 602
Mrs.
2019-03- 1 day, 7 hours Block 1-
137 6666 Plumbing Prathibha/Manish
02 ago 305
Amlathe
2019-03- 1 day, 7 hours Block 20- Mallikarjuna N
138 6669 Plumbing
02 ago 104 Ammu
2019-03- 1 day, 7 hours Block 20- Raj Gaurav
139 6670 Plumbing
02 ago 1404 Asthana
2019-03- 1 day, 6 hours Block 20-
140 6675 Plumbing Srikala Y
02 ago 1101
2019-03- 1 day, 6 hours Block 17-
141 6678 Plumbing arvind
02 ago 703
2019-03- 1 day, 6 hours Block 12-
142 6681 Plumbing Rajaneesh
02 ago 1001

2019-03- 1 day, 7 hours Block 20- Sreekanth


143 6673 Plumbing
02 ago G002 Papishetty

2019-03- 1 day, 5 hours Block 2-


144 6685 Plumbing
02 ago 303
Aruna
2019-03- 1 day, 3 hours Block 17-
145 6691 Plumbing Alavala/Aakash
02 ago 401
Garg
2019-03- 1 day, 3 hours Block 19-
146 6692 Plumbing Phani Kumari A
02 ago 406

2019-03- 1 day, 4 hours Block 19-


147 6688 Plumbing Pankaj Kumbhare
02 ago 1106

Block 7-
2019-03- 22 hours,
148 6705 Plumbing 1606 / Anusha Shankar
02 9 minutes ago
1706
Block 7-
2019-03- 22 hours,
149 6704 Plumbing 1606 / Anusha Shankar
02 9 minutes ago
1706
2019-03- 6 hours, Block 5-
150 6720 Plumbing Vivek Yadav
03 54 minutes ago 903
2019-03- 6 hours, Block 12- Koteswara
151 6721 Plumbing
03 54 minutes ago 1006 Rao/Swati Moitra
2019-03- 7 hours, Block 19-
152 6718 Plumbing Ashish Hemani
03 24 minutes ago 901
2019-03- 5 hours, Block 14-
153 6729 Plumbing
03 24 minutes ago 902

2019-03- 1 day, 5 hours Block 16-


154 6684 Plumbing
02 ago 805

2019-03- 4 hours, Block 19-


155 6737 Plumbing Mukund Parihar
03 39 minutes ago 1306
2019-03- 5 hours, Block 14-
156 6734 Plumbing Padmaja
03 9 minutes ago 807
Mr. Pammi
2019-03- 2 hours, Block 1-
157 6739 Plumbing Thejovardhan/Roh
03 54 minutes ago 1103
it Roy
2019-03- 1 hour, Block 8- K Suresh/satish
158 6742 Plumbing
03 39 minutes ago 1001 manne
Deepak K
2019-03- 22 hours, Block 9-
159 6749 Plumbing Jain/Sambhav
03 39 minutes ago 602
Jain
2019-03- 23 hours, Block 14-
160 6747 Plumbing Veerababu T
03 39 minutes ago 801
2019-03- 21 hours, Block 10-
161 6748 Plumbing Priya
03 48 minutes ago G005
Mr. Vishal
2019-03- 20 hours, Block 10-
162 6755 Plumbing Dharanipathi/V
03 54 minutes ago 1206
RAMA DEVI
2019-03- 20 hours, Block 13-
163 6760 Plumbing
03 54 minutes ago 1103
2019-03- 19 hours, Block 19-
164 6769 Plumbing Vidyaranya Kuppa
03 9 minutes ago 502
2019-03- 21 hours, Block 17- K S VARA
165 6753 Plumbing
03 9 minutes ago 106 PRASAD REDDY
2019-03- 20 hours, Block 11-
166 6757 Plumbing Kanika
03 54 minutes ago 1406
2019-03- 20 hours, Block 14-
167 6754 Plumbing
03 54 minutes ago 701
2019-03- 20 hours, Block 17-
168 6767 Plumbing Vani Singireddy
03 24 minutes ago 602
2019-03- 9 hours, Block 14-
169 6777 Plumbing
04 24 minutes ago 701
2019-03- 6 hours, Block 20-
170 6789 Plumbing
04 39 minutes ago G004
2019-03- 4 hours, Block 20-
171 6801 Plumbing S. P Rao
04 54 minutes ago 904
Ramesh
2019-03- 2 hours, Block 8-
172 6804 Plumbing Maddukuri/Ravi
04 54 minutes ago 305
Dhing
2019-03- 23 hours, Block 11-
173 6810 Plumbing
04 20 minutes ago 1005

2019-03- 21 hours, Block 10-


174 6813 Plumbing
04 9 minutes ago 1601
Subject Status

Stinky and smelly water from all toilet flushes Open

Worms in flush Open

Car wash area taps dont have pressure to clean the


Open
car
Drain blockage in utility area Open

Foul smell in guest washroom flush Open

water leakage in living room Open

water leakage Open

stinky dirty STP water Open

STP issue, stinking badly. Open

Flush water stinking Open

Leakage in utility area drainage pipe Open

Smell in master bathroom Open

MBR Toilet flush is not working after maintenance Open

Kitchen sink leakage. Open

Utility drain leak Open

Flush issue Open

Check all toilets in basements Open

Flush continuous in mbr washroom.. Open

Leakage of water from the basin bottom. Open

Water leakage from commode... Open

Diameter tap leakage Open

drain pipe in utility area for washing machine not fitting


Open
properly
Smelly water in flush Open

wc line above leakage Open

flush plate need to repaired in mbr washroom. Open

The tap water on the wash basin on 3 tap stinks bery


very very bad. I am hoping it is not toxic or injurious as Open
odour is very bad
silicon gel required to fill the gaps surround the
Open
commode

Flush continuous in mbr washroom.. Open

Faulty flush plate, plumber Vishwanath verified that the


button gets stuck, flush plate is faulty. Repeated flush Open
overflow issues this week. Replace the flush plates

water leakage in mbr washroom near wall & WC Open

water pressure is too low Open

WC leakage Open

plenty of worms in flush water Open

Flush not working in mbr washroom. Open

I can see a moving worm with naked eye in RO input


water. Please check it urgently as it is a serious health Open
hazard.

Water leakage from roof Open

wc leakage in mbr washroom Open

One of the bathroom has a very foul which comes


Open
intermittently

MBR flush not working once more Open

Flush plate required Open

All flushes are not working properly,jaquar visit required Open

19-802
Common toilet flush not working. Open
Urgent help needed.

Flush continuous in mbr washroom.. Open

Observed moving worm in STP/flush water. Please


Open
look into this ASAP.
The flush in block 7 is coming with more pressure since
Saturday. With full force that feels like pipes might burst
or water would come out. Residents are complaining Open
about it. Please confirm if there are any changes in the
pipeline or pressure.

Shower pressure is very low in mbr washroom Open


Flush plate need to be repaired/ replacement,send only
Open
Jaquar technician

Flush continuous in mbr washroom.. Open

Flush overflowing in CBR and MBR Open

Hi
Noticing worms in the master bedroom toilet. Open
Please rectify

Faucet tap leaking in 17-602 Master bedroom Open

Domestic water is too hard. RO purifier and geyser


failures in last 1 month.
Open
We are supposed to get municipal water. What is the
problem here ?

water clogging in bathroom and wc spout leaking Open

The tap set in my utility area basin is loose and the


plumber is not able to tighten it up. Please send Open
someone to repair this.

No drain lid in my corridor . Open

Flush Plate got damaged Open

Water from wash basin in living room flows into the


Open
common toilet.

Geyser not working.. Open

Stinking and smelly water from toilet flushes Open

Worms in flush water Open

water leakage from below the kitchen sink,need to fix


Open
with white cement..
Issue still continues... Water keeps flowing
Open
continuously... Need a proper resolution for this
Flush not working properly in common washroom,flush
Open
plate need to be repaired
Washing machine outlet in wash area doesn't work. Open
Flush issue not resolved yet, flush plate need to be
Open
repaired
Tap knob problem, send only Jaquar technician Open

Continuous leakages in the duct area Open

flush continuous in mbr washroom Open

The cover of the drain pipe in front of block20 flat 1103


Open
is missing. Please fix it.
Flush Plate got damaged,send a Supervisor and
Open
Jaquar technician
Leakage in the master bedroom. Please send any
Open
experienced plumber.
Water leakage in master bath room Open

Jaquar technician needed. Vihanga plumber not able to


Open
solve problem. Flush not working at all.
We have reported to help desk club house 2 regarding
two flush tank are not properly working so far no Open
responce

WC leakage in all wash room.. Open

Upstairs Toilet drain clogged Open

Master bedroom WC flush not working Open

Sound coming from Common washroom flush Open

WC leakage Open

Wash basin leakage


Open

1) Shower not working as expected. It has become


loose and is hanging and we can't change the way
water is released
Open
2) when flushed water is leaking from the bottom of the
commode... This needs to be fixed as the tiles are
damaging

Water leakage from below the kitchen sink.. Open

WC leakage in mbr wash room Open

Mbr tap water pressure is too low Open

Jagaur fitting for shower handle missing!

SS pipe covering the shower handle in Children Bath


Open
room is missing. Please have this fixed
STP flush water is more frothy and stinky in recent
times in our block at least. Had no issues till last week
Open
but started from Thursday - Feb 14. Please check and
let us know the cause for the change and resolution.

Blockage in drain pipe provided in wash area for


washing machine. Water kicks back from the pipe due Open
to blockage in the pipe.

Water not draining in the bathroom of Master bedroom. Open

Flush water quality need to check Open

Very bad smelly browny water coming in all 3


Open
bathrooms

Hi
Noticed frothing and bad smell in the flush water for Open
past couple of days. Please rectify at the earliest

Foul smelling of STP water which unbearable Open


Guest bedroom flush not working for a week. Please
Open
send Jaquar technician urgently.
Flush plate issue, jaquar technician visit required Open
1) Leak from bathroom roof
Open
2) washbasin water not going away
Flush problem please fix it Open

Guest bathroom flush- particles coming in flush water.


Open
Bad smell in flush water

Flush continuous in mbr washroom.. Open

The flush water is really stinking bad with brown color


Open
water
Stp smell is horrible and water is very very dirty Open

Flush water getting very stinking smell.. Open

WC leakage Open
STP stink unbearable in tower 1. Also froth comming
Open
during flushing.
Water leakage from pipe in cbr washroom.. Open

Water leakage in the guest washroom.. Open

STP water is frothy and stinking Open


Stp water stinking Open

STP water is stinking a lot.. is there any issue with the


maintenance? Looks like issue is taken very lightly... let Open
me know when can we expect a resolution

Flush water has froth and horrible stink Open


Flush Issue, Jaquar Visit required send before 11 am
Open
only
Flush plate to be fix properly in the mbr washroom.. Open

Shower water leakage in common bathroom Open

Flush plate damaged,replacement required Open

HORRIBLE SMELL FROM STP Open

Un bearable smell in master bed room toilet Open

Foul smelling and yellow flush water which is


unbearable in all toilets. In spite complaining N number Open
of times no action from JLL/MHV

In kid's bathroom drainage pipe is overflowing Open

Smelly water in the flush Open

Water blockage in utility area Open


Flush plate need to be repaired,send Only Jaquar
Open
technician
MBR flush stopped working again Open

Flush not working properly,Send Jaquar technician to


Open
check the issue thoroughly

Flush not working properly,Send Jaquar technician to


Open
check the issue thoroughly

Water is not draining from the kitchen sink Open

Flush continuous Open

Froth and bad smell in the flush. Open

Jet spray is not working .. Open

Flush not working in cbr washroom. Open


Flush not working. Open

Foul smell in washroom flushes.. Open

Flush water getting very stinking smell.. Open

STP FLUSH WATER STINKING FOR LAST TWO


Open
DAYS
Very stinky and smelly water from all the flushes for
past 3-4 days. Not sure what JLL , MHC or MC is doing Open
with STP..... Please address ASAP.

Foul smell in all washroom flushes.. Open

Foul smell and foam getting in the flush water and


Open
hand flush..

Foul smell and foam getting in the flush water and


Open
hand flush..

Water is stinking too much specially for MBR Open

Water is stinking smell in all the washroom flushes.. Open

Foul smell and foam getting in the flush water.. Open

STP bad water quality. Open

Foul smell and foam getting in the flush water.. Open


Bad smell eminating from Flushs. The smell is
Open
becoming worse day by day.
Flush water is stinky with pungent odor and frothy.. pls
resolve this permanently.. it's been like this for almost Open
1.5 years now.. still the same issue
Multiple people in Block reported stinking bathroom
Open
flushes.

kitchen sink leakage.. Open

Foul smell in Mbr washroom flush Open

Flush button hard and does not stop automatically.


requires multiple push attempts to stop the flush
Open
Send jaguar person on either weekend or in non office
hours.

Water in many of the bathrooms are not open yet.


Open
There is no flow of water from the taps

Water on 1706 bathroom does not drain fast. Open


wash basin blockage Open

Flush continuous Open

Flush water Smell Open

flush not working Open

Water in the taps (bath and wash basin) for master


bedroom smells really bad. There seems to be some
problem with the connection as it smells like the flush
water.
Open
The plumber who visited said that he will inform it to
some sir in the office. Kindly help to get the issue
resolved at earliest. Thank you.

Flush continuous in cbr washroom.. Open

Flush continuous Open

Flush not working in one of the bathroom Open

Fitting of the shower panel. Open

Leakage under the kitchen sink,grouting required Open

Flush continuous in mbr washroom.. Open

water leakage from roof in mbr washroom. Open

Grouting required for kitchen sink Open

Grouting required for kitchen sink Open

Flush continuous in mbr washroom.. Open

Water not coming in kitchen and utility Open

Flush Plate button damaged,send Jaquar technician Open

Foul smell in the washroom flush water Open

Flush continuous in mbr washroom.. Open

water leakage from roof in cbr washroom. Open

No water in utility area since morning Open

WC leakage in mbr wash room Open


Need a type T water outlet for Tap in utility area Open

Flush continuous in mbr washroom.. Open

Geyser in master bedroom has water drop leaking from


it continuously. Electrician fixed the power issue but Open
please send plumber immediately Thanks
Last Owner
Sl.no. ID Create Date Category Flat
update /Tenant
1 day,
Block 2-
1 2576 2018-09-17 6 hours Electrical Lalith
906
ago
1 month,
Block 17-
2 3543 2019-01-04 4 weeks Electrical sharmila
502
ago

1 month Block 7- Suryanar


3 3988 2019-01-11 Electrical
ago 1402 ayanan R

1 month,
Block 7-
4 4277 2019-01-15 2 weeks Electrical
1101
ago
1 day,
Block 14- Mayank
5 4283 2019-01-15 7 hours Electrical
604 Gupta
ago
1 month,
Block 17- Sreenivas
6 4384 2019-01-17 2 weeks Electrical
206 u Oggu
ago
1 day,
Block 2-
7 3910 2019-01-09 6 hours Electrical Lalith
906
ago
1 month,
Block 13-
8 2048 2018-12-09 1 week Electrical
905
ago
K
1 month Block 3-
9 5150 2019-01-28 Electrical Ramacha
ago G001
ndra Rao
3 weeks, Block 2-
10 5155 2019-01-28 Electrical
1 day ago 903
Anil
4 weeks Block 9- Kumar/Sa
11 5428 2019-02-03 Electrical
ago 702 umya
Chandra
Dr.
Srinivas
2 weeks Block 5- Jakkina
12 6120 2019-02-17 Electrical
ago 302 Boina/Avi
nash
Kumar

Mr. Vishal
1 week, Dharanip
Block 10-
13 6111 2019-02-17 6 days Electrical athi/V
1206
ago RAMA
DEVI

4 days, Block 4- Dhruva


14 6278 2019-02-20 3 hours Electrical 1605 Jyoti
ago 1705 Dasgupta

1 week Block 2-
15 6410 2019-02-23 Electrical
ago 802
2 days Block 15-
16 6643 2019-03-01 Electrical
ago 703
4 days,
Block 10- Prathyush
17 6545 2019-02-26 21 hours Electrical
603 a Vala
ago
3 days,
Block 19- annapurn
18 6588 2019-02-27 20 hours Electrical
405 a
ago
3 days, Mrs.
Block 9-
19 6591 2019-02-27 19 hours Electrical Mousumi
1101
ago Dash
2 days,
Block 9-
20 6629 2019-03-01 6 hours Electrical Soumita
106
ago
1 day,
Block 17- smriti
21 6648 2019-03-01 20 hours Electrical
605 singh
ago
1 day,
Block 12-
22 6649 2019-03-01 20 hours Electrical
402
ago
1 day,
Block 9- Mallikarju
23 6656 2019-03-01 18 hours Electrical
605 na Reddy
ago
1 day,
Block 7- Harshit
24 6694 2019-03-02 1 hour Electrical
106 Gangal
ago
Mayank
1 day,
Block 4- Gulati/Jha
25 6699 2019-03-02 1 hour Electrical
1604 navi
ago
Sheth
22 hours,
Block 6-
26 6751 2019-03-03 9 minutes Electrical
601
ago
20 hours,
Block 19-
27 6765 2019-03-03 53 minute Electrical Neelima
702
s ago
9 hours,
Block 9-
28 6776 2019-03-04 24 minute Electrical
1201
s ago
8 hours,
Block 14-
29 6783 2019-03-04 9 minutes Electrical
1305
ago

8 hours,
Block 6-
30 6782 2019-03-04 24 minute Electrical
601
s ago
Subject Status

still corridor lights are in off Open

Mcb is tripping in flat. Open

My Home Vihanga display board (Red colour) in Main


Gate Entrance has few letters not working. Please Open
correct that.

Exhaust not working in master bedroom. Open

Change of one power socket in living room Open

Meter is not showing any readings, need to check. Open

Block 2 ground floor lights are not working Open

Display meter is not working,display not showing proper


Open
readings

New display meter required Open

Meter Balance deducted incorrectly Open

New display meter required Open

Meter reading is very high & fast Open

Meter is not showing any readings, need to check. Open

Tripping Issue was not resolved from long time Open

Please move the electricity/gas metet inside the house. It


is in the electricity panel inside. We dont get to know Open
when the credits expire.
Mcb tripping issue Open

Internet is not working on DG backup, wire is not


Open
available in The shaft box

No power in the flat Open

Corridor lights are blinking and not working properly from


Open
last two weeks..

There is no light on Block 9 pillar while coming from block


Open
8. Also the light shade is broken.

Mcb tripping again and again Open

Mcb tripping issue Open

Flood light on the skating rink are not being switched off
Open
after 10pm.

Lights not working in block 7-8 pathway Open

Check cabling for ac installation Open

The reading meter shows running on DG. Confirmed that


Open
electricity is there. Look into it.

Door bell is not working Open

Power supply to one of the Bedroom is not working.


Open
Seems to be some loose connection.

meter is blinking / not working Open

The electric meter in the house shows running on DG


since weekend. The meter reading is also stuck at 500.7.
Open
have already bought this to notice earlier but still no
action
Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
2 months,
2018-09- Cable Block 10-
1 2440 2 weeks
16 Issues 1704
ago
2 months,
2018-11- Cable Block 2- Manish
2 825 2 weeks
21 Issues 1606 Agarwal
ago
2 months,
2018-11- Cable Block 5- Purnima
3 611 2 weeks
17 Issues 801 Gupta
ago
2018-11- 2 months Cable Block 5- Purnima
4 1147
26 ago Issues 801 Gupta
2 months,
2018-10- Cable Block 5- Purnima
5 4305 2 weeks
13 Issues 801 Gupta
ago
3 weeks,
2018-12- Cable Block 20- ankur
6 3185 4 days
28 Issues G005 khera
ago
1 month,
2019-01- Cable Block 18- Dr V Ravi
7 3957 3 weeks
10 Issues 401 Sankar
ago
2 weeks,
2019-02- Cable Block 2- Padma
8 5735 6 days
09 Issues G004 Kanumuri
ago
2 weeks,
2019-02- Cable Block 1- Shirisha
9 5843 6 days
11 Issues 904 Pulijala
ago
2019-03- 2 days Block 8- Suresh
10 6640 Cable TV
01 ago 707 Vuppala

Ms. Pooja
2 weeks, Rao
2019-01- Block 9-
11 5124 5 days IO Kosunam/
28 1303
ago Malathi
Bondili
Subject Status

Tata Sky Cable Issue Open

T.V. cable is damaged in Master bed room. Open

Tatasky cable damaged Open

Tv cable issue Open

LAN cable damage in hall, and tatasky cable


Open
damage in mbr

No electrical cable in ceiling point in balcony. Open

Intercom cable damaged from shaft to hall Open

TV cable missing from DB to Shaft Open

Living hall Intercom Connecting Cable got


Open
damaged

Tata sky is not working.. Open

Internet IO socket is not available Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
vijay/See
2018-10- 2 months Block 15- ma
1 4183 Security
11 ago G002 Bhatnaga
r
2 months, Murali
2018-12- Block 8-
2 3048 1 week Security Krishna
26 1402
ago Lanka

1 month,
2019-01- Block 9-
3 3914 3 weeks Security
09 906
ago

Mr.
Ashwin
2019-01- 4 weeks, Block 19- Simha
4 4409 Security
17 1 day ago 701 Reddy/Al
o Sujay
Banarji

2019-01- 1 month Block 8- Suresh


5 4673 Security
21 ago 401 Dorepally

2019-01- 1 month Block 8- Suresh


6 4796 Security
22 ago 401 Dorepally

1 month,
2019-01- Block 8-
7 4238 1 week Security Anuj Pant
14 705
ago

2019-01- 1 month Block 8- Suresh


8 5183 Security
29 ago 401 Dorepally

2019-01- 1 month Block 8- Suresh


9 4854 Security
23 ago 401 Dorepally

Mohit
2 weeks,
2019-02- Block 14- Aggrawal/
10 5563 6 days Security
05 107 Sneha
ago
Agrawal

Kalyana
2019-02- 3 weeks, Block 17-
11 5739 Security sangam/A
09 1 day ago 1201
run
Mr.
Lokesh
2 weeks, Kedia ,
2019-02- Block 20-
12 5897 5 days Security Saurabh
12 403
ago Khoria/Ka
rtavya
Ramnani

2 weeks,
2019-02- Block 4- Samyukta
13 5882 5 days Security
12 902 S Pillay
ago

2019-02- 2 weeks Block 17-


14 6112 Security Jaya T
17 ago 1102

1 week,
2019-02- Block 14- T Srinath
15 6170 6 days Security
18 301 Rao
ago

1 week,
2019-02- Block 14- T Srinath
16 6217 5 days Security
19 301 Rao
ago

1 week,
2019-02- Block 8-
17 6162 6 days Security
18 301
ago

P.
2019-02- 2 weeks Block 17-
18 6139 Security Chakrapa
17 ago 404
ni Reddy

3 days,
2019-02- Block 7-
19 6472 22 hours Security Moni
25 1206
ago

Y
2019-02- 1 week, Block 12-
20 6380 Security Srinivasa
23 1 day ago 304
Rao

Mrs.
2019-02- 1 week, Block 11- Nitasha
21 6383 Security
23 1 day ago 606 Dhir/Kapil
Adatiya
3 days,
2019-02- Block 14-
22 6594 19 hours Security Anita
27 406
ago
1 day,
2019-03- Block 2-
23 6654 20 hours Security
01 303
ago
Chaya
16 hours,
2019-03- Block 7- Rao/Lave
24 6714 39 minute Security
03 202 ena
s ago
Punjabi
1 day, ashutosh/
2019-03- Block 15-
25 6697 2 hours Security Abhishek
02 G001
ago Chauhan

Mr.
Bavisetty
9 hours, Lakshma
2019-03- Block 7-
26 6715 9 minutes Security n
03 606
ago Kumar/Ab
hishek
Gupta
Subject Status

some one hit the window and glass broken please check
Open
the issue

Heavy disturbance sounds from above flat. Open

requested girls staying in block 9 flat 1006 4 times


already not to play loud music during night
. every alternate day loud music is played till 1am night. Open
it interrupts my sleep. please provide phone number of
the owner so that i can raise a complain

Thank you for the security update..still cooks maids


drivers coming going without the knowledge of Open
security..tighten that..thanks

1) Speed breakers required at the rear gate exit and at


the entry of ramp for vendors at the rear gate. This will
Open
avoid speeding and accidents for walkers, kids at
intersection.

When will be RFID is made available for 2 wheelers, Its


waste of time waiting behind cabs, waiting security to Open
manually lift the gate. Give the timelines asap

My maid is in the society, working in my flat. Why does


Open
the status show checked out?

Vendors ( Swiggy, Zomato,big basket, amazon, milk


vendors) are parking in "No Parking" Zones..near entry
Open
to lift areas. what is the plan or policy for this ?? How we
are going to address this problem??
At the main entrance there is no visibility for the security
for incoming vehicles. While coming on 2wheeler as
RFID is not available we have to honk multiple times to
Open
get guard attention. As already manual check done
before entry there is no real purpose of the guard and
the gate there . please act

Some one parked their car with 2" Extra distance into 14-
107 parking,resident requested to send a my-gate Open
notification to all the residents to avoid this type of issues

Block 17, 10 floor. The workers are doing all the work in
lobby. Whoever is getting the work done they should do
in their house. They are doing all cutting work in Lobby, Open
spreading wooden powder everywhere. Pls restrict it
immediately and se d them inside house.
M.D. Ansari security guard has been extremely
unprofessional and rude to me when one of the delivery
guys was trying to enter.
Open
He was being assertive and arrogant.
What should be done to take actions again him so that
such behavior is not repeated ?

Please share details of periodic tests carried out on the


fire detection system in the society.
Open
Please inform status of fault rectification in the fire
detectiin system.
BB Kiosk in community without any approval is a big
security concern and how were they allowed with Open
approvals.
Every day we hear lot of carpentry work disturbances
starting from 7 am till late night above 301. Pls check in
which floor this heavy work is going and for how long Open
work will go on as we are living with this nouse for more
than a year now

Is there special permission given to block 14 flat 201 to


carry out carpentry at any time as early as 7 am in the
Open
morning till late evening? Pls act as its a nuisance to
neighbours if the work continues at any odd hours

Someone moved my bike parked in Basement-1 (Block


8) outside parking area...It was outside yellow line in Open
morning

Railing in common area apposite to Flat 404 Block 17


Floor 4 is broken. Need to be fixed as soon as possible
because it is not safe for children without railing. This is
safety issue. Complained about this earlier. This railing Open
was not fixed properly by builder at construction time, as
a result it fell down. I brought to notice of supervisors
about 18 months ago many times.

Please instruct residents of block 7 12th floor not to keep


cycles and shoe rack in corridor. It is a fire hazard. Open
IMMEDEATELY.

Pizza delivery entry approval from my gate to my flat 12-


304 at 1:55 AM multiples on the mobile. Wrong flat
Open
number given. Second call even after the denial on the
first call. Attached the screenshot. Update the action

2 wheeler entry in basement 2 has been diverted to a


very narrow gap beside the automated RFID gate. The
opening is so narrow that it possesses high righ for
accidents specially for broder bikes like bullet and Open
avenger. Can we please either widen the gap or instruct
security to not force two wheeler riders to enter only
through the gap. Thanks in advance.
Mattress delivery personal left after dispatching it. Bit I
Open
saw just now status his exit status is not being updated.

Gold chain(Mangalsutra) lost near Skating rink need to


Open
check in CC footage..

Someone from block 7 not sure about the floor but flat no
6 threw an egg on me while I was walking down n the Open
walkway

Green boards for RFID at main gate exit and entry is


threat to driver side glass of tall vehicles. please raise its Open
height or remove.

In -2basement next to the liftblock 7/8 garbage-room a


white steet dog is a case of menace n fear , it's feeds on
the garbage n rest of the time hides there n chases small
kids and people carrying any stuff in their hands on the
assumption of food.
Open
This could turn out fatal if it bites anyone, iam facing this
day n night n this dog has made a den their at
basement. Can't take photo as my kid was chased badly
n was running after the dog to save her.
Pls. Look into it.
Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant

Mr. Dhiren
1 week,
2019-02- Safety/Lif Block 4- Praful
1 6153 6 days
17 t 604 Damani/P
ago
reeti

Raghaven
1 week,
2019-02- Safety/Lif Block 8- dra
2 6211 5 days
19 t 1705 Putnala/A
ago
bhi
1 month,
2019-01- Block 18- Mayank
3 4640 1 week Safety
20 904 Joshi
ago
1 month,
2019-01- Block 7- Suryanar
4 4702 1 week Safety
21 1402 ayanan R
ago
1 month,
2019-01- Block 1- Sunil
5 4764 1 week Safety
22 1005 Sachdeva
ago
1 month,
2019-01- Block 7- Suryanar
6 4962 1 week Safety
25 1402 ayanan R
ago

Shreyans
h
1 month,
2019-01- Block 20- Agrawal/
7 4822 1 week Safety
23 604 Mahesh
ago
Kumar
Agrawal

2 weeks,
2019-02- Block 4- Samyukta
8 5909 4 days Safety
12 902 S Pillay
ago
4 days, Block 18-
2019-02- Sai
9 6080 21 hours Safety 1304
16 Abhilash
ago 1404
Siddharth
1 week,
2019-02- Block 19- a
10 6294 3 days Safety
21 601 Chinthapa
ago
lly
Subject

Kindly switch off /reduce the volume of the music in lifts from 10 pm to 6 am as it unneccessary n
disturbing This complaint has been raised in the past as well but no action has been taken till date.

Broken wall panel.


Block-8,
17th floor.
It's been 10 months, no one fixed it even after raising complaints.

Swings in children play area next to block 3-4 are not working for more than 2 months...

Children play area in central park (rubberized one) is torn in many places. There is a big area which is torn
and is in India ahape. Also the swings are not operational. Please correct them.

Please look into the upkeep of the children play area. Most of the swings are either broken or have tapes
fixed...... Even the flooring is coming out at many places.... My 3year old daughter is unable to play.... Hope
the concerned will take suitable action on the same

Open Gym - 2 to 3 exercise machines in open gym are broken. Please correct them.

Thanx for accepting my few opinions.


Still there is many which yet to be corrected. Like
1. No major taken for repairing the damaged instrument of open gym yet.
2.No step taken light on both side approach road. Sims to be waiting for any incidance occure.
3.The food court still have no sign of opening, either you think the residents don't have need or you are
helping residents to save the money.
I hope u will be in path to solve these.
Few more steps are required on these points too...
1 attached photos show the position of corridor at 6.33 am, after switching light at 6.30am. It's requested
please revise timing to 7am instead of 6.30 am
2.Few despencing machine for Tea, Coffee and Cold breavarage should be instal in both the club houses. It
will fullfill the need of morning evening walker as well as players and residents.
Thanx.

Metal Angles located above car wash area may cause serious head injury.

Hand rail in corridor outside 1404 door is not secured and is freely moving. Major safety risk for residents.
Please resolve on priority

The rubber mat in the children's play area is peeling off in many areas. Request management to undertake
repair at the earliest.
Status

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open
Create
Sl.no. ID Last update Category Flat Owner /Tenant
Date

2018-09- 2 months, 2 weeks Seepage/ Block 8-


1 3283 Manjulata Agrawal
27 ago Leakage 901

2018-07- 3 months, 2 weeks Seepage/ Block 16-


2 443 Rattan Amol Kaur
23 ago Leakage 1003

2018-12- 2 months, 2 weeks Seepage/ Block 19-


3 1713 Ramya Dronavalli
04 ago Leakage 505

2018-10- 2 months, 2 weeks Seepage/ Block 5-


4 4571
17 ago Leakage 1505

2018-08- 2 months, 2 weeks Seepage/ Block 1- Mr. P. Sridhar


5 679
23 ago Leakage 503 Reddy/Amulya Reddy

2018-12- 2 months, 1 week Seepage/ Block 13-


6 1460 Sheetal Valunj
01 ago Leakage 104

2018-12- 2 months, 2 weeks Seepage/ Block 19-


7 2412 Mili Kataria
15 ago Leakage 206

2018-11- 1 month, 1 week Seepage/ Block 6-


8 5688 Rajesh Rath
05 ago Leakage 205

2018-10- 2 months, 2 weeks Seepage/ Block 1-


9 4552 P Sudheer Reddy
17 ago Leakage 604

2018-10- 2 months, 2 weeks Seepage/ Block 4-


10 4541 Samyukta S Pillay
17 ago Leakage 902

2018-10- 2 months, 2 weeks Seepage/ Block 6-


11 4325
13 ago Leakage 1603

2018-09- 2 months, 2 weeks Seepage/ Block 17- R Arul Prakasam/R.ARUL


12 2601
18 ago Leakage 806 PRAKASAM

2018-10- 2 months, 2 weeks Seepage/ Block 5-


13 4938 hari krishna galla
24 ago Leakage 506

2018-11- 2 months, 2 weeks Seepage/ Block 3- Mr. K. V. L. N.


14 419
14 ago Leakage 902 Sarma/Kashish Singhal

2018-11- 2 months, 2 weeks Seepage/ Block 16- Mr. Muttineni


15 570
17 ago Leakage 1201 Veerasekhar/nirmala

2018-11- Seepage/ Block 15-


16 789 2 weeks, 6 days ago
21 Leakage 804

2018-11- 2 months, 2 weeks Seepage/ Block 16-


17 1022 Rattan Amol Kaur
24 ago Leakage 1003
2018-11- 2 months, 2 weeks Seepage/ Block 20-
18 1256 Aruna bonthu
28 ago Leakage 901

2018-12- 2 months, 2 weeks Seepage/ Block 18-


19 1529 Arundhati PANTAWANE
02 ago Leakage 502

2018-12- Seepage/ Block 17-


20 1811 2 weeks, 4 days ago Sreenivasu Oggu
05 Leakage 206

2018-12- 2 months, 2 weeks Seepage/ Block 3-


21 1776 Sushma
05 ago Leakage 905

2018-12- 2 months, 1 week Seepage/ Block 7-


22 1979 Viswa
08 ago Leakage 1401

2018-12- Seepage/ Block 15- Mr. Pragyan Ojha/Manisa


23 2319 3 days ago
14 Leakage 103 Dash

2018-12- 2 months, 2 weeks Seepage/ Block 19-


24 2430 Ramya Dronavalli
15 ago Leakage 505

2018-12- 2 months, 1 week Seepage/ Block 2- Mrs. Madhavi


25 2499
16 ago Leakage 301 Chada/Komal Jindal

2018-12- 2 months, 2 weeks Seepage/ Block 5-


26 2509
16 ago Leakage 901

2018-05- 2 months, 2 weeks Seepage/ Block 20-


27 162 Sreekanth Papishetty
25 ago Leakage G002

2018-10- 2 months, 2 weeks Seepage/ Block 12- Mrs. Swati Nirwani /Pallavi
28 4558
17 ago Leakage 1003 S

2018-11- Seepage/ Block 5- Mr.Virinchi Akunuri ,


29 5612 2 weeks, 1 day ago
04 Leakage 501 Debashish Ray/Debashish

2018-09- 2 months, 1 week Seepage/ Block 5-


30 3316 Raj Agrawal
27 ago Leakage 1301

2018-09- 2 months, 2 weeks Seepage/ Block 12-


31 1656 Sarthak Vasudeva
06 ago Leakage 105

2018-10- Seepage/ Block 13- Sailaja Prasad/Nirmal


32 4910 1 month ago
23 Leakage 302 Gupta

2018-09- 1 month, 2 weeks Seepage/ Block 14-


33 2404
15 ago Leakage 802

2018-09- 2 months, 2 weeks Seepage/ Block 1-


34 3251 Anthil
26 ago Leakage 602
2018-09- 2 months, 2 weeks Seepage/ Block 5-
35 3389 Mr. Vaka Ravikanth/Rajesh
29 ago Leakage 1204

2018-09- 2 months, 2 weeks Seepage/ Block 7-


36 1775 Allen
08 ago Leakage 506

2018-09- 1 month, 3 weeks Seepage/ Block 16-


37 2992 A V S S S Lakshmi
22 ago Leakage 1306

2018-11- 2 months, 2 weeks Seepage/ Block 8- Aseem Bansal/Mutum


38 184
11 ago Leakage 403 Bindiyarani Devi

2018-11- 2 months, 2 weeks Seepage/ Block 16- Mr.Balmuri Hanmanth


39 585
17 ago Leakage 1203 Rao/Prakhar Singh

2018-11- Seepage/ Block 20-


40 1307 1 month ago D SANTHOSH REDDY
29 Leakage 706

2018-11- Seepage/ Block 5-


41 971 1 week, 4 days ago N.Sreedhar
24 Leakage 1202

2018-12- 2 months, 2 weeks Seepage/ Block 3-


42 1598 manasa reddy
03 ago Leakage 1002

2018-12- Seepage/ Block 17-


43 1541 1 week, 3 days ago Manu Bhatia
02 Leakage 402

2018-12- 2 months, 2 weeks Seepage/ Block 19-


44 1957 Sneha Srivatsav
08 ago Leakage 706

2018-09- 2 months, 2 weeks Seepage/ Block 13-


45 1340 J P Acharya
03 ago Leakage 801

2018-10- 2 months, 2 weeks Seepage/ Block 7-


46 3945 Suryanarayanan R
08 ago Leakage 1402

2018-12- 2 months, 2 weeks Seepage/ Block 7- Dibin Raj , Shebah


47 2389
15 ago Leakage 1006 Dibin/Anshul Agarwal

2018-12- 2 months, 1 week Seepage/ Block 5-


48 2677
20 ago Leakage 505

2018-12- Seepage/ Block 15-


49 2720 2 months ago Dr Ashish Patil
20 Leakage 401

2018-12- Seepage/ Block 9- V Radha Krishna/Ankit


50 2725 1 month ago
20 Leakage 104 Dubey

2018-12- 2 months, 1 week Seepage/ Block 7-


51 2857
22 ago Leakage 807
2018-12- 2 months, 1 week Seepage/ Block 19-
52 2859 Sneha Srivatsav
23 ago Leakage 706

2018-12- 2 months, 1 week Seepage/ Block 14-


53 2877 nitin prakash agrawal
23 ago Leakage 606

2018-07- 2 months, 1 week Seepage/ Block 13-


54 405 Sheetal Valunj
14 ago Leakage 104

2018-12- 1 month, 2 weeks Seepage/ Block 19-


55 2951
24 ago Leakage 1202

2018-12- 2 months, 1 week Seepage/ Block 1-


56 3065 YENDLURI CHOUDARY
26 ago Leakage 405

2018-12- 2 months, 1 week Seepage/ Block 19-


57 3086 Tata Gayathri
26 ago Leakage 905

2018-12- Seepage/ Block 20-


58 3142 2 months ago VISHAL SINGH MAHALA
27 Leakage 802

2018-12- Seepage/ Block 13-


59 3203 2 months ago Samyukta S Pillay
29 Leakage 1205

2018-12- Seepage/ Block 10-


60 3233 2 months ago Amruta Arunima
29 Leakage 1105

2019-01- 1 month, 2 weeks Seepage/ Block 19- Mr.Lakamsani Nageswar


61 3657
06 ago Leakage 806 Rao/vivek gupta

2019-01- Seepage/ Block 9-


62 3403 2 months ago
01 Leakage 703

2019-01- 1 month, 4 weeks Seepage/ Block 17-


63 3490 Ramakrishna
03 ago Leakage 601

2019-01- 1 month, 3 weeks Seepage/ Block 14-


64 3578
05 ago Leakage 202

2019-01- 1 month, 3 weeks Seepage/ Block 1-


65 3765
07 ago Leakage 1204

2019-01- 1 month, 2 weeks Seepage/ Block 20-


66 4130 RRChaitanya
13 ago Leakage 1401

2019-01- 1 month, 2 weeks Seepage/ Block 15- Mrs. Manda


67 4159
13 ago Leakage 506 Nirupama/Swati Karanam
2019-01- Seepage/ Block 1-
68 4456 4 days, 6 hours ago Anthil
18 Leakage 602

2019-01- 1 month, 1 week Seepage/ Block 14-


69 4520
19 ago Leakage 202

2019-01- 1 month, 1 week Seepage/ Block 7-


70 4628 S SRINIVASAN
20 ago Leakage 702

2019-01- Seepage/ Block 3-


71 4971 1 month ago priyanka samar
25 Leakage 706

2019-01- Seepage/ Block 16-


72 5032 1 month ago Tulasi Gandham
27 Leakage 506

2019-01- Seepage/ Block 19-


73 5074 1 month ago Ramya Dronavalli
27 Leakage 505

2018-08- Seepage/ Block 17-


74 560 1 month ago Jaya T
18 Leakage 1102

Mrs. K.
2019-01- Seepage/ Block 10-
75 5104 1 month ago Seethalakshmi/Sahil Dhar
28 Leakage 1204
Hakim

2019-01- Seepage/ Block 7-


76 5173 1 month ago Allen
29 Leakage 506

2019-01- Seepage/ Block 4-


77 5179 1 month ago Samyukta S Pillay
29 Leakage 902

Block 7-
2019-01- Seepage/
78 5268 1 month ago 1606 / Anusha Shankar
30 Leakage
1706

2019-01- Seepage/ Block 6-


79 5266 5 days, 1 hour ago Bala Rukmini
30 Leakage 1206

2019-01- Seepage/ Block 18-


80 5281 3 weeks, 4 days ago Nizam Ahmed
31 Leakage 403

2019-01- Seepage/ Block 16-


81 5284 1 month ago Naveen Penda
31 Leakage 206

2019-02- Seepage/ Block 20-


82 5323 3 weeks, 1 day ago
01 Leakage 501

2019-02- Seepage/ Block 20-


83 5328 4 weeks, 1 day ago RRChaitanya
02 Leakage 1401

Mr.
2019-02- Seepage/ Block 16-
84 5344 4 weeks, 1 day ago C.N.V.S.Satyanarayana/Sh
02 Leakage 705
ilpy
2019-02- Seepage/ Block 13-
85 5338 1 day, 4 hours ago Akash Kumar Tripathi
02 Leakage 107

2019-02- Seepage/ Block 6-


86 5374 4 weeks ago Sridevi K
02 Leakage 105

2019-02- Seepage/ Block 20-


87 5396 4 weeks ago
02 Leakage 1403

2019-02- Seepage/ Block 10- Sandeep Sonti/Sandeep


88 5694 3 weeks, 1 day ago
08 Leakage G001 Sonti

2019-02- Seepage/ Block 18-


89 5734 2 weeks, 6 days ago Vijay Ashok Nandanwar
09 Leakage 302

2019-02- Seepage/ Block 10-


90 5933 2 weeks, 4 days ago Jayant Modi
13 Leakage 1102

2019-02- Seepage/ Block 3-


91 6063 2 weeks, 1 day ago Kalyan Reddy
16 Leakage 1004

2019-02- Seepage/ Block 14-


92 6073 2 weeks, 1 day ago Saumye Rastogi
16 Leakage 702

2019-02- Seepage/ Block 2-


93 6093 1 week, 2 days ago
16 Leakage 802

2019-02- Seepage/ Block 13-


94 6090 2 weeks ago shrikant mundra
16 Leakage 703

2019-02- Seepage/ Block 7-


95 6117 2 weeks ago Madhuri/Pareekshith KJ
17 Leakage 1601

2019-02- Seepage/ Block 9-


96 6141 1 week, 6 days ago L Sita/Rachana Bhosale
17 Leakage 1202

2019-02- Seepage/ Block 18-


97 6154 1 week, 6 days ago eeshwar
18 Leakage 1004

2019-02- Seepage/ Block 3-


98 6222 1 week, 5 days ago
19 Leakage 303

2019-02- 2 days, 20 hours Seepage/ Block 3-


99 6232 Deepika
19 ago Leakage 701

2019-02- Seepage/ Block 11-


100 6340 6 days, 1 hour ago Shyam Agrawal
22 Leakage G001

2019-02- Seepage/ Block 14-


101 6374 1 week, 1 day ago Neetu Dahiya
23 Leakage G001
2019-02- Seepage/ Block 10-
102 6408 1 week ago
23 Leakage 601

2019-02- Seepage/ Block 6-


103 6427 1 week ago
24 Leakage 402

2019-02- Seepage/ Block 8-


104 6443 1 week ago Manjulata Agrawal
24 Leakage 901

2019-02- 3 days, 23 hours Seepage/ Block 4-


105 6584 Pushpak
27 ago Leakage 801

2019-03- Seepage/ Block 20-


106 6682 1 day, 6 hours ago Sreekanth Papishetty
02 Leakage G002

Block 9-
2019-03- Seepage/
107 6695 1 day, 3 hours ago 1605 Varshith Rao
02 Leakage
1705

2019-03- 21 hours, Seepage/ Block 6-


108 6752
03 54 minutes ago Leakage 601

2019-03- 8 hours, 54 minutes Seepage/ Block 5- Mr. Sreedhar Ramireddy ,


109 6779
04 ago Leakage 1405 Gautam Paul/Gautam Paul
Subject Status

leakage parking Open

Seepage in my flat Open

Rain Water leakage in basement-1 parking area Open

water leakage in basement -1 Open

car parking leakage Open

sand and cement falls on vehicle in parking Open

seepage in mbr washroom.. Open

Water seepage (Ceiling) at the Basement 2 parking for


Open
B6-205

Water leakage in basement 2 0arking slot Open

Water leakage in basements Open

B1 parking area roof leakage Open

water seepage from the wall below kitchen sink. Open

B2 parking area roof leakage Open

Water leakage in basement-1 Parking area Open

cbr wash room roof leakage Open

water leakage from roof in mbr washroom. Open

seepage in the wash room complaint pending from 5


Open
months
Water leakage from roof in basement-2 car parking
Open
area,unable to use the parking area

Leakage in basement -1 car parking area from roof. Open

water leakage from roof in mbr washroom. Open

Water leakage in basement-1 car parking area Open

Leakage in basement -2car parking area from roof,Iron


Open
rods come out of slab

Water leakage from roof in basement-2 car parking


Open
area,unable to use the parking area

Water leakage from roof in car parking area B-1.. Open

water leakage from roof in mbr washroom. Open

Water leakage in basement-2 parking area Open

multiple leakages from roof in B1 after the b1 entry Open

seepage in mbr washroom sink floor Open

seepage issue in Master bedroom's bathroom Open

water leakage from parking area Open

seepage issue Open

Water leakage from wall in mbr washroom Open

seepage from above flat in mbr washroom. Open

water leakage from the wall when rain Open


seepage issue in mbr Open

water leakage in parking spot Open

seepage issue Open

water leakage from roof in mbr washroom. Open

water leakage from roof in mbr washroom. Open

Leakage in basement -1 car parking area from roof. Open

water leakage from roof in mbr washroom. Open

B-1 parking area roof leakage Open

water leakage from roof in mbr washroom. Open

Water seepage from mbr washroom wall... Open

Leakage issue Open

Water leakage from above flat in utility area. Open

Water leakage from roof pipe in basement-1 near car


Open
parking...

water leakage from roof in car parking area B -1 and


Open
seepage in cbr Washroom..

Seepage of water in Master bedroom toilet wall Open

Water leakage from sprinkler located above block9-104


parking slot in basement 1. Car paint is getting affected. Open
Please resolve ASAP

water leakage from roof in kitchen Open


Water seepage from mbr washroom wall... Open

water leakage in mbr washroom Open

seepage of drainage water in kitchen Open

Dampness in MBR washroom and MBR walls outside


Open
washroom....looks construction related.

There are Two issues regarding leakagenof water


1. In B1 parking near block 1 parking drive way
continuously water leakage
Open
2. In South gate exit drive way water leakage .
Please address leakages and continuously check

seepage in common washroom.. Open

Water leakage from the roof in Basement-2 Car parking


Open
area

Water leakage from roof in common washroom.. Open

Water leakage from shaft area.. Open

Wall seepage Open

Water leakage from the roof and false ceiling sheet got
Open
damaged

Water leakage from the roof in cbr dress area Open

water leakage in the wash room Open

Water leakage in the washroom grouting to be done Open

Water leakage from.master bath room ceiling. Open

water leakage from roof in mbr washroom. Open


water leakage from roof in mbr washroom. Open

water leakage from roof in mbr washroom. Open

Roof leakage in utility area. Open

Leakage in basement -1 car parking area from roof. Open

Water is leaking in B2 car parking and spoiled my car.


Pls check and resolve the issue asap. Refer the pics
attached. ( B216-505, 2nd parking slot ). Temporarily I Open
have parked my car in some other Numberless parking
slot in B2 Near Clubhouse 2

Rain Water leakage in basement-1 parking area Open

Seepage in B2 parking B17/1102 Open

Rain Water leakage in basement-2 parking area Open

There is severe leakage in my basement 2 parking lots.


This is right next to the lift. Have filed multiple complaints Open
for this and no action is being taken

4-902 parking area has water seepage. Requires


Open
immediate attention.

Seepage near the staircase. Open

Water leakage from the roof,it seems like seepage Open

The overhead pipe just above the car parking for 18 403
keeps leaking. It has been like that for the last one year. Open
Please fix this.

Water leakage in basement-1 car parking area Open

Water leakage from out side near children bed room


Open
washroom..

Water leakage in master bath room. Open

Toilet is leaking from above floor. Complain filed since


Open
three weeks. No action yet.
Guest bedroom bathroom have leakage problem near
Open
shower area

Water leakage from pooja room roof Open

Water leaking from wall Open

Mbr washroom roof leakage Open

water leakage from parking area roof Open

Water leakage in basement 1 near block 10 Open

Water leaking from flat above on to MBR bathroom false


Open
ceiling

Noticed seepage and drainage in B1 near block 14.


Open
Please rectify at the earliest

Water leakage in mbr near Wall Open

seepage issue Open

water leakage from roof in mbr washroom. Open

water leakage from roof in mbr washroom. Open

Water leakage from roof in the mbr washroom.. Open

Leakage in basement-1 near Block 3 lifts Open

water leakage from roof in common washroom. Open

Water leakage in basement 2, near block 11 parking. Open

Sharft area pipe leakage & corridor glass need to


Open
change
water leakage from roof in mbr washroom, send plumber
Open
tomorrow afternoon.

Roof leakage in common washroom - Hall, near water


Open
meter

Leakage in master bedroom washroom ceiling. Open

Water leakage from roof, Seepage issue Open

Block 20, 002 series master bedroom south gate


Open
side..there is a leakage of the drain pipes.. pls fix it

Water leakage on car near parking area in Basement-1.. Open

Their is water dripping in parking area in basement one.


Has been their for last 3 months. Why is it not repaired.
Open
In monsoon it only worsens. The developer should fix it
asap. Have captured the nearby parking slot numbers.

Water leakage from roof in Basement -1 car parking


Open
area..
Create
Sl.no. ID Last update Category Flat Owner /Tenant
Date
2018-12- 2 months, False Block 4-
1 1839 sreeharsha r
06 1 week ago ceiling 1606
2018-12- 2 months, False Block 14-
2 2277
13 1 week ago ceiling 1203
2018-10- 2 months, False Block 16-
3 4709 Parameswari
20 1 week ago ceiling 801
2018-12- False Block 20- VISHAL SINGH
4 3143 2 months ago
27 ceiling 802 MAHALA
2018-10- False Block 8- Venkatesh
5 4716 2 months ago
20 ceiling 1703 Mahapatra
2019-02- False Block 15-
6 5387 4 weeks ago
02 ceiling 805
2019-02- False Block 10- Sandeep
7 5951 1 hour ago
13 ceiling G001 Sonti/Sandeep Sonti
2019-02- 1 week, 1 day False Block 14-
8 6386 Mayank Gupta
23 ago ceiling 604
2019-03- 22 hours, False Block 18-
9 6703 amrita
02 39 minutes ago ceiling 804
Subject Status

fall ceilling one sheet missing in utility


Open
area
Fall ceilling one sheet missing in mbr
Open
washroom.
2 Fall Ceiling sheet missing Open

2 False ceiling sheets got damaged Open


Two false ceiling sheets are
Open
damaged,requested for replacement
2 False ceiling sheets are not
Open
available from handover time
False ceiling sheets are missing in
Open
utility area
One False ceiling sheet missing Open

2 false ceiling sheets are missing Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
2018-07-
4 weeks, House Keeping/External Block 4-
1 483 Jyothi
30 1 day ago window cleaning 403
2 months,
2018-12- House Keeping/External Block 5- Varun
2 1707 2 weeks
04 window cleaning 402 Sayal
ago
2 months,
2018-06- House Keeping/External Block 5- Sonal
3 238 2 weeks
07 window cleaning 1102 Sharma
ago
2 months,
2018-08- House Keeping/External Block 17-
4 561 2 weeks Jaya T
18 window cleaning 1102
ago
1 month,
2018-04- House Keeping/External Block 7- Rajat
5 24 1 week
29 window cleaning 1106 Mishra
ago
2018-12- 1 month House Keeping/External Block 5- Monu
6 1958
08 ago window cleaning 305 Agrawal
2 months, Ojas
2018-04- House Keeping/External Block 12-
7 4 2 weeks Kale/Raja
28 window cleaning 1306
ago t Bathwal
2 months,
2018-11- House Keeping/External Block 5- Ravi
8 781 1 week
21 window cleaning 104 Shankar
ago
Mrs. K.
1 month,
2018-09- House Keeping/External Block 9- Krishnave
9 2614 2 weeks
18 window cleaning 204 ni/Mohit
ago
Gupta
2 months, Arpana
2018-11- House Keeping/External Block 4-
10 5923 2 weeks Choudhar
08 window cleaning 202
ago y

2 months, P Venkata
2018-09- House Keeping/External Block 5-
11 2683 2 weeks Srikanth
19 window cleaning 904
ago Reddy

Abir
2 months,
2018-11- House Keeping/External Block 14- Bhattacha
12 630 2 weeks
18 window cleaning 102 ryya/Rahu
ago
l
6 days, Kiran
2018-12- House Keeping/External Block 12-
13 2740 16 hours Kanakada
21 window cleaning G001
ago ndi

1 month,
2019-01- House Keeping/External Block 7-
14 4683 1 week Viswa
21 window cleaning 1401
ago

2019-01- 1 month House Keeping/External Block 7- Suryanar


15 4963
25 ago window cleaning 1402 ayanan R
3 weeks,
2019-02- House Keeping/External Block 14- vineetbad
16 5560 4 days
05 window cleaning 503 oni
ago
Ratnamal
a Ravi
2019-02- 1 week, House Keeping/External Block 5-
17 5892 Chander/
12 1 day ago window cleaning G005
Manohar
Puri
1 week,
2019-02- House Keeping/External Block 4- Samyukta
18 6218 5 days
19 window cleaning 902 S Pillay
ago
3 days, P
2019-02- House Keeping/External Block 1-
19 6223 4 hours Sudheer
19 window cleaning 604
ago Reddy

Mr.Surya
6 days, Mohan
2019-02- House Keeping/External Block 11-
20 6305 7 hours .G/Winsto
21 window cleaning 106
ago n Roy
Veigas

2 days,
2019-03- House Keeping/External Block 9-
21 6631 6 hours Soumita
01 window cleaning 106
ago
21 hours,
2019-03- House Keeping/External Block 12-
22 6711 24 minute
02 window cleaning 401
s ago
Subject Status

Block 4 ramp area is filled with rats and garbage Open

outside window cleaning Open

External Windows cleaning Open

Windows not clean from outside. Open

External window paint to be removed Open

water logging in parking b2 5-305 Open

corridor windows Open

window external cleaning Open

Garbage thrown behind lift basement 2 Open

external window cleaning Open

Exterior glass window cleaning Open

external window cleaning Open

-2 parking smells very, very bad near block 12 lift Open

In the basement-2 parking slot for B7-1401The rods


are still there, the uneven cement patches are still
present in the slot making it unusable. Please get it Open
cleaned and the rods cut. And confirm me, this has
been pending since long even after many follow-ups.
Plants inside the community are affected with mealy
bugs. Please get a good Gardner and apply proper
Open
pesticides / neem oil or whatever that's needed to get
rid of it.
External window cleaning required Open

External window cleaning need to be done Open

Tobacco stains in block 4 elevator Open

Floor level cleaning is not satisfactory ... tiles are


Open
actually turning black.

The housekeeping staff are blocking all the passenger


lifts in the morning during rush hour n this happens
every single day. Today, for the third time, I missed my
appointments because of this. I have repeated
complained at the back gate n to helpdesk, buy
nothing seems to happen. I have spine issues n am
strictly forbidden from taking stairs. You staff are
forcing me to do that n it is affecting my health really
bad n also my work. Who will compensate me for
ending up in pain n not able to move for a week after Open
this? That too, they block even the ground floor lobby
as well. So, u can't even rush through the stairs.
Management needs to be more active in this regard.
When there is a rule that they have to take the service
lifts, why can't they use it?? How far is it??? What is
the logic in blocking the lifts in the morning rush
hour??? I have also raised this with managing
committee members coz I have exhausted other
options and JLL doesn't seem to care.

There are many plants/ trees which are completely


dried. It's looking very odd. It's between block 8 & 13. Open
Please replace them with live plants/trees.

Rats are there in the flat Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
2 months,
2018-10- Block 8-
1 4281 2 weeks Carpentry
13 303
ago
2 months,
2018-11- Block 19-
2 1202 2 weeks Carpentry
27 402
ago
2 months,
2018-12- Block 8- Suresh
3 2330 1 week Carpentry
14 707 Vuppala
ago
2 months,
2018-12- Block 2- ADITYA
4 1962 1 week Carpentry
08 606 RVSS
ago
2 months,
2018-12- Block 2- ADITYA
5 3043 1 week Carpentry
25 606 RVSS
ago
Mr.
2019-01- 2 months Block 7- P.V.N.H.R
6 3435 Carpentry
02 ago 1301 avi/Rauna
k
2019-01- 1 month Block 20- RRChaita
7 3613 Carpentry
05 ago 1401 nya
2 weeks,
2019-01- Block 1-
8 3993 2 days Carpentry Deepak J
11 1304
ago
Block 1-
2019-01- 1 month
9 4134 Carpentry 1605 sahitya
13 ago
1705
2019-01- 1 month Block 19-
10 4402 Carpentry sreelatha
17 ago 1204
2 weeks,
2019-01- Block 15- Vishu
11 5138 2 days Carpentry
28 403 Muthreja
ago
3 weeks,
2019-02- Block 12-
12 5430 6 days Carpentry
03 402
ago
2 weeks,
2019-02- Block 12- Keerthi
13 5742 6 days Carpentry
09 602 Hudumula
ago
1 week,
2019-02- Block 12- Ashwani
14 6174 6 days Carpentry
18 705 Verma
ago
1 week,
2019-02- Block 13- Sashanka
15 6207 5 days Carpentry
18 902 Prayaga
ago
1 week, Ranjeet
2019-02- Block 12-
16 6289 3 days Carpentry Kumar
20 605
ago Singh
Mrs.
2019-02- 1 week, Block 1- Prathibha/
17 6365 Carpentry
22 1 day ago 305 Manish
Amlathe
2019-02- 1 week Block 12-
18 6399 Carpentry
23 ago 703
5 days,
2019-02- Block 13-
19 6508 18 hours Carpentry Raju
25 203
ago
1 day,
2019-03- Block 12-
20 6680 6 hours Carpentry Neeru
02 202
ago
Venu
Sikha/Mur
1 day,
2019-03- Block 20- ale
21 6674 6 hours Carpentry
02 306 Karthick
ago
Arumuga
m
23 hours,
2019-03- Block 1- Sunil
22 6700 54 minute Carpentry
02 1005 Sachdeva
s ago
5 hours,
2019-03- Block 14-
23 6730 39 minute Carpentry
03 902
s ago
22 hours,
2019-03- Block 20- Rashmi
24 6750 24 minute Carpentry
03 304 Malgudi
s ago
2019-03- 9 minutes Block 5-
25 6745 Carpentry
03 ago 1106
Mr.Siddha
3 hours,
2019-03- Block 7- rth
26 6812 56 minute Carpentry
04 1002 Singh/Aru
s ago
ni Ray
Subject Status

door need to fix properly Open

DB door need to be closed properly Open

Door lock not working properly Open

DB box door is broken requested for replacement Open

DB door need to be closed properly Open

Door not closing properly Open

Need to fix window grills. Open

DV box of flat does not have a lock. Open

Window screw missing for the grill Open

window handle need to fix Open

DB door not closing properly Open

Letter box key need to be replaced Open

DB lock set is not available,new one required Open

Db lock need to provide... Open

Lock damaged on the external electrical DB. This is state from the start, not a
Open
recent damage.

MCB box lock brocken Open

Bathroom door is not closing after grouting Open


DB lock set is not available, New DB lock set required Open

Main door issue and false ceiling sheets need to be arrange in utility area.. Open

door stopper need to fix Open

Carpenters in 406 block 20 are too noisy. They walk around too loudly. They
are dragging their stuff around as well. Please ask them to at least walk softly. Open
It's getting unbearable to go through this everyday.

Screw need to fix for the cupboard.. Open

door not closing. Open

To fix door stopper of Main Door Open

Need carpenter help for (1) wardrobe door issue and (2) main door lock
Open
adjustment. Thanks

main door lock is not working Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
2 months,
2018-11-
1 1187 2 weeks Aparna Block 10-G005 Priya
27
ago
2018-11- 1 month Akansha
2 1071 Aparna Block 3-1703
25 ago Kapoor
5 months,
2018-06- Samyukta
3 201 1 week Aparna Block 4-902
01 S Pillay
ago
2018-10- 3 weeks, Samyukta
4 3818 Aparna Block 4-902
06 1 day ago S Pillay
2018-12- 2 months
5 2863 Aparna Block 17-1101
23 ago
2019-01- 2 months suma
6 3395 Aparna Block 1-1703
01 ago navneeth
2019-01- 1 month Phani
7 5077 Aparna Block 19-406
27 ago Kumari A
3 weeks,
2019-02- Pooja
8 5526 5 days Aparna Block 1-1504
05 Saini
ago
1 week,
2019-02- Srinivas
9 5540 6 days Aparna Block 18-1205
05 Varma
ago
2 weeks, Snehdip
2019-02-
10 5784 4 days Aparna Block 18-1204 Karandika
10
ago r
2 days,
2019-02- Sharath
11 6396 20 hours Aparna Block 3-305
23 Chandra
ago
2 days,
2019-02-
12 6475 20 hours Aparna Block 13-203 Raju
25
ago
3 days,
2019-02- Mukund
13 6608 5 hours Aparna Block 19-1306
28 Parihar
ago
Subject Status

window lock not working properly Open

Hinges need to fix for balcony door.. Open

Drain caps missing in window sills Open

Leak below french windows Open

Sliding door has become very tight. Open

Washroom Window handle was broken Open

French door stopper broken,send aparna vendor.. Open

sliding window not working properly Open

carridor window door 12th floor not closing properly Open

During maintenance request washroom window handle


Open
broken by plumber. Need it fixed urgently.

Balcony sliding door lock need to be repaired Open

Kitchen sliding door need to be repaired(Aparna) Open

French door need to be repaired(Aparna) Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
3 weeks,
2018-08- Block 18- Rimpy
1 582 3 days Communication
21 604 Arora
ago
T.S.Sai
11 hours,
2019-02- Block 8- Karthik/Sy
2 6134 39 minute Communication
17 1302 ril
s ago
Thomas
4 days,
2019-02- Block 18- Srinivas
3 6238 6 hours Communication
19 1205 Varma
ago
3 days, Pankaj
2019-02- Block 19-
4 6596 19 hours Communication Kumbhar
27 1106
ago e
5 days,
2019-02- Block 7-
5 6531 1 hour Communication Viswa
26 1401
ago

5 days, AMALA
2019-02- Block 18-
6 5636 1 hour Communication SUGANT
07 405
ago HA

K
2 days,
2019-02- Block 8- Karthika
7 6619 20 hours Communication
28 507 Kalyan
ago
Swami
1 day,
2019-03- Block 11-
8 6644 22 hours Communication
01 504
ago
1 day,
2019-03- Block 17-
9 6646 21 hours Communication Jaya T
01 1102
ago
Mr.Siddha
1 day,
2019-03- Block 6- rth
10 6655 19 hours Communication
01 G003 Sen/nitish
ago
a
Mr.
19 hours, Shankar
2019-03- Block 14-
11 6713 39 minute Communication Gopalan/
02 904
s ago Rohit
Jaiswal
20 hours,
2019-03- Block 15- Vishu
12 6762 53 minute Communication
03 403 Muthreja
s ago
19 hours,
2019-03- Block 2- Preeti
13 6770 9 minutes Communication
03 905 Gaur
ago
20 hours,
2019-03- Block 8- Mrs.Karis
14 6815 5 minutes Communication
04 1103 hma/Allan
ago
Avinash
2018-06- 9 minutes Block 1-
15 245 Communication Katikanen
08 ago 1002
i
Subject Status

Internet connection upload speed is slow Open

Internet download speed not good. Open

Internet speed is slow...


Open
Intermittent disconnect for more than 10 mints some times

Internet very slow mostly in evening time.. Gets disconnected frequently Open

The internet speeds are trickling, less than 100kbps and unable to take any
video/voice calls over internet. This has become more prominent from last 1 Open
week. This is so irritating, please fix it.
The internet connectivity in our flat is very bad, there is lot of request time out
and packet loss. The service provider has already looked into it and says that
Open
there is no problem from their end. Please have pyramid team check this
problem.

Zoom internet is not working Open

Intercom is not working .problem with handset. Have another handset of beetle
Open
request to install the same

Internet very very slow please check and let us know the reason. Open

Act internet speed is too slow. Open

Act internet speed is very slow. Open

Router configuration need to be done Open

Internet is very slow around 8-9 PM almost on a daily basis. Streaming movies
Open
doesn't work as expected.

zoom internet is very slow Open

Internet point Open


Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
Mr.
5 months, Swapnil
2018-06-
1 328 3 weeks AC Block 2-302 Palod/Kra
22
ago nthi
Kinnera
5 months,
2018-08- JP
2 490 1 week AC Block 13-801
02 Acharya
ago
2 months,
2018-09-
3 1803 2 weeks AC Block 9-705
08
ago
K.
2 months,
2018-09- Ramakris
4 2497 2 weeks AC Block 5-902
16 hna
ago
Reddy
2 months,
2018-09-
5 2714 2 weeks AC Block 13-507
19
ago
2 months, Aishvarya
2018-10-
6 4903 2 weeks AC Block 9-G001 Verma/Ay
23
ago an Paul
2 months,
2018-11-
7 691 2 weeks AC Block 16-704
19
ago
K.
2 months,
2018-11- Ramakris
8 257 2 weeks AC Block 5-902
12 hna
ago
Reddy
2 months, Harshara
2018-10-
9 3962 2 weeks AC Block 12-102 n Singh
08
ago Sokhi
K.
1 month,
2018-11- Ramakris
10 5605 4 weeks AC Block 5-902
04 hna
ago
Reddy
2 months,
2018-11- N.Sreedh
11 523 2 weeks AC Block 5-1202
16 ar
ago
2 months,
2018-12-
12 2221 1 week AC Block 10-106 Shyam
12
ago
Mr. Sai
2 months, Krishna
2018-12-
13 2813 1 week AC Block 15-105 Rayudu/R
22
ago ajat
Mishra
1 month, Anil
2018-12-
14 3174 1 week AC Block 1-G002 Kumar
28
ago Tomer
1 month,
2019-01-
15 3460 1 week AC Block 1-1304 Deepak J
02
ago
K.
1 month,
2019-01- Ramakris
16 3567 3 weeks AC Block 5-902
04 hna
ago
Reddy
K.
1 month,
2019-01- Ramakris
17 3631 3 weeks AC Block 5-902
05 hna
ago
Reddy

K.
1 month,
2019-01- Ramakris
18 3840 3 weeks AC Block 5-902
09 hna
ago
Reddy
Subject Status

AC Water Leakage Open

builder related ac drain pipe issue. it's long pending now. already
Open
raised. but nobody attending

AC outlet pipe leakage Open

Ac drain pipe leakage. Open

AC outlet pipe leakage Open

AC outlet pipe leakage Open

Ac drain pipe leakage & sloop issue Open

Common bed room AC outlet not kept correctly Open

Ac drain pipe leakage. Open

Ac drain pipe leakage. Open

AC outlet pipe leakage Open

AC drain Open

For ac connection Open

There is water leakage from the external pipe some floor above
resulting the water falling in the area outside the AC outdoor unit of Open
master bedroom.
AC drain pipe joints need to be fixed using solvent as per AC
technician. Currently no such mechanism is used which can cause Open
leakage. Flat 1304 Block 1.
AC pipe water is coming inside in common bed room and AC fitting
people said it is to be undertaken by a MHV. Since one year the
Open
complaint is pending.

Common bed room AC water is coming inside. Since, one year I


complaining. Some persons are coming and going, without
Open
carrying out any repair. Only false promises are being made.
Please resolve immediately.

In Common bed room When AC is switched on water is coming


inside. AC people told only MHC can do this. The complaint is
Open
pending for one year and raised at various forums including MHV
meetings. Let us see how many more days/ months it will take.
Create Last Owner
Sl.no. ID Category Flat
Date update /Tenant
7 months, tanya
2018-07- Block 4-
1 416 3 weeks Civil chakrabor
15 1601
ago ty
8 months,
2018-06- Block 10-
2 262 3 weeks Civil
11 406
ago
10 month Tarun
2018-04- Block 19-
3 39 s, 1 week Civil Ramsingh
30 1301
ago ani
Block 19- Harleen/K
2018-05- 10 month
4 71 Civil 1302 - aran V S
05 s ago
1402 Bagga
2018-05- 10 month Block 19- Narasimh
5 91 Civil
07 s ago 802 an
2018-05- 10 month Block 19- Narasimh
6 91 Civil
07 s ago 802 an
8 months,
2018-06- Block 14- Megha
7 260 3 weeks Civil
10 605 Jaiswal
ago
Deep
4 months,
2018-06- Block 2- Sharma/D
8 298 3 weeks Civil
17 604 eep
ago
Sharma
5 months,
2018-05- Block 17-
9 128 2 weeks Civil Jaya T
14 1102
ago
Mrs. K.
2 months,
2018-09- Block 9- Krishnave
10 1307 2 weeks Civil
03 204 ni/Mohit
ago
Gupta
2 months,
2018-08- Block 7- Ashay
11 1045 2 weeks Civil
31 1407 Raut
ago
5 months,
2018-06- Block 3-
12 342 1 week Civil
24 303
ago
2 months,
2018-09- Block 18- Srinivas
13 2453 2 weeks Civil
16 1205 Varma
ago
2 months,
2018-11- Block 3- Prameela
14 111 2 weeks Civil
10 1105 Rani
ago
2018-04- 1 month Block 18- Mayank
15 26 Civil
29 ago 904 Joshi
2 months,
2018-09- Block 18- Jyothi
16 1394 2 weeks Civil
03 1202 Juloori
ago
Mr. Vijay
2 months, Kumar
2018-11- Block 7-
17 5614 2 weeks Civil Bommena
04 602
ago /Anup
Mayank
2 months,
2018-11- Block 18- Y Venkata
18 835 2 weeks Civil
21 1305 Raman
ago
2 months,
2018-11- Block 19- Narasimh
19 1063 2 weeks Civil
25 802 an
ago
2 months,
2018-11- Block 18- Dr K.
20 1200 2 weeks Civil
27 406 Uma Devi
ago
Ratnamal
2 months, a Ravi
2018-12- Block 5-
21 1453 2 weeks Civil Chander/
01 G005
ago Manohar
Puri
2 months, Ankur/R
2018-12- Block 13-
22 1622 2 weeks Civil Venakate
03 506
ago sh
2 months, P.
2018-12- Block 17-
23 2151 2 weeks Civil Chakrapa
11 404
ago ni Reddy
2 months,
2018-12- Block 18-
24 2255 2 weeks Civil eeshwar
13 1004
ago
Mrs.
Vasudha .
2 months,
2018-12- Block 4- S.
25 2392 2 weeks Civil
15 402 Mantha/S
ago
agar
Bangal
Raghaven
2018-05- 2 weeks Block 8- dra
26 64 Civil
03 ago 1705 Putnala/A
bhi
2 weeks,
2018-05- Block 2- Nitesh
27 63 3 days Civil
03 1502 Misra
ago
2018-11- 1 month Block 20- RRChaita
28 755 Civil
20 ago 1401 nya
2 months, Santosh
2018-12- Block 6-
29 1500 2 weeks Civil Reddy
02 1506
ago Pati
1 week, Pankaj
2018-12- Block 19-
30 1539 2 days Civil Kumbhar
02 1106
ago e
2 months,
2018-11- Block 14- Neetu
31 1103 2 weeks Civil
25 G001 Dahiya
ago
5 months,
2018-08- Block 19- Narasimh
32 562 1 week Civil
18 802 an
ago
2 months, Block 19-
2018-09- Rajesh
33 2768 2 weeks Civil 1305 -
20 Kotha
ago 1405
2 months, Ojas
2018-09- Block 12-
34 2808 2 weeks Civil Kale/Raja
20 1306
ago t Bathwal
5 months,
2018-07- Block 16-
35 371 1 week Civil
07 105
ago
Mrs.Priya
2 months, nka
2018-09- Block 5-
36 2115 2 weeks Civil Gupta/Ro
12 404
ago bin
Pahwa
2 months,
2018-10- Block 5-
37 4713 2 weeks Civil
20 205
ago
2 months,
2018-10- Block 4-
38 4927 2 weeks Civil
24 1402
ago
Mr.
2 months,
2018-10- Block 1- Pradeep
39 5042 2 weeks Civil
26 1006 Kumar
ago
Vecha
2 months,
2018-10- Block 7-
40 5078 2 weeks Civil
27 1107
ago
Mr.yellam
2 months, a raju sai
2018-10- Block 15-
41 5088 2 weeks Civil sreenath/
27 G003
ago Sundara
m
2 months,
2018-09- Block 6-
42 2275 2 weeks Civil Nene
14 G005
ago
Mr.
Srinivasa
Murthy
2 months,
2018-12- Block 5- Chilla &
43 2493 1 week Civil
16 304 Keesara
ago
Anup
Reddy/Sh
ishir
2 months,
2018-09- Block 18- Balasathy
44 2350 2 weeks Civil
15 105 a
ago
Mr. K.
2 months, Anki
2018-09- Block 5-
45 3286 2 weeks Civil Reddy/Ra
27 202
ago jendra
Shinde
2 months, tanya
2018-08- Block 4-
46 883 2 weeks Civil chakrabor
29 1601
ago ty

Mr. K.
Venugopa
2 months,
2018-09- Block 15- l
47 1520 2 weeks Civil
06 803 Reddy/Viv
ago
ek
Kothakota

Mr.
2 months,
2018-09- Block 1- Jaideep
48 1960 2 weeks Civil
10 1102 Agarwal/R
ago
itika
2 months,
2018-09- Block 15-
49 2278 2 weeks Civil Bhavya
14 205
ago
1 month, G
2018-09- Block 3-
50 3087 1 week Civil Rajashek
23 1502
ago ar Reddy
Mrs.
2 months, Harini
2018-09- Block 1-
51 3319 2 weeks Civil Chintapall
27 1101
ago y/Vinayak
Maske
2 months,
2018-10- Block 8-
52 4986 2 weeks Civil
25 503
ago
2 months,
2018-10- Block 18-
53 5224 1 week Civil
29 1005
ago
2 months,
2018-11- Block 19-
54 178 2 weeks Civil Rajan
11 606
ago
Gangaraj
2 months,
2018-10- Block 5- u
55 3606 2 weeks Civil
02 1304 AnanthaL
ago
akshmi
1 month,
2018-11- Block 3- Prameela
56 38 3 weeks Civil
10 1105 Rani
ago
1 month, Snehdip
2018-09- Block 18-
57 1122 2 weeks Civil Karandika
01 1204
ago r
2 months,
2018-12- Block 3-
58 2627 2 weeks Civil
19 1406
ago
Mr.
2 months,
2018-07- Block 15- Pragyan
59 457 2 weeks Civil
26 103 Ojha/Mani
ago
sa Dash
2018-06- 3 weeks, Block 20- Shweta
60 254 Civil
10 1 day ago 1103 Gupta
1 month, Ankur/R
2018-12- Block 13-
61 1621 1 week Civil Venakate
03 506
ago sh
2 months, Amit
2018-10- Block 4-
62 4398 1 week Civil Kumar
14 1406
ago Gupta

Venkates
1 month,
2018-12- Block 19- warlu
63 3297 1 week Civil
30 1406 Tedla/Rah
ago
ul Tandon

Dr. B.
1 month, Saroj
2019-01- Block 6-
64 3484 4 weeks Civil Kumar
03 405
ago Prusty/Niti
n Gupta
1 month,
2018-12- Block 2- Padma
65 3098 3 weeks Civil
26 G004 Kanumuri
ago

Mr.
Vonteru
Vinesh
Reddy,
1 month,
2019-01- Block 3- Mr.
66 3860 1 week Civil
09 503 Sandeep
ago
Phadke/B
ala
Krishna
Kolan

1 month,
2018-07- Block 18- Y Venkata
67 435 2 weeks Civil
19 1305 Raman
ago
1 month,
2018-08- Block 14- Veerabab
68 492 2 weeks Civil
03 801 uT
ago
1 month,
2019-01- Block 18- Ramya
69 4613 1 week Civil
20 1401 Kodali
ago
2 weeks,
2019-01- Block 14-
70 4965 4 days Civil Nikita
25 1205
ago

2019-01- 1 month Block 7- Suryanar


71 4964 Civil
25 ago 1402 ayanan R

3 weeks,
2019-01- Block 17-
72 5048 3 days Civil anurag
27 405
ago
Nitin
2019-01- 1 month Block 16-
73 5244 Civil Srivastav
30 ago 1401
a
2019-01- 1 month Block 8-
74 5288 Civil Sunil Baid
31 ago 302
3 weeks,
2019-02- Block 19-
75 5561 4 days Civil Sravani
05 1404
ago
3 weeks,
2019-02- Block 7-
76 5567 4 days Civil
05 1404
ago
3 weeks,
2019-02- Block 7- Biswanat
77 5543 5 days Civil
05 501 h Muduli
ago
2019-02- 3 weeks, Block 14-
78 5720 Civil Jyotsna
09 1 day ago 105

Aishvarya
2019-02- 3 weeks, Block 9-
79 5738 Civil Verma/Ay
09 1 day ago G001
an Paul

2 weeks, Block 3- SRIDEVI


2019-02-
80 5803 6 days Civil 1602 Block 3 -
10
ago 1702 1602
2018-08- 3 weeks, Block 4- Samyukta
81 546 Civil
16 1 day ago 902 S Pillay
2019-02- 1 week, Block 20- manokant
82 5900 Civil
12 1 day ago 406 h madapu
1 week,
2019-02- Block 4- Samyukta
83 6228 5 days Civil
19 902 S Pillay
ago
1 week,
2019-02- Block 19- simarpree
84 6150 6 days Civil
17 1001 t
ago
1 week,
2019-02- Block 3- Sujata
85 6257 4 days Civil
20 404 Bhowal
ago
1 week,
2019-02- Block 13-
86 6332 2 days Civil neha
21 G004
ago
Mr.
1 week, Gadepalli
2019-02- Block 2-
87 6326 2 days Civil Kalyan/R
21 506
ago anjitha
Munjal
M
6 days,
2019-02- Block 7- Chalapath
88 6474 6 hours Civil
25 205 i/rinku
ago
goel
22 hours,
2019-03- Block 3- Ganga
89 6702 39 minute Civil
02 801 Bagirathy
s ago
Mr.
2 hours, Pammi
2019-03- Block 1-
90 6740 54 minute Civil Thejovard
03 1103
s ago han/Rohit
Roy
Subject Status

Door painting not completed Open

Slope problem in bathrooms Open

cracks in bathroon tiles Open

Loose floor tiles Open

wall crack (again) Open

wall crack (again) Open

tiles damaged Open

tiles and wall cracks. isible Open

Broken tiles in bathroom, hall and other places Open

Tiles issue Open

Tile broken Open

rainwater collection on the roof of the shade for basement


Open
way on ground floor in front of block 3

floor Tiles got faded in the flat. Open

Balcony grill need to fix, it is loose. Open

no grouting done in bathrooms Open

Bathroom flooring uneven slope Open


A tile in common bathroom is broken Open

floor number near the elevator and in the corridor are still
Open
missing on 13th floor

broken tile around light point in guest bathroom Open

floor tile is break in utility area. Open

Walls got crack & new door stopper replacement Open

Mbr washroom tile crack need to check Open

common area railing rod need to fix Open

Number plate required for flat. Open

2 tiles replacement in common washroom Open

Broken Tiles in lift Area Block 8, 17th floor Open

Broken marbletop in corridor Open

No railing in the corridor Open

no sign board for block 6 in ground floor Open

unauthorised item in corridor lying since 9 months Open

Corridor window glass broken in block-14 Ground floor Open


broken Granite lift wall Floor 0 Open

railing rod is missing in B-19 14th floor Corridor Open

windows in block 12, 13th floor corridor Open

bathroom tile gaps Open

tiles need to fix Open

Tile need to be fixed in living hall Open

Tiles are missing in hall & kitchen, Kitchen oulet is in a


Open
different way

Mbr bathroom slope is not proper & seepage in wall Open

mbr washroom tiles leakage Open

Water leakage from Granite Open

floor slope level problem in the utility area Open

mbr sink loose fixing & tile got damage Open

there is a crack on the wall behind the main door Open


In kitchen One of the granite strip is fall down. Open

Broken window pane Open

Tile broken Open

water leakage from tiles in washroom, plumbers visited 4


times, they said that they will send nagendra, but till now no Open
action was taken against it.

flooring slope problem in mbr wash room Open

No proper WC slope Open

tiles need to refix Open

Tiles need to be fixed properly Open

Water leakage from tile in mbr washroom. Open

tiles broken in the mbr and cbr wash room Open

water blockage in front of main door , flooring level problem Open

Common area corridor grill need to fix properly it may harm


Open
to children

Guest bathroom tiling slope is not good Open

pooja room tile & common area tile broken Open


tile hollow from beneath and cracking Open

washbasin level incorrect Open

WC slope issue Open

there is no proper slope in the wash room, Open

Flat number plate is missing Open

Tiles broken in kitchen need to fix properly.. Open

Washroom tiles seepage issue Open

WC reverse slope issue Open

terrace parapet wall rod Open

broken granite skirting Open

Flat number plate(18-1401) is not available Open

WC reverse slope issue. Open

Block 7 - While entering lifts from Ground floor, cement tiles


are broken. It's been like that for more than a year. Please Open
correct it.

Broken railing in corridor in Block17, 4th floor Open


Basement-2 parking slot paint marking has to be done Open

Tile broken in the washroom Open

Railing rod in the corridor need to be fixed properly Open

Plaster of Paris has not done in two washrooms Open

Because of uneven laying of tiles in the master bathroom,


water is not receeding and remains for hours together. Pl Open
attend to this urgently.

Mbr washroom floor slope issue Open

Block 9-10 common activity room was damaged due to


illegal construction done for Pujari accommodation. The
current state of the room can be seen in the images. Needs Open
immediate attention and fix to restore the room to earlier
state, and available for community use.

Crack in the master bedroom wall in 17 th floor. Visible from


Open
both inside and outside

Rain water seepage from window sill Open

Cbr washroom sink tiles below leakage Open

Cracks developed in bathroom wall tiles Open

Washroom have tiles gaps so need grounting as worms and


Open
smell is coming up in both washrooms

Master bedroom WC pipeline is not at correct height at


connection point with main pipe and causing a reverse flow Open
of whole worlds garbage onto my WC.

Water coming reverse from WC Open

Washroom Floor Scaling need to be done Open

Water coming reverse from WC Open

WC reverse slope issue Open


Loose tile in one of the room Open
Last Owner
Sl.no. ID Create Date Category Flat
update /Tenant
2 months,
Tulasi
1 1819 2018-12-06 1 week Common Area Block 16-506
Gandham
ago
1 month
2 129 2018-05-14 Common Area Block 17-1102 Jaya T
ago
Mrs.
Kappagan
tula
3 weeks,
Anjani
3 3801 2019-01-08 3 days Common Area Block 10-802
Madhavi/
ago
parul
chaudhar
y
1 month,
Bindu
4 4161 2019-01-13 1 week Common Area Block 20-203
Palety
ago

1 month, M.Srija/A
5 4267 2019-01-14 2 weeks Common Area Block 3-1306 bhishek
ago Kumar

Mrs. A.
1 month,
Gayatri
6 4412 2019-01-17 2 weeks Common Area Block 3-401
Devi/Vikra
ago
m Dhillon

1 month Nizam
7 5159 2019-01-28 Common Area Block 18-403
ago Ahmed

1 month
8 5075 2019-01-27 Common Area Block 11-1306 Mohit
ago

4 weeks
9 5386 2019-02-02 Common Area Block 2-402
ago
2 weeks,
10 5858 2019-02-11 5 days Common Area Block 6-1406
ago
2 weeks,
11 5844 2019-02-11 3 days Common Area Block 9-106 Soumita
ago

2 weeks,
12 6032 2019-02-15 Common Area Block 7-506 Allen
1 day ago
2 weeks,
Samyukta
13 5965 2019-02-14 3 days Common Area Block 4-902
S Pillay
ago
1 week,
Manjulata
14 6338 2019-02-22 2 days Common Area Block 8-901
Agrawal
ago

1 week Mallikarju
15 6420 2019-02-24 Common Area Block 9-605
ago na Reddy

Ms. Pooja
4 days, Rao
16 6552 2019-02-26 7 hours Common Area Block 9-1303 Kosunam/
ago Malathi
Bondili

5 days,
Vikas
17 6519 2019-02-26 6 hours Common Area Block 1-106
Gupta
ago
2 days, Tejaswi
18 6628 2019-03-01 6 hours Common Area Block 7-1505 gupta/Sas
ago hidhar J
2 days,
Shishir
19 6634 2019-03-01 4 hours Common Area Block 1-1706
Bhand
ago
1 day,
20 6696 2019-03-02 1 hour Common Area Block 5-1106
ago
21 hours,
Ganga
21 6706 2019-03-02 54 minute Common Area Block 3-801
Bagirathy
s ago

5 hours,
22 6792 2019-03-04 54 minute Common Area Block 10-1601
s ago

6 hours, Bharat
23 6787 2019-03-04 39 minute Common Area Block 13-602 Ram/vinit
s ago ha
Subject Status

Need Dhobi for Block 15&16 tower Open

Regarding furniture opposite to our door blocking Open

Inspite of calling several times . Iron person has not turnedup to


collect clothes to iron. Kindly let me know urgently,what is the Open
solutions. I have to get the iron done urgently.

Complaint against Drinking water supply vendor Open

This is to request the lights in the cricket nets to not face the batting
side. Everyone playing under lights has faced this issue and it's a
potential injury risk as well as the ball gets lost in the lights very
often.
Open
I would humbly request the concerned authority to change the
direction of the mask lights perpendicular to the mat and install a few
more lights at the back of the nets.

Water vendor is very bad at his job, he never gets water on time, he
commits something delivers 2-3 hours later. Please change the Open
vendor. I have been facing this problem since 4-5 months

Horrible sewage smell in block 18 balcony and inside the house in


Open
the evenings.

We are getting annoying noise in our master bedroom at night time


which starts around 10:30-11:00PM and continue till morning.
It seems some heavy motor starts running such as AC/water pump
with vibration like sound.
I checked with upper floor 11-1406 and they are also having same Open
noise problem.
This problem is grown much for last couple of months now and we
are finding it very difficult to sleep at night.
Please find the root cause and rectify the issue.

I raised two complaints on security and on plumbing. They are both


Open
showing resolved?????!!!!!!!

Copper pipe got damaged, need to be replaced for Gas connection Open
I want to bring it to your notice that since last few months everyday
morning I get to see pet's pee at the corner of the G floor slope at
block 9. I get to see this around 7:30 am everyday.

Can please talk to the owners of the pet at block 9 and ensure that
they are taking care of this matter and keeping MHV clean. Open

Also if required please find out the owner of this pet at 9 block
through CC TV and make sure this is not repeated in future.

Thanks!

Please send vendor to close up the class ceiling on Saturday


Open
morning 16-02-2019,IBS

Vijeta has cameras directly above POS machines to capture credit


Open
card pin entries. This is illegal.

Area between block 20 and tennis court smell bad like horse stable.
Open
Also there are lot of tiny white mosquitoes / fly.

Temple bhajan timings are not being maintained. It is being too noisy
Open
for the residents in block 9/10 on multiple days for long hours

Block 9, floor 13 seems to have dog pee near the service lift. This
seems to be a regular occurrence on this floor and is very annoying Open
and unsanitary. Please take it up with the pet owner.

The Dry-cleaning person in block 18 has lost 10 sarees of my


mother. How can that happen, pls check via security camera and ask Open
him to compensate if he is unable to find.

Random maids stopping by asking for work. Block 7. Open

wheel chair are not in good condition at Gate- 1. need to replace or


Open
repair

Newly moved to b5 1106 as tenant. Kindly remove old vehicles


shown up in my gate database. I am unable to remove old tenant Open
vehicles. Thanks

Painting need to be done for Booster signal POP patches Open

Screws are coming out of a speed breaker. This is near the water
supply in centre at basement -2.
Open
Attached pics, please call if it is unclear where it is. On the lane
where we exit using south exit, it is 3rd speed breaker towards roggt

Maid Rasmani has taken extra money and products and left the
work. She is not returning the money despite warning her. Please Open