Академический Документы
Профессиональный Документы
Культура Документы
Plumbing&STP 174
Electrical&Meter Issues 30
Cable&IO Socket Issues 11
Security Related Issues 26
Safety&Lift Related Issues 10
Seepage&Leakages 109
False ceiling Sheet Related 9
Housekeeping&External Window Cleaning 22
Carpentry&DB Lock Issues 26
Door&Window(Aparna) related Issues 13
Communication(Internet speed) Issues 15
AC Drain&Inlet Issues 18
Civil Works 90
Common Area&Vendor service related Issues 23
TOTAL 576
Create
Sl.no. ID Last update Category Flat Owner /Tenant
Date
2018-09- 4 days, 7 hours Block 18-
1 2858 Plumbing Rimpy Arora
21 ago 604
2018-12- Block 2-
2 2158 1 month ago Plumbing Lalith
11 906
2018-12- 2 months, Block 7-
3 1905 Plumbing Vijay Kumar Rojra
07 2 weeks ago 1703
2018-10- 2 months, Block 4-
4 4719 Plumbing Rajesh Chopra
20 2 weeks ago G004
Mrs.
2018-12- 1 month, 1 week Block 1-
5 2043 Plumbing Prathibha/Manish
09 ago 305
Amlathe
2018-12- 2 months, 1 week Block 8-
6 2171 Plumbing
11 ago 605
2018-12- 2 months, Block 16-
7 2137 Plumbing
11 2 weeks ago 105
2018-09- 2 months, Block 20- Sreekanth
8 2061 Plumbing
12 2 weeks ago G002 Papishetty
2018-09- 2 months, Block 17-
9 2863 Plumbing Jaya T
21 2 weeks ago 1102
2018-10- 1 week, 3 days Block 12-
10 3754 Plumbing Y SrinivasaRao
05 ago 304
2018-08- 2 months, 1 week Block 10-
11 716 Plumbing Avi Mathur
24 ago 302
Mr. Vijay Kumar
2018-10- 2 months, 1 week Block 7-
12 4960 Plumbing Bommena/Anup
25 ago 602
Mayank
2018-09- 4 days, 8 hours Block 18-
13 2126 Plumbing Rimpy Arora
12 ago 604
2018-11- 2 months, 1 week Block 1-
14 5479 Plumbing Kalyan Vadlamani
03 ago 606
Mr. Paruchuri
2018-11- 2 months, 1 week Block 6- Suhas
15 1380 Plumbing
30 ago 501 Kiran/Pratyusha
Meduri
2018-12- Block 2-
16 2586 5 minutes ago Plumbing Nitesh Misra
18 1502
2018-12- 1 month, 1 week Block 20-
17 2690 Plumbing Pallepati C Rao
20 ago 1406
Mr. Paruchuri
2018-12- 2 months, 1 week Block 6- Suhas
18 2784 Plumbing
22 ago 501 Kiran/Pratyusha
Meduri
2018-12- 2 months, 1 week Block 12-
19 2777 Plumbing Sarthak Vasudeva
22 ago 105
2018-12- 3 weeks, 5 days Block 1-
20 2783 Plumbing Kavita Vadlamani
22 ago 605
2018-12- 2 months, 1 week Block 8- K Suresh/satish
21 2839 Plumbing
22 ago 1001 manne
2018-12- 4 days, 10 hours Block 8-
22 1658 Plumbing Boda Phanendar
03 ago 806
2018-09- 1 week, 6 days Block 8-
23 2911 Plumbing Ranjan Rai
21 ago 103
Mr. Sai Krishna
2018-12- 2 months, 1 week Block 6-
24 2900 Plumbing Anantha/J
23 ago 906
Sudharshan
2018-10- 1 month, 2 weeks Block 20- Thasari Raja
25 4508 Plumbing
16 ago 703 Rajeswara Rao
Mr.Amit
2019-01- 1 month, 1 week Block 1-
30 3596 Plumbing Gorantiwar/Shwet
05 ago 401
a Choudhary
Block 4-
2019-01- 3 weeks, 4 days Dhruva Jyoti
31 3741 Plumbing 1605
07 ago Dasgupta
1705
2019-01- 6 days, 22 hours Block 3-
32 4115 Plumbing priya gupta
12 ago 1006
2019-01- 1 month, 3 weeks Block 17-
33 3979 Plumbing Gayathri J
10 ago 906
2019-01- Block 2-
34 3972 6 minutes ago Plumbing Nitesh Misra
10 1502
2019-02- Block 2-
97 6407 1 week ago Plumbing Preeti Gaur
23 905
Block 1-
2019-02- 1 week, 1 day
98 6393 Plumbing 1605 sahitya
23 ago
1705
2019-02- 6 days, 22 hours Block 12-
99 6459 Plumbing Swarna Latha
24 ago 1206
2019-02- 6 days, 15 hours Block 12- Kiran
100 6451 Plumbing
24 ago G001 Kanakadandi
Mr.Surya
2019-02- 6 days, 23 hours Block 11-
101 6453 Plumbing Mohan .G/Winston
24 ago 106
Roy Veigas
2019-02- 5 days, 23 hours Block 7-
102 6460 Plumbing Biswanath Muduli
24 ago 501
2019-02- 6 days, 2 hours Block 1-
103 6482 Plumbing Amit Gupta
25 ago 1404
2019-02- 5 days, 23 hours Block 16-
104 6490 Plumbing Parameswari
25 ago 801
Vinod
2019-02- 5 days, 23 hours Block 7-
105 6492 Plumbing Tipparaju/Vinod
25 ago 403
Tipparaju
2019-02- 6 days, 2 hours Block 19-
106 6483 Plumbing shanku vuppala
25 ago 1401
2019-02- 6 days, 1 hour Block 5- P Venkata
107 6488 Plumbing
25 ago 904 Srikanth Reddy
Block 7-
2019-03- 22 hours,
148 6705 Plumbing 1606 / Anusha Shankar
02 9 minutes ago
1706
Block 7-
2019-03- 22 hours,
149 6704 Plumbing 1606 / Anusha Shankar
02 9 minutes ago
1706
2019-03- 6 hours, Block 5-
150 6720 Plumbing Vivek Yadav
03 54 minutes ago 903
2019-03- 6 hours, Block 12- Koteswara
151 6721 Plumbing
03 54 minutes ago 1006 Rao/Swati Moitra
2019-03- 7 hours, Block 19-
152 6718 Plumbing Ashish Hemani
03 24 minutes ago 901
2019-03- 5 hours, Block 14-
153 6729 Plumbing
03 24 minutes ago 902
WC leakage Open
19-802
Common toilet flush not working. Open
Urgent help needed.
Hi
Noticing worms in the master bedroom toilet. Open
Please rectify
WC leakage Open
Hi
Noticed frothing and bad smell in the flush water for Open
past couple of days. Please rectify at the earliest
WC leakage Open
STP stink unbearable in tower 1. Also froth comming
Open
during flushing.
Water leakage from pipe in cbr washroom.. Open
1 month,
Block 7-
4 4277 2019-01-15 2 weeks Electrical
1101
ago
1 day,
Block 14- Mayank
5 4283 2019-01-15 7 hours Electrical
604 Gupta
ago
1 month,
Block 17- Sreenivas
6 4384 2019-01-17 2 weeks Electrical
206 u Oggu
ago
1 day,
Block 2-
7 3910 2019-01-09 6 hours Electrical Lalith
906
ago
1 month,
Block 13-
8 2048 2018-12-09 1 week Electrical
905
ago
K
1 month Block 3-
9 5150 2019-01-28 Electrical Ramacha
ago G001
ndra Rao
3 weeks, Block 2-
10 5155 2019-01-28 Electrical
1 day ago 903
Anil
4 weeks Block 9- Kumar/Sa
11 5428 2019-02-03 Electrical
ago 702 umya
Chandra
Dr.
Srinivas
2 weeks Block 5- Jakkina
12 6120 2019-02-17 Electrical
ago 302 Boina/Avi
nash
Kumar
Mr. Vishal
1 week, Dharanip
Block 10-
13 6111 2019-02-17 6 days Electrical athi/V
1206
ago RAMA
DEVI
1 week Block 2-
15 6410 2019-02-23 Electrical
ago 802
2 days Block 15-
16 6643 2019-03-01 Electrical
ago 703
4 days,
Block 10- Prathyush
17 6545 2019-02-26 21 hours Electrical
603 a Vala
ago
3 days,
Block 19- annapurn
18 6588 2019-02-27 20 hours Electrical
405 a
ago
3 days, Mrs.
Block 9-
19 6591 2019-02-27 19 hours Electrical Mousumi
1101
ago Dash
2 days,
Block 9-
20 6629 2019-03-01 6 hours Electrical Soumita
106
ago
1 day,
Block 17- smriti
21 6648 2019-03-01 20 hours Electrical
605 singh
ago
1 day,
Block 12-
22 6649 2019-03-01 20 hours Electrical
402
ago
1 day,
Block 9- Mallikarju
23 6656 2019-03-01 18 hours Electrical
605 na Reddy
ago
1 day,
Block 7- Harshit
24 6694 2019-03-02 1 hour Electrical
106 Gangal
ago
Mayank
1 day,
Block 4- Gulati/Jha
25 6699 2019-03-02 1 hour Electrical
1604 navi
ago
Sheth
22 hours,
Block 6-
26 6751 2019-03-03 9 minutes Electrical
601
ago
20 hours,
Block 19-
27 6765 2019-03-03 53 minute Electrical Neelima
702
s ago
9 hours,
Block 9-
28 6776 2019-03-04 24 minute Electrical
1201
s ago
8 hours,
Block 14-
29 6783 2019-03-04 9 minutes Electrical
1305
ago
8 hours,
Block 6-
30 6782 2019-03-04 24 minute Electrical
601
s ago
Subject Status
Flood light on the skating rink are not being switched off
Open
after 10pm.
Ms. Pooja
2 weeks, Rao
2019-01- Block 9-
11 5124 5 days IO Kosunam/
28 1303
ago Malathi
Bondili
Subject Status
1 month,
2019-01- Block 9-
3 3914 3 weeks Security
09 906
ago
Mr.
Ashwin
2019-01- 4 weeks, Block 19- Simha
4 4409 Security
17 1 day ago 701 Reddy/Al
o Sujay
Banarji
1 month,
2019-01- Block 8-
7 4238 1 week Security Anuj Pant
14 705
ago
Mohit
2 weeks,
2019-02- Block 14- Aggrawal/
10 5563 6 days Security
05 107 Sneha
ago
Agrawal
Kalyana
2019-02- 3 weeks, Block 17-
11 5739 Security sangam/A
09 1 day ago 1201
run
Mr.
Lokesh
2 weeks, Kedia ,
2019-02- Block 20-
12 5897 5 days Security Saurabh
12 403
ago Khoria/Ka
rtavya
Ramnani
2 weeks,
2019-02- Block 4- Samyukta
13 5882 5 days Security
12 902 S Pillay
ago
1 week,
2019-02- Block 14- T Srinath
15 6170 6 days Security
18 301 Rao
ago
1 week,
2019-02- Block 14- T Srinath
16 6217 5 days Security
19 301 Rao
ago
1 week,
2019-02- Block 8-
17 6162 6 days Security
18 301
ago
P.
2019-02- 2 weeks Block 17-
18 6139 Security Chakrapa
17 ago 404
ni Reddy
3 days,
2019-02- Block 7-
19 6472 22 hours Security Moni
25 1206
ago
Y
2019-02- 1 week, Block 12-
20 6380 Security Srinivasa
23 1 day ago 304
Rao
Mrs.
2019-02- 1 week, Block 11- Nitasha
21 6383 Security
23 1 day ago 606 Dhir/Kapil
Adatiya
3 days,
2019-02- Block 14-
22 6594 19 hours Security Anita
27 406
ago
1 day,
2019-03- Block 2-
23 6654 20 hours Security
01 303
ago
Chaya
16 hours,
2019-03- Block 7- Rao/Lave
24 6714 39 minute Security
03 202 ena
s ago
Punjabi
1 day, ashutosh/
2019-03- Block 15-
25 6697 2 hours Security Abhishek
02 G001
ago Chauhan
Mr.
Bavisetty
9 hours, Lakshma
2019-03- Block 7-
26 6715 9 minutes Security n
03 606
ago Kumar/Ab
hishek
Gupta
Subject Status
some one hit the window and glass broken please check
Open
the issue
Some one parked their car with 2" Extra distance into 14-
107 parking,resident requested to send a my-gate Open
notification to all the residents to avoid this type of issues
Block 17, 10 floor. The workers are doing all the work in
lobby. Whoever is getting the work done they should do
in their house. They are doing all cutting work in Lobby, Open
spreading wooden powder everywhere. Pls restrict it
immediately and se d them inside house.
M.D. Ansari security guard has been extremely
unprofessional and rude to me when one of the delivery
guys was trying to enter.
Open
He was being assertive and arrogant.
What should be done to take actions again him so that
such behavior is not repeated ?
Someone from block 7 not sure about the floor but flat no
6 threw an egg on me while I was walking down n the Open
walkway
Mr. Dhiren
1 week,
2019-02- Safety/Lif Block 4- Praful
1 6153 6 days
17 t 604 Damani/P
ago
reeti
Raghaven
1 week,
2019-02- Safety/Lif Block 8- dra
2 6211 5 days
19 t 1705 Putnala/A
ago
bhi
1 month,
2019-01- Block 18- Mayank
3 4640 1 week Safety
20 904 Joshi
ago
1 month,
2019-01- Block 7- Suryanar
4 4702 1 week Safety
21 1402 ayanan R
ago
1 month,
2019-01- Block 1- Sunil
5 4764 1 week Safety
22 1005 Sachdeva
ago
1 month,
2019-01- Block 7- Suryanar
6 4962 1 week Safety
25 1402 ayanan R
ago
Shreyans
h
1 month,
2019-01- Block 20- Agrawal/
7 4822 1 week Safety
23 604 Mahesh
ago
Kumar
Agrawal
2 weeks,
2019-02- Block 4- Samyukta
8 5909 4 days Safety
12 902 S Pillay
ago
4 days, Block 18-
2019-02- Sai
9 6080 21 hours Safety 1304
16 Abhilash
ago 1404
Siddharth
1 week,
2019-02- Block 19- a
10 6294 3 days Safety
21 601 Chinthapa
ago
lly
Subject
Kindly switch off /reduce the volume of the music in lifts from 10 pm to 6 am as it unneccessary n
disturbing This complaint has been raised in the past as well but no action has been taken till date.
Swings in children play area next to block 3-4 are not working for more than 2 months...
Children play area in central park (rubberized one) is torn in many places. There is a big area which is torn
and is in India ahape. Also the swings are not operational. Please correct them.
Please look into the upkeep of the children play area. Most of the swings are either broken or have tapes
fixed...... Even the flooring is coming out at many places.... My 3year old daughter is unable to play.... Hope
the concerned will take suitable action on the same
Open Gym - 2 to 3 exercise machines in open gym are broken. Please correct them.
Metal Angles located above car wash area may cause serious head injury.
Hand rail in corridor outside 1404 door is not secured and is freely moving. Major safety risk for residents.
Please resolve on priority
The rubber mat in the children's play area is peeling off in many areas. Request management to undertake
repair at the earliest.
Status
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Create
Sl.no. ID Last update Category Flat Owner /Tenant
Date
2018-10- 2 months, 2 weeks Seepage/ Block 12- Mrs. Swati Nirwani /Pallavi
28 4558
17 ago Leakage 1003 S
Mrs. K.
2019-01- Seepage/ Block 10-
75 5104 1 month ago Seethalakshmi/Sahil Dhar
28 Leakage 1204
Hakim
Block 7-
2019-01- Seepage/
78 5268 1 month ago 1606 / Anusha Shankar
30 Leakage
1706
Mr.
2019-02- Seepage/ Block 16-
84 5344 4 weeks, 1 day ago C.N.V.S.Satyanarayana/Sh
02 Leakage 705
ilpy
2019-02- Seepage/ Block 13-
85 5338 1 day, 4 hours ago Akash Kumar Tripathi
02 Leakage 107
Block 9-
2019-03- Seepage/
107 6695 1 day, 3 hours ago 1605 Varshith Rao
02 Leakage
1705
Water leakage from the roof and false ceiling sheet got
Open
damaged
The overhead pipe just above the car parking for 18 403
keeps leaking. It has been like that for the last one year. Open
Please fix this.
2 months, P Venkata
2018-09- House Keeping/External Block 5-
11 2683 2 weeks Srikanth
19 window cleaning 904
ago Reddy
Abir
2 months,
2018-11- House Keeping/External Block 14- Bhattacha
12 630 2 weeks
18 window cleaning 102 ryya/Rahu
ago
l
6 days, Kiran
2018-12- House Keeping/External Block 12-
13 2740 16 hours Kanakada
21 window cleaning G001
ago ndi
1 month,
2019-01- House Keeping/External Block 7-
14 4683 1 week Viswa
21 window cleaning 1401
ago
Mr.Surya
6 days, Mohan
2019-02- House Keeping/External Block 11-
20 6305 7 hours .G/Winsto
21 window cleaning 106
ago n Roy
Veigas
2 days,
2019-03- House Keeping/External Block 9-
21 6631 6 hours Soumita
01 window cleaning 106
ago
21 hours,
2019-03- House Keeping/External Block 12-
22 6711 24 minute
02 window cleaning 401
s ago
Subject Status
Lock damaged on the external electrical DB. This is state from the start, not a
Open
recent damage.
Main door issue and false ceiling sheets need to be arrange in utility area.. Open
Carpenters in 406 block 20 are too noisy. They walk around too loudly. They
are dragging their stuff around as well. Please ask them to at least walk softly. Open
It's getting unbearable to go through this everyday.
Need carpenter help for (1) wardrobe door issue and (2) main door lock
Open
adjustment. Thanks
5 days, AMALA
2019-02- Block 18-
6 5636 1 hour Communication SUGANT
07 405
ago HA
K
2 days,
2019-02- Block 8- Karthika
7 6619 20 hours Communication
28 507 Kalyan
ago
Swami
1 day,
2019-03- Block 11-
8 6644 22 hours Communication
01 504
ago
1 day,
2019-03- Block 17-
9 6646 21 hours Communication Jaya T
01 1102
ago
Mr.Siddha
1 day,
2019-03- Block 6- rth
10 6655 19 hours Communication
01 G003 Sen/nitish
ago
a
Mr.
19 hours, Shankar
2019-03- Block 14-
11 6713 39 minute Communication Gopalan/
02 904
s ago Rohit
Jaiswal
20 hours,
2019-03- Block 15- Vishu
12 6762 53 minute Communication
03 403 Muthreja
s ago
19 hours,
2019-03- Block 2- Preeti
13 6770 9 minutes Communication
03 905 Gaur
ago
20 hours,
2019-03- Block 8- Mrs.Karis
14 6815 5 minutes Communication
04 1103 hma/Allan
ago
Avinash
2018-06- 9 minutes Block 1-
15 245 Communication Katikanen
08 ago 1002
i
Subject Status
Internet very slow mostly in evening time.. Gets disconnected frequently Open
The internet speeds are trickling, less than 100kbps and unable to take any
video/voice calls over internet. This has become more prominent from last 1 Open
week. This is so irritating, please fix it.
The internet connectivity in our flat is very bad, there is lot of request time out
and packet loss. The service provider has already looked into it and says that
Open
there is no problem from their end. Please have pyramid team check this
problem.
Intercom is not working .problem with handset. Have another handset of beetle
Open
request to install the same
Internet very very slow please check and let us know the reason. Open
Internet is very slow around 8-9 PM almost on a daily basis. Streaming movies
Open
doesn't work as expected.
K.
1 month,
2019-01- Ramakris
18 3840 3 weeks AC Block 5-902
09 hna
ago
Reddy
Subject Status
builder related ac drain pipe issue. it's long pending now. already
Open
raised. but nobody attending
AC drain Open
There is water leakage from the external pipe some floor above
resulting the water falling in the area outside the AC outdoor unit of Open
master bedroom.
AC drain pipe joints need to be fixed using solvent as per AC
technician. Currently no such mechanism is used which can cause Open
leakage. Flat 1304 Block 1.
AC pipe water is coming inside in common bed room and AC fitting
people said it is to be undertaken by a MHV. Since one year the
Open
complaint is pending.
Mr. K.
Venugopa
2 months,
2018-09- Block 15- l
47 1520 2 weeks Civil
06 803 Reddy/Viv
ago
ek
Kothakota
Mr.
2 months,
2018-09- Block 1- Jaideep
48 1960 2 weeks Civil
10 1102 Agarwal/R
ago
itika
2 months,
2018-09- Block 15-
49 2278 2 weeks Civil Bhavya
14 205
ago
1 month, G
2018-09- Block 3-
50 3087 1 week Civil Rajashek
23 1502
ago ar Reddy
Mrs.
2 months, Harini
2018-09- Block 1-
51 3319 2 weeks Civil Chintapall
27 1101
ago y/Vinayak
Maske
2 months,
2018-10- Block 8-
52 4986 2 weeks Civil
25 503
ago
2 months,
2018-10- Block 18-
53 5224 1 week Civil
29 1005
ago
2 months,
2018-11- Block 19-
54 178 2 weeks Civil Rajan
11 606
ago
Gangaraj
2 months,
2018-10- Block 5- u
55 3606 2 weeks Civil
02 1304 AnanthaL
ago
akshmi
1 month,
2018-11- Block 3- Prameela
56 38 3 weeks Civil
10 1105 Rani
ago
1 month, Snehdip
2018-09- Block 18-
57 1122 2 weeks Civil Karandika
01 1204
ago r
2 months,
2018-12- Block 3-
58 2627 2 weeks Civil
19 1406
ago
Mr.
2 months,
2018-07- Block 15- Pragyan
59 457 2 weeks Civil
26 103 Ojha/Mani
ago
sa Dash
2018-06- 3 weeks, Block 20- Shweta
60 254 Civil
10 1 day ago 1103 Gupta
1 month, Ankur/R
2018-12- Block 13-
61 1621 1 week Civil Venakate
03 506
ago sh
2 months, Amit
2018-10- Block 4-
62 4398 1 week Civil Kumar
14 1406
ago Gupta
Venkates
1 month,
2018-12- Block 19- warlu
63 3297 1 week Civil
30 1406 Tedla/Rah
ago
ul Tandon
Dr. B.
1 month, Saroj
2019-01- Block 6-
64 3484 4 weeks Civil Kumar
03 405
ago Prusty/Niti
n Gupta
1 month,
2018-12- Block 2- Padma
65 3098 3 weeks Civil
26 G004 Kanumuri
ago
Mr.
Vonteru
Vinesh
Reddy,
1 month,
2019-01- Block 3- Mr.
66 3860 1 week Civil
09 503 Sandeep
ago
Phadke/B
ala
Krishna
Kolan
1 month,
2018-07- Block 18- Y Venkata
67 435 2 weeks Civil
19 1305 Raman
ago
1 month,
2018-08- Block 14- Veerabab
68 492 2 weeks Civil
03 801 uT
ago
1 month,
2019-01- Block 18- Ramya
69 4613 1 week Civil
20 1401 Kodali
ago
2 weeks,
2019-01- Block 14-
70 4965 4 days Civil Nikita
25 1205
ago
3 weeks,
2019-01- Block 17-
72 5048 3 days Civil anurag
27 405
ago
Nitin
2019-01- 1 month Block 16-
73 5244 Civil Srivastav
30 ago 1401
a
2019-01- 1 month Block 8-
74 5288 Civil Sunil Baid
31 ago 302
3 weeks,
2019-02- Block 19-
75 5561 4 days Civil Sravani
05 1404
ago
3 weeks,
2019-02- Block 7-
76 5567 4 days Civil
05 1404
ago
3 weeks,
2019-02- Block 7- Biswanat
77 5543 5 days Civil
05 501 h Muduli
ago
2019-02- 3 weeks, Block 14-
78 5720 Civil Jyotsna
09 1 day ago 105
Aishvarya
2019-02- 3 weeks, Block 9-
79 5738 Civil Verma/Ay
09 1 day ago G001
an Paul
floor number near the elevator and in the corridor are still
Open
missing on 13th floor
1 month, M.Srija/A
5 4267 2019-01-14 2 weeks Common Area Block 3-1306 bhishek
ago Kumar
Mrs. A.
1 month,
Gayatri
6 4412 2019-01-17 2 weeks Common Area Block 3-401
Devi/Vikra
ago
m Dhillon
1 month Nizam
7 5159 2019-01-28 Common Area Block 18-403
ago Ahmed
1 month
8 5075 2019-01-27 Common Area Block 11-1306 Mohit
ago
4 weeks
9 5386 2019-02-02 Common Area Block 2-402
ago
2 weeks,
10 5858 2019-02-11 5 days Common Area Block 6-1406
ago
2 weeks,
11 5844 2019-02-11 3 days Common Area Block 9-106 Soumita
ago
2 weeks,
12 6032 2019-02-15 Common Area Block 7-506 Allen
1 day ago
2 weeks,
Samyukta
13 5965 2019-02-14 3 days Common Area Block 4-902
S Pillay
ago
1 week,
Manjulata
14 6338 2019-02-22 2 days Common Area Block 8-901
Agrawal
ago
1 week Mallikarju
15 6420 2019-02-24 Common Area Block 9-605
ago na Reddy
Ms. Pooja
4 days, Rao
16 6552 2019-02-26 7 hours Common Area Block 9-1303 Kosunam/
ago Malathi
Bondili
5 days,
Vikas
17 6519 2019-02-26 6 hours Common Area Block 1-106
Gupta
ago
2 days, Tejaswi
18 6628 2019-03-01 6 hours Common Area Block 7-1505 gupta/Sas
ago hidhar J
2 days,
Shishir
19 6634 2019-03-01 4 hours Common Area Block 1-1706
Bhand
ago
1 day,
20 6696 2019-03-02 1 hour Common Area Block 5-1106
ago
21 hours,
Ganga
21 6706 2019-03-02 54 minute Common Area Block 3-801
Bagirathy
s ago
5 hours,
22 6792 2019-03-04 54 minute Common Area Block 10-1601
s ago
6 hours, Bharat
23 6787 2019-03-04 39 minute Common Area Block 13-602 Ram/vinit
s ago ha
Subject Status
This is to request the lights in the cricket nets to not face the batting
side. Everyone playing under lights has faced this issue and it's a
potential injury risk as well as the ball gets lost in the lights very
often.
Open
I would humbly request the concerned authority to change the
direction of the mask lights perpendicular to the mat and install a few
more lights at the back of the nets.
Water vendor is very bad at his job, he never gets water on time, he
commits something delivers 2-3 hours later. Please change the Open
vendor. I have been facing this problem since 4-5 months
Copper pipe got damaged, need to be replaced for Gas connection Open
I want to bring it to your notice that since last few months everyday
morning I get to see pet's pee at the corner of the G floor slope at
block 9. I get to see this around 7:30 am everyday.
Can please talk to the owners of the pet at block 9 and ensure that
they are taking care of this matter and keeping MHV clean. Open
Also if required please find out the owner of this pet at 9 block
through CC TV and make sure this is not repeated in future.
Thanks!
Area between block 20 and tennis court smell bad like horse stable.
Open
Also there are lot of tiny white mosquitoes / fly.
Temple bhajan timings are not being maintained. It is being too noisy
Open
for the residents in block 9/10 on multiple days for long hours
Block 9, floor 13 seems to have dog pee near the service lift. This
seems to be a regular occurrence on this floor and is very annoying Open
and unsanitary. Please take it up with the pet owner.
Screws are coming out of a speed breaker. This is near the water
supply in centre at basement -2.
Open
Attached pics, please call if it is unclear where it is. On the lane
where we exit using south exit, it is 3rd speed breaker towards roggt
Maid Rasmani has taken extra money and products and left the
work. She is not returning the money despite warning her. Please Open
help