Appendix V

PETROLEUM TECHNICAL SERVICES COMPANY


SAO VANG AND DAI NGUYET
DEVELOPMENT PROJECT

EQUIPMENT SUPPORT
INSPECTION RELEASE NOTE FOR EQUIPMENT INSTALLATION
PROJECT: SAO VANG DAI NGUYET DEVELOPMENT PROJECT RELEASE NO.

CLIENT : IKC INITIATOR:

DATE:

ASSEMBLY: Equipment : SV-44-XX-002

ITEM No. VERIFIED INSPECTION POINTS YES NA Reference

1 Support leveling is acceptable x Document attached

2 Support direction, loacation as design support drawing x Document attached


3 Support welding is completed with NDT acceptable x Document attached
4 Support painting is accepted x Document attached

REMARKS:

All content follow Doc attached are:


approved ITP - SUPPORT IRN for painting
- Painting acceptable IRN

Approved by PTSC QC- Inspector Inspected /Reviewed by:

NAME: NAME

SIGNATURE: SIGNATURE: IKC: ANH LUU ký

DATE: DATE:

DISTRIBUTION:

ORIGINAL TO QC FILE PAINTING DEPT. (When required)

SUPERVISOR CONSTRUCTION MANAGER


INITIATOR