CONTENTS
1. PURPOSE
2. SCOPE
3. REALTED DOCUMENTS
4. GENERAL INFORMATION
5. TEST PROCEDURE
5.1 Visual Inspection
5.2 Mechanical Cheks of Withdrawable units
5.3 Operational Checks
6. TESTING METHOD
6.1Secondary Injection test
6.2 Primary Injection test
6.3 High Volatge AC tests on Main Circuits
6.4 Dilelctric test on Auxiliry and Control Circuit
6.5 Ammeter/ Current Transducer test
6.6 Voltage/ Voltage Tansducer test
6.7 Verification of Corrrect Wiring
6.8 Measurement of the Resistance of the Main Circuit
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 2/12
1. PURPOSE
Purpose of this procedure is to show routine tests on low-voltage switchgear and control gear
assemblies up to 1000 V AC or 1500 V DC and perform the way of inspection during assembly
process of switchgear and control gear.
2. SCOPE
Test procedure has application in routine tests low-voltage switchgear and control gear assemblies
carried out by Quality Inspectors.
3. REALTED DOCUMENTS
Standards: PN-IEC 439-1:1994, CEI / IEC 60439-1:1999
Customer order and documentation
Assembly documentation, elementary and assembly drawings
Routine Test Card for LV
Form test, "Report of carried out testing"
4. GENERAL INFORMATION.
This procedure presents general rules of routine test on low-voltage switchgear and control gear
assemblies. Requirements given below are minimized and can be tighten or developed if particular
technical documentation or customer order provides additional test or other value of parameters
(for example higher test voltage)
5. TEST PROCEDURE.
Routine tests are carried out by a Quality Inspector on each assembled set
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 3/12
Check that bus-bars supports distances are correct according to the technical
documentation
Check that secondary winding of transformers (CT & VT) are connected to the ground
(if required according to the technical documentation)
5.1.4.Bus bars and wiring check
Check that the bus-bars, power and auxiliary cables are according to the technical
documentation (size, color, insulating degree, sheath, galvanic protection)
Check that insulation has not to be crimped inside lug body
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 4/12
If devices passed dielectric test before the test voltage should be reduced to 85% of value given in the
above table.
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 5/12
6. Testing Method
Description of test
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 6/12
Description of test
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 7/12
Description of test
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 8/12
Description of test
Description of test
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 9/12
Description of test
Description of test
The test shall be carried with reference to the schematic diagram to verify the functions.
Description of test
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 11/12
2. Check the general appearance of Panel that assembly is satisfactory completed B-A-C
o Correct layout of compartment as per accepted drawings
o Door stay clear away of internal fitting.
o Doors interlock mechanism and door lock.
o Proper enclosure assembly.
o All hook bolts, Bus bar support blocks, lifting brackets, door stay, Standard fixing bracket &
rail are properly tighten.
o Doors open and close satisfactory.
o All starter are properly labeled on the front door with their
o Equipment name and ratings.
o General cleanliness of MCC.
3. Check and ensure the copper bus bar section is satisfactorily B-A-C
o Correct bus bar size & color coded.
o Bus bar are properly secured and supported.
o Sufficient clearance between phase to phase and metal parts.
o Correct insulation cover thickness.
o “Danger” sign sticker.
5. Check and ensure the internal power cables are correctly size, B-A-C
tagged and color coded.
6. Current Transformer polarity and position are correctly installed and labeled B-A-C
7. Check and ensure the Current Transformer accuracy class & burden (VA) B-A-C
12. Check that the installation properly recorded for the AS-BUILT drawing B-A-C
Operating Instruction Title: RTR Testing LV Doc No: D-QC-I-003, Rev.B Page: 12/12