78
75.37 55.97
18.36 14.98
7.61 15.02
36.82 9.46
201.36 135.21
RENDIMIENTOS DE VEREDAS RENDIMIENTOS
L=1
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL ANCHO
50.00 1.00 0.10 5.00 3.00 8.00 1.00
1.20
L = 1.2 1.50
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL 1.80
44.00 1.20 0.10 5.28 2.64 7.92 2.00
2.50
L = 1.5 3.00
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL
38.00 1.50 0.10 5.70 2.28 7.98
L = 1.8
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL
33.00 1.80 0.10 5.94 1.98 7.92 SARDIN
L=2 73.22
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL
30.00 2.00 0.10 6.00 1.80 7.80
L = 2.5 115.00
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL
25.00 2.50 0.10 6.25 1.50 7.75
secion
L=3 13-06-2013 AL 19-06-2013
LONGITUD ANCHO ALTURA SUB TOTAL UÑA TOTAL
22.00 3.00 0.10 6.60 1.32 7.92 1
1
48 M3 0.8
CONCRETO RIGIDO UÑAS
50 0.12 3.3 3 22.8
VACEADO PASO CALLE VICT
48 m3
interseccion 31.90
180.26 0.12 21.63
camellon SARDINELES CALLE VICTO
6.6 2.6 0.10 1.716
6.6 2 0.10 2.64 9 DE JUNIO Y L. PRADO
4.356 L. PRADO Y A. UGARTE
56 3.3 0.12 22.176 PS S/N 1 - A
40 m3 35 m3 CIRCUNVALACION
6/20/2013
56 0.12 3.3 3.36 25.536
6 0.12 3.3 0.36 2.736
intersección 4.8 48.16
33.072
40 0.12 4.8
sobran
7 m3 para cesar vallejo 38 4.4 0.12 24.624
Martillos 11.69
55.93
6/28/2013
62 4.2 0.12 3.72 34.97 56 m3
45 3 0.12 2.7 18.90
Martillos
5.14 1.5 0.12 2 1.85
5.14 1.2 0.12 1 0.74 2.59
6/29/2013 40 m3
71 4.2 0.12 4.26 40.04
7/1/2013
56 3 0.12 3.36 23.52
65 3.32 0.12 3.9 29.80
CAMELLON
6 1.5 0.12 2 2.16 56 m3
6 1.2 0.12 1 0.86 3.02
56.34
7/2/2013
56 3 0.12 3.36 23.52
37 3.32 0.12 2.22 16.96
CAMELLON
6 1.5 0.12 2 2.16 1
7.04 1.2 0.12 2 2.03 2 56 m3
56.19
7/3/2013 refine para asfalto
102 3.32 0.12 6.12 46.76
17 3.1 0.12 1.02 7.34 56 m3
CAMELLON
6.64 1.5 0.12 2 2.39
56.49
7/4/2013
82 3.1 0.12 4.92 35.42 48 m3
0 3.1 0.12 0 0.00
48.50
7/5/2013
35 3.1 0.12 2.1 15.12
42 6.42 0.12 2.52 34.88 64 m3
64.88
7/6/2013
7/8/2013
Garay
23 7.2 0.12 1.38 21.25
65.08
7/9/2013
65.93
7/10/2013
billinghurst
35 6 0.12 2.1 27.30
rampas 0.4
68.20
7/11/2013
7/12/2013 SARDINELES
7/13/2013
7/19/2013
7/20/2013
CAMELLON
6 1.5 0.12 2 2.10
39.90
46
7/22/2013
7/23/2013
VEREDAS S. PEÑA
89 1.2 0.1 5.34 16.02
CAMELLON 2
6 1.4 0.12 3 6.05
64.66
7/26/2013
7/27/2013
24.52
VICTORIA
50 0.1 1 5
50 0.2 0.3 3
8
RENDIMIENTOS DE VEREDAS
2.4 16 2 80.8
30
40.4 28
121.2 30
SARDINELES 29
18
0.15 0.30 3.29 M3
VEREDAS
1 JARDINERA ADOQUINADO
0.1 2 0.5 0.10 ok R. Palma y R. Venezuela
0.1 2 0.5 0.08 R. Venezuela y 9 de Junio
0.18 M3 9 de Junio y L. Prado
L. Prado y A. Ugarte
VACEADO PASO CALLE VICTORIA ENTRE R. VENEZUELA Y L. PRADO 31.90
5.93
11.69
8.56 4.28
PAVIMENTO RIGIDO
ADOQUINADO
R. Palma
76.7 reniec De S. Peña a F. Bolognesi
F. Bolognesi a Av. P. Piedra
50 Bolognesi
De R. Palma a 2 de Mayo
2 de Mayo
De F. Bolognesi a Av. P. Piedra
M. Garay
De 2 de Mayo a Lecaros
Billinghurst
De M. Garay a S. Peña
37
109 m2
42
49
50
141
23
67
45
135 135
97 rampas
0.4 28
28
153
1.4 1.4 1.4 4.2
3.024
1.5 1.2 1.5
1.80
0.72
2.52
DESDE A. UGARTE A THORNNE
75.81
102.03
113.95
65.72
357.51 178.755 2 MIXER 178
73.22
30 RAMPAS
38 0.125 1 RAMPA
115.00
3.6 IMPRIMACION
2154.07
575.93 18.36
956.12
310.48 PALERMO
20.85 207.91 M1 1.8
4204.51 M2 2.8
208.56 M3 1.8
8617.58 66
183 RAMPAS 0.375 75
0k 6.775 70
ADOQUINADO M2 JARDINERAS DIAS 66 80
. Palma y R. Venezuela 865.00 19.00 13.00 467 13.1061 70
. Venezuela y 9 de Junio 153.00 PLAZA DE ARMAS 3.00 398 3.1875 48 m2/dia 80
de Junio y L. Prado 82.00 4.00 1.00 865 60
. Prado y A. Ugarte 92.00 4.00 1.00 1.84 70
1192.00 27.00 18.00 80
80
R = 24 M2/DIA 18.625 3.1875 90
44
0.00
865
0.18 3.42 13 15-Jun 4 1 2
0.18 0.72 17 22-Jun 12 falta
24 29-Jun 7 3 4
1 5-Jul 4 1 1
27 ok
0.54 3.025
ASFALTADO
625.57
1,863.32
208.56
1,183.60
773.63
651.97
5306.65
76
14
62
amente se demolerá la carpeta existente en mal estado, luego se reconformará la base existente
luego se imprimara y finalmente se colocará la carpeta asfáltica.
=210 Kg/cm²) de e=12cm; previamente se demolerá la carpeta existente en mal estado,
una capa compacta de 5cm de afirmado, luego se colocará el concreto de calidad f’c=210 kg/cm².
PAVIMENTO RIGIDO
ADOQUINADO M2
R. Palma 0.68 104.00
e S. Peña a F. Bolognesi 76.70 149.00 0.68 76.70 6
Bolognesi a Av. P. Piedra 357.00 104.00 208.00 1.36 149.00 dias
Bolognesi 433.70 357.00 329.70
e R. Palma a 2 de Mayo 66.00
2 de Mayo 19.83
e F. Bolognesi a Av. P. Piedra 249.00
M. Garay 682.70 199.00
e 2 de Mayo a Lecaros 355.00 63.00 860.00
Billinghurst 93.00
e M. Garay a S. Peña 86.00 355.00
1189.70
14.33
0.00
50 25 30
60 28 35
43 29 27
153 82 92
1
1 1
e existente
210 kg/cm².
garay
8 al 13/07
46.00 6-Jul 40.00 20-Jul 60.00 24-Jul 41.00 2-Aug
48.00 8-Jul 26.00 22-Jul 55.00 25-Jul 45.00 3-Aug
COLOCACION 47.00 9-Jul 45.00 26-Jul
ADOQUIN 45.00 10-Jul 40.00 27-Jul
7/13/2013 48.00 11-Jul 50.00 30-Jul
5.495 46.00 12-Jul 60.00 31-Jul
49.00 13-Jul 45.00 1-Aug
55.00 15-Jul
49.70 16-Jul
46.00 17-Jul
56.00 18-Jul
58.00 19-Jul
65.00 20-Jul
24.00 23-Jul
NOTA: 3 DIAS 6 MIXER Y 01 DIA 4 MIXER (C/MIXER = 8.00 M3) = 176 M3 TOTAL 172.50 4
TOTAL
PEDIDO DE CONCRETO VEREDAS F´C= 175 Kg/cm2
CALLES AREA E UÑA M3 C/MIXER 8 M3
AV. P. PIEDRA N°
ENTRE R. PALMA Y 2 DE MAYO 215.12 0.10 3.74 25.26 ya 1
S. PEÑA 2
ENTRE C. VALLEJO Y PSJ. S/N 2 229.80 0.10 8.53 31.51 4.00 32 M3 43.5 3
PSJ. S/N 2 (FRENTE HOSPITAL) TOTAL
ENTRE AV. BUENOS AIRES Y S. PEÑA 76.67 0.10 4.60 12.27 2.00 13 M3
CIRCUNVALACION 45 M3 45 0.51
ENTRE MINA Y PROGRESO 188.67 0.10 8.34 27.21 14
TOTAL 25.33
NOTA: 3 MIXER 24 M3 (CADA MIXER 8 M3) = 24 M3
C/MIXER 8 M3
M3 CANT.
48 6
48 6
RIGIDO
48 6
32 4
176 22
C/MIXER 8 M3
M3 CANT.
VEREDAS
40 5
32 4 VEREDAS
32 4
104 13
C/MIXER 8 M3
M3 CANT.
24 3 SARDINELES
24 3
MATERIAL M3
ARENA GRUESA 28.94
ARENA FINA 5.79
NA PARA ADOQUINES
AREA E M3
19.20 0.008 0.1536
13.20 0.008 0.1056
32.40 0.2592
689.12 5.79
M3
29.00
6.00
PAVIMENTO FLEXIBLE
ENSAYOS
COMPACTACION PROCTOR
CALLES A C AT
C. VALLEJO 773.5 0.25 193.375 3.09 5.00 0.05 38.68
PSJE. C. VALLEJO 171.3 0.25 42.825 0.69 1.00 0.05 8.57
C. SUCRE 1594.26 0.25 398.565 6.38 7.00 0.05 79.71
C. R. PALMA 2293.57 0.25 573.3925 9.17 10.00 0.05 114.68
PSJE. PROGRESO 155.35 0.25 38.8375 0.62 1.00 0.05 7.77
C. CENTRAL 169.34 0.25 42.335 0.68 5.00 0.05 8.47
C. PROGRESO 1478.32 0.25 369.58 5.91 3.00 0.05 73.92
C. LIMA 790.86 0.25 197.715 3.16 2.00 0.05 39.54
PSJE. MARIATEGUI 318.42 0.25 79.605 1.27 2.00 0.05 15.92
C. MARIATEGUI 696.76 0.25 174.19 2.79 3.00 0.05 34.84
PSJE. R. CASTILLA 154.84 0.25 38.71 0.62 1.00 0.05 7.74
C. R. CASTILLA 1355.17 0.25 338.7925 5.42 1.00 0.05 67.76
C. R. VENEZUELA 927.11 0.25 231.7775 3.71 4.00 0.05 46.36
C. J. GALVEZ 1962.07 0.25 490.5175 7.85 3.00 0.05 98.10
C. 9 DE JUNIO 1114.2 0.25 278.55 4.46 5.00 0.05 55.71
C. A. UGARTE 1925.26 0.25 481.315 7.70 8.00 0.05 96.26
EL PARRAL 1407.58 0.25 351.895 5.63 6.00 0.05 70.38
C. L. PRADO 735.38 0.25 183.845 2.94 3.00 0.05 36.77
PSJE. SUCRE 327.09 0.25 81.7725 1.31 2.00 0.05 16.35
PSJE. LA VEGA 933.44 0.25 233.36 3.73 4.00 0.05 46.67
PSJE. SANTO DOMINGO 210.56 0.25 52.64 0.84 5.00 0.05 10.53
JR. PROGRESO 687.23 0.25 171.8075 2.75 3.00 0.05 34.36
SUB TOTAL 1 M2 20,181.61
TOTAL M2 29,692.77
PAVIMENTO RIGIDO
ENSAYOS
COMPACTACION PROCTOR
CALLES M2
CA. F. BOLOGNESI 1,176.92 4.71 5.00 0.05 58.85
CA. RICARDO PALMA 1,211.35 4.85 5.00 0.05 60.57
CA. 2 DE MAYO 1209.64 4.84 5.00 0.05 60.48
CA.MANUEL GARAY 1,017.72 4.07 4.00 0.05 50.89
CA. BILLINGHURST 904.17 3.62 4.00 0.05 45.21
CA. JORGE CHAVEZ 427.10 1.71 2.00 0.05 21.36
AV. VICTORIA 3,610.01 14.44 14.00 0.05 180.50
CA. AGUSTO B. LEGUIA 522.71 2.09 2.00 0.05 26.14
CA. CESAR VALLEJO 1,089.58 4.36 4.00 0.05 54.48
PSJE. S/N 1-A 625.57 2.50 3.00 0.05 31.28
TOTAL 11,794.77 48.00 589.74 0.79
EXPEDIENTE REFORMULADO
DETALLE M2 E M3
PAVIMENTO FLEXIBLE 32,530.71 0.051 1659.07
PAVIMENTO RIGIDO 11,794.77 0.120 1415.37
44,325.48 3,074.44
TOTAL 29,692.77
PAVIMENTO FLEXIBLE COLOCADO PAVIMENTO FLEXIBLE FALTANTE
ENSAYOS C. SAN JOSE
CALLES AREA C. VICTORIA DESDE THORNNE 1,965.85
C. VALLEJO 773.5 PSJE. S/N 2 (FRENTE HOSPITAL)
PSJE. C. VALLEJO 171.3 TOTAL 1,965.85 M2
C. SUCRE 1594.26
C. R. PALMA 2293.57
PSJE. PROGRESO 155.35 CONTRATO 32,530.71 M2
C. CENTRAL 169.34
C. PROGRESO 1478.32 PAVIMENTO FLEXIBLE COLOCADO 29,692.77 M2
C. LIMA 790.86 PAVIMENTO FLEXIBLE FALTANTE 1,965.85 M2
PSJE. MARIATEGUI 318.42 TOTAL PAVIMENTO 31,658.62 M2
C. MARIATEGUI 696.76
PSJE. R. CASTILLA 154.84 * Falta Metrado del Sello en la calle Victoria
C. R. CASTILLA 1355.17
C. R. VENEZUELA 927.11
C. J. GALVEZ 1962.07
C. 9 DE JUNIO 1114.2
C. A. UGARTE 1925.26
EL PARRAL 1407.58
C. L. PRADO 735.38
PSJE. SUCRE 327.09
PSJE. LA VEGA 933.44
PSJE. SANTO DOMINGO 210.56
JR. PROGRESO 687.23
SUB TOTAL 1 20,181.61
TOTAL 29,692.77
PAVIMENTO RIGIDO
CALLES M2
CA. F. BOLOGNESI 1,176.92
CA. RICARDO PALMA 1,211.35
CA. 2 DE MAYO 1017.72
CA. MANUEL GARAY 1,017.72
CA. BILLINGHURST 904.17
AV. VICTORIA 3,031.97
CA. AGUSTO B. LEGUIA 522.71
CA. CESAR VALLEJO 1,089.58
PASAJE S/N 2 (FRENTE HOSPITAL) 155.13
CALLE SAN JOSE 795.70
TOTAL 10,922.97
AREA (M2)
CONTRATO 11,794.77
AREA (M2)
SALDO 871.80
PAVIMENTO FLEXIBLE DEMOLICION DE VEREDAS
CALLES AREA E CALLES
C. VALLEJO 773.50 193.38 CA. RODRIGUEZ SARMIENTO
PSJE. C. VALLEJO 171.30 42.83 CA. MELGAR
C. SUCRE 1,594.26 398.57 CA. BOLOGNESI
C. R. PALMA 2,293.57 573.39 CA. J. CHAVEZ
PSJE. PROGRESO 155.35 38.84 CA. M. GARAY
C. CENTRAL 169.34 42.34 CA. BILLINGHURST
C. PROGRESO 1,478.32 369.58 CA. SAN JOSE
C. LIMA 790.86 197.72 PJE. M GARAY
PSJE. MARIATEGUI 318.42 79.61 CA. 2 DE MAYO
C. MARIATEGUI 696.76 174.19 CA. RICARDO PALMA
PSJE. R. CASTILLA 154.84 38.71 CA. SAENZ PEÑA
C. R. CASTILLA 1,355.17 338.79 CA. VALLEJO
C. R. VENEZUELA 927.11 231.78 CA. VICTORIA
C. J. GALVEZ 1,962.07 490.52 CA. SUCRE
C. 9 DE JUNIO 1,114.20 278.55 CA. MARIATEGUI
C. A. UGARTE 1,925.26 481.32 PASAJE. MARIATEGUI
EL PARRAL 1,407.58 351.90 CA. RAMON CASTILLA
C. L. PRADO 735.38 183.85 CA. LIMA
PSJE. SUCRE 327.09 81.77 PJE PROGRESO
PSJE. LA VEGA 933.44 233.36 CA. PROGRESO
PSJE. SANTO DOMINGO 210.56 52.64 CA. JOSE GALVEZ
JR. PROGRESO 687.23 171.81 CA. VENEZUELA
SUB TOTAL 1 20,181.61 5,045.40 CA. 9 DE JUNIO
CA. L. PRADO
CALLES PAV (m2) E CA. SUCRE
C. VICTORIA DESDE 9 DE JUNIO A THORNNE 2,154.07 538.52 CA. A. UGARTE
C. SUCRE 575.93 143.98 PJE. LA VEGA
AA.HH. SAN MARTIN 956.12 239.03 PJE. DOMINGO
PQ. HUAMANTANGA (ALREDEDORES) 310.48 77.62 PJE. VICTORIA
PSJE. LA MINA 207.91 51.98 PJE. HUANCAVELICA
SUB TOTAL 2 4,204.51 1,051.13 PJE. LA PAZ
CA. CIRCUNVA-BOLIVIA
CALLES PAV (m2) E PJE. SAN GABRIEL
C. RODRIGUEZ SARMIENTO 1,183.60 295.90 TOTAL M2
C. M. MELGAR 773.63 193.41
C.F. BOLOGNESI 651.97 162.99
C. SAN GABRIEL 208.56 52.14
C. CIRCUNVALACION DESDE BOLIVIA A 9 DE JUNIO 1,863.32 465.83
PSJE. S/N 1 - A (PARQUE VICTORIA) 625.57 156.39
SUB TOTAL 3 5,306.65 1,326.66
PAVIMENTO RIGIDO
CALLES M2 E
CA. F. BOLOGNESI 1,176.92 376.61
CA. RICARDO PALMA 1,211.35 387.63
CA. 2 DE MAYO 1,017.72 325.67
CA. MANUEL GARAY 1,017.72 325.67
CA. BILLINGHURST 904.17 289.33
AV. VICTORIA 3,031.97 970.23
CA. AGUSTO B. LEGUIA 522.71 167.27
CA. CESAR VALLEJO 1,089.58 348.67
PASAJE S/N 2 (FRENTE HOSPITAL) 155.13 49.64
TOTAL M2 10,127.27 3,240.73
ELIMINACION DE MATERIAL EXCEDENTE
DEMOLICION DE VEREDAS 1,561.51 0.10
DEMOLICION DE PAVIMENTO ASFALTICO 1,484.64 0.05
EXCAVACION A NIVEL DE SUBRASANTE 10,663.92
EXCAVACION DE SARDINELES 496.35
EXCAVACION DE VEREDAS 4,247.22
RECONFORMACION PAV. FLEXIBLE Y RIGIDO 978.28
TOTAL M3 19,431.91
VEREDAS
AREA
765.39
449.10
620.04
59.34
392.68
405.18
358.68
134.36
816.10
1,124.10
649.89
706.56
2,191.03
809.58
284.46
79.56
506.22
218.40
96.42
640.80
492.66
355.44
328.32
278.71
91.33
528.72
338.04
35.92
1,420.56
70.68
104.76
217.53
44.54
15,615.10
EXCAVACION MANUAL EN VEREDAS
CALLES AREA ALTO M3
CA. RODRIGUEZ SARMIENTO 181.44 0.15 27.216
210.86 0.15 31.629
76.7 0.15 11.505
24 0.15 3.6
MARTILLOS (BOLOGNESI) 19.43 0.15 2.9145
MARTILLOS (BOLOGNESI) 20.12 0.15 3.018
MARTILLOS (MELGAR) 16.7 0.15 2.505
MARTILLOS (MELGAR) 23.34 0.15 3.501
MARTILLOS (SAENZ)
CA. MELGAR 208.18 0.15 31.227
173.77 0.15 26.0655
12.57 0.15 1.8855
MARTILLOS (VALLEJO) 16.87 0.15 2.5305
MARTILLOS (VALLEJO)
CA. BOLOGNESI 173 0.15 25.95
115.14 0.15 17.271
162.05 0.15 24.3075
167.02 0.15 25.053
53.96 0.15 8.094
64.53 0.15 9.6795
198.5 0.15 29.775
12.99 0.15 1.9485
MARTILLOS (VALLEJO) 7.3 0.15 1.095
7.26 0.15 1.089
9.73 0.15 1.4595
7.86 0.15 1.179
MARTILLOS (AUGUSTO B.LEGUIA) 9.81 0.15 1.4715
20.03 0.15 3.0045
MARTILLOS (PALMA) 12.11 0.15 1.8165
13.37 0.15 2.0055
24.51 0.15 3.6765
5.92 0.15 0.888
MARTILLOS (2 de mayo) 59.54 0.15 8.931
CA. VICTORIA
129.05 0.15 0.3 5.81
90.24 0.15 0.3 4.06
160.09 0.15 0.3 7.20
43.82 0.15 0.3 1.97
31.87 0.15 0.3 1.43
40.48 0.15 0.3 1.82
75.59 0.15 0.3 3.40
102.04 0.15 0.3 4.59
260.83 0.15 0.3 11.74
CA. 9 DE JUNIO
68.69 0.15 0.3 3.09
63.21 0.15 0.3 2.84
29.06 0.15 0.3 1.31
10.07 0.15 0.3 0.45
53.87 0.15 0.3 2.42
74.95 0.15 0.3 3.37
29.92 0.15 0.3 1.35
CA. L. PRADO
73.31 0.15 0.3 3.30
14.61 0.15 0.3 0.66
CA. A. UGARTE
254.7 0.15 0.3 11.46
105.15 0.15 0.3 4.73