Вы находитесь на странице: 1из 2

~tcS{lat ~tilot ~:qarr fetct>t~ gdt~

( lJllftul"~lf"'~ , m«f ~ )
National Rural Infrastructure Development Agency
(Ministry of Rural Development, Govt. of India)
Uttam Kumar
51t1 Floor, 15-NBCC Tower, Bhikaji Cama Place, New Delhi-110066
Director (Projects-I)
Tel: 011-26179556
Fax:011-26179555
Email: uttam.basantl 8@gmail.com

Ltr. No. NRRDA-PO 17(28)/2/2019-Dir(P-I) /; t?ftj' dated the 3'd May, 2019

To,
I
The Principal Secretaries/ Secretaries in charge of Pradhan Mantri Gram
Sadak Yojana (PMGSY) of all the States.

Sub: Quarter-wise Targets in terms of Length to be constructed during 2019-


20 under PMGSY.

Sir/Madam,

Please refer Ministry of Rural Development's letter No. P-17018/2/2019-RC


dated 6th March, 2019 vide which the annual targets was fixed for PMGSY in
respect of 9,454 Nos. habitation to be connected by constructing of 52,502 km of
road length during 2019-20 based on the balance habitation and road length
available with the States as per sanction by the MoRD. In continuation of this, the
undersigned is directed to communicate the quarter-wise targets in terms of Length
to be constructed during 2019-20 based on trend of quarterly achievement during
I
2018-19. Care has been taken to ensure that the cumulative target for the first three
'
quarters for any state does not exceed the awarded length available with the state on
date. The states will be requested to award the remaining un-awarded length within
next two months, so that the work can commence and completed length is available
from these works in the fourth quarter of year 2019-20.

2. The statement showing State-wise, quarter-wise targets of length is attached


(Annexure-1) for your reference.

3. It is requested to kindly issue needful direction to concerned officials to go


through the projected quarterly target and intimate if any changes are required in the
Quarter-wise target fixed for the state latest by 15th May, 2019.
Encl:As above CN~ ~ -

r2/Jb~, ,
Yours faithfully,

(U~K:~ar)
~
>
. Annexure-1
• Length Projected Quarterly Length Target for 2019-20
Target Balance Awarded (Based on Last Year Trend)
Sr.No. State Name Total
(in km) Length Length
2019-20 Qtr-1 Qtr-2 Qtr-3 Qtr-4

1 Andhra Pradesh 800 1408.83 904.04 150 100 350 200 800
Arunachal
2 3,500 5931.28 895.28 200 150 545 2605 3,500
Pradesh

3 Assam 5,500 5230.33 3950.86 300 300 2200 2700 5,500

4 Bihar 4,300 3811.03 2163.41 300 250 1200 2550 4,300

5 Chhattisgarh 2,500 4665.52 2727.11 200 100 1100 1100 2,500

6 Himachal Pradesh 2500 5497.91 2937.85 400 300 700 1100 2,500
Jammu And
7 3,000 9215.60 6907.63 600 400 800 1200 3,000
Kashmir

8 Jharkhand 3,500 3004.02 1884.41 400 200 1250 1650 3,500

9 Kerala 240 378.48 349.46 60 20 90 70 240

10 Madhya Pradesh 3,297 2814.75 2753.28 300 200 1350 1447 3,297

11 Maharashtra 500 822.90 466.52 35 15 200 250 500

12 Manipur 2,000 424i.48 868.23 100 90 670 1140 2,000

13 Meghalaya 1,000 2764.80 961.48 150 100 350 400 1,000

14 Mizoram 600 1155.52 815.05 150 50 200 200 600

15 Nagaland 400 457.59 196.51 70 10 110 210 400

16 Odisha 8,715 8416.79 4204.76 600 500 3000 4615 8,715

17 Punjab 50 32.93 32.93 5 5 15 25 50

18 Rajasthan 150 286.77 283.27 15 15 50 70 150

19 Sikkim 800 906.83 832.66 150 100 250 300 800

20 Tamilnadu 1,500 1586.96 1438.38 200 150 550 600 1,500

21 Tripura 450 455.04 388.67 50 20 180 200 450

22 Uttar Pradesh 1,000 1211.04 495.25 100 50 250 600 1,000

23 Uttarakhand 3,000 7013.30 1235.69 350 150 675 1825 3,000

24 West Bengal 2,600 5795.71 2845.13 250 194 1000 1156 2,600

25 Telangana 600 866.77 774.80 50 10 190 350 600

Total: 52,502 77,975.17 41312.63 5185 3479 17275 26563 52,502