Академический Документы
Профессиональный Документы
Культура Документы
WH lAMP
CONNECTIQN ~~
:; SWITCH
(KEY PANEl)
OVEN LAMP REPLACEMENT
~"8BON
eNl
";9
WH
GY
IoIONITOR
SWITCH
INTERlOCK
I!iTERlOCK
H.V.DIODE
1.
2.
3.
4.
Disconnect power and discharge capacitor.
Disconnect leads from lamp.
Lift up the lamp by spreading spring tab.
Install new lamp.
BK SWITCH
"
RD
WH~""_
SUPPORTER
MOTOR
:~TURNTAIIlE
GY
'AG'E¡R~ ~j SUPPORTER
MTG SCRE'"
LV,TRANS
RD
[O] BK
H.Y.
TRANSFORI.IER
eN3
8l .~
BK
ruSE
:
~• •• "•. ~ MGT.MTG.SCREW
MAGNETRON .
lINEFILTfR
MAGNETRON REMOVAL
1. Disconnect power and discharge capacitor.
2. Disconnect leads to magnetron.
3. Remove magnetron supporting Qracket secured by screw.
4. Remove a screw securing the magnetron to the wave
guide.
DOOR FRAJ.lE
~T/T MOTOR
MTG.SCREW
DOOR AssEMBL y
MICROWAVE LEAKAGE TEST
A microwave leakage test must be performed any time a
door is removed, replaced disassembled, or adjusted for any
reason. THE MAXIMUM LEAKAGE IS 4 mW/cm2
DOOR
The door is serviced by individual parts. Complete doors are
not available.
TO DISASSEMBLE DOOR
1. Disconnect power and remove glass shelf.
2. Remove the gasket door from door plate.
3. Remove the door frame from door plate.
4. Remove the barrier screen outer from door frame
5. Remove the top hinge stopper from door plate.
6. Remove the spring and the hook
capacitar.
2. Disconnect all the lead wires connected to control panel
assembly.
3. Remove the screws holding the control panel assembly.
11
o
y l. DISPLAY LIT
• CHECK POWER
CONTROL RELAY
• SMART BOARD • TURNE O ON?
o KEY PANEL
o CHECK POWER
• CONTROL RELAY
N y
Y
PROGRAM TIME
COOK FOR 10 SECo
~ I SMART BOARD I H.v. SECT ¡--- RESISTANCE
HIGH VOLTAGEOK?
WINDING ..
j
r
o DO ES IT START, TIME
OUT & TURN "OFF"?
. DIODE FA OPEN? 1-+-1 CAPACITOR
Y I____
CHECK ~ FILAMENT
CHECK F TO
F TO I N I REPLACE
GROUND & FA
CONTROL SYSTEM
y
NORMAL
REPLACE
Y
MAGNETRON t TO GROUND
CHECK MGT
SHORTED?
MICROWAVE OVEN- TOUCH CONTROL 164D 3745P 080
PRIMARY
INTERLOCK SW
MONITOR
INTERLOCK SW
SECONDARY
INTERLOCK SW
(REAR)