Академический Документы
Профессиональный Документы
Культура Документы
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
SITE MOBILISATION
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
1 Activity
Routine
Prepared By Approved By
Sl
1
No Routine
Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Poisoning due to
Crab/snake/harmful insect
bite.
Prepared By Approved By
2 EXCAVATION &
EHS Department
Routine V. N. Giridhar
BACKFILLING
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Injury/Burns due to
electrocution because of
possible presence of
2 EXCAVATION &
Routine underground electical
BACKFILLING cables.
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
2 EXCAVATION & Activity
Routine
BACKFILLING
Hazard due to possible
inhalation of toxic gases
while doing digging.
Prepared By Approved By
Sl
2 EXCAVATION &
No Routine
Routine
(R) / Non
BACKFILLING
Sub Activity Potential Hazard
Routine
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
COMPACTION WORK
3
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Collision of vehicles
3
Compaction Work Routine
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
3
Compaction Work Routine
Generation of dust
MATERIAL HANDLING
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
Routine
No Loading & Unloading of Routine
materials (R) / Non
Sub Activity Routine Potential Hazard
Activity
Improper Rigging
Prepared By Approved By
Name of the
Loading project site:
& Unloading of CPWD- IIT project, Jodhpur
Routine
materials
Prepared by: EHS Department, CPWD- IIT project, Jodhpur
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
4
EHS Department V. N. Giridhar
Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
4
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Shifting of materials like Activity
steel bar, stone , wooden
bar, plywood, scaffold
materials, sand, bricks Toppling of hydras, forklifts
etc. or other transporting
equipments.
Prepared By Approved By
Prepared
Shifting by: EHS Department,
of materials like CPWD- IIT project, Jodhpur
steel bar, stone , wooden
Sl bar, plywood, scaffold
No materials, sand, bricks Routine
(R) / Non
Subetc.
Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Material Stacking
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Material Stacking
Improper access
approach/housekeeping.
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Lifting of materials
Fall of person from height
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Lifting of materials Activity
ELECTRICAL WORKS
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
5
EHS Department V. N. Giridhar
ELECTRICAL WORKS
Tata Projects Limited
BF # 5, RSP(SAIL) Routine Resident Construction Manager
Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
5 (R) / Non
Sub Activity
ELECTRICAL WORKS Routine
Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity
6 BAR BENDING & FORM Routine Potential Hazard
Routine
Activity
WORK
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
STORES
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Vehicle Movement, Activity
Unloading of New
7 materials,Issue of
Routine Potential risk of electric
materials and receiving of
materials,Storage of shocks while maitenance.
materials. Spreading of nails while
unpacking.
Prepared By Approved By
Material Stacking
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Fire Hazards
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
AIR COMPRESSOR
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
8 Activity
AIR COMPRESSOR Routine
Prepared By Approved By
9
EHS Department
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
WORK AT HEIGHTS
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
10 Lifting work, Welding, Activity
Gas cutting, Brick Work Routine
etc at height
Injury due to fall after hit by
an object.
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
GRINDING WORK
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
Grinding work at (R) / Non
Sub Activity Routine Potential Hazard
11 Fabrication yard,
Activity
Routine
Finishing work at height
etc.
Injury due to electric shock
Prepared By Approved By
WELDING WORK
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
12 Welding work at
Routine
fabrication yard
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Storage & Handling of
Cement Activity
14
Routine
Fall of cement bags over
men
STORAGE & HANDLING OF COMPRESSED GAS CYLINDERS
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Explosion of cylinders
Prepared By Approved By
15
EHS
Storage & Handling of
Department V. N. Giridhar
Compressed
Tata Projects Limited
BF # 5, RSP(SAIL)
Gas Routine Resident Construction Manager
Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
15 StorageSub
& Handling of (R) / Non
Activity Routine Potential Hazard
Compressed Gas Routine
cylinders Activity
CONCRETEING
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
16 Concreting work for cable (R) / Non
Sub Activity Potential Hazard
tunnels, buildings, Routine
Routine
chimneys Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No a) Power Connection Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
17
Routine
b) Posture Back pain due to improper
posture
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
17
Routine
Activity
b) Posture
Prepared By Approved By
17
Sl Routine
Routine
No
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
18 Transportation of
Prepared By Routine Approved By
EHS Department
Materials V. N. Giridhar
Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
18 Transportation of
Routine
Materials
Overturn of vehicle due to
improper road
Prepared By Approved By
Sl
No Routine
18 Transportation of (R) / Non
Sub Activity Routine
Routine Potential Hazard
Materials
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
VEHICULAR MOVEMENT
Over Speed
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
19 Activity
Vehicular Movement Routine
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Batching Plant Operation Routine
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
22
KITCHEN & PANTRY Routine Heat(steam) from pressure
cooker
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
22 Activity
KITCHEN & PANTRY Routine
Prepared By Approved By
22
Sl KITCHEN & PANTRY Routine
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
23
Prepared By
Routine Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
23 Sub Activity Routine Potential Hazard
Routine
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
25 EXTREME
Non
TEMPERATURE DURING
Routine
Prepared By SUMMER Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
25 EXTREME
Non
TEMPERATURE DURING
Routine
SUMMER Fall/ slip due hot structure
PAINTING WORK
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Harmful by inhalation
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
26
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
PAINTING WORK At
Routine
Prepared By
Height Approved By
Sl
No Routine
26 (R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity
PAINTING WORK At Routine Potential Hazard
Routine
Height Activity
Prepared By Approved By
26
Name of the project site: CPWD- IIT project, Jodhpur
Prepared by: EHS Department, CPWD- IIT project, Jodhpur
PAINTING WORK At
Sl Routine
Height Routine
No
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Accidental Swallowing of
Thinner or Paint
Height work
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Improper access
Routine approach/housekeeping.
Stacking of materials at height
27
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Stacking of materials at height
Loose materials may fall
from height.
27 Routine
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
27 Activity
Height work
Prepared By Approved By
Sl
27
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
28
Fire due to short circuit.
Test Run Of Motor Non
Routine
Prepared By Approved By
Sl
No Routine
28 (R) / Non
Sub Activity Routine Potential Hazard
Test Run Of Motor Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Non
Prepared By Fire Hazard Approved By
29 Routine
EHS Department
Acid cleaning work
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA
Sl
No Routine
29 (R) / Non
AcidSub
cleaning work
Activity Potential Hazard
Routine
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
30
EHS Department
TYRE PUNCTURE OF Non V. N. Giridhar
VEHICLE ON ROAD
Tata Projects Limited
BF # 5, RSP(SAIL) Routine Resident Construction Manager
Tata Projects Limited
HA
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
30 TYRE PUNCTURE OF Non
VEHICLE ON ROAD Activity
Routine
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Rout Permit, Driver's competency,
injury, Equipment Safe loading of materials
damage Yes 5 3 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Testing, Examination of lifting
injury, Equipment gear , crane.
damage No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Provision of DB, overhead cable
injury, Equipment routing , earthing Yes 4 4 16
damage
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
injury, Equipment Housekeeping No 3 4 12
damage
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Performing regular inspections as
Chance of Reportable per checklist for tension
No 4 4 16
injury, cracks/cave-ins/dewatering / rain-
cut.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Providing Sloping / benching
Chance of Reportable /shoring / sheet piling to restrict
No 4 3 12
injury, the soil collapse as per the type of
soil.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
Housekeeping,Carbolic acid No 3 3 9
injury,
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Relocating or removing the
No 3 4 12
injury, overhead electrical lines.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Checking the oxygen levels &
Chance of Reportable
other toxic gases with gas No 3 4 12
injury,
detector.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Explosives and detonators shall
Chance of Reportable
be taken to blasting area with Yes 4 5 20
injury,
original containers
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
Proper Housekeeping No 4 2 8
injury,
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Avoiding vehicle movement near
No 3 3 9
injury, to the excavation.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Signage and caution boards shall
injury, be displayed at vehicle movement
area. Engage flagmen's to guide No 3 4 12
the movement of vehicles.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury, Ill Health Wear respirators or cover mouth
and nose with wet cloth.
No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of strains and Signage and caution boards shall
sprains be displayed at vehicle movement
area. Engage flagmen's to guide No 3 4 12
the movement of vehicles.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper inspection and
injury. examination of tools No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury. Periodic testing & inspection. Pre
use testing of lifting equipment's,
lifting tools like Shackles, ropes,
slings, pulley, etc.Periodic
maintenance of lifting equipment's No 3 5 15
Prepared By & tools. Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury. Periodic maintenance of lifting
equipment's & tools. Special
training to the Riggers. No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of minor cuts &
wounds
Use of proper PPE No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Peoper loading of materials,don't
injury. allow overload. No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury. Only trained rigger / operator to
perform the loading / unloading
operation.Carefully select the type
of equipment to carry out loading /
No 3 3 9
unloading activity.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury. Check the stability & firmness of
the ground where the crane,TRX
is to be placed. No 3 4 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Minor Cuts & Wounds Competent rigger,use of tag
line,Authorized signal man.
No 4 3 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Cuts and bruises
caused by falling
materials. Proper stacking of materials and
No 3 3 9
housekeeping
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Slips & Trips may lead Housekeeping and Keep access
to minor cuts & free from materials. No 4 3 12
wounds.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Provide barricading to ground
Chance of Reportable level lifting area for privent
No 3 4 12
injury. authorized entry.handile the load
with help of tag line
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper platform and life line,
No 4 4 16
injury. safety harness.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Lifting shall be avoided where
Chance of Reportable
overhead electrical lines are No 4 3 12
injury.
crossing.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Competent person has been
injury deployed.Use hand gloves.All
equipment will be routed through No 3 4 12
30 mA, All tools shall be fitted with
adequate fuse protect
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper inspection of electrical
injury, Equipment PDB's,Use of plug top and privent
damage unauthorized connection. No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Provide barricades to work area.
injury, Equipment LOTO system. No 3 4 12
damage
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Minor Injury Proper inspection of machine with
weekly checklist,competent fitter No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Minor Injury Use of proper
PPE,housekeeping,Access and No 3 3 9
eggress.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
injury Proper supervision ,Handgloves No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper disporsal of steel scrap.
Housekeeping. No 3 4 12
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Ensure reversing warning devices
injury are active, and activate hazards
lights.Provide warning signs at all
entrances and exits to the site. No 3 4 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Use of PPE, Proper material
No 4 3 12
handling
Injury Materials handling
No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable MSDS shall be dispalyed,Using
injury handgloves
No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury All equipment will be routed
through 30 mA, No 3 5 15
Injury Proper inspection of materials
while unloading.supervision No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper walkway.
No 3 3 9
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
injury Remove flammable materials
from work place. No 4 3 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Implement rest breaks and job
rotation for frequent and/or heavy No 3 3 9
lifting.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper inspection of compressor
Yes 3 5 15
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Use of PPE,
Yes 4 2 8
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Competent Rigger,engage singnal
injury man. No 4 5 20
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Use tag line and avoid direct
touch contact with suspended No 4 5 20
load
Slips, Skin irritation
Use of proper PPE No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Adequate access ladders shall be
injury fixed, suitable work platform shall
be provided with toe boards. No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable All equipment will be routed
injury through 30 mA, All tools shall be
fitted with adequate fuse protect No 4 3 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper platform and back railing
injury. ,fall protection net shall be fixed,to
be removed unwanted materials
from ground level. No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Select the proper grinding wheel
and machine for the job.Visually
Chance of Reportable inspect all grinding wheels. Also,
No 3 5 15
injury. the use of “ring testing” or
Prepared By Approved By
EHS Department
“vibration testing” is required for V. N. Giridhar
Tata Projects Limited
BF # 5, RSP(SAIL)
many grinding wheels. Resident Construction Manager
Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper inspection of grinding No 2 5 10
machine,Remove all flammable
materials from hot work area.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
All equipment will be routed
through 30 mA RCCB, All tools
Injury shall be fitted with adequate fuse No 3 5 15
protect.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Using ear plug and Goggles and No 3 3 9
nose mask
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Provision of double earth
conductors & RCCBs to avoid
Chance of Reportable electric shock. Pre-inspection of
No 3 5 15
injury machines, cables by a qualified
electrician.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable welding cables shall be inspected.
injury No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Housekeeping and removal of
combustible materials before
starting the work.Taking fire
protection measures such as
Injury placing adequate fire No 3 5 15
Prepared By extinguishers, water buckets, Approved By
EHS Department
Tata Projects Limited
sand buckets and fire blankets. V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Using Face shield No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Using PPEs like leather gloves,
No 3 4 12
safety shoes and aprons.
Chance of Reportable
injury. Using Face shield. No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Cylinder should be kept away
injury. from the source of heat to prevent
fire and over pressurization of Yes 5 5 25
cylinder.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Wear respirators or cover mouth
and nose with wet cloth. No 2 4 8
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper stacking, loading and
unloading methods. No 3 2 6
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
injury.
Never tamper with, not attempt to Yes 3 5 15
repair cylinder valves do not apply
grease to it for loosening it.Keep
Prepared By
cylinder in designed area Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Giving proper training using the
injury. proper eye protection methods No 3 3 9
like welding shield,
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper storages of cylinders
injury. No 3 4 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proper inspection of form work.
injury No 4 5 20
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Inspection of lisfting bucket and
injury structure of concrete.supervision No 4 4 16
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Ensure earthing of equipment's
injury and proper functioning of
electrical circuit before No 3 3 9
commencement of work.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Vibrator machie will be routed
injury through 30 mA RCCB,Proper
No 4 4 16
cable routing
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
More than 30mA All equipment will be routed No 3 5 15
current may be caused through 30 mA RCCB.
risk of human life.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Proper inspection of machine. No 4 3 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health No 4 2 8
Good posture
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health No 2 4 8
Perodic break
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Use UV protection goggles. No 2 4 8
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Vehicles shall not be Yes 4 5 20
injury overloaded,proper lashing.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Vehicles shall not be overloaded Yes 3 3 9
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Speed limit controlling. Yes 4 5 20
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Vehicles shall not be overloaded Yes 3 4 12
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proepr supervision and proepr Yes 3 5 15
injury communication with
driver.Reversing of vehicle shall
be restricted.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Speed limit controlling Yes 3 5 15
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of reportable Secrity inspection will be done Yes 2 5 10
injury. when driver entring gate.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Provide separate route for Yes 3 4 12
pedastrians.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Eletrocution, Injury,
Breakdown, Fire
No 4 4 16
Prepared By Approved By
EHS Department
Tata Projects Limited Use of PPEs V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
No 3 4 12
injury
Ill Health Use of PPEs
No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Use of PPEs
Ill Health
No 4 3 12
No 3 3 9
Skin irritation
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable WARNING SIGNAL - a one-
injury minute series of long audible
signals 5 minutes prior to blast Yes 5 5 25
signal
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Providing warning signs /
injury. barricades as per the
requirement. Alerting the public Yes 4 5 20
with flaggers.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of fire, No 4 5 20
explosion,Reportable
injury Awareness on gas cylinder use
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of First Aid No 3 4 12
injury
Chance of Reportable No 4 4 16
Proper guard for rotating part.
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Awarenesson using of presure No 3 5 15
injury cooker
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
May cause ill Health No 4 3 12
Good posture
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
May cause ill Health Provide vendilator for smoke exit. No 3 4 12
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Proepr inspection vehicle.regualr No 3 3 9
inspection of break system.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Mind concentration, No 2 4 8
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Mind concentration, No 2 4 8
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Safe evacuation. No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Increase the consumption of Yes 2 5 10
water,
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Increase the consumption of Yes 3 4 12
water,
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Use of PPE, provide designated Yes 2 5 10
walkway.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Use of PPE No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Remove flammable materials Yes 4 4 16
from work place.Housekeeping.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Proper platform and use of Yes 4 5 20
PPE,access and eggress,life line
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Use of carry bags for tools. Yes 5 5 25
injury
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable Injury Provide separate storage area for Yes 4 4 16
paints. Keep paint away from hot
work area.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Ill Health Use of PPE No 3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Indentification mark. Yes 2 5 10
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Cuts and bruises Proper stacking of materials and
caused by falling housekeeping. No 3 4 12
materials.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Slips & Trips may lead Proper stacking of materials and
to minor cuts & housekeeping. No 3 4 12
wounds.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Proepr stacking and locking of Yes 3 4 12
injury materials .
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Use of PPE and Life line and Yes 4 4 16
injury Access.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Injury Proper stacking of materials No 4 5 20
materials keep away from edge
side.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Use of Handgloves.
injury No 4 4 16
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of injury No 3 5 15
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable Regular inspection of Motor
injury, Equipment No 3 4 12
damage
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Chance of Reportable
injury, Equipment Barricading to be provided. No 3 4 12
damage
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
May be caused
irritation to skin,
eyes & respiratory
tract, May be
harmful if swallowed
Prepared By Approved By
orDepartment
EHS inhaled.May be V. N. Giridhar
fatal
BF if swallowed or
Tata Projects Limited
# 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
4 5 20
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
More than 30mA 4 5 20
current may be All equipment will be routed
Yes
caused risk of through 30 mA RCCB,
human life.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
3 3 9
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
3 4 12
Risk of human injury Display Signage boards and
Yes
& risk of human life Caution signages
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
3 4 12
More than 30mA
current may be All equipment will be routed
Yes
caused risk of through 30 mA RCCB,
human life.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Speed limit controlling . Caution No 3 4 12
signage boards.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Speed limit controlling No 4 4 16
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Reportable injury Speed limit controlling . Caution No 4 4 16
signage boards.
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis
Legal Concern
Probability
Severity
(Y/N)
Consequence Present control measures
Risk
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Training/ Awareness
2 3 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Proper walkway,
HousekeepingTraining & Awareness 2 2 4 Acceptable (A)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
OCP-14, PPEs
2 3 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Use of Handgloves
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Training/ Awareness
3 2 6 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Training/ Awareness
2 3 6 Acceptable (A)
Training/ Awareness
2 2 4 Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Training/ Awareness
1 4 4 Acceptable (A)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (A)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Follow OCP 09
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
2 3 6 Acceptable (A)
Properly guard the rotating part
of the electrical motor.All
equipment will be routed
through 30 mA RCCB,
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
1 4 4 Acceptable (A)
Follow OCP 24
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
1 4 4 Acceptable (A)
Follow OCP 09
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By
Acceptable (U)
Acceptable
Probability
Remarks
Severity
Proposed Control Measures
(A)/ Un
Risk
(OCP, HSMP, PPE etc.)
Prepared By Approved By