Вы находитесь на странице: 1из 396

HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

SITE MOBILISATION

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Transportation of Injury due to fall of


Contatiners/ Pre equipment, toppling of
fabricated structures/ vehicles.
Equipments.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Loading /Unloading of Injury due to failure of lifting


1 Containers/ Pre gear, crane etc.
fabricated structures / Routine
Equipments.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
1 Activity
Routine

Temporary Power Injury due to electric shock,


Connection Fall Hazards

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
1
No Routine
Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fire Protection of site Injury due to fire .


office & stores

EXCAVATION & BACKFILLING

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to collapse of


earth.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to fall while


digging.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Poisoning due to
Crab/snake/harmful insect
bite.

Prepared By Approved By
2 EXCAVATION &
EHS Department
Routine V. N. Giridhar

BACKFILLING
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury/Burns due to
electrocution because of
possible presence of
2 EXCAVATION &
Routine underground electical
BACKFILLING cables.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
2 EXCAVATION & Activity
Routine
BACKFILLING
Hazard due to possible
inhalation of toxic gases
while doing digging.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
2 EXCAVATION &
No Routine
Routine
(R) / Non
BACKFILLING
Sub Activity Potential Hazard
Routine
Activity

Injury due to flying objects


while doing blasting
operation.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

2 Name of the project


EXCAVATION & site: CPWD- IIT project, Jodhpur
Routine
BACKFILLING
Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to slips and trips


because of improper
housekeeping.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
2 EXCAVATION &
Routine HA
BACKFILLING

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Chances of getting hit by


vehicles while excavating on
roads

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

COMPACTION WORK

3
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Collision of vehicles

3
Compaction Work Routine
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
3
Compaction Work Routine
Generation of dust

MATERIAL HANDLING
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper load handling.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Selection of proper tools.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
Loading & Unloading of
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Failure of lifting gear.

Loading & Unloading of


Routine
materials
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
Routine
No Loading & Unloading of Routine
materials (R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper Rigging

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the
Loading project site:
& Unloading of CPWD- IIT project, Jodhpur
Routine
materials
Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to non use of


PPEs.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall of material during


transportation.

Prepared By Approved By

4
EHS Department V. N. Giridhar
Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Hit by various equipments


like hydra, forklift etc while
transporting.
4

Shifting of materials like


Prepared By Approved By
steel bar, stone , wooden
EHS Department V. N. Giridhar
bar, plywood, scaffold
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
4
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Shifting of materials like Activity
steel bar, stone , wooden
bar, plywood, scaffold
materials, sand, bricks Toppling of hydras, forklifts
etc. or other transporting
equipments.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

4 Name of the project site: CPWD- IIT project, Jodhpur

Prepared
Shifting by: EHS Department,
of materials like CPWD- IIT project, Jodhpur
steel bar, stone , wooden
Sl bar, plywood, scaffold
No materials, sand, bricks Routine
(R) / Non
Subetc.
Activity Routine Potential Hazard
Activity

Hit by transporting materials.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
4
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper material stacking.

Material Stacking
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Material Stacking
Improper access
approach/housekeeping.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall of materials from height

Prepared By Lifting of materials Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Lifting of materials
Fall of person from height

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Lifting of materials Activity

Injury due to electric shock

ELECTRICAL WORKS
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to electrical shock

Prepared By Approved By

5
EHS Department V. N. Giridhar
ELECTRICAL WORKS
Tata Projects Limited
BF # 5, RSP(SAIL) Routine Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

5 Burns due to short circuit.


ELECTRICAL WORKS Routine

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
5 (R) / Non
Sub Activity
ELECTRICAL WORKS Routine
Routine Potential Hazard
Activity

Injury due to explosion

BAR BENDING & FORM WORK


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to bending,


cutting of steel.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to handling of


steel bars.

6 BAR BENDING & FORM


Routine
WORK
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

6 BAR BENDING & FORM


Routine Injury while doing loading
WORK and unloading of steel bars

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity
6 BAR BENDING & FORM Routine Potential Hazard
Routine
Activity
WORK

Injury due to slips and trips


because of improper
housekeeping.
Injury to palms while doing
overlapping of MS rods.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

STORES

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Potential accidents due to


movement of vehicles.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Potential Cuts to hands


while handling of materials.
Potential fall of heavy
objects on head/toe.

Prepared By Approved By

EHS Department V. N. Giridhar


Vehicle Movement,
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Potential injuries due to


chemical contact.
Vehicle Movement,
Unloading of New
7 materials,Issue of
Routine
materials and receiving of
Prepared By Approved By
materials,Storage of
EHS Department V. N. Giridhar
materials.
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Vehicle Movement, Activity
Unloading of New
7 materials,Issue of
Routine Potential risk of electric
materials and receiving of
materials,Storage of shocks while maitenance.
materials. Spreading of nails while
unpacking.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur
Vehicle Movement,
Unloading of New
Sl
7 materials,Issue of
Routine
No materials and receiving of Routine
(R) / Non
Sub Activity
materials,Storage of Routine Potential Hazard
materials. Activity

Potential trips due to non


availability of walkways

Material Stacking

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA
Vehicle Movement,
Unloading of New
7 materials,Issue of
Routine
materials and receiving of
Name of the project site: CPWD- IIT project, Jodhpur
materials,Storage of
Prepared
materials.by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fire Hazards

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Vehicle Movement,
Unloading of New
7 materials,Issue of HA
Routine
materials and receiving of
materials,Storage of
materials.
Name of the project site: CPWD- IIT project, Jodhpur
Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Ergonomics due to Lifting of


heavy weights.

AIR COMPRESSOR

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
8
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to burst of air


receiver
8
AIR COMPRESSOR Routine Deafness due to Exposure
to high noise
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
8 Activity
AIR COMPRESSOR Routine

Injury while Handling of


waste
USE OF MOBILE CRANE

Prepared By Approved By

9
EHS Department
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Potential injuries while using


Hydra for material handling

9 Use of Hydra (Mobile


Hydraulic Crane) for Routine
carrying the materials
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

9 Use of Hydra (Mobile Potential accidents due to


Hydraulic Crane) for Routine
fall of objects during
carrying the materials
movement of Hydra
Physical contact of Grease
& other chemicals.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

WORK AT HEIGHTS

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to fall.

Prepared By Approved By

EHS Department V. N. Giridhar


Lifting work, Welding,
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to fall caused by


electric shock
10 Lifting work, Welding,
Gas cutting, Brick Work Routine
etc at height
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
10 Lifting work, Welding, Activity
Gas cutting, Brick Work Routine
etc at height
Injury due to fall after hit by
an object.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

GRINDING WORK

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to flying off cut-off


wheels/ metal particles

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Grinding work at Injury due to burns


11 Fabrication yard,
Routine
Finishing work at height
etc.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
Grinding work at (R) / Non
Sub Activity Routine Potential Hazard
11 Fabrication yard,
Activity
Routine
Finishing work at height
etc.
Injury due to electric shock

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Grinding work at
11 Prepared by: yard,
Fabrication EHS Department, CPWD- IIT project, Jodhpur
Routine
Finishing work at height
Sl etc.
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Human ill health due to poor


ergonomics.

WELDING WORK
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Electric shock due to


unearthed welding machine
/transformer
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Electric shock due to


exposed joints of the
welding cable.
12 Welding work at
Routine
fabrication yard
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

12 Welding work at
Routine
fabrication yard

Burn injury due to the


contact with hot surfaces.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


12 Welding work at
Routine
Prepared by: EHS Department, CPWD- IIT project, Jodhpur
fabrication yard
Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall of minute particles in


the eyes while gas cutting
GAS CUTTING WORK

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
13
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Burn injury due to the


contact with hot surfaces.
Fall of minute particles in
13 Gas cutting work at the eyes while gas cutting
fabrication yard, at height Routine
work.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

13 Gas cutting work at


fabrication yard, at height Routine
work.
Explosion of LP gas
cylinders

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

STORAGE & HANDLING OF CEMENT


Storage & Handling of Inhalation of the cement
Cement dust
14
Routine
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Storage & Handling of
Cement Activity
14
Routine
Fall of cement bags over
men
STORAGE & HANDLING OF COMPRESSED GAS CYLINDERS

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Explosion of cylinders

Prepared By Approved By

15
EHS
Storage & Handling of
Department V. N. Giridhar
Compressed
Tata Projects Limited
BF # 5, RSP(SAIL)
Gas Routine Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

15 Storage & Handling of


Compressed Gas Routine Cold burns to the direct
cylinders exposure of gas

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
15 StorageSub
& Handling of (R) / Non
Activity Routine Potential Hazard
Compressed Gas Routine
cylinders Activity

Injury due to fall of cylinders

CONCRETEING
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to collapse of


form work.

Prepared By Approved By

16 Concreting work for cable


EHS Department
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
tunnels, buildings,
BF # 5, RSP(SAIL) Routine Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to fall of


temporary support structure/
concrete bucket.
16 Concreting work for cable
tunnels, buildings, Routine
chimneys
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury/Burns while using


16 Concreting work for cable
tunnels, buildings, Routine electrical vibrators.
chimneys

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
16 Concreting work for cable (R) / Non
Sub Activity Potential Hazard
tunnels, buildings, Routine
Routine
chimneys Activity

Chances of getting electric


shock while using electrical
concreting machines,
vibrators
WORK ON COMPUTERS/LAPTOPS
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

a) Power Connection Injury due to electric shock

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No a) Power Connection Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to fire on excess


heat generation
17
Routine

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

17
Routine
b) Posture Back pain due to improper
posture

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
17
Routine
Activity
b) Posture

Ergonomics problem due to


excess use

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

17
Sl Routine
Routine
No
(R) / Non
Sub Activity Routine Potential Hazard
Activity

c) Radiation Eye injury due to ultra-


vilolate radiation from
screen
TRANSPORTATION OF MATERIALS

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall of materials from


truck/trailor due to improper
lashing

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Failure of truck due to over


load his capacity

18 Transportation of
Prepared By Routine Approved By

EHS Department
Materials V. N. Giridhar
Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Incident due to over Speed


18 Transportation of of vehicle
Routine
Materials

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
18 Transportation of
Routine
Materials
Overturn of vehicle due to
improper road

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
18 Transportation of (R) / Non
Sub Activity Routine
Routine Potential Hazard
Materials
Activity

Man falling from truck

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

VEHICULAR MOVEMENT
Over Speed

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Consuming alcohol before


and during the driving
operation
19
Vehicular Movement Routine
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
19 Activity
Vehicular Movement Routine

Adverse weather condition

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper cable routing

Prepared By Approved By

Batching Plant Operation Routine


EHS Department
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

No proper protection around


the running machines
Batching Plant Operation Routine Loose parts, leading to
avoidable noise generation

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Batching Plant Operation Routine

Inhalation of cement / stone


dust generated during
mixing.
Skin Contact with cement.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to improper


handling.

BLASTING OPERATION Routine


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

BLASTING OPERATION Routine

Injury due to flying objects

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

KITCHEN & PANTRY


Fire due to leakage of LPG

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Cut injury from knife

Mechanical hazards due


using of mixing grinder
22
KITCHEN & PANTRY Routine
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

22
KITCHEN & PANTRY Routine Heat(steam) from pressure
cooker

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
22 Activity
KITCHEN & PANTRY Routine

Ergonomics problem due


short or long cooking
platform and more time
standing

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

22
Sl KITCHEN & PANTRY Routine
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Health hazard due Smok,


steem,oil & mist
TRAVEL & STAY ARRANGEMENTS

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Purchasing of Ticket Injury due to travel by


vehicle/two wheeler

23
Prepared By
Routine Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

23 Travelling by Train Tension due to late of


/Bus/Air/Auto Routine Train /Bus/Air/Auto
Theft of Luggage during
travel
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
23 Sub Activity Routine Potential Hazard
Routine
Activity

Stay arremgement Tension or harrasment after


arrival at destination
LIGHTNING & STROM DURING AND AFTER RAIN
Fall from height due
24 LIGHTNING & STROM Non unbalance
DURING AND AFTER
Prepared By
Routine Approved By

EHS Department RAIN V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

24 LIGHTNING & STROM


Non
DURING AND AFTER
Routine Incident due collapse of
RAIN
structure
EXTREME TEMPERATURE DURING SUMMER

Prepared By Approved By

EHS Department V. N. Giridhar


25
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall from height due sun


stroke

25 EXTREME
Non
TEMPERATURE DURING
Routine
Prepared By SUMMER Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

EXTREME Fall due dehydration


25 Non
TEMPERATURE DURING
Routine
SUMMER

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
25 EXTREME
Non
TEMPERATURE DURING
Routine
SUMMER Fall/ slip due hot structure

PAINTING WORK
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Harmful by inhalation

Storage of Paint &


Routine
Prepared By
Solvant Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Highly Flammable, Chance


Storage of Paint &
Routine of Fire
Solvant

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Fall of person from height

26
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

26 Fall of materials (paint drum,


Paint Brush) from height

PAINTING WORK At
Routine
Prepared By
Height Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
26 (R) / Non
Sub Activity Routine Potential Hazard
Activity

PAINTING WORK At Chance of fire


Routine
Height

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


26 Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity
PAINTING WORK At Routine Potential Hazard
Routine
Height Activity

Eye injury due to spillage of


paint

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

26
Name of the project site: CPWD- IIT project, Jodhpur
Prepared by: EHS Department, CPWD- IIT project, Jodhpur
PAINTING WORK At
Sl Routine
Height Routine
No
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Accidental Swallowing of
Thinner or Paint

Height work

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper material stacking.


Routine

Stacking of materials at height


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Improper access
Routine approach/housekeeping.
Stacking of materials at height

27
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity
Stacking of materials at height
Loose materials may fall
from height.
27 Routine

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
27 Activity

Fall of person from height.


Routine

Height work

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
27
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Height work Fall of Material from height.


Routine

ELECTRIC MOTOR TEST RUN


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Non Injury due to electrical shock


Providing Electric power
Routine

Prepared By Approved By

EHS Department V. N. Giridhar


28
Tata Projects Limited
BF # 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Accidental Contact witrh


rotating parts.
Non
Routine
28
Prepared By Approved By

EHS Department Test Run Of Motor V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

28
Fire due to short circuit.
Test Run Of Motor Non
Routine

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
28 (R) / Non
Sub Activity Routine Potential Hazard
Test Run Of Motor Activity

Injury due to explosion


Non
Routine

Acid cleaning work


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Non
Prepared By Fire Hazard Approved By
29 Routine
EHS Department
Acid cleaning work
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
29 (R) / Non
AcidSub
cleaning work
Activity Potential Hazard
Routine
Activity

Electric shock due to the


Non
improper earthing to the
Routine
electrical installations

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


29
Acid cleaning work
Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Crushing due to the


Non
improper gaurding of the
Routine
electrical Motor
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
29
Acid cleaning work
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Injury due to accidental


Non
release of high pressure
Routine
water

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Electric shock due to the


Non
improper earthing to the
Routine
electrical installations
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

TYRE PUNCTURE OF VEHICLE ON ROAD


Incident due vehicle turn
over

Prepared By Approved By
30
EHS Department
TYRE PUNCTURE OF Non V. N. Giridhar
VEHICLE ON ROAD
Tata Projects Limited
BF # 5, RSP(SAIL) Routine Resident Construction Manager
Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

30 TYRE PUNCTURE OF Non Incident due to uncontrol of


VEHICLE ON ROAD Routine vehicle for over speed
Loss of time for not available
of stefnee tyre

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
30 TYRE PUNCTURE OF Non
VEHICLE ON ROAD Activity
Routine

Runover of driver & others

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
HA

Name of the project site: CPWD- IIT project, Jodhpur


Prepared by: EHS Department, CPWD- IIT project, Jodhpur

Sl
No Routine
(R) / Non
Sub Activity Routine Potential Hazard
Activity

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Rout Permit, Driver's competency,
injury, Equipment Safe loading of materials
damage Yes 5 3 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Testing, Examination of lifting
injury, Equipment gear , crane.
damage No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Provision of DB, overhead cable
injury, Equipment routing , earthing Yes 4 4 16
damage

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
injury, Equipment Housekeeping No 3 4 12
damage

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Performing regular inspections as
Chance of Reportable per checklist for tension
No 4 4 16
injury, cracks/cave-ins/dewatering / rain-
cut.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Providing Sloping / benching
Chance of Reportable /shoring / sheet piling to restrict
No 4 3 12
injury, the soil collapse as per the type of
soil.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
Housekeeping,Carbolic acid No 3 3 9
injury,

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Relocating or removing the
No 3 4 12
injury, overhead electrical lines.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Checking the oxygen levels &
Chance of Reportable
other toxic gases with gas No 3 4 12
injury,
detector.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Explosives and detonators shall
Chance of Reportable
be taken to blasting area with Yes 4 5 20
injury,
original containers

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
Proper Housekeeping No 4 2 8
injury,

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Avoiding vehicle movement near
No 3 3 9
injury, to the excavation.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Signage and caution boards shall
injury, be displayed at vehicle movement
area. Engage flagmen's to guide No 3 4 12
the movement of vehicles.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury, Ill Health Wear respirators or cover mouth
and nose with wet cloth.
No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of strains and Signage and caution boards shall
sprains be displayed at vehicle movement
area. Engage flagmen's to guide No 3 4 12
the movement of vehicles.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper inspection and
injury. examination of tools No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury. Periodic testing & inspection. Pre
use testing of lifting equipment's,
lifting tools like Shackles, ropes,
slings, pulley, etc.Periodic
maintenance of lifting equipment's No 3 5 15
Prepared By & tools. Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury. Periodic maintenance of lifting
equipment's & tools. Special
training to the Riggers. No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of minor cuts &
wounds
Use of proper PPE No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Peoper loading of materials,don't
injury. allow overload. No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury. Only trained rigger / operator to
perform the loading / unloading
operation.Carefully select the type
of equipment to carry out loading /
No 3 3 9
unloading activity.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury. Check the stability & firmness of
the ground where the crane,TRX
is to be placed. No 3 4 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Minor Cuts & Wounds Competent rigger,use of tag
line,Authorized signal man.
No 4 3 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Cuts and bruises
caused by falling
materials. Proper stacking of materials and
No 3 3 9
housekeeping

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Slips & Trips may lead Housekeeping and Keep access
to minor cuts & free from materials. No 4 3 12
wounds.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Provide barricading to ground
Chance of Reportable level lifting area for privent
No 3 4 12
injury. authorized entry.handile the load
with help of tag line
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper platform and life line,
No 4 4 16
injury. safety harness.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Lifting shall be avoided where
Chance of Reportable
overhead electrical lines are No 4 3 12
injury.
crossing.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Competent person has been
injury deployed.Use hand gloves.All
equipment will be routed through No 3 4 12
30 mA, All tools shall be fitted with
adequate fuse protect
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper inspection of electrical
injury, Equipment PDB's,Use of plug top and privent
damage unauthorized connection. No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Provide barricades to work area.
injury, Equipment LOTO system. No 3 4 12
damage

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Minor Injury Proper inspection of machine with
weekly checklist,competent fitter No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Minor Injury Use of proper
PPE,housekeeping,Access and No 3 3 9
eggress.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
injury Proper supervision ,Handgloves No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper disporsal of steel scrap.
Housekeeping. No 3 4 12

Injury Competent fitter and use of


No 3 3 9
Handgloves
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Ensure reversing warning devices
injury are active, and activate hazards
lights.Provide warning signs at all
entrances and exits to the site. No 3 4 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Use of PPE, Proper material
No 4 3 12
handling
Injury Materials handling
No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable MSDS shall be dispalyed,Using
injury handgloves
No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury All equipment will be routed
through 30 mA, No 3 5 15
Injury Proper inspection of materials
while unloading.supervision No 3 3 9
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper walkway.
No 3 3 9

injury Materials handling


No 3 4 12
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
injury Remove flammable materials
from work place. No 4 3 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Implement rest breaks and job
rotation for frequent and/or heavy No 3 3 9
lifting.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper inspection of compressor
Yes 3 5 15

Ill Health Proper maintainance of


compressor Yes 2 4 8
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Use of PPE,
Yes 4 2 8

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Competent Rigger,engage singnal
injury man. No 4 5 20

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Use tag line and avoid direct
touch contact with suspended No 4 5 20
load
Slips, Skin irritation
Use of proper PPE No 3 5 15
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Adequate access ladders shall be
injury fixed, suitable work platform shall
be provided with toe boards. No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable All equipment will be routed
injury through 30 mA, All tools shall be
fitted with adequate fuse protect No 4 3 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper platform and back railing
injury. ,fall protection net shall be fixed,to
be removed unwanted materials
from ground level. No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Select the proper grinding wheel
and machine for the job.Visually
Chance of Reportable inspect all grinding wheels. Also,
No 3 5 15
injury. the use of “ring testing” or
Prepared By Approved By

EHS Department
“vibration testing” is required for V. N. Giridhar
Tata Projects Limited
BF # 5, RSP(SAIL)
many grinding wheels. Resident Construction Manager
Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper inspection of grinding No 2 5 10
machine,Remove all flammable
materials from hot work area.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
All equipment will be routed
through 30 mA RCCB, All tools
Injury shall be fitted with adequate fuse No 3 5 15
protect.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Using ear plug and Goggles and No 3 3 9
nose mask

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Provision of double earth
conductors & RCCBs to avoid
Chance of Reportable electric shock. Pre-inspection of
No 3 5 15
injury machines, cables by a qualified
electrician.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable welding cables shall be inspected.
injury No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Housekeeping and removal of
combustible materials before
starting the work.Taking fire
protection measures such as
Injury placing adequate fire No 3 5 15
Prepared By extinguishers, water buckets, Approved By

EHS Department
Tata Projects Limited
sand buckets and fire blankets. V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Using Face shield No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Using PPEs like leather gloves,
No 3 4 12
safety shoes and aprons.
Chance of Reportable
injury. Using Face shield. No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Cylinder should be kept away
injury. from the source of heat to prevent
fire and over pressurization of Yes 5 5 25
cylinder.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Wear respirators or cover mouth
and nose with wet cloth. No 2 4 8

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper stacking, loading and
unloading methods. No 3 2 6

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
injury.
Never tamper with, not attempt to Yes 3 5 15
repair cylinder valves do not apply
grease to it for loosening it.Keep
Prepared By
cylinder in designed area Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Giving proper training using the
injury. proper eye protection methods No 3 3 9
like welding shield,

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper storages of cylinders
injury. No 3 4 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proper inspection of form work.
injury No 4 5 20

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Inspection of lisfting bucket and
injury structure of concrete.supervision No 4 4 16

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Ensure earthing of equipment's
injury and proper functioning of
electrical circuit before No 3 3 9
commencement of work.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Vibrator machie will be routed
injury through 30 mA RCCB,Proper
No 4 4 16
cable routing

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
More than 30mA All equipment will be routed No 3 5 15
current may be caused through 30 mA RCCB.
risk of human life.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Proper inspection of machine. No 4 3 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health No 4 2 8
Good posture

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health No 2 4 8
Perodic break

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Use UV protection goggles. No 2 4 8

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Vehicles shall not be Yes 4 5 20
injury overloaded,proper lashing.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Vehicles shall not be overloaded Yes 3 3 9
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Speed limit controlling. Yes 4 5 20
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Vehicles shall not be overloaded Yes 3 4 12
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proepr supervision and proepr Yes 3 5 15
injury communication with
driver.Reversing of vehicle shall
be restricted.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Speed limit controlling Yes 3 5 15
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of reportable Secrity inspection will be done Yes 2 5 10
injury. when driver entring gate.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Provide separate route for Yes 3 4 12
pedastrians.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Eletrocution, Injury,
Breakdown, Fire
No 4 4 16

Prepared By Approved By

EHS Department
Tata Projects Limited Use of PPEs V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
No 3 4 12
injury
Ill Health Use of PPEs
No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Use of PPEs

Ill Health
No 4 3 12

No 3 3 9
Skin irritation
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable WARNING SIGNAL - a one-
injury minute series of long audible
signals 5 minutes prior to blast Yes 5 5 25
signal

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Providing warning signs /
injury. barricades as per the
requirement. Alerting the public Yes 4 5 20
with flaggers.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of fire, No 4 5 20
explosion,Reportable
injury Awareness on gas cylinder use

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of First Aid No 3 4 12
injury
Chance of Reportable No 4 4 16
Proper guard for rotating part.
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Awarenesson using of presure No 3 5 15
injury cooker

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
May cause ill Health No 4 3 12
Good posture

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
May cause ill Health Provide vendilator for smoke exit. No 3 4 12

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Proepr inspection vehicle.regualr No 3 3 9
inspection of break system.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Mind concentration, No 2 4 8

Mental Stress keep luggage always near by No 2 5 10

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Mind concentration, No 2 4 8

Reportable injury Stay away from edge side. No 3 5 15


Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Safe evacuation. No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Increase the consumption of Yes 2 5 10
water,

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Increase the consumption of Yes 3 4 12
water,

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Use of PPE, provide designated Yes 2 5 10
walkway.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Use of PPE No 3 5 15

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Remove flammable materials Yes 4 4 16
from work place.Housekeeping.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Proper platform and use of Yes 4 5 20
PPE,access and eggress,life line

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Use of carry bags for tools. Yes 5 5 25
injury

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable Injury Provide separate storage area for Yes 4 4 16
paints. Keep paint away from hot
work area.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Ill Health Use of PPE No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Indentification mark. Yes 2 5 10

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Cuts and bruises Proper stacking of materials and
caused by falling housekeeping. No 3 4 12
materials.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Slips & Trips may lead Proper stacking of materials and
to minor cuts & housekeeping. No 3 4 12
wounds.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Proepr stacking and locking of Yes 3 4 12
injury materials .

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Use of PPE and Life line and Yes 4 4 16
injury Access.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Injury Proper stacking of materials No 4 5 20
materials keep away from edge
side.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Use of Handgloves.
injury No 4 4 16

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of injury No 3 5 15

Provide guard for roating part.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable Regular inspection of Motor
injury, Equipment No 3 4 12
damage

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Chance of Reportable
injury, Equipment Barricading to be provided. No 3 4 12
damage

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
May be caused
irritation to skin,
eyes & respiratory
tract, May be
harmful if swallowed
Prepared By Approved By
orDepartment
EHS inhaled.May be V. N. Giridhar

fatal
BF if swallowed or
Tata Projects Limited
# 5, RSP(SAIL)
Resident Construction Manager
Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
4 5 20

Provide separate storage


may be resulted
area for paints. Keep
property
Prepared By damage & No Approved By
chemical away from hot work
human
EHS Department injury V. N. Giridhar
Tata Projects Limited
BF # 5, RSP(SAIL) area. Resident Construction Manager
Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
More than 30mA 4 5 20
current may be All equipment will be routed
Yes
caused risk of through 30 mA RCCB,
human life.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
3 3 9

May be caused Properly guard the rotating


No
reportable injury part of the electrical motor

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
3 4 12
Risk of human injury Display Signage boards and
Yes
& risk of human life Caution signages

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
3 4 12
More than 30mA
current may be All equipment will be routed
Yes
caused risk of through 30 mA RCCB,
human life.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Speed limit controlling . Caution No 3 4 12
signage boards.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Speed limit controlling No 4 4 16

Mental Stress Proper supervision. No 3 3 9

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Reportable injury Speed limit controlling . Caution No 4 4 16
signage boards.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
TATA PROJECTS LIMITED
HAZARD IDENTIFICATION & RISK ASSESSMENT

Location: IIT
Jodhpur
Approved by:
Base Risk
Analysis

Legal Concern

Probability

Severity
(Y/N)
Consequence Present control measures

Risk
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, Obtaining Route Permit,


Insurance Coverage, Proper
2 3 6 Acceptable (A)
Lashing of Equipment. Follow Traffic
Rules (Speed Limit, No Entry)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, TPI of all lifting gears and


eqipment, Ground condition , safe
2 3 6 Acceptable (A)
lifting procedure , rigging foreman,
Close supervision

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, Inspection / Connection by


qualified electrician. Use of ELCB, 2 3 6 Acceptable (A)
Joints free Cable, proper tools.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, Fire Extinguishers, Fire


2 2 4 Acceptable (A)
Buckets, House Keeping.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Shoring/ cutting slope,


placing of equipment, Ensuring 2 3 6 Acceptable (A)
work permit/checklist

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Material 1.5 M away, Hard


2 3 6 Acceptable (A)
Barrication and Warning signs.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Good Housekeeping,


Carbolic Acid, Carrying anti-venom 1 3 3 Acceptable (A)
in First Aid box

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Taking proper precautions


before start of work, Doing pre-
1 4 4 Acceptable (A)
checking for cables, Ensuring work
permit/checklist
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Using respirator whenever


2 3 6 Acceptable (A)
necessary, Gas detection system

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Obtaining blasting license, Taking


proper precautions before and
2 3 6 Acceptable (A)
during blasting, PPEs, Area
Evacuation.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Proper housekeeping


1 3 3 Acceptable (A)
should be practised

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP -3, Proper danger displays,


2 2 4 Acceptable (A)
Barricading of area.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Training/ Awareness

2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of PPEs, Training & Awareness


3 1 3 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Appropriate load handling, Training


& Awareness.
2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP, Competent riggers, Training &


Awareness 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Test certificate by competent


person, proper maintenance, 2 2 4 Acceptable (A)
training
Prepared By & awareness. Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Competent riggers, Training &


Awareness
2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of Proper PPEs, Guy ropes,


Training & Awareness.
2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP, Proper stacking of materials,


proper tieing during transportation, 2 3 6 Acceptable (A)
Training & Awareness.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP, Run over protection in hydras,


Speed limit, proper signalling,
competent operator, training &
awareness.
2 3 6 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Competent operator, proper load


handling.
2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of double tag line, flagman


,safe load bearing capacity , safe
access for vehicle movement, 2 3 6 Acceptable (A)
trained operator to be provided

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Stack materials according to its


size.Provide packing and stop poles
for preventing for uncertain slip/fall 1 3 3 Acceptable (A)
down of stacked materials.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper Stacking of materials,


Housekeeping 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

No overload & safe loading & side


protection & barricaded the lifting
area & Emergency exit access. 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Fall protection arrangements


(Access,Fall arrestor rore, Life 2 3 6 Acceptable (A)
line,Safety net & FBH must be used

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-11, PTW, Lockout/Tag out,


Work Permit, Daily Checklist, 2 3 6 Acceptable (A)
ELCBs

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, PTW, Lockout/Tag out,


Work Permit, Daily Checklist,
ELCBs 1 4 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-09 ,Proper maintainance,


experienced person
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of rubber hand gloves/ boots,


removal of flammable gases/ 2 3 6 Acceptable (A)
liquids.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of handgloves, Training &


Awareness of handling 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of handgloves, Training &


Awareness of handling 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper housekeeping should be


practiced, Use of handgloves, 2 2 4 Acceptable (A)
Training & Awareness of handling

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper housekeeping, Use of


handgloves, Training & Awareness 2 3 6 Acceptable (A)
of handling
Use of handgloves.Training &
2 2 4 Acceptable (A)
Awareness
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Control is achieved by giving proper


awareness training, Speed limit,
signals, proper loading unloading
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of PPE, Proper material


2 3 6 Acceptable (A)
handling,Training & Awareness
Use of PPES, Material
Stacking,Training & Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of PPEs, Training & Awareness


2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, Use of PPEs, Proper


maintainance, ELCBs 2 3 6 Acceptable (A)
Use of PPEsTraining & Awareness
2 2 4 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper walkway,
HousekeepingTraining & Awareness 2 2 4 Acceptable (A)

Material should be stacked in


2 2 4 Acceptable (A)
asecured manner.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper amount of Fire extuinguisher


to be kept. 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper body posture, material


handling 1 3 3 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Precaution, checking of air reciever.


2 3 6 Acceptable (A)

Use of PPEs, Monitor Noise level,


Maintainance 1 3 3 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of PPEs, Training & Awareness


2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper approach, proper load


selection, Guy rope, proper rggers, 2 3 6 Acceptable (A)
competent operator

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper lashing of materials, Use of


guy rope, proper load selection 2 3 6 Acceptable (A)

Proper maintainance/ Use of PPE's


2 2 4 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-7, Use of Double Lanyard


FBH, Life Line Rope, Proper
Access, Platform, Hand rails 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-7, Use of Double Lanyard


FBH, Life Line Rope, Proper
Access, Platform, Hand rails, 2 3 6 Acceptable (A)
ELCBs, Proper electrical check

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-7, Proper material handling.

2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-14, Use of face shield, Hand


Gloves, Leather apron, Leg Gurad,
Check of Grinding wheel, Wheel
Guard
2 3 6 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-14, PPEs
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-14, PTW, Lockout/Tag out,


Work Permit, Daily Checklist,
ELCBs 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-14, Proper body posture


2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-13, Proper earthing, ELCBs,


Proper maintainance,Proper cable
routing.
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-13, PTW, Lockout/Tag out,


Work Permit, Daily Checklist, 2 3 6 Acceptable (A)
ELCBs

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-13, PPEs, Proper


maintainance

2 3 6 Acceptable (A)
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-13, PPEs, Area barricading,


Use of sheets 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-12,Proper PPEs, Awareness


2 3 6 Acceptable (A)
OCP-12 PPEs, Area barricading,
Use of sheets 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-12,Proper Storage & Handling,


Proper checking,
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Dust masks provided to all workers


working for cement loading. 1 3 3 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper stacking, loading and


unloading methods. 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Storage of cylinders under the


protected roof, Upright straight, Take
care of chemical property
2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of hand gloves,Training &


Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of trolleys while transporting the


cylinders,Training & Awareness. 1 3 3 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Pre-use inspection of form work,


temporary,Training & Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Support structures,Training &


Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper PPEs, Awareness

2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

PTW, Lockout/Tag out, Work Permit,


Daily Checklist, ELCBs,Training &
2 3 6 Acceptable (A)
Awareness

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, 1 4 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety 1 4 4 Acceptable (A)


Training/Awareness,Providefire
point near by.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 4 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, Use UV 2 2 4 Acceptable (A)


protection display.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 3 2 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 1 4 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness,Security 2 3 6 Acceptable (A)


controlling.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Vehicle aging record, documents, 2 3 6 Acceptable (A)


speed limit, no reversal or
Flagman , competent driver, regular
road safety monitoring
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Vehicle aging record, documents, 2 3 6 Acceptable (A)


speed limit, no reversal or
Flagman , competent driver, regular
road safety monitoring

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Vehicle aging record, documents, 2 3 6 Acceptable (A)


speed limit, no reversal , Flagman ,
competent driver, regular road
safety monitoring

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper power connection & Cable Acceptable (A)


management, Provision of FE,
2 2 4
Safety Training/Awareness, Proper
maintenance

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, Proper Acceptable (A)


2 3 6
machine guarding
Use of PPEs, Strict supervision and Acceptable (A)
2 2 4
maintainance of plant

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of PPEs, Strict supervision and Acceptable (A)


maintainance of plant 3 2 6

Use of PPEs, Strict supervision and Acceptable (A)


3 2 6
maintainance of plant
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-18, Safety Training/ Acceptable (A)


Awareness, Competent Person and
close supervision during blasting 2 3 6

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-18, Safety Training/ Acceptable (A)


Awareness, Area evquation/
corroding off, proper 3 3 9
communication, safety monitoring
during blasting to be ensured
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Training on basic fire fighting, 2 3 6 Acceptable (A)


Proper storage and handling of gas
cylinder and regular maintainance

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

2 3 6 Acceptable (A)
Use of Handgloves

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 3 2 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Training/ Awareness
3 2 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Training/ Awareness
2 3 6 Acceptable (A)
Training/ Awareness
2 2 4 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Training/ Awareness
1 4 4 Acceptable (A)

Safety Training/Awareness, Use of 1 5 5 Acceptable (A)


PPES
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, Use of 2 3 6 Acceptable (A)


PPES

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, 1 5 5 Acceptable (A)


Precaution to avoid sun stroke.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, 1 4 4 Acceptable (A)


Precaution to avoid sun stroke.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness, 2 3 6 Acceptable (A)


Precaution to avoid sun stroke.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Ensure adequate ventilation / Do 2 3 6 acceptable (A)


not breathe vapour/ Safety
awareness

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Keep metal container tightly closed 2 3 6 acceptable (A)


in a well-ventilated place / Protect
against sun / Keep away from heat,
flame, spark & hot work / Suitable
Fire extinguishing / Display of No
Smoking
Prepared By Board. Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Follow OCP 007 / Follow Safe work 2 3 6 acceptable (A)


Methodlogy / Safety Training

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Paint bucket should be in good 2 3 6 acceptable (A)


condition / Proper anchoring of
Bucket / Safety Training /
Awareness

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Keep away from heat, flame, spark 1 4 4 acceptable (A)


& Hot Work / Do not smoke when
handling / Suitable Fire
extinguishing / Safety training

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use Safety Googles during 2 3 3 acceptable (A)


Handling

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Identification of Thinner / use 2 3 4 acceptable (A)


rubber gloves / Wash hand properly
before eating / Safety Training

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper Stacking of materials,


Housekeeping as per 5S standard, 2 2 4 Acceptable (A)
Use of PPEs,Close Supervision

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper Stacking of materials,


Housekeeping as per 5S standard, 2 3 6 Acceptable (A)
Use of PPEs,Close Supervision

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper Stacking of materials, 2 3 6 Acceptable (A)


Housekeeping as per 5S standard,
Use of PPEs,Close Supervision

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-7, Use of Double Lanyard 2 3 4 Acceptable (A)


FBH, Life Line Rope, Proper
Access, Platform, Hand rails

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper handling, training, 1 5 5 Acceptable (A)


awareness

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

OCP-9, PTW, Lockout/Tag out,


Work Permit, Daily Checklist 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Follow PTW, Use guards for all 2 3 6 Acceptable (A)


rotating parts. Caution board
display, Area Cordoning to restrict
un-authorised person. Provision of
emergency stop button.
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Proper maintainance, experienced


person 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Use of rubber hand gloves/ boots,


removal of flammable gases/ 2 3 6 Acceptable (A)
liquids.

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Acceptable (A)

Prepared By Approved By

1)Follow OCP-20, 2) Follow


EHS Department
Tata Projects Limited
V. N. Giridhar
Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Follow OCP-20, Keep chemical 2 3 6 Acceptable (A)


storage & handling area away
from the hot work area, Display
caution Board, make
arrangment of fire fighting
Prepared By Approved By
system. Stop all hot work
EHS Department V. N. Giridhar
during
BF # 5, RSP(SAIL)Acid Cleaning of Boiler.
Tata Projects Limited Resident Construction Manager
Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

2 3 6 Acceptable (A)
Follow OCP 09

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

2 3 6 Acceptable (A)
Properly guard the rotating part
of the electrical motor.All
equipment will be routed
through 30 mA RCCB,
Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

1 4 4 Acceptable (A)
Follow OCP 24

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

1 4 4 Acceptable (A)

Follow OCP 09

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 1 4 4 Acceptable (A)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Safety Training/Awareness 2 3 6 Acceptable (A)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited
Format No.TSF:011
Rev:00
Revised on:03-.10.2018
Date of assessment:03/10/2018
by:
Residual Risk

Acceptable (U)
Acceptable
Probability

Remarks
Severity
Proposed Control Measures

(A)/ Un
Risk
(OCP, HSMP, PPE etc.)

Prepared By Approved By

EHS Department V. N. Giridhar


Tata Projects Limited Resident Construction Manager
BF # 5, RSP(SAIL) Tata Projects Limited

Вам также может понравиться