S.N Erection
Description-Erection works Unit Qty
o Rate (Rs.) Amount (Rs.)
Erection of Load break switch / VCB Panel with Suitable rating with one incomer
1
from HT Metering cubicle and Required no of outgoings for transformer
Erection of Oil filled transformers 11/6.6 (or) 0.433 kV, ONAN, DYn11, %Z = As
per IS 2026, OLTC / OCTC, Cable end boxes at HT & LT side, unloading and
installation on a platform and with all standard accessories for making
2
connections as per Specification and Single line Diagram; with all complete
works. All relevant test as per IS shall be performed and certificates to be
produced
3 RTCC Panels
6 Outdoor termination kit suitable for 11 kV 3C X 400 sq.mm XLPE UG Al. Ar. Cable
At DP Structure No 1 0
7 Indoor termination kit suitable for 11 kV 3C X 400 sq.mm XLPE UG Al. Ar. Cable
At Metering Cubicle No 2 0
At VCB Panel No 5 0
At Transformer HV side No 4 0
9 Indoor termination kit suitable for 6.6 kV 3C X 185 sq.mm XLPE UG Al. Ar. Cable
At Transformer LV side No 2 0
At LT Kisok No 2 0
13 Termination kit suitable for 1.1 kV 3.5C X 95 sq.mm XLPE UG Al. Ar. Cable
VCB Panel No 2 0
15 GI flat along with Green Colur Paint as per the Specificaitons of BESCOM
GI Flat - 50 x 6 mm for Equipment Body Earthng & Earth Grid Rmt 800 0
Sand Cmt 3 0
High pressure sodium vapour street light fitting die cast aluminium canopy with aluminium
housing for control gear, finished stove enamel gray glassy white canopy interior with a pair
of anodized aluminium reflectors clear acrylic blow, gasket lining for drip inseat resistance No 4 0
duly wired with porcelain holder copper choke, igniter and HPF condenser including a sodium
vapour lamp etc., complete with all lead & lift In all Respects
4C x 2.5 Sq mm 1.1 KV class UG cable when supplied agency in existing trench GI pipe /
stoneware pipe / on wall / on pole as required etc., complete with all lead & lift as per the Rmt 100 0
direction of the Engineer-in-charge.
Total -
Note:
Civil founadation for panels and Transfomer will be in meil scope
Balance civil labour Works in contacrotor scope and material supply will be meil in scope
BOQ - 11 KV / 6.6/ 0.433 KV Substation - at Anekal -lift
Load break switch / VCB Panel with Suitable rating with one incomer
1 from HT Metering cubicle and Required no of outgoings for
transformer
3 RTCC Panels
At Transformer HV side No
At Transformer LV side No
At Transformer LV side No
At LT Kisok No
Termination kit suitable for 1.1 kV 3.5C X 95 sq.mm XLPE UG Al. Ar.
13
Cable
At Transformer -01 OLTC Side Lot
VCB Panel No
R.C.C. pole of 2.40 m height with 0.15m square at bottom and 0.12 m square
at top in C.C. 1:2:4 using 20 mm and down size granite or basalt metal with No
4 Nos. of 10 mm dia M.S. reinforcement and 17 Nos. of 6 mm dia stirrups etc
Sand Cmt
Switch yard Lighting Arrangement as per the specifications of
19
BESCOM
Sub Total
Note:
Civil founadation for panels and Transfomer will be in meil scope
Balance civil Works in contacrotor scope and material supply will be meil in scope
n - at Anekal -lift-2
Erection
Qty
Rate (Rs.) Amount (Rs.)
1 0
2 0
2 0
2 0
1 0
1 0
20 0
20 0
20 0
20 0
20 0
20 0
1 0
2 0
5 0
4 0
20 0
20 0
20 0
2 0
4 0
2 0
20 0
20 0
2 0
2 0
1 0
20 0
20 0
1 0
1 0
1 0
1 0
2 0
3 0
2 0
2 0
8 0
8 0
2 0
2 0
800 0
500 0
300 0
70 0
36 0
25 0
30 0
20 0
3 0
320 0
3 0
4 0
4 0
100 0
e meil in scope