COMPANY SPA

PROJECT :
SUBJECT : BUILDING WORKS INCLUDING FOUNDATION
CONTRACT N°: CONSTRUCTION COST (DZD)
TOTAL PROGRESS QUANT
NO. ITEM UNIT Q'TY
UNIT RATE COST Cumulate last Month

3 STEEL STRUCTURE WORK


3.1 STRUCTURAL STEEL
3.1.1 STRUCTURAL STEEL - INDOOR STEEL TON
3.1.2 STRUCTURAL STEEL - OUTDOOR STEEL TON
3.2 ANCHOR BOLT TON
3.3 NON-SHRINKAGE GROUT M3
3.4 DECK PLATE -THK.1.6mm M2
3.5 FIRE PROOFING COATING (2.0 HOUR FIRE RESISTANT) M2
10 PANEL & ROOF WORK
THERMAL INSULATED TRAPEZOIDAL CLADDING
10.1 M2
FOR EXT. WALL
THERMAL INSULATED TRAPEZOIDAL CLADDING
10.2 M2
FOR
THK. ROOF
0.8SINGLE TRAPEZOIDAL CLADDING
10.3 M2
FOR
THK. WALL
0.8 SINGLE TRAPEZOIDAL CLADDING
10.4 M2
FOR ROOF
10.5 GUTTER FLASHING M
10.6 AL. SUNSHADE M
10.7 ROOF DRAIN Φ100 EA
10.8 ROOF DRAIN Φ150 EA
10.9 DOWN SPOUT Φ100 M
10.10 DOWN SPOUT Φ150 M
10.11 DOWN SPOUT Φ250 M
10.12 DOWN SPOUT HEAD EA
11 DOOR & WINDOW WORK
11.1 DOOR WORK
11.1.1 a) FIRE RESIST. STEEL DOOR 1.0×2.1(2.0 HOUR) EA
b) FIRE RESIST. STEEL DOOR 2.0×2.1(2.0 HOUR) EA
c) FIRE RESIST. STEEL DOOR 2.0×2.7(2.0 HOUR) EA
c) FIRE RESIST. STEEL DOOR 2.5×3.3(2.0 HOUR) EA
11.1.2 a) NORMAL STEEL DOOR 1.0×2.1 EA
b) NORMAL STEEL DOOR 2.0×2.1 EA
c) NORMAL STEEL DOOR 2.0×2.7 EA

Page 1 de 8
COMPANY SPA
PROJECT :
SUBJECT : BUILDING WORKS INCLUDING FOUNDATION
CONTRACT N°: CONSTRUCTION COST (DZD)
TOTAL PROGRESS QUANT
NO. ITEM UNIT Q'TY
UNIT RATE COST Cumulate last Month

d) NORMAL STEEL DOOR 3.0×3.0 EA


e) NORMAL STEEL DOOR 4.0×3.0 EA
11.1.3 a) STAINLESS STEEL DOOR 1.0×2.1 EA
b) STAINLESS STEEL DOOR 2.0×2.1 EA
b) STAINLESS STEEL DOOR 11.2x2.7 EA
b) STAINLESS STEEL DOOR 5.4x2.7 EA
b) STAINLESS STEEL DOOR 3.0x2.7 EA
11.1.4 a) SLIDING DOOR 3.0×4.0 EA
b) SLIDING DOOR 4.0×5.0 EA
d) SLIDING DOOR 6.5×7.6 EA
11.1.5 a)TIMBER FLUSH DOOR 1.0×2.1 EA
b)TIMBER FLUSH DOOR 2.0×2.1 EA
11.1.5.1 a) ALUMINIUM DOOR 0.9×2.1 EA
11.1.6 MASTER-KEY SYSTEM FOR WHOLE PLANT L/S
11.2 WINDOW WORK
11.2.1 a)ALUMINIUM WINDOW (SINGLE) 2.4×1.2 EA
b)ALUMINIUM WINDOW (SINGLE) 1.2×1.2 EA
c)ALUMINIUM WINDOW (SINGLE) 1.2×0.6 EA
d)ALUMINIUM WINDOW (SINGLE) 2.4×0.9 EA
e)ALUMINIUM WINDOW (SINGLE) 3.6×0.9 EA
f)ALUMINIUM WINDOW (SINGLE) H=1.2 M
11.2.2 a)ALUMINIUM WINDOW (DOUBLE) 2.4×1.2 EA
b)ALUMINIUM WINDOW (DOUBLE) 1.2×1.2 EA
c)ALUMINIUM WINDOW (DOUBLE) 1.2×0.6 EA
d)ALUMINIUM WINDOW (DOUBLE) 2.4×1.0 EA
e)ALUMINIUM WINDOW (DOUBLE) 3.6×0.9 EA
f)ALUMINIUM WINDOW (DOUBLE) H=1.2 M

Page 2 de 8
COMPANY SPA
PROJECT :
SUBJECT : BUILDING WORKS INCLUDING FOUNDATION
CONTRACT N°: CONSTRUCTION COST (DZD)
TOTAL PROGRESS QUANT
NO. ITEM UNIT Q'TY
UNIT RATE COST Cumulate last Month

g} FIRE RESIST. WINDOW 0.6x0.6 EA


11.2.3 a)ALUMINIUM LOUVER M2
12 MISC METAL WORK
12.1 MISC. STEEL WORK TON
12.2 GALV. STEEL GRATING T5×32 M2
12.3 CHEQUERED PLATE THK. 6mm M2
12.4 STEEL PIPE HANDRAIL M
12.5 GALV. STEEL LADDER M
12.6 STAINLESS PIPE HANDRAIL M
12.7 ALUMINIUM SHEET THK.3mm M2
13 MISCELLANEOUS WORK N/A
13.1 ISOLATION JOINT THK. 50mm M
13.2 EXPANSION JOINT THK. 25×25 M
13.3 SEPARATION JOINT THK. 12×12 M
13.4 CONTROL JOINT THK. 6×6 FOR FLOOR M
13.5 CONTROL JOINT THK. 10×10 FOR WALL M
13.6 a) PREMOULDED JOINT FILLER THK. 50 M2
b) PREMOULDED JOINT FILLER THK. 25 M2
c) PREMOULDED JOINT FILLER THK. 12 M2
13.7 DOWEL BAR FOR SEPARATION JOINT EA
13.8 a) VENETIAN BLIND 2.4 x 1.2 EA
b) VENETIAN BLIND 1.2 x 1.2 EA
c) VENETIAN BLIND 1.2 x 0.6 EA
d) VENETIAN BLIND 2.4 x 0.9 EA
e) VENETIAN BLIND 3.6 x 0.9 EA
14 PILING WORK N/A
14.1 BORED PILE (DIA 600, L=15m) EA
14.2 RC PILE (SQ 500, L=15m) EA
14.3 RC PILE (SQ 400, L=15m) EA

Page 3 de 8
COMPANY SPA
PROJECT :
SUBJECT : BUILDING WORKS INCLUDING FOUNDATION
CONTRACT N°: CONSTRUCTION COST (DZD)
TOTAL PROGRESS QUANT
NO. ITEM UNIT Q'TY
UNIT RATE COST Cumulate last Month

Total

Page 4 de 8
Month: XXXXXXX

PROGRESS QUANTITY PROGRESS AMOUNT

This Month Cumulate this Month Cumulate last Month This Month Cumulate this Month

Page 5 de 8
Month: XXXXXXX

PROGRESS QUANTITY PROGRESS AMOUNT

This Month Cumulate this Month Cumulate last Month This Month Cumulate this Month

Page 6 de 8
Month: XXXXXXX

PROGRESS QUANTITY PROGRESS AMOUNT

This Month Cumulate this Month Cumulate last Month This Month Cumulate this Month

Page 7 de 8
Month: XXXXXXX

PROGRESS QUANTITY PROGRESS AMOUNT

This Month Cumulate this Month Cumulate last Month This Month Cumulate this Month

Page 8 de 8