Project: Construction Technology ENS5252

Re: Formwork Column Calculation


Date:
Prepared by :

FOR COLUMNS ONLY


Note: Please fill in value in "yellow" box only

Unit Weight of Concrete (kg/m3) 2400 kg/m3


Type of Cement Blend (1,2,3,4 or 5) 2
Temparature (oC) 30 oC
Classification of Cement Bend
Types I, II, and III cements without retarders* 1
Types types
Other I, II, and III cements
or blends with a less
containing retarder
than 70% 2
slag ortypes
Other 40% or fly blends
ash without retarders*
containing less than 70% 3
slag or 40%
Blends fly ashmore
containing with than
a retarder*
70% slag or 40% 4
fly ash 5

Calculation :
Cw 1.00
Cc 1.20

Rate of Pour vs Pressure


Height (m) Rate of Pour (m/h) pmax (kPa) Remark Check
- 8.64
0.50 18.49
1.00 28.35
1.50 38.20 Warrning
Rate of Pour Vs Pressure
45

40

35

30

25
pmax (kPa)

20

15

10

-
- 0.50 1.00 1.50

Rate of Pour (m/h)


Notes :

Type Description Cc
1 Types I, II, and III cements without retarders* 1
2 Types types
Other I, II, and III cements
or blends with a less
containing retarder
than 70% 1.2
3 slag or 40% fly ash without retarders*
Other types or blends containing less than 70% 1.2
4 slag
Blendsor 40% fly ashmore
containing with than
a retarder*
70% slag or 40% 1.4
5 fly ash 1.4

Table of Cw
Unit Weight of Concrete (kg/m3) Cw
<2240 1.02
2240-2400 1.00
>2400 1.03

Guide to formwork of concrete, ACI 347-04


Project: Construction Technology ENS5252
Re: Formwork Column Calculation
Date:
Prepared by :

FOR WALL ONLY


Note: Please fill in value in "yellow" box only
*This calculation not for Pour Rate > 4.5m/h
Placement Height (m) 0.3 m

Unit Weight of Concrete (kg/m3) 2400 kg/m3


Type of Cement Blend (1,2,3,4 or 5) 2
Temparature (oC) 30 oC
Classification of Cement Bend
Types I, II, and III cements without retarders* 1
Types types
Other I, II, and III cements
or blends with a less
containing retarder
than 70% 2
slag or 40% fly ash without retarders*
Other types or blends containing less than 70% 3
slag
Blendsor 40% fly ashmore
containing with than
a retarder*
70% slag or 40% 4
fly ash 5

Calculation :
Cw 1.00
Cc 1.20
g 9.81 N/kg

Height, Rate of Pour vs Pressure


Rate of
Placement Height (m) Pour,R p1 (kPa) p2a (kPa) p2b
(m/h) Pl H<=4.2mPl H >4.2m2.1<R<4.5m/h
R<2.1m/h R<2.2m/h
Placement 2.00 1.00 28.35
2.00 2.00 48.05
2.00 3.00 56.04
2.00 4.00 62.16
Placement 6.00 1.00 43.79
6.00 2.00 49.91
6.00 3.00 56.04
6.00 4.00 62.16
2.1<Rate o 1.00 1.50 38.20
2.00 2.50 52.97
3.00 3.50 59.10
4.00 4.00 62.16
Placement Height, Rate of Pour Vs Pressure
65

60

55

50

Placement Height <=4.2m


45 Placement Height >4.2m
pmax (kPa)

2.1<Rate of Pour<4.5m/h

40

35

30

25

20
1.00 2.00 3.00 4.00
Notes :

Type Description
1 Types I, II, and III cements without retarders*
2 Types types
Other I, II, and III cements
or blends with a less
containing retarder
than 70%
3 slag or 40% fly ash without retarders*
Other types or blends containing less than 70%
4 slag
Blendsor 40% fly ashmore
containing with than
a retarder*
70% slag or 40%
5 fly ash

Table of Cw
Unit Weight of Concrete (kg/m3)
<2240
2240-2400
>2400

Guide to formwork of concrete, ACI 347-04

Pl H<=4.2m
R<2.1m/h

Pl H >4.2m +
R<2.1m/h
Or 2.1<R<4.5m/h

p
1<R<4.5m/h

28.35
48.05
56.04
62.16
43.79
49.91
56.04
62.16
38.20
52.97
59.10
62.16
ure

Placement Height <=4.2m


Placement Height >4.2m
2.1<Rate of Pour<4.5m/h
Cc
1
1.2
1.2
1.4
1.4

Cw
1.02
1.00
1.03