NGCP CALAMBA

230kV SS -
Select a period to highlight at right. A legend describing the charting follows. Period Highlight: 1 Plan Duration Actual Start % Complete Actual (beyond plan) % Complete (beyond plan)

COSTRUCTION
ACTIVITY
PLAN ACTUAL
PLAN START DURATION ACTUAL START DURATION PERCENT COMPLETE
PERIODS

FOR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
PROJECT PERIOD
25%
1 5 1 4

MECHANICAL
DRILLING OF 330 FT
100%
1 6 1 6
PIPE CASING INSTALLATION

WORKS
35%
2 4 2 5
WELDING OF JOINTS
10%
4 8 4 6
GROUTING
85%
4 2 4 8
FITTINGS AND INSTALLATION
85%
4 3 4 6
PROJECT PERIOD
50%
5 4 5 3
FABRICATION
60%
5 2 5 5
BASE/BOTTOM SHELL INSTALLATION
75%
5 2 5 6
MAIN SHELL INSTALLATION
100%
6 5 6 7
TOP SHELL INSTALLATION
60%
6 1 5 8
PROJECT PERIOD
0%
9 3 9 3
MOBILIZATION
50%
9 6 9 7
INSTALLATION
0%
9 3 9 1
PROJECT PERIOD
1%
9 4 8 5
FIRE HYDRANT & ACCESSORIES
80%
10 5 10 3
ADDRESABLE FDAS
0%
11 2 11 5
INERT GAS CLEAN AGENT FSS
0%
12 6 12 7
HFC 227ea/FM-200
0%
12 1 12 5
FIREPROOFING SYSTEM
0%
14 5 14 6
PROJECT PERIOD
44%
14 8 14 2
MOBILIZATION
0%
14 7 14 3
INSTALLATION
12%
15 4 15 8
COMMISSIONING
5%
15 5 15 3
TESTING AND COMMISSIONING
0%
15 8 15 5
TURNOVER
50%
16 28 16 30
DEMOBILIZATION
50%
16 28 16 30

Page 1 of 1