ABSTRACT COST FOR REPAIR WORK OF----------------------------------
On the basis of south chotanagpur division ,effective from-------------------
Sl S.O.R DESCRIPTION OF ITEM UNIT RATE (Rs) QUANTITY AMOUNT no 1 5.10.4 Dismantelling of patent stone m2 flooring-------do----all complete job. 2 5.10.7 Dismanteling of all plaster of m2 ceiling and wall----do ----all complete job. 3 5.10.3 Dismantelling RCC work ----do - m2 ---all complete job. 4 5.10.10 Taking down old door and Each window shutter including stacking serviceable material --- --do ----all complete job . 5 5.10.11 Taking down chowkhat and Each door -----do----all complete job . 6 5.10.12 Taking down chowkhat and m2 windows -----do----all complete job . 7 5.10.22 Dismantelling of leak repair of m2 terraced roof with cement and powder application-----do------ all complete job . 8 5.3.15 Providing RCC (1:2:4) in chajja - m2 ---do -----all complete job . 9 5.6.7 Providing 25 mm thick IPS m2 florring (1:2:4)-----do -----all complete job. 10 5.7.6 Provding 6 mm thick cement m2 plaster (1:4) in ceiling -----do --- --all complete job. 11 5.7.14 Providing 12 mm thick water m2 proof cement plaster (1:3) with clean course sand with 5% cico- ---do ----all complete job . 12 5.5.29 S/F/F steel door &windows m2 with GCI Sheet 20 gauge ----do ----all complete job. 13 5.5.12 S/F/F MS Grill made up of Kg (20x6) mm MS Flat------do ---- all complete job. 14 5.8.41 Providing primer one coat of m2 red lead enamel paint of approved shade -----do ----all complete job . 15 5.8.45 Providing two coat of synthetic m2 ABSTRACT COST FOR REPAIR WORK OF---------------------------------- On the basis of south chotanagpur division ,effective from------------------- enamel paint approved shade - ----do -------all complete job . 16 5.8.6 Providing two coat of colour m2 washing over new surface ----- do ----all complete job . 17 5.8.14 Providing two oat of snowsem - m2 ---do ------all complete job . 18 5.7.1 Providing 12 mm thick CP with m2 CM (1:3) with neat cement punning -----do -----all complete job . 19 5.3.2 Providing 25 mm thick PCC m3 (1:2:4)in a roof surface------do - ---all complete job. 20 5.7.3 Providing 12 mm thick CP with m2 CM (1:6) in wall ----do ----all complete job . TOTAL