Академический Документы
Профессиональный Документы
Культура Документы
MEASUREMENT OF
CIVIL ENGINEERING WORKS
EARTHWORK :
VOLUME
CALCULATION
A ‘PIECE OF WORK’ BY :
NUR’AIN BT. ISMAIL
DQS393_CLASS F :
1
EARTHWORK_NUR'AIN ISMAIL
LEARNING OUTCOMES
DQS393_CLASS F :
2
EARTHWORK_NUR'AIN ISMAIL
EARTHWORK
DQS393_CLASS F :
3
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
DQS393_CLASS F :
4
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
DQS393_CLASS F :
5
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
CUT
PROPOSED
PLATFORM
LEVEL
FILL
DQS393_CLASS F :
6
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
1. Volume of CUT > FILL
CUT
PROPOSED
PLATFORM
LEVEL
FILL
DQS393_CLASS F :
7
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
2. Volume of CUT < FILL
CUT
PROPOSED
PLATFORM
LEVEL
FILL
DQS393_CLASS F :
8
EARTHWORK_NUR'AIN ISMAIL
VOLUME CALCULATION
METHOD
There are various method of
calculation the volume that can be
used.
DQS393_CLASS F :
10
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
DQS393_CLASS F :
11
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
DQS393_CLASS F :
12
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Site Boundary
15.00
15.00
scale : 1:100
DQS393_CLASS F :
13
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Site Boundary
15.00
15.00
scale : 1:100
create GRID
size 25 x 25
DQS393_CLASS F :
14
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Site Boundary
A B C D E F G
1
C2 D2 E2
2
3
15.00
4
5
Labeled GRID POINT
6
7
15.00
scale : 1:100
create GRID
size 25 x 25
DQS393_CLASS F :
15
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Site Boundary
A B C D E F G
1
CUT
C2 D2 E2
FILL
2
Platform Level =
80.00
3
15.00
4
5
Labeled GRID POINT
6
7
15.00
scale : 1:100
create GRID
size 25 x 25
DQS393_CLASS F :
16
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Site Boundary
A B C D E F G
1
CUT
C2 D2 E2
FILL
2
Platform Level =
80.00
3
Identify LEVEL of
15.00
4
INTERPOLATION
METHOD
5
Labeled GRID POINT
6
7
15.00
scale : 1:100
create GRID
size 25 x 25
DQS393_CLASS F :
17
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Identify LEVEL of EACH grid point using INTERPOLATION
METHOD
View ON PLAN
C
B
y A
x 1. Identify distance
AB (x) & BC (y)
Level : 80.00
E
Grid point E5
D View by SECTION
Height :
1.00 m
Y : 1.60 m X : 2.30 m A
C B
Level : 79.00 Level : 79.00
DQS393_CLASS F :
18
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
Level : 80.00
E
Grid point E5
D
Height :
1.00 m
Y : 0.60 m B X : 2.30 m A
C
Level : 79.00 Level : 79.00
E5 = 79.00 + 0.59
= 79.59
DQSQSD393_CLASS F :
19
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD – CUT TABLE
POINT EXISTING LEVEL PLATFORM LEVEL DEPTH
TOTAL 36.95
DQS393_CLASS F :
20
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD – FILL TABLE
POINT EXISTING LEVEL PLATFORM LEVEL DEPTH
TOTAL 39.48
VOLUME OF CUT :
1
CUT = X Length X Width X Depth
2
= 1
X 150.00 m X 150.00 m X 1.76 m
2
= 19,800.00 m³
VOLUME OF FILL :
1
FILL = X Length X Width X Depth
2
= 1
X 150.00 m X 150.00 m X 1.41 m
2
= 15,862.50 m³
DQS393_CLASS F :
22
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 1
Iskandar, Perak for UiTM (Perak)
Heading :
1
2 150.00 [ Fill
150.00
1.41
15,862.50
DQS393_CLASS F :
23
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 2
Iskandar, Perak for UiTM (Perak)
Heading :
1
2 150.00 [ Cut
150.00
1.76
19,800.00
1
2 150.00 [ DDT Fill
150.00
1.41
15,862.50
3,937.50
DQS393_CLASS F :
24
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 3
Iskandar, Perak for UiTM (Perak)
Heading :
15,862.50 [ Fill
1.00 quantity taken
1.00 from slip no 1
15,862.50
DQS393_CLASS F :
25
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD
(WITH WEIGHTAGE)
Site Boundary
A B C D E F G
1
1 2 2 2 2 2 1
2
2 4 4 4 4 4 2
3
CUT
15.00
4
FILL
5
6
1 2
7
15.00
scale : 1:100
DQS393_CLASS F :
26
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD (with
weightage) – CUT TABLE
CUT
Average Total
WEIGHTAGE Weightage Zm
=
DEPTH : depth
(X)
Total
weightage
(Y) QSD393_CLASS F :
27
EARTHWORK_NUR'AIN ISMAIL
AVERAGE DEPTH METHOD (with
weightage) – FILL TABLE
FILL
DQS393_CLASS F :
28
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 1
Iskandar, Perak for UiTM (Perak)
Heading :
1
2 150.00 [ Fill
150.00
1.23
13,837.50
DQS393_CLASS F :
29
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 2
Iskandar, Perak for UiTM (Perak)
Heading :
1
2 150.00 [ Cut
150.00
1.54
17,325.00
1
2 150.00 [ DDT Fill
150.00
1.23
13,837.50
3,487.50
DQS393_CLASS F :
30
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork in Lot 1234, Seri EARTHWORK 3
Iskandar, Perak for UiTM (Perak)
Heading :
13,837.50 [ Fill
1.00 quantity taken
1.00 from slip no 1
13,837.50
DQS393_CLASS F :
31
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
DQS393_CLASS F :
32
EARTHWORK_NUR'AIN ISMAIL
Simpsons’ Rules
DQS393_CLASS F :
33
EARTHWORK_NUR'AIN ISMAIL
QSD393_CLASS F :
34
EARTHWORK_NUR'AIN ISMAIL
SIMPSON’S RULES
Notes :
DQS393_CLASS F :
35
EARTHWORK_NUR'AIN ISMAIL
SIMPSON’S RULES
X1 X4 X2 X4 X2 X4 X1
A
1 2 3 4 5 6 7
6.00 m
4.00 m
50.00 m
A
Divide length into same
400.00 m
distance of cross section
Area = 1000 m2 X 4
40.00 m
DQS393_CLASS F :
36
EARTHWORK_NUR'AIN ISMAIL
b
40.00 m
1
2
20.00 m
Slope
40.00 m
a
Slope ratio = 2:1
Area = ½ X (a+b) X h
DQS393_CLASS F :
2
EARTHWORK_NUR'AIN ISMAIL
Cross section area
Cross
section = 1
X (40.00m + 44.00m) X 4.00m
1 2
= 168.00m2 X 1
= 168.00m2
Cross
section = 1
X (40.00m + 50.00m) X 10.00m
2 2
= 450.00m2 X 4
= 1800.00m2
DQS393_CLASS F :
38
EARTHWORK_NUR'AIN ISMAIL
Cross section area
Cross
section = 1
X (40.00m + 56.00m) X 16.00m
3 2
= 768.00m2 X 2
= 1536.00m2
Cross
section = 1
X (40.00m + 58.00m) X 18.00m
5 2
= 882.00m2 X 2
= 1764.00m2
DQS393_CLASS F :
39
EARTHWORK_NUR'AIN ISMAIL
Cross section area
Cross
section = 1
X (40.00m + 52.00m) X 12.00m
6 2
= 184.00m2 X 4
= 736.00m2
Cross
section = 1
X (40.00m + 46.00m) X 6.00m
7 2
= 258.00m2 X 1
= 258.00m2
DQS393_CLASS F :
40
EARTHWORK_NUR'AIN ISMAIL
1
= X distance between X sum of all cross-
3 cross section section
1
= X 50.00m X 168.00m2 + 1800.00m2
3
1536.00m2 + 4000.00m2
1764.00m2 + 736.00m2
+ 258.00m2
1
= X 50.00m X 10,262.00m2
3
= 156,033.33 m3
DQS393_CLASS F :
41
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork for Road in Lot EARTHWORK 1
1234, Seri Iskandar, Perak
Heading :
1
3 50.00 [ Cut
9362.00
1.00
156,033.33
DQS393_CLASS F :
42
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
Primordial Rules
DQS393_CLASS F :
43
EARTHWORK_NUR'AIN ISMAIL
PRIMORDIAL RULES
Application of Primodial Rule
First 4X Last
1
X Total length X cross + middle + cross
=
6 cross section
section
area section area
area
20.00 m
16.00 m 18.00 m
10.00 m 12.00 m
6.00 m
4.00 m
400.00 m
Total length
DQS393_CLASS F :
44
EARTHWORK_NUR'AIN ISMAIL
Cross section area
First
Cross = 1
X (40.00m + 44.00m) X 4.00m
section 2
= 168.00m2
Middle
Cross = 1
X (40.00m + 60.00m) X 20.00m
section 2
= 1000.00m2
Last
Cross = 1
X (40.00m + 46.00m) X 6.00m
section 2
= 258.00m2
DQS393_CLASS F :
45
EARTHWORK_NUR'AIN ISMAIL
Application of Primodial Rule
First 4X Last
1 + +
= X Total length X cross middle cross
6 cross section
section
area section area
area
168.00 4X 258.00
1
X 400.00m X m2 + 1000.00 + m2
=
6 m2
1 400.00m X 4,426.00m2
= X
6
= 295,066.67m3
DQS393_CLASS F :
46
EARTHWORK_NUR'AIN ISMAIL
CLASS F : EARTHWORK
Job : Element : Slip No :
Proposed Earthwork for Road in Lot EARTHWORK 1
1234, Seri Iskandar, Perak
Heading :
1
6 400.00 [ Cut
4426.00
1.00
295,066.67
DQS393_CLASS F :
47
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
Conventional Method
DQS393_CLASS F :
48
EARTHWORK_NUR'AIN ISMAIL
BULK EXCAVATION
Conventional Method
1. Multiplying the capacity of the
transport vehicle.
2. The number of loads dumped into
the Site.
3. Weighing the rock and convert into
volume by using density
DQS393_CLASS F :
49
EARTHWORK_NUR'AIN ISMAIL
the END
DQS393_CLASS F :
50
EARTHWORK_NUR'AIN ISMAIL
REFERENCES
• Construction Industry Development Board (2011).
Malaysian Civil Engineering Standard Method of
Measurement (CESMM). Malaysia: CIDB
QSD393_CLASS F :
51
EARTHWORK_NUR'AIN ISMAIL