RFP – MEP CONSULTANCY SERVICES-ADDENDUM-1
a. Conduct site visit and compile key information on the geographic and
engineering characteristics and resources available on the site and its
immediate surroundings, also refer the topographic and survey plans
given by the client.
c. Compile, with assistance from the client to gather data and information
from the relevant infrastructure and utilities authorities and companies
on the availability and suture supply of infrastructure and utility
services, including electricity, water sewerage, telecommunication,
drainage and solid waste disposal.
b. Based on the architectural master plan layout and client’s brief, the
‘First Draft of the Conceptual Infrastructure Plan’ based on the site
information will be developed, considering:
• Overall concept
• Physical feasibility and congruity
• Carrying capacity of the site
• Known official constraints, guidelines and controls
Based on the ‘First Draft of the Conceptual master Plan’, discuss and
decide on suggestions based on which the infrastructure plan will be
refined and modified.