WEIGHT OF RAFT

AREA MKD. NO. L B AREA D Density WEIGHT


A 2 20.1 3.35 134.67 1.75 1.5 353.51
B 1 13.4 3.9 52.26 0.95 1.5 74.47
C 2 3.35 3.9 26.13 1.75 1.5 68.59
D 1 6.1 4 24.4 1.75 1.5 64.05
E 1 1.7 6.8 11.56 0.95 1.5 16.47
F 1 20.1 1.7 34.17 0.95 1.5 48.69
G 1 12.3 1.7 20.91 0.95 1.5 29.80
H 1 6.1 1.7 10.37 0.95 1.5 14.78
I 1 1.7 3.6 6.12 0.95 1.5 8.72
J 1 1.7 7.6 12.92 0.95 1.5 18.41
K 1 1.7 5.7 9.69 0.95 1.5 13.81
L 1 1.7 14 23.8 0.95 1.5 33.92
M 1 4.5 2.15 9.675 2.47 1.5 35.85
N 2 13.4 0.8 10.72 0.8 1.5 12.86
O 2 2.3 0.8 1.84 0.8 1.5 2.21
TOTAL AREA= 389.235 TOTAL LOAD = 796.13

TOTAL WEIGHT RAFT= 796.13

WEIGHT OF SOIL ON RAFT


AREA MKD. NO. L B Ht Of Soil Density WEIGHT

D 1 20.1 1.7 11.9 2.1 853.9083


E 1 12.3 1.7 11.9 2.1 522.5409
F 1 6.1 1.7 11.9 2.1 259.1463
G 1 1.7 3.6 11.9 2.1 152.9388
H 1 1.7 7.35 11.9 2.1 312.25005
I 1 1.7 5.65 11.9 2.1 240.02895
J 1 1.7 14 11.9 2.1 594.762
Deduction for counterfort 17.5 0.4875 11.9 2.1 213.19594
area

TOTAL LOAD = 2722.3794

Weight of Filled up Soil AT EL (-) 10.4 M LVL


7.1X4.5 X1.8X (1.275+0.535)/2 = 50.321

TOTAL WEIGHT SOIL ON RAFT= 2868.567


WEIGHT OF SOIL ON RAFT
AREA NO. L B Ht Of Soil Density WEIGHT
MKD.
D 1 20.1 1.7 0.8 1.1 30.0696
E 1 12.3 1.7 0.8 1.1 18.4008
F 1 6.1 1.7 0.8 1.1 9.1256
G 1 1.7 3.6 0.8 1.1 5.3856
H 1 1.7 7.35 0.8 1.1 10.9956
I 1 1.7 5.65 0.8 1.1 8.4524
J 1 1.7 14 0.8 1.1 20.944
Deduction 17.5 0.4875 0.8 1.1 7.5075
for
counterfor
t area
TOTAL LOAD = 95.8661
WEIGHT OF WALL

MKD. ZONE NO. L t H Density WEIGHT


W1 ZONE-A 1 19 0.55 12.2 2.5 318.7
W2 ZONE-A 1 14 0.55 12.2 2.5 234.9
W3 ZONE-A 1 5 0.55 12.2 2.5 83.9
1 10.1 0.55 5.07 2.5 70.4
W4 ZONE-A
1 14.6 0.55 7.13 2.5 143.1
W5 ZONE-A 1 4 0.55 12.2 2.5 67.1
W6 ZONE-A 1 10.6 0.55 12.2 2.5 177.8
TOTAL WEIGHT OF WALL = 1095.9
WEIGHT OF BEAM

BEAM NO. L B D Density WEIGHT


MKD.
B1 1 8.165 0.3 0.55 2.5 3.37
B1A 2 4.8 0.75 0.55 2.5 9.90
B2 2 2.35 0.3 0.55 2.5 1.94
B2A 1 2.35 0.45 0.55 2.5 1.45
B3 1 8.165 0.45 0.55 2.5 5.05
B4 1 5 0.3 0.6 2.5 2.25
B5 1 3.365 0.5 0.55 2.5 2.31
B5A 1 5 0.3 0.3 2.5 1.13
B6 1 6.95 0.5 0.6 2.5 5.21
B7 1 9.5 0.5 0.8 2.5 9.50
B8 1 9.5 0.5 0.8 2.5 9.50
B8A 1 2.675 0.3 0.3 2.5 0.60
B9 2 9.5 0.75 0.95 2.5 33.84
B10 1 3.7 0.7 0.8 2.5 5.18
TOTAL LOAD = 91.24

TB1 2 5 0.23 0.3 2.5 1.73


TB2 1 5 0.23 0.3 2.5 0.86
RB1 2 5 0.3 0.3 2.5 2.25
RB2 1 5.5 0.3 0.3 2.5 1.24
RB3 1 2.7 0.3 0.3 2.5 0.61
RB4 1 4.3 0.3 0.3 2.5 0.97
RB5 1 1.65 0.3 0.3 2.5 0.37
RB6 1 6.75 0.3 0.3 2.5 1.52
RB7 2 6.75 0.3 0.3 2.5 3.04
RB8 1 6.75 0.3 0.3 2.5 1.52
TOTAL LOAD = 14.10

TOTAL WEIGHT OF BEAM = 105.34


WEIGHT OF SLAB

SLAB NO. L B D Density WEIGHT


MKD.
S1 1 20.8 11.3 0.25 2.5 146.90
1 6.9 0.9 0.25 2.5 3.88
S2 1 6.8 0.9 0.25 2.5 3.83
1 4 0.9 0.25 2.5 2.25
DECTION 1 5.5 5.8 0.25 2.5 19.94
OF
OPENING(
hopper,
staircase)
1 3.05 5 0.25 2.5 9.53

TOTAL LOAD = 127.39

SLAB NO. L B D Density WEIGHT


MKD.
2S1 1 6.6 7.6 0.25 2.5 31.35
TOTAL LOAD = 25.08
COLUMN NO. H B D Density WEIGHT
MKD.
SC1 4 4.45 0.3 0.45 2.5 6.01
INCLINED 1 9.5 4.5 0.15 2.5 16.03
SLAB
S/W Of 1 X 39.81 39.81
HOPPER
TOTAL LOAD = 61.85
TOTAL WEIGHT OF SLAB = 214.32
CHECK UPLIFT

TOTAL WEIGHT RAFT= 796.13 T


WEIGHT OF SOIL ON RAFT 2868.57 T
TOTAL WEIGHT OF WALL = 1095.91 T
STAIR CASE WEIGHT 25.00 T
TOTAL WEIGHT OF BEAM 105.34 T
TOTAL WEIGHT OF SLAB = 214.32 T
TOTAL WEIGHT OF COUNTERFORT= 348.66 T
AREA 367 m^2

TOTAL WEIGHT = 5453.92

F.O.S = total weight/(area x height)

F.O.S = 1.25