Total No. of Questions : 12] SEAT No.

:
P3109 [5461]-146
[Total No. of Pages : 4

3
B.E. (Mechanical)

3:2
3:3
INDUSTRIAL ENGINEERING

81
(402049C) (2012 Pattern) (Semester - II) (Elective - III) (End Sem.)

1/2 1
9
01
8 2 30
Time :2 ½ Hours] .23 01 [Max. Marks : 70
Instructions to the candidates :
2/1
1) Answer Q1or Q2, Q3or Q4,Q5 or Q6, Q7 or Q8, Q9 or Q10 or Q11 or Q.12.
8.2 G
P

2) Answer should be written in one answer book.


.24 CE

3) Neat diagrams must be drawn wherever necessary.


16

4) Figures to the right side indicate full marks.


5) Assume suitable data if necessary.

3
3:2
49

3:3
Q1) a) Explain with neat flow chart types of organisation. [4]
81
91
b) A manufacturing unit is producing 8,000 products by employing 50
01
workers at 8 hrs./day for 25 days in a month. If company increases this
30
1/2

quantity to 9,600 products by hiring 10 additional workers at 8 hrs./day


01
2/1

for 25 days in a month. Is there increase in labor productivity? What will


GP

be the increase in labor productivity if company increases quantity to


82

10,000 products without hiring additional workers? [4]


.23
CE

OR
16
8.2

3
.24

3:2
Q2) a) Discuss the scope and any four objectives of industrial engineering. [4]
49

3:3

b) A company produces 1500 kg of tablets by consuming 2000 kg mix of


81
91

raw material for a particular period. For the next period, the output is
01
30

3200 kg by consuming 4265 kg of the raw material and for the third
1/2

period, the output is increased to 3500 kg by consuming 4200 kg of raw


01
2/1

material. Comment on increase or decrease of productivity for second


GP

and third period. [4]


82
.23
CE
16

Q3) State the various steps of method study and explain in detail critical exmination
8.2

of methods. [6]
.24

OR
49

P.T.O.
Q4) Explain principles of motion economy related to use of human body,
arrangement of workplace and design of tools and equipment. [6]

3
3:2
Q5) The two steps in preparing chocolate candy bars are molding and packaging.

3:3
Personal fatigue and delay allowances are set at 12%. The molding machine

81
1/2 1
operator is rated at 90% and the packer is rated at 110%. Observed times per

9
01
batch are given below. Determine the normal and standard time for both task.
8 2 30 [6]
.23 01
2/1 observed time in minutes
8.2 G
P

Task 1 2 3 4
.24 CE

Molding 26 30 29 31
16

Packing 45 50 35 30

3
3:2
49

3:3
OR
81
91
01
30
1/2

Q6) A group of 10 workers working for 8 hours per day produced 320 pieces of
01

component. It was observed that 15% of the total available time workers were
2/1

idle and for remaining time they worked at an average performance of 80%.
GP
82

Calculate standard time for the Job assuming operations to be completed


.23

manually and workers are entitled for 12% relaxation allowances. [6]
CE
16
8.2

3
.24

Q7) a) Explain in brief various functions of production planning and control.[8]


3:2
49

3:3

b) Historical data on the sale of mobile phones of a company for the year
2011 to 2017 is given below. Using the regression analysis establish the
81
91

trend values and extrapolate for the year 2018 ignoring the effect of
01
30

seasonal and random fluctuations. What is the forecast for the year 2018.
1/2

[9]
01
2/1

Year 2011 2012 2013 2014 2015 2016 2017


GP
82

Sales 3286 4751 5867 4580 5020 8444 11072


.23
CE
16
8.2

OR
.24
49

[5461]-146 2
Q8) a) Explain the concept of supply chain management and supply chain
network. Describe any one order control strategy in detail. [8]

3
3:2
b) Historical data on the sale of lubrication pumps for the last 12 years is

3:3
given below. By the method of three yearly moving average establish the

81
1/2 1
trend values and forecast demand for 13th year. If actual demand for 13th

9
01
8 2 30
year is 520 nos. what shall be the forecast for 14th year?
.23 01 [9]

Year 1 2 3 4 5 6 7 8 9 10 11 12
2/1
P

Sales
8.2 G
.24 CE

Nos. 332 344 328 336 370 408 420 432 428 450 498 540
16

3
3:2
Q9) a) Explain in detail factors affecting selection of location for the industrial
49

3:3
plant. [8]
81
91
b) A company buys an item in lots of 500 units which is a three months
01
30

requirement. The cost per unit is Rs.90 and the ordering cost in Rs.180
1/2

per batch order. The inventory carrying cost is estimated at 20% of the
01
2/1

average inventory investment. What is the annual total cost of existing


GP
82

inventory policy? How much money can be saved from economic order
quantity purchase? [9]
.23
CE
16

OR
8.2

3
.24

3:2
49

Q10)a) What are different principles of material handling? Explain different


3:3

material handling equipment’s with their applications. [8]


81
91
01

b) A company spends Rs. 34,000/- on its purchasing activity and


30
1/2

Rs.67,200/- for maintenance of inventory of Rs. 4,20,000/- annually.


01

Around 850 orders are placed every year to replenish stocks of the
2/1

various items. One of the item whose annual consumption is 9600 nos.
GP
82

costing Rs.30/- each is brought by the company based on staggered


.23
CE

deliveries. How frequently should the company receive staggered


16

deliveries and in what quantities? What is the corresponding annual total


8.2

cost for this item. [9]


.24
49

[5461]-146 3
Q11)a) An industry manufacturing small capacity motors has the cost structure
as follows
Material cost :Rs.50

3
3:2
Labor cost: Rs. 80

3:3
Variable overhead : 75% of labour cost.

81
1/2 1
9
01
Fixed overhead : Rs. 2,40,000/annum.
8 2 30
Sales price: Rs. 230/motor
.23 01
2/1
Determine the number of motors to be manufactured to break-even.
8.2 G
P

Number of motors to be sold to make a profit of Rs.1,00,000/-


.24 CE
16

Number of motors to be sold to break even if price is reduced by


Rs. 15/ motor. [8]

3
3:2
b) What do you understand by industrial safety? What are different safety
49

3:3
issues and general safety rules in industry? [8]
81
91
OR
01
30
1/2

Q12)a) Explain break-even analysis with neat chart? What are assumptions made
01

in break-even analysis? What are different applications of break-even


2/1

analysis? [8]
GP
82

b) Explain in brief different functions of human resource department.


.23
CE

Comment on concept of key result areas and performance appraisal of


16

employee. [8]
8.2

3
.24

3:2


49

3:3
81
91
01
30
1/2
01
2/1
GP
82
.23
CE
16
8.2
.24
49

[5461]-146 4