2. Outline of the Project: This project was carried out by Ackyeong Chemtech INDIA PVT.LtdI, a
subsidiary of AK Chemtech,
We will quote the specification, design book, and BOQ that we submitted today.
3) Other conditions: Production until January 2019 Production facilities and experiment
Equipment can be installed. Totok floor, exterior wall, roof construction should be
completed.
4) Completion criteria: Completion of all licenses related to the use of the factory, such as
construction, firefighting, etc.
3) 5% after completion (after completing necessary licenses for construction, electricity, fire and
other factory operations)
6. Uniqueness
1) The drawings and BOQ (mailed to us) submitted by the Company to the Quotation Presentation,
this specification,
Estimate that there are no parts. If there is an error in the quantity and quantity in the current
quantity calculation sheet,
If there is any content on the drawing, it should be done on site. (No additional settlement)
A) Construction work
• On-site office - Install one container or equivalent of temporary container before construction
• Temporary Toilets
• Power and water for construction: Power supply and water required for construction are
provided by the contractor.
B) earthworks
• The soil for backfilling is stored at the designated site in the site and stored.
• Construction of other earthworks companies in accordance with the basic and standard
principles.
C) Construction, sanitation, sewage disposal, fire fighting, supply of water, steel frame, roof,
waterproof, plaster, exterior wall, window, painting, landscape
• Inspection and approval of the supervisor must be obtained for major materials and processes.
• To prevent water leakage, it is important to waterproof the roof and waterproofing such as
eaves.
2) Electric works
• Construction shall be carried out in accordance with drawings and general electrical work
standards.
• Construction scope: Water distribution (750KVA three-phase four-wire 400 / 230V 50Hz),
UPS 50KVA
Construction electric, fire fighting electric, telecommunication, internet, mechanical power facility
cable construction,
- Primary Power in MCC Room Main Lt Panel, Dissolver Panel, CABLE Duct,
Conduit, explosion proof flexible, sealing fitting, (motor, LOP) are to be constructed in order.
- Dissolver (D-101, D-104) On-site facilities All power control circuits
(Agitator, Hydraulic Pump, Control, RPM Instrument - 2nd Installation Diesel for India)
- Two Dissolver 20HP units (D-102,103) are built into one panel.
- Dissolver 20HP 2 unit has 2 holes of 42ø hole in the terminal box.
Connect the cable to the 50A tongue to ground the portable tank by grounding to the dissolver.
-. Place the cooling fan space (15 cm) on both sides of the dissolver (D-101, D-104) panel.
- Primary power in MCC room Main Lt Panel, Rimmel panel, CABLE duct,
- Since the ring box field terminal box is 54ø, 42ø * 2EA hole,
New installation of panel after installing 16SQ * 4C cable in PDB panel SPARE (MCCB 4P
63A After main installation, branch MCCB 2P 20A 10EA, 7EA use, 3EA SPARE) In the laboratory
Experimental table after wall installation 5 lines for each 4SQ * 3C, 4SQ * 3C for small oven 2 lines
a. Primary Power in MCC Room Main Lt Panel, Dissolve Panel, CABLE Duct,
Conduit, explosion proof flexible, sealing fitting, (motor, LOP) are to be constructed in order.
b. Dissolver (D-105) On-site facility All power and control circuits
A. Dust collector, compressor, table lift, air conditioner, electric forklift charger, etc. (see
drawing)
- In addition to other facilities, SUS304 panel for outdoor use is installed outside the factory.
- The electric panel production of each auxiliary facilities is done by the equipment manufacturer.
- Installation of cables from the Utility PANEL to the field installation location in the drawing
(included in the BOQ and drawings)
- The forklift local panel is newly installed outside the charger (Sus304)
After installing MCCB 63A inside the panel, install 6SQ * 4C branch MCCB 30A * 2EA.
(Additional addition)
C. SCALE Power
- Install 10A MCCB in 2p branch of factory light panel and install it in 2.5SQ * 3C (Additional
addition)
- Construction should be done in accordance with design books and specification standards.
- Electrical work in explosion-proof areas should be done in accordance with the explosion-proof
standards.
• The electrical materials supplied by our company are electric panels of dissolver and ring mill,
related sealing fit, explosion proof SUS
FLEXIBLE hose, panel and electrical materials other than the above are handled by the integrator.
Construction. Refer to the drawing for cable installation on power installations (dissolver and ring
seal, etc.).
• When making the main electric panel, we give the production drawing to our company and
make it after approval.
• For electrical piping specifications, refer to the drawings, and the drawings of the supporter or
channel
Because there is not, it estimates it considering this. Supporters (3-4m apart) and piping are either
saddles or clamps
Fix
• Install a high pressure, low pressure pressure switch (max. 10kgf / cm2) in the pressure tank for
the water and fire pump,
Depending on the pressure setting, the pressure switch can be connected to the control panel for
operation and stop
4) Additional work
• Two table lifts and one platform scale foundation work, with separate drawings
- Equipment list: Three dissolvers (10HP, 5HP, 0.5HP each electric panel included), Dry oven (1.5m
* 2m) 1
- Transferred to the new factory from the second floor of the Sungji Paint Factory (Grater Noida)
(Panel MCC room installation, dissolver production site anchor fixing)
- The related electric works are included in the BOQ and provide separate reference specifications
- Equipment list: 20 sets of dissolver (20HP), ring mill (1 set, 60HP), chiller, 10 kinds of portable
tanks,
- The related electric works are included in the BOQ and provide separate reference specifications
- Installed factory designated place in our shipping container (2 Dissolver 20HP, 1 RINGMILL 60HP,
1 CHILLER 1
(Unloading equipment from the container, fixing the anchor in the field, providing the anchor)
We will cooperate with the designers in order to allow us to operate the factory without any
problems.
6) Others:
8. General
1) Those who received contract work should submit the construction work schedule and
construction schedule within 3 days before and after the start of construction.
shall.
2) This contractor is responsible for construction quality, air, etc. based on the basic design chart,
this specification,
In principle, there is no settlement, so you should be careful when estimating.
The matters that necessarily arise due to the finishing relationship should also be applied in the
contract amount and air.
4) For the process requested by the Supervisor, make sure to submit the construction plan and
proceed with the approval process
5) If the design books are inadequate or wrong during the construction, please consult with the
supervisor before proceeding
7) The safety management and all the insurance related to the construction shall be made by the
person who received the contract,
All the rules and the training of the workers should be fully prepared.
8) The contractor shall not comply with the relevant laws such as environment, safety,
The contractor is solely responsible for the cost and legal liability.
9) If it is judged that the construction can not be terminated within the due date, we will ask the
contractor for night work