Вы находитесь на странице: 1из 2

BE FORM 2.

2
BRIGADA ESKWELA 2019
BRIGADA ESKWELA ACCOMPLISHMENT REPORT
SCOPE OF WORK
Division ID:____ Division: _____________

SCOPE OF WORK Total Project Status of Projects Over-all


Cost (on- Percentage of
going/completed) completion

Repair of classrooms Repair/Construction of toilets Repair/Construction of New Improvements and


(Indicate the number of classrooms and the Type of Building) (indicate the number of toilets) Handwashing Facility Beautification/Landscaping/Learners' Kiosks
(indicate the number of facilities) (Identify the specific project)

School ID Name of
School Type of Qty of Specific Program of Works Project Qty of Qty of toilets Project Qty of Qty of Project New Improvements and Learning Kiosks and Project
Building classrooms (write 1 if applicable) Cost toilets constructed Cost Handwashing Handwashing Cost Beautification/Landscapin others Cost
repaired facility facility g
(base on repaired constructed
NSBI
Report)
Roof Covering Ceilings Walls Floors Electricals Doors and
and Structure Windows

TOTAL

Prepared by: Noted by: Recommending Approval: Approved by:

BE/ASP Division Coordinator SGOD Chief Asst. Schools Division Superintendent Schools Division Superintendent
BE FORM 2.2
BRIGADA ESKWELA 2019
BRIGADA ESKWELA ACCOMPLISHMENT REPORT
SCOPE OF WORK
Division ID:____ Division: _____________

SCOPE OF WORK Total Project Status of Projects Over-all


Cost (on- Percentage of
going/completed) completion

Repair of classrooms Repair/Construction of toilets Repair/Construction of New Improvements and


(Indicate the number of classrooms and the Type of Building) (indicate the number of toilets) Handwashing Facility Beautification/Landscaping/Learners' Kiosks
(indicate the number of facilities) (Identify the specific project)

School ID Name of
School Type of Qty of Specific Program of Works Project Qty of Qty of toilets Project Qty of Qty of Project New Improvements and Learning Kiosks and Project
Building classrooms (write 1 if applicable) Cost toilets constructed Cost Handwashing Handwashing Cost Beautification/Landscapin others Cost
repaired facility facility g
(base on repaired constructed
NSBI
Report)
Roof Covering Ceilings Walls Floors Electricals Doors and
and Structure Windows

TOTAL
Prepared by: Noted by: Recommending Approval: Approved by:

BE/ASP Division Coordinator SGOD Chief Asst. Schools Division Superintendent Schools Division Superintendent