BHARAT PETROLEUM CORPORATION LIMITED
Govt. of India Enterprise
Kochi Refinery
To,
M/s. BUREAU VERITAS (INDIA)
MARWAH CENTRE, 6TH FLOOR,
KRISHANEAL MARWAN MARG, ANDHERI EAST
SAKI VIHAR ROAD
MUMBAI SUBURBAN, MUMBAT SUBURBAN, MAHARASHTRA,
INDIA ~ 400072
Ph : 022 66956300.
VENDOR CODE: 322235
PRIVATE LTD
Fax + 022-56956309/310
Purchase order
PO number/date
4505789441/28.09.2016
Contact person/Telephone
RAGHUNATHAN K/282-2093
ERX NO ~
Email,
|-aghunathank@bharatpetroleum, in
Deliver to:
M/s. Bharat Petroleum Corpn.Ltd
KOCHI REFINERY,
AMBALAMUGAL,
KOCHI, ERNAKULAM, INDIA - 682302
Purchase Grp: J22/PROJECT - SERVICES|
Your quotation/Dated:
126.09,2016
Delivery date: 27.11.2016
Our Reference: J22/1693KR
Contract Documents
8L.No. Decription
Estimated Order Value :
INR 600,000.00
(in words: Rs. Six Lakh Only.)
Subject: HIRA STUDY OF IREP-cbU
With reference to your Quotation/Contract No dated
26.09.2016 and subsequent correspondence/discussions had till date, we are
pleased to issue our Purchase Order as per terms and conditions mentioned in this
order.In case of clarification please contact:
RAGHUNATHAN K
MANAGER (PROJECTS)
BPCL - KOCHI REFINERY
POST BAG NO 2, AMBALAMUGAL
KOCHI, INDIA PIN ~ 682302
For any further clarifications/instructions/Site related information needed for
rendering services as per scope of work, you are requested to contact our
Engineer-in-charge MOHAMED SHAMBEM MACHINGAL.
iften MaterialNo. Orderguantity Unit
Description Price Currency Net Value
0010
HIRA STUDY of IREP-CDU
Gross Price 600,000.00 INR 600,000.00
Service Tax 14.000 84,000.00
Swachbharat Cess 0.500 3,000.00
Page tof 6 Please sign & send the duplicate For Bharat Corporation Ltd
copy ofthis order
18 acknowledgement
ANJOD JOHN:
hare ~ eae 902, reer en, Bre, HT: 0404 2722061- 60,
‘araler: Wed Wa, 486, @eviia as, ders geez, dt. at. a. 688 Hag -400 001
jharalpetroleum.in 44: www.bharatpetroleum.in _ fit: L23220MH1952G01008931
2, Anplapl 682902 Ernakulam Ot, KeralaPone: O48 -27205-6 Fax 2720061 2721004
Rogtred Oe: Bharat Bhavan, 4&6, Curinthoy Rod, Batard Ee, 8. No 65, Numba - 400001
emai info@bharaigeticleum in. Web wwnrbheraigeticeumin CIN: L23220NH 962601006081‘20,
M/s.
BUREAU VERITAS (INDIA)
VENDOR CODE: 322235
PRIVATE LTD
PO nunber/date
4505789441 / 28.09.2016
Ire
HIRA shall _be conducted and developed for IREP-cDU / VOU.
MaterialNo. Orderquantity. Unit
Description Price Currency Net Value
Krishi Kalyan Cess 0.500 @ 3,000.00
the item covers the following service!
ho HIRA development at TREP-CDU area
60 DaY (Days)
10,000.00 600,000.00
TOTAL AMOUNT (IN WORDS
Total net item val.
RUPEES SIX LAC ONLY
600,000.
INR
Pagezot 6
For Bharat Petroleum Corporation Lt.To, PO number/date
M/s. BUREAU VERITAS (INDIA) PRIVATE LTD 4505789441 / 28.09.2016
VENDOR CODE: 322235
Common Conditions
ferms of payment.
Pay immediately
ther contractual stipulations
FERENCE: ~ Your offer No. IND.C.4.16.0327R2 dated 26/09/2016 and all subsequent
orrespondences till date for the subject job,
BPCL-KR REF. NO, 10/J22/1693/KR/16
lame of job: HIRA Study of IREP-CDU/VDU and Associated Units
‘cope of Work: : Identify the existing / potential safety, health, work environment
pnd fire hazard in all activities department listed the scope of work, Study the
dequacy of existing measures, procedures and systems at place for controlling
azards, To assess the probability of occurrence of accidents/incidents, Evaluate the|
beverity potential of accident/incident on people, property damage, Estimate the risk)
jievel, Suggest additional control measures in addition to the existing one to
juinimize the risk.
cope of Supply:
1. BPCL: Nil
2. Contractor: All arrangements as necessary for successful completion of the job.
[NGINEER-IN-CHARGE:~ Mr. Mohammed Shameem , Dy. Manager (IREP commissioning) shall be|
|che Engineer-in-charge.
[TERMS AND CONDITIONS:~ General Conditions of Contract (GCC) [except Liquidated
pamages, Security Deposit « Defect Liability Period Clauses], and other terms and
onditions as stipulated by the Engineer ~ in ~ Charge shall apply.
[IME OF COMPLETION: Two Months from the date of P 0.
"AYMENT TERMS:~ Payment shall be made on the basis of actual work done and on due
certification by BECL-KR Engineer as per commercial proposal/ GCC. 50% payment will
e made on submission of Draft Report and 50% on submission of Final Report.
provident Fund (PF)/EST: You are requested to comply with the statutory obligations
nder the PF and ESI Act. If there is any default on the part of the contractor in
his regard, payment of bills will be kept in abeyance till clearance of PF and / or
aI dues or the said dues will be recovered from the bills and paid to the
uthorities concerned.
Pst/eer scueme:
Page Sof 6 For Bharat Peticleum Gorperation Ltd