Вы находитесь на странице: 1из 6
ura daiferr aiden fares TE ee aT ST wifea Ree BHARAT PETROLEUM CORPORATION LIMITED Govt. of India Enterprise Kochi Refinery To, M/s. BUREAU VERITAS (INDIA) MARWAH CENTRE, 6TH FLOOR, KRISHANEAL MARWAN MARG, ANDHERI EAST SAKI VIHAR ROAD MUMBAI SUBURBAN, MUMBAT SUBURBAN, MAHARASHTRA, INDIA ~ 400072 Ph : 022 66956300. VENDOR CODE: 322235 PRIVATE LTD Fax + 022-56956309/310 Purchase order PO number/date 4505789441/28.09.2016 Contact person/Telephone RAGHUNATHAN K/282-2093 ERX NO ~ Email, |-aghunathank@bharatpetroleum, in Deliver to: M/s. Bharat Petroleum Corpn.Ltd KOCHI REFINERY, AMBALAMUGAL, KOCHI, ERNAKULAM, INDIA - 682302 Purchase Grp: J22/PROJECT - SERVICES| Your quotation/Dated: 126.09,2016 Delivery date: 27.11.2016 Our Reference: J22/1693KR Contract Documents 8L.No. Decription Estimated Order Value : INR 600,000.00 (in words: Rs. Six Lakh Only.) Subject: HIRA STUDY OF IREP-cbU With reference to your Quotation/Contract No dated 26.09.2016 and subsequent correspondence/discussions had till date, we are pleased to issue our Purchase Order as per terms and conditions mentioned in this order.In case of clarification please contact: RAGHUNATHAN K MANAGER (PROJECTS) BPCL - KOCHI REFINERY POST BAG NO 2, AMBALAMUGAL KOCHI, INDIA PIN ~ 682302 For any further clarifications/instructions/Site related information needed for rendering services as per scope of work, you are requested to contact our Engineer-in-charge MOHAMED SHAMBEM MACHINGAL. iften MaterialNo. Orderguantity Unit Description Price Currency Net Value 0010 HIRA STUDY of IREP-CDU Gross Price 600,000.00 INR 600,000.00 Service Tax 14.000 84,000.00 Swachbharat Cess 0.500 3,000.00 Page tof 6 Please sign & send the duplicate For Bharat Corporation Ltd copy ofthis order 18 acknowledgement ANJOD JOHN: hare ~ eae 902, reer en, Bre, HT: 0404 2722061- 60, ‘araler: Wed Wa, 486, @eviia as, ders geez, dt. at. a. 688 Hag -400 001 jharalpetroleum.in 44: www.bharatpetroleum.in _ fit: L23220MH1952G01008931 2, Anplapl 682902 Ernakulam Ot, KeralaPone: O48 -27205-6 Fax 2720061 2721004 Rogtred Oe: Bharat Bhavan, 4&6, Curinthoy Rod, Batard Ee, 8. No 65, Numba - 400001 emai info@bharaigeticleum in. Web wwnrbheraigeticeumin CIN: L23220NH 962601006081 ‘20, M/s. BUREAU VERITAS (INDIA) VENDOR CODE: 322235 PRIVATE LTD PO nunber/date 4505789441 / 28.09.2016 Ire HIRA shall _be conducted and developed for IREP-cDU / VOU. MaterialNo. Orderquantity. Unit Description Price Currency Net Value Krishi Kalyan Cess 0.500 @ 3,000.00 the item covers the following service! ho HIRA development at TREP-CDU area 60 DaY (Days) 10,000.00 600,000.00 TOTAL AMOUNT (IN WORDS Total net item val. RUPEES SIX LAC ONLY 600,000. INR Pagezot 6 For Bharat Petroleum Corporation Lt. To, PO number/date M/s. BUREAU VERITAS (INDIA) PRIVATE LTD 4505789441 / 28.09.2016 VENDOR CODE: 322235 Common Conditions ferms of payment. Pay immediately ther contractual stipulations FERENCE: ~ Your offer No. IND.C.4.16.0327R2 dated 26/09/2016 and all subsequent orrespondences till date for the subject job, BPCL-KR REF. NO, 10/J22/1693/KR/16 lame of job: HIRA Study of IREP-CDU/VDU and Associated Units ‘cope of Work: : Identify the existing / potential safety, health, work environment pnd fire hazard in all activities department listed the scope of work, Study the dequacy of existing measures, procedures and systems at place for controlling azards, To assess the probability of occurrence of accidents/incidents, Evaluate the| beverity potential of accident/incident on people, property damage, Estimate the risk) jievel, Suggest additional control measures in addition to the existing one to juinimize the risk. cope of Supply: 1. BPCL: Nil 2. Contractor: All arrangements as necessary for successful completion of the job. [NGINEER-IN-CHARGE:~ Mr. Mohammed Shameem , Dy. Manager (IREP commissioning) shall be| |che Engineer-in-charge. [TERMS AND CONDITIONS:~ General Conditions of Contract (GCC) [except Liquidated pamages, Security Deposit « Defect Liability Period Clauses], and other terms and onditions as stipulated by the Engineer ~ in ~ Charge shall apply. [IME OF COMPLETION: Two Months from the date of P 0. "AYMENT TERMS:~ Payment shall be made on the basis of actual work done and on due certification by BECL-KR Engineer as per commercial proposal/ GCC. 50% payment will e made on submission of Draft Report and 50% on submission of Final Report. provident Fund (PF)/EST: You are requested to comply with the statutory obligations nder the PF and ESI Act. If there is any default on the part of the contractor in his regard, payment of bills will be kept in abeyance till clearance of PF and / or aI dues or the said dues will be recovered from the bills and paid to the uthorities concerned. Pst/eer scueme: Page Sof 6 For Bharat Peticleum Gorperation Ltd

Вам также может понравиться