Вы находитесь на странице: 1из 6
REPUBLIC OF RWANDA Kiga ly irorc ait Rel. NE 2942 /Po/oty MINISTRY OF INFRASTRUCTURE P.O, Rox 24 Tel: 4250252885503 Boulevard de PUmuganda ‘Kigali-Rwanda ADVERTISEMENT OF THE REQUEST FOR EXPRESSIONS OF INTEREST TITLE: CONSULTANCY FOR FEASIBILITY STUDY AND ASSOCIATED PRELIMINARY, AND DETAILED DESIGNS FOR INFRASTRUCTURE IN SECONDARY CITIES (CLIENT: MINISTRY OF INFRASTRUCTURE ‘SOURCE OF FUNDS: GOVERNMENT OF RWANDA. REQUEST FOR EXPRESSION OF INTEREST N° ch.-Tlimons iz pec m4 Date: 1. BACKGROUND: ‘The Government of the Republic of Rwanda through the Ministry of Infrastructure (MININFRA) intend to engage a consultant for the Feasibility Study and Associated Preliminary and Detailed Designs for Infiastructre in Secondary Cites. ‘This request for Expression of Interest sets the framework forthe assignment, which involves assesing infrastructure priorities (based on curently available information) eururing sustained urban economieé growth: transport, urban services, and energy; and a diagnostic of the country’s Public and Private Partnership (PPP) framework, to leverage private sector resoures. ‘The success of the assignment will be based on the achievement of certain milestones, which will reflect the delivery and acceptance by the Ministry of Infrastructure (MININFRA) in eccondance with the technical specifications and forms of outputs-deliveables in the terms of references of the feasibility study. 2. OBJECTIVE OF THE ASSIGNMENT: ‘The overall project objective ofthis assignment is guided by Rwande's Urbanisation end Rural Settlement Sector Strategic Plan 2013-18, ‘The Sector Strategy promotes the development of sevondaty cities while creating 2 network of urban and urbanizing centers The successful consultant will be asked to work with six selected secondary cities, the City of Kigali, and the Ministry of Infrastructure in assessing ther respective realistic and sustainable investment priorities in relation to urban services. These priorities will be framed within the form of two basic produets: (a) Feasibility Study and (b) Preliminary Design, While the assessment in the secondary cities looks at their Page 1 of 6 centre urban areas, the City of Kigali has chosen to concentrate ona pre-determined study area within one ofits Distet 3. DESCRIPTION OF THE SCOPE OF WORK FOR THE FEASIBILITY STUDY AND ASSOCIATED PRELIMINARY AND DETAILED DESIGNS FOR INFRASTRUCTURE IN ‘SECONDARY CITIES The key priorities of the six secondary cities within the context of their curent status as well as anticipated growth include, but are not limited to (1) roads, 2) water supply & sanitation, @) storm water

Вам также может понравиться