Вы находитесь на странице: 1из 2

4 Construction details including foundation, 4 A final inspection is conducted when the

structure, plumbing, mechanical, electrical, pool is completed and all fencing, alarms,
How to Apply for a and any special design features pool covers, etc. have been installed or
Permit to Build or 4 Engineering data, including signed completed.
calculations and geotechnical report
Repair a Pool or Spa 4 Energy calculation data. What fees must I pay?
A separate handout entitled Plan Requirements You must pay building, planning,
describes requirements in greater detail and gives plumbing, electrical, plan check, filing,
What kinds of permits do I need you examples of how the various plans should be and microfilm fees.
to build or repair a pool or spa? drawn.
4 A combination permit, which
includes separate building, At what point should I call for an
plumbing, mechanical, and What’s the next step in this
inspection of my project? process?
electrical permits
Prior to the permit being issued, a
4 Approval from your water district, pre-site inspection will be required. The
Read the pamphlet General
Geotechnical, and possibly other County Procedures When You Apply for a
applicant must contact the Building
sections Planning or Building Permit This
Inspection Section at (650) 599-7311 to
pamphlet explains the general
4 Planning approval schedule this inspection. It is the
procedures for applying for a permit, paying fees,
responsibility of the applicant to ensure that the
4 Depending upon your property’s location, inspector has access to the property where the
calling for inspections, and other related matters.
you may need additional approvals. If your Then you should also review the following
pool will be constructed. If no one will be home
home is near the coast, for example, you documents, which contain other information that
on the day of the pre-site inspection, the
may need a design review and a coastal you may need:
applicant must call this office on the morning of
development permit. the inspection and advise the inspector how he How to Apply for Design Review
or she can obtain access to the construction site. How to Apply for a Coastal Development
Gates must be unlocked and dogs or other Permit
Do I have to visit all of these animals secured in an area that does not require
offices individually? access by the inspector. The plan check of the Geotechnical Requirements
Building will automatically route your application permit cannot be completed until this pre-site After you have become familiar with these
and plans to most of them. You will be inspection is conducted. documents, we recommend that you prepare
responsible for showing plans to your water Although projects may vary, generally speaking, some very preliminary plans and bring them to
district the following inspections will be required during the DRC counter so that we can review them. An
the construction. informal meeting at this stage may save you
considerable time and money later on.
How do I apply for a permit? 4 A pre-gunite inspection will be required
when the excavation is completed, If you are new to San Mateo County, you may
Submit an application to Building that reinforcing steel is in-place, circulation also wish to make an appointment to meet with
identifies the property, lists the name of staff as part of the County’s Early Assistance
piping install (and under test), and forming
any architect or engineer who will Meeting Program. Early assistance meetings are
work on the project, and describes the shells for lighting are installed. designed to acquaint owner/builders,
proposed work in detail. Along with this 4 An inspection of all gas piping and electrical contractors, architects, and other professionals
application, submit three sets of the following: associated with pool is required. Gas piping who are new to the area or unfamiliar with our
4 A plot plan showing the entire property, must be under test. permit system, with the different agencies
4 An inspection of the decking must be involved, and the various costs and requirements.
including the proposed pool or spa and its
There is no charge for the meeting, which you
mechanical equipment, and any driveways, performed before concrete is placed. All can schedule by calling (650) 363-1825.
walkways, parking areas, wells, retaining bonding of metallic parts will be reviewed
walls, utilities, easements, trees, or other at this time.
structures.
11014.vp ds 5-14-02
San Mateo County
Permit Process to Build or Planning and Building Division

Repair a Pool or Spa


How to Apply
for a Permit
to Build or
Repair a Pool
or Spa

County Government Center

455 County Center, Second Floor

Redwood City, California 94063

(650) 599-7311

FAX (650) 363-4849

email: INTERNET:plngbldg@co.sanmateo.ca.us
web site address:
http://www.co.sanmateo.ca.us/planning

Вам также может понравиться