Вы находитесь на странице: 1из 24

Bid Schedule Contract No.

DJT/RJP-3

Nazik Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
13/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, watering ‰
4.069 3500 14241.50 1.695 5932.50 0.000 0.00 1.695 5932.50
and ramming lead up to one chain (30 m) Cft
and lift up to 5 ft. (1.5 m)
In ordinary soil

13/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, in %
foundation and plinth:- 2.231 13000 29003.00 0.783 10179.00 0.000 0.00 0.783 10179.00
Cft
(b) Ratio 1: 4: 8
13/3 Reinforced cement concrete in roof slab,
beams, columns, lintels, girders & other
structural members laid in situ or precast
laid in position or prestressed members Cft 553.378 275 152178.95 673.894 185320.85 0.000 0.00 673.894 185320.85
cast in situ, complete in all respects:-
Ratio 1:2:4 (Type-C)

13/4 Providing and fabrication of mild steel


reinforcement for cement concrete %
including cutting bending laying in 52.707 9500 500716.50 21.815 207242.50 0.000 0.00 21.815 207242.50
Kg
position deformed bars
13/5 Pacca brick work other than building upto
10ft. (3 m) Ratio 1:3 Cement Sand %
14.263 12500 178287.50 6.259 78237.50 0.000 0.00 6.259 78237.50
mortar Cft

13/6 Cement concrete plain including placing,


compacting, finishing and curing
complete (including screening and %
0.664 16000 10624.00 0.221 3536.00 0.000 0.00 0.221 3536.00
washing of stone aggregate): Cft
(f) Ratio 1: 2: 4 (Type-C)

Total for Bill No. 2 885051.45 490448.35 0.00 490448.35

340476.53
830924.88
Bid Schedule Contract No. DJT/RJP-3

Nazik Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
Contractor Executive Engineer Resident Engineer
M/S Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16 6.38 7.84 1600.614

Wing Wall Cft 2 11 2.875 1.5 94.875

Total (Cft) for One 1695.489

Total (‰Cft) for No 1 1.695

lean (1:4:8)

Abutment Wall Cft 2 16 4.38 0.333 46.673

Wing Wall Cft 2 11 2.875 0.5 31.625

Total (Cft) for One 78.298

Total (%Cft) for No 1 0.783

RCC (1:2:4)

RCC Pad Cft 2 16 4.38 1 140.160

Roof Slab Cft 1 16 18.81 1.5 451.440

Parapet Wall Cft 2 18.81 0.875 2.5 82.294

Total (Cft) for No 3 673.894

Total (Cft) for No 1 673.894

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16 3.38 1.01 109.242

Step-2 Cft 2 16 3.005 1 96.160

Step-3 Cft 2 16 2.630 1 84.160

Step-4 Cft 2 16 2.255 1 72.160

Step-5 Cft 2 16 1.880 1 60.160

Step-6 Cft 2 16 1.500 1.5 72.000

Wing Wall

Step-1 Cft 2 11 1.875 1 41.250

Step-2 Cft 2 11 1.5 1 33.000

Step-3 Cft 2 11 1.125 1 24.750

Step-4 Cft 2 11 0.75 2 33.000

Total (Cft) for One 625.882

Total (%Cft) for No 1 6.259


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

PCC (1:2:4)

Coping at Abutment Wall Cft 2 16 1.125 0.5 18.000

Coping at Wing Wall Cft 2 11 0.75 0.25 4.125

Total (Cft) for One 22.125

Total (%Cft) for No 1 0.221

Contractor Sub Divisional Officer J.E/Inspector


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
RCC Slab

Main Bars (Bott) 15.5 #8 8 " C/C 1 24 24 19.340 464.160 1.210 561.634 "4-'18 "6
"6

Main Bars (Top) 15.5 #6 8 " C/C 1 24 24 19.340 464.160 0.681 316.093 "4-'18 "6
"6

Distribution Bars (T&B) 18.31 #6 8 " C/C 2 28 56 15.500 868.000 0.681 591.108 "6-'15

RCC Pad

Main Bars (T &B) 15.5 #6 8 " C/C 4 24 96 4.666 447.936 0.681 305.044 "0-'4 "4
"4

Distribution Bars (T&B) 2.50 #6 10 " C/C 4 4 16 15.500 248.000 0.681 168.888 "6-'15

Parapet

Longitudinal Bars (Top) 2.5 #4 8 " C/C 4 9 36 15.500 558.000 0.302 168.516 "6-'15

"6

"6-'2
Stirups 18.31 #4 6 " C/C 2 15 30 7.750 232.500 0.302 70.215 "0-'3

"9

"9
Total Weight (Kg) 2181.498
Total Weight (%Kg) 21.815
Dia Of Bar Weight (Kg) For 1 No VRB 21.815
#4 238.731 "4
#6 1381.133
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Total Weight (Kg) 1619.86
"7
Contractor Sub Divisional Officer J.E/Inspector
M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
Bid Schedule Contract No. DJT/RJP-3

Nazik Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
13/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, watering ‰
4.069 3500 14241.50 1.215 4252.50 0.000 0.00 1.215 4252.50
and ramming lead up to one chain (30 m) Cft
and lift up to 5 ft. (1.5 m)
In ordinary soil

13/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, in %
foundation and plinth:- 2.231 13000 29003.00 0.703 9139.00 0.000 0.00 0.703 9139.00
Cft
(b) Ratio 1: 4: 8
13/3 Reinforced cement concrete in roof slab,
beams, columns, lintels, girders & other
structural members laid in situ or precast
laid in position or prestressed members Cft 553.378 275 152178.95 460.091 126525.03 0.000 0.00 460.091 126525.03
cast in situ, complete in all respects:-
Ratio 1:2:4 (Type-C)

13/4 Providing and fabrication of mild steel


reinforcement for cement concrete %
including cutting bending laying in 52.707 9500 500716.50 14.667 139336.50 0.000 0.00 14.667 139336.50
Kg
position deformed bars
13/5 Pacca brick work other than building upto
10ft. (3 m) Ratio 1:3 Cement Sand %
14.263 12500 178287.50 4.615 57687.50 0.000 0.00 4.615 57687.50
mortar Cft

13/6 Cement concrete plain including placing,


compacting, finishing and curing
complete (including screening and %
0.664 16000 10624.00 0.221 3536.00 0.000 0.00 0.221 3536.00
washing of stone aggregate): Cft
(f) Ratio 1: 2: 4 (Type-C)

Total for Bill No. 2 885051.45 340476.53 0.00 340476.53


Bid Schedule Contract No. DJT/RJP-3

Nazik Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
Contractor Executive Engineer Resident Engineer
M/S Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16 5.63 6.22 1120.595

Wing Wall Cft 2 11 2.875 1.5 94.875

Total (Cft) for One 1215.470

Total (‰Cft) for No 1 1.215

lean (1:4:8)

Abutment Wall Cft 2 16 3.63 0.333 38.681

Wing Wall Cft 2 11 2.875 0.5 31.625

Total (Cft) for One 70.306

Total (%Cft) for No 1 0.703

RCC (1:2:4)

RCC Pad Cft 2 16 3.63 1 116.160

Roof Slab Cft 1 16 14.11 1.25 282.200

Parapet Wall Cft 2 14.11 0.875 2.5 61.731

Total (Cft) for No 3 460.091

Total (Cft) for No 1 460.091

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16 2.63 1.39 116.982

Step-2 Cft 2 16 2.255 1 72.160

Step-3 Cft 2 16 1.880 1 60.160

Step-4 Cft 2 16 1.505 1 48.160

Step-5 Cft 2 16 1.130 1 36.160

Step-6 Cft 0 16 0.750 0.5 0.000

Wing Wall

Step-1 Cft 2 11 1.875 1 41.250

Step-2 Cft 2 11 1.5 1 33.000

Step-3 Cft 2 11 1.125 1 24.750

Step-4 Cft 2 11 0.75 1.75 28.875

Total (Cft) for One 461.497

Total (%Cft) for No 1 4.615


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

PCC (1:2:4)

Coping at Abutment Wall Cft 2 16 1.125 0.5 18.000

Coping at Wing Wall Cft 2 11 0.75 0.25 4.125

Total (Cft) for One 22.125

Total (%Cft) for No 1 0.221

Contractor Sub Divisional Officer J.E/Inspector


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
RCC Slab

Main Bars (Bott) 15.5 #6 8 " C/C 1 24 24 14.666 351.984 0.681 239.701 "8-'13 "6
"6

Main Bars (Top) 15.5 #6 10 " C/C 1 20 20 14.660 293.200 0.681 199.669 "8-'13 "6
"6

Distribution Bars (T&B) 13.61 #6 10 " C/C 2 17 34 15.500 527.000 0.681 358.887 "6-'15

RCC Pad

Main Bars (T &B) 15.5 #6 8 " C/C 4 24 96 3.920 376.320 0.681 256.274 "3-'3 "4
"4

Distribution Bars (T&B) 2.50 #6 10 " C/C 4 4 16 15.500 248.000 0.681 168.888 "6-'15

Parapet

Longitudinal Bars (Top) 2.5 #4 8 " C/C 4 9 36 15.500 558.000 0.302 168.516 "6-'15

"6

"9-'2
Stirups 13.61 #4 6 " C/C 2 15 30 8.250 247.500 0.302 74.745 "3-'3

"9

"9
Total Weight (Kg) 1466.680
Total Weight (%Kg) 14.667
Dia Of Bar Weight (Kg) For 1 No VRB 14.667
#4 243.261 "4
#6 1223.419
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Total Weight (Kg) 1466.68
"7
Contractor Sub Divisional Officer J.E/Inspector
M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
Bid Schedule Contract No. DJT/RJP-3

Bukhari Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
13/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, watering ‰
4.069 3500 14241.50 1.217 4259.50 0.000 0.00 1.217 4259.50
and ramming lead up to one chain (30 m) Cft
and lift up to 5 ft. (1.5 m)
In ordinary soil

13/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, in %
foundation and plinth:- 2.231 13000 29003.00 0.703 9139.00 0.000 0.00 0.703 9139.00
Cft
(b) Ratio 1: 4: 8
13/3 Reinforced cement concrete in roof slab,
beams, columns, lintels, girders & other
structural members laid in situ or precast
laid in position or prestressed members Cft 553.378 275 152178.95 459.604 126391.10 0.000 0.00 459.604 126391.10
cast in situ, complete in all respects:-
Ratio 1:2:4 (Type-C)

13/4 Providing and fabrication of mild steel


reinforcement for cement concrete %
including cutting bending laying in 52.707 9500 500716.50 14.597 138671.50 0.000 0.00 14.597 138671.50
Kg
position deformed bars
13/5 Pacca brick work other than building upto
10ft. (3 m) Ratio 1:3 Cement Sand %
14.263 12500 178287.50 4.623 57787.50 0.000 0.00 4.623 57787.50
mortar Cft

13/6 Cement concrete plain including placing,


compacting, finishing and curing
complete (including screening and %
0.664 16000 10624.00 0.221 3536.00 0.000 0.00 0.221 3536.00
washing of stone aggregate): Cft
(f) Ratio 1: 2: 4 (Type-C)

Total for Bill No. 2 885051.45 339784.60 0.00 339784.60


Bid Schedule Contract No. DJT/RJP-3

Bukhari Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
Contractor Executive Engineer Resident Engineer
M/S Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16 5.63 6.23 1122.397

Wing Wall Cft 2 11 2.875 1.5 94.875

Total (Cft) for One 1217.272

Total (‰Cft) for No 1 1.217

lean (1:4:8)

Abutment Wall Cft 2 16 3.63 0.333 38.681

Wing Wall Cft 2 11 2.875 0.5 31.625

Total (Cft) for One 70.306

Total (%Cft) for No 1 0.703

RCC (1:2:4)

RCC Pad Cft 2 16 3.63 1 116.160

Roof Slab Cft 1 16 14.09 1.25 281.800

Parapet Wall Cft 2 14.09 0.875 2.5 61.644

Total (Cft) for No 3 459.604

Total (Cft) for No 1 459.604

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16 2.63 1.4 117.824

Step-2 Cft 2 16 2.255 1 72.160

Step-3 Cft 2 16 1.880 1 60.160

Step-4 Cft 2 16 1.505 1 48.160

Step-5 Cft 2 16 1.130 1 36.160

Step-6 Cft 0 16 0.750 -0.5 0.000

Wing Wall

Step-1 Cft 2 11 1.875 1 41.250

Step-2 Cft 2 11 1.5 1 33.000

Step-3 Cft 2 11 1.125 1 24.750

Step-4 Cft 2 11 0.75 1.75 28.875

Total (Cft) for One 462.339

Total (%Cft) for No 1 4.623


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

PCC (1:2:4)

Coping at Abutment Wall Cft 2 16 1.125 0.5 18.000

Coping at Wing Wall Cft 2 11 0.75 0.25 4.125

Total (Cft) for One 22.125

Total (%Cft) for No 1 0.221

Contractor Sub Divisional Officer J.E/Inspector


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
RCC Slab

Main Bars (Bott) 15.5 #6 8 " C/C 1 24 24 14.580 349.920 0.681 238.296 "7-'13 "6
"6

Main Bars (Top) 15.5 #6 10 " C/C 1 20 20 14.580 291.600 0.681 198.580 "7-'13 "6
"6

Distribution Bars (T&B) 13.59 #6 10 " C/C 2 17 34 15.500 527.000 0.681 358.887 "6-'15

RCC Pad

Main Bars (T &B) 15.5 #6 8 " C/C 4 24 96 3.920 376.320 0.681 256.274 "3-'3 "4
"4

Distribution Bars (T&B) 2.50 #6 10 " C/C 4 4 16 15.500 248.000 0.681 168.888 "6-'15

Parapet

Longitudinal Bars (Top) 2.5 #4 8 " C/C 4 9 36 15.500 558.000 0.302 168.516 "6-'15

"6

"6-'2
Stirups 13.59 #4 6 " C/C 2 15 30 7.750 232.500 0.302 70.215 "0-'3

"9

"9
Total Weight (Kg) 1459.656
Total Weight (%Kg) 14.597
Dia Of Bar Weight (Kg) For 1 No VRB 14.597
#4 238.731 "4
#6 1220.925
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Total Weight (Kg) 1459.66
"7
Contractor Sub Divisional Officer J.E/Inspector
M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
Bid Schedule Contract No. DJT/RJP-3

Bukhari Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
13/1 Excavation in foundation of buildings,
bridges and other structures including
dagbelling, dressing, refilling around
structure with excavated earth, watering ‰
4.069 3500 14241.50 1.418 4963.00 0.000 0.00 1.418 4963.00
and ramming lead up to one chain (30 m) Cft
and lift up to 5 ft. (1.5 m)
In ordinary soil

13/2 Cement concrete brick or stone ballast


1½ " to 2" (40 mm to 80 mm) gauge, in %
foundation and plinth:- 2.231 13000 29003.00 0.744 9672.00 0.000 0.00 0.744 9672.00
Cft
(b) Ratio 1: 4: 8
13/3 Reinforced cement concrete in roof slab,
beams, columns, lintels, girders & other
structural members laid in situ or precast
laid in position or prestressed members Cft 553.378 275 152178.95 584.306 160684.15 0.000 0.00 584.306 160684.15
cast in situ, complete in all respects:-
Ratio 1:2:4 (Type-C)

13/4 Providing and fabrication of mild steel


reinforcement for cement concrete %
including cutting bending laying in 52.707 9500 500716.50 15.826 150347.00 0.000 0.00 15.826 150347.00
Kg
position deformed bars
13/5 Pacca brick work other than building upto
10ft. (3 m) Ratio 1:3 Cement Sand %
14.263 12500 178287.50 5.165 64562.50 0.000 0.00 5.165 64562.50
mortar Cft

13/6 Cement concrete plain including placing,


compacting, finishing and curing
complete (including screening and %
0.664 16000 10624.00 0.221 3536.00 0.000 0.00 0.221 3536.00
washing of stone aggregate): Cft
(f) Ratio 1: 2: 4 (Type-C)

Total for Bill No. 2 885051.45 393764.65 0.00 393764.65


Bid Schedule Contract No. DJT/RJP-3

Bukhari Disty
VILLAGE ROAD BRIDGE – Bill No. 13
Item Total as per Bid Schedule Executed Up-todate Paid Upto Previous Due this Certificate
Description Unit Amount Amount Amount Amount
No. Quantity Rate Quantity Quantity Quantity
(Rs.) (Rs.) (Rs.) (Rs.)
Contractor Executive Engineer Resident Engineer
M/S Nishan Engineers Rajanpur Canal Division Rajanpur PISIP Rajanpur
PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

Excavation

Abutment Wall Cft 2 16 6.01 6.88 1323.162

Wing Wall Cft 2 11 2.875 1.5 94.875

Total (Cft) for One 1418.037

Total (‰Cft) for No 1 1.418

lean (1:4:8)

Abutment Wall Cft 2 16 4.01 0.333 42.731

Wing Wall Cft 2 11 2.875 0.5 31.625

Total (Cft) for One 74.356

Total (%Cft) for No 1 0.744

RCC (1:2:4)

RCC Pad Cft 2 16 4.01 1 128.320

Roof Slab Cft 1 16 16.07 1.5 385.680

Parapet Wall Cft 2 16.07 0.875 2.5 70.306

Total (Cft) for No 3 584.306

Total (Cft) for No 1 584.306

B/W (1:3)

Abutment Wall

Step-1 Cft 2 16 3.01 1.05 101.136

Step-2 Cft 2 16 2.635 1 84.320

Step-3 Cft 2 16 2.260 1 72.320

Step-4 Cft 2 16 1.885 1 60.320

Step-5 Cft 2 16 1.510 1 48.320

Step-6 Cft 2 16 1.130 0.5 18.080

Wing Wall

Step-1 Cft 2 11 1.875 1 41.250

Step-2 Cft 2 11 1.5 1 33.000

Step-3 Cft 2 11 1.125 1 24.750

Step-4 Cft 2 11 0.75 2 33.000

Total (Cft) for One 516.496

Total (%Cft) for No 1 5.165


PUNJAB IIRIGATION SYSTEM IMPROVEMENT PROJECT
Village Road Bridge@ RD 2+400 & 7+200
Fakhar Minor

Description Unit No Length Width Depth Qty

PCC (1:2:4)

Coping at Abutment Wall Cft 2 16 1.125 0.5 18.000

Coping at Wing Wall Cft 2 11 0.75 0.25 4.125

Total (Cft) for One 22.125

Total (%Cft) for No 1 0.221

Contractor Sub Divisional Officer J.E/Inspector


M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
RCC Slab

Main Bars (Bott) 15.5 #6 8 " C/C 1 24 24 16.570 397.680 0.681 270.820 "7-'13 "6
"6

Main Bars (Top) 15.5 #6 10 " C/C 1 20 20 16.570 331.400 0.681 225.683 "7-'13 "6
"6

Distribution Bars (T&B) 15.57 #6 10 " C/C 2 20 40 15.500 620.000 0.681 422.220 "6-'15

RCC Pad

Main Bars (T &B) 15.5 #6 8 " C/C 4 24 96 3.920 376.320 0.681 256.274 "3-'3 "4
"4

Distribution Bars (T&B) 2.50 #6 10 " C/C 4 4 16 15.500 248.000 0.681 168.888 "6-'15

Parapet

Longitudinal Bars (Top) 2.5 #4 8 " C/C 4 9 36 15.500 558.000 0.302 168.516 "6-'15

"6

"6-'2
Stirups 15.57 #4 6 " C/C 2 15 30 7.750 232.500 0.302 70.215 "0-'3

"9

"9
Total Weight (Kg) 1582.616
Total Weight (%Kg) 15.826
Dia Of Bar Weight (Kg) For 1 No VRB 15.826
#4 238.731 "4
#6 1343.885
PUNJAB IRRIGATION SYSTEM IMPROVEMENT PROJECT
Bar Bending Detail
VRB at Fakhar Minor@ RD 2+400 & 7+200
Description Distribution Dia of Spacing No No Total Cut Total Unit Total Bending
Span Bar of of Bar Length Length Weight Weight Detail
Ft items Bar No's Ft Ft Kg/Ft Kg
Total Weight (Kg) 1582.62
"7
Contractor Sub Divisional Officer J.E/Inspector
M/S Nishan Engineers Kadara Sub Division Rajanpur PISIP Rajanpur