ORIGINAL WORKS - NHIDCL
Total Length
Civil works (Roads & Rehabilitation work under Total Project Total Civil works in Total DPR works in
Tunnel civil work Completed As On Tunnel DPR work DPR other than BMP Bharatmala DPR NH-in principle Overall Total
Bridges ) NH(O) Completed 31.12.2018 progress progress
S.No State
Length Cost Length Cost Length (in Cost Length Cost Length Length Cost Length Cost Length Cost Length Cost Length Cost Length Cost Total Length Cost
(in Km ) (Rs in Cr) (in Km ) (Rs in Cr) Km ) (Rs in Cr) (in Km ) (Rs in Cr) (in Km ) (in Km ) (Rs in Cr) (in Km ) (Rs in Cr) (in Km ) (Rs in Cr) (in Km ) (Rs in Cr) (in Km ) (Rs in Cr) (in Km ) (Rs in Cr) Nos. (in Km ) (Rs in Cr)
Andaman &
321 2095 0 0 0 0 56 321 2095 0 0 0 0 91 1315 91 1315 17 411 3411
1 Nicobar Island
Arunachal Pradesh 616 8708 0 0 0 0 75 626 85 616 8708 229 0 0 0 228 3306 457 3306 35 1073 12014
2
3 Assam 379 8909 0 0 0 0 49 379 8909 269 8944 1341 19445 1253 18168 2863 46557 85 3243 55466
6 Manipur 47.2 1010 0 0 161 170 307 248 0 208 1180 1009 12681 879 13181 0 0 1888 25862 22 2096 27041
7 Meghalaya 52 553 0 0 0 0 0 52 553 845 12289 304 4408 0 0 1149 16697 21 1200 17250
9 Nagaland 343 5937 0 0 0 0 0 343 5937 75 0 333 4829 84 840 492 5669 25 834 11606
10 Sikkim 77 1522 0 0 10 18 0 87 1540 506 6906 158 5364 0 0 664 12270 17 751 13810
11 Tripura 50 878 0 0 0 0 74 815 39 50 878 0 0 598 9768 0 0 598 9768 10 648 10646
12 Uttarakhand 95 1095 5 1384 4.6 302 0 104 2781 0 0 0 0 745 10407 0 0 745 10407 17 849 13188
Grand Total 2180 32462 25.7 10873 176 490 605 1781 229 2381 43825 41.50 8640 4053 57315 4850 74535 1740 23629 10684 164120 284 13065 207944
Target for
Road Total Cost i/c Date of Award of Total Length
Estimated Cost Contractor/Auth completion Target Date of
Sl. No. NH Funding Name of project Length Centages as per Job No. Contract Completed As Status
(Rs. in crore) ority Engineer. (length in km) completion
(km) HPC (Rs. in Cr.) /Appointed Date On 31.12.2018
for FY 2018-19
Civil work
0223- (i) LOA issued to M/s Mantena Vasistha Bridge JV on 18.12.2017 & Contract Agreement signed on
Construction of Major Bridge over Middle Strait Creek between 18.12.2017/ M/s Mantena
1 NH-04 NH(O) 1.90 170.40 262.97 A&N(1)/2014- 0 0 02.01.2022 02.01.2018.
Km. 106.590 to Km. 107.762 of NH-223 03.01.2019 Vasistha Bidge JV
15/001-S&R(B) (ii) Contract negotitaion under process.
M/s Vasishta
2-Lane with hard shoulder,Rehabilitation and up-gradation of Mantena NH JV/ (i) Physical Progress - 3.00 %
NHIDCL Cell/NH- 31.03.2017/
3 NH-04 NH(O) section from Km 242.0 to 298.0 of NH-223 (New NH-4) on 55.45 259.00 409.85 EPTISA 0 15 04.12.2020 (ii) Financial Progress - 4.38 %
223/ 2016-17/4 05.12.2017
EPC Basis. (Package-II) SERVICIOS DE
INGENIERIA, S.L.
Target for
Road Total Cost i/c Date of Award of Total Length
Estimated Cost Contractor/Auth completion Target Date of
Sl. No. NH Funding Name of project Length Centages as per Job No. Contract Completed As Status
(Rs. in crore) ority Engineer. (length in km) completion
(km) HPC (Rs. in Cr.) /Appointed Date On 31.12.2018
for FY 2018-19
Rehabilitation
D Total (Rehabilitation Work) 0.00 0.00 0.00
Maintenance & Repair
Routine Maintenance of Chidiya Tapu to Middle Strait from Km i) LoA issued to M/s Baba Projects Pvt. Ltd. on 26.07.2017 and Letter to Proceed on 27.07.2017.
M/s Baba Projects ii) Work in progress.
18 NH-04 M&R 0.00 to Km 107.00 (Km 0-12; 21-28 & 45-107) of NH-4 (old NH- 81.00 3.13 3.13
Pvt.Ltd. iii) 5th RA bill has been processed.
223) (Maintenance Package-I)
Routine Maintenance of Middle Strait to Rangat from Km i) LoA issued to M/s Baba Projects Pvt. Ltd. on 26.07.2017 and Letter to Proceed on 27.07.2017.
M/s Baba Projects ii) Work in progress.
19 NH-04 M&R 107.00 to Km 220.00 (Length= 113 Km) of NH-4 (old NH-223) 113.00 3.69 3.69
Pvt.Ltd. iii) 5th RA bill has been processed.
(Maintenance Package-II)
Routine Maintenance of Rangat to Diglipur (North Andamans) i) LoA issued to M/s Baba Projects Pvt. Ltd. on 18.07.2017 and letter to proceed on 19.07.2017.
M/s Baba Projects ii) Work in progress.
20 NH-04 M&R from Km 220.00 to Km 330.70 (Length= 110.7 Km) of NH-4 110.70 2.92 2.92
Pvt.Ltd. iii) 5th RA bill has been processed.
(old NH-223) (Maintenance Package-III)
M/s Jandu i) LoA issued to M/s Jandu Construction Co. on 28.05.2018 and agreement signed on 11.07.2018
Improvement by overlaying of Stretch from Km 21-km28 on NH-
21 NH-04 M&R 7.00 4.05 5.07 Construction 4.00
4 in the UT of Andaman & Nicobar Islands
Company
E Total (Maintenance & Repair) 311.70 13.79 14.81 4.00
DPR Work
Feasibility Report Draft DPR Final DPR
Sl. No. Status Of Pre-Construction Activity
Road Total Alignment
NH Funding Name of project / Consultant Length Project Approval Actual Target
(km) Cost Status Actual Date Target Date LA FC Utility Shifting Target Date Actual Date
Date Date
Estimate
BO-Roing
(i) Work in Progress
New NH- Construction of 2-lane road from existing km. 21.50 of 06.05.2016/ SARDP-NE/Hunli Anini/21.50- M/s Madhucon Projects Ltd./M/s
11 SARDP 16 245.79 322.15 0 3 20.12.2019 (ii) Physical Progress- 16.89%
313 Hunli-Anini road (Near Ithun Bridge) to Km. 37.500 21.12.2016 37.50/Ar.Pkg/2016-17/102 Eptisa Servicio ingenerio
(iii)Financial Progress- 20.58%
BO-Lakhimpur
(i) Work in progress
State Construction of 2-lane road from km. 12.00 to Km. 02.11.2015/ SARDP-NE/Aka-Lika- M/s JKM-KCL JV /M/s MSV (ii) Physical Progress- 62.10 %
18 SARDP 21 148 210.5 7 10 Delayed
Road 33.00 of Akajan-Likabali- Bame road 21.01.2016 Bame/Ar.Pkg/2015-16/94 Internationa Inc. (iii) Financial Progress-61.12 %
DPR Work
Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
Sl. Road Length Alignment
NH Funding Name of project / Consultant
No. (km) Approval Status Actual Date Target Date Actual Date Target Date LA FC Actual Date Target Date
Utility Shifting
Estimate
In-principle
New NH- Construction of 2-lane road from Demwe to Brahmkund approval of
1 SARDP 56.17 Under tender 15 jan'2018 under tender
113 and Arrowa-Khupa-Hayuliang alignment has
been accorded.
In-principle
State Construction of 2-lane road from km. 15.00 ( Bile end) approval of
2 SARDP 36
Road to Km. 51.56 of Bile Migging road alignment has
been accorded.
Tripartite Agreement Signed with BRO
In-principle
State Construction of 2- lane road from km.30.00(Taliha end) approval of
3 SARDP 79
Road to km 109.3 of Taliha- Tato road alignment has
been accorded.
State Alignment
4 NK 2 langing of Diyun to Yankang 57.82 31.01.2019 20 Feb'19 31.03.2019
Road finalized.
Civil Work
(i) Financial Progress-12.855%
M/s T K Engineering Consortium (ii) Physical Progress-15.992%
SARDP-NE/NH-37/Naga-
4 laning from end of Nagaon bypass to Rangagara (Km. 02.02.2016/ (iii) Revised Milestone 1 : 30.10.2017 (Achieved)
1 37 SARDP 18.4 159.2 291.628 Rang/AS/2015-16/275 dtd Pvt. Ltd. / M/s STUP -Ayoleeza (JV) 0 10 22.05.2019
278.600 to Km. 297.000) of NH-37on EPC basis 23.05.2016 (iv) Revised Milestone 2 : 28.02.2018 (Not Achieved)
14.01.2016 Consultancy
(v) Milestone 3 : 04.03.2018 (Not achieved)
(vi) Notice for Intention to terminate issued on 16.07.2018
(i) Financial Progress-0.928%
SARDP-NE/NH-37/Rang- (ii) Physical Progress-4.027%
4 laning from Rangagara to Kaliabhor Tiniali from km 23.01.2017/ M/s Simplex Infrastructure/M/s
2 37 SARDP 18.315 196.24 289.99 Kalia/AS/2015-16/274 dtd 0 5 22.10.2020 (III)Contractor mobilised on site.
297.00 to km 315.315 of NH-37 on EPC basis. 23.10.2017 STUP -Ayoleeza (JV) Consultancy
12.01.2016 (iv) Clearing & Grubbing in progress
(v) Physical progress : 2.35%
(i) Work is in progress.
(ii) PHYSICAL: 48.46%
(iii) FINANCIAL: 45.61%
MSI(10%) : 25.09.15(Not achieved)
4 laning from Kaliabor Tinali to Dolabari section from MS II(40%) : 28.11.16 (Not achieved)
14.11.2014/ M/s Gammon- S.P. Singhla (JV) /
3 37A SARDP Km 0.0 to Km 17.3 of NH 37-A including construction of 17.3 588.95 873.91 - 10 Delayed MS III(70%) : 03.12.17(Not achieved)
29.11.2014 M/s S A Infra
new Brahmaputra bridge REVISED MILESTONE
(Supplementary Agreement signed on 16.04.2018)
MS-I & MS II -28.05% (31.01.2018) Acheived
MS-III 70% (14.11.2019) (EOT for 712 days)
Schedule Completion : 100% (09.11.2020)
(i) Contractor mobilised on site.
(ii) Earthwork upto subgrade and river training works in progress
4 - lane highway connecting km 17.3 of NH 37A and km SARDP-NE/NH-52/Dola-
12.04.2017/ M/s Simplex Infrastructure/TPF (iii) Physical progress : 7.0%
4 37A &52 SARDP 182 of NH 52 between Dolabari and Jamuguri on EPC 18.81 744.1 1050 Jam/AS/2016-17/290 dtd 0 5 31.08.2020
01.09.2017 Getinsa-Rodic JV (iv) Finiancial Progress: 5.52%
basis 08.03.2017
(v) Milestone 1 : 27.02.2018 (Not achieved)
NH-In Principle
76 NHIP NK Margherita Pengeri Phiobari Doondoma Road 56.76 709.5 823.02 11.01.2018
DPR Work
Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
Sl. Road Length Total Project Alignment
NH Funding Name of project / Consultant Utility Shifting
No. (km) Cost Approval Status Actual Date Target Date Actual Date Target Date LA FC Actual Date Target Date
Estimate
Alignment
Badarpurghat bridge over River Barak near Silchar on changed as per
Public Consultation
NH-44-Rehabilitation of existing bridge and construction
meeting. DPR
1 44 JICA of new bridge 4 200 Consultant is
Pending 12.09.2015 Pending 12.01.2016 Pending NA Pending Pending 12.01.2016
(JICA funding) directed to submit
Consultant : M/s SA Infra- DPR Consultant reports on new
alignment
Consultancy Services for Feasibility Study, Preparation (i) Total 6 Bids received on Bid Due Date i.e. 26.06.2018.
of Detailed Project Report and providing pre- (ii) Financial Bid Opened on 29.10.2018
7 217 NK construction services for up gradation of National 93
Highway No. 217(Paikan-Tura Section) in the state of
(iii) M/s Almondz Global Infra Consulting Limited (A wholly Owned Subsidiary of Almondz Global Securities Ltd.) in Association with Thoughts Consultants Jaipur Pvt. Ltd. has been identified as the H-1
Assam/Meghalaya Bidder.
DPR Work
Feasibility Report Draft DPR Final DPR
Sl. Status Of Pre-Construction Activity
No. Road Total Alignment
NH Funding Name of project / Consultant Length Project Approval Utility Remarks
(km) Cost Status Actual Date Target Date Actual Date Target Date LA FC Shifting Actual Date Target Date
Estimate
3(a)
Hathithan (NH-21)-Manikaran-Pulga
In-principle notification Stage-I under under
1 21 NK Consultant : M/s Lion Engineering 42.938 648.97 02.08.2017 08.05.2017 25.11.2017 09.07.2017 16.08.2018 31.12.2018
Approved published on process process
Consultants
Rohru-Jangla-Sungri-Taklesh- 22.06.2017
3(a)
Sarahan-Jeori (NH-5)
In-principle notification Stage-I under under Draft DPR have been
2 5 NK Consultant : M/s Lion Engineering 109.6 1688.9 11.09.2017 08.05.2017 25.11.2017 09.07.2017 31.12.2018
Approved published on process process submitted to Ministry
Consultants
22.06.2017 for their consideration
Chandigarh-Karoran-Tanda-Prempura- and decision.
Gariran-Paploha-Bar-Shilukurd- 3(a)
Jangesh-Kasuali-Dharmpur (on NH-5) In-principle notification Stage-I under under
3 5 NH(O) 45.603 916.33 11.09.2017 08.05.2017 25.11.2017 09.07.2017 16.08.2018 31.12..2018
Consultant : M/s Lion Engineering Approved published on process process
Consultants 22.06.2017
Date of Award
Target for
TPC of Contract/ Total Length
Sl. Road Estimated Cost Contractor/Auth completion Target Date of
NH Funding Name of project Including LA Job No. Date of Completed As Status
No. Length (km) (Rs. in crore) ority Engineer (length in km) completion
(In Cr) Commencem On 31.12.2018
for FY 2018-19
ent
M/s SSTL
Work of construction, operation and maintenance of Z-Morh tunnel on DBFOT IE-M/s EPTISA
1 1 NH(O) 6.50 2680.42 2680.42 01.04.2015 0 0 Work Stopped
(Annuity basis) Servicios de
Ingenieria SL
work in progress
Restoration of Road by way of clearance of landslide, surface boulders side drain,
Notice to
culverts including construction of R/wall/Scuppers and laying of WBM-II, WBM-III, M/s Khandey
5 244 NH(O) 14.00 6.35 7 proceed 0 10 06.03.2021
& Pre- Mixed Surfacing/Mixed seal Surfacing (PC) on Batote-Kishtwar-Chatroo- Infrastructure Ltd.
07.03.2018
Sinthan top road NH-244 Km from Km 170.000 to Km 184.000
Widening and upgradation to 2 lane with paved shoulder configuration and LOA has been issued to M/s ECI Engineering & Construction in JV with SRM
geometric improvement from km 0.000 to km 16.990 on Chenani – Sudhmahadev Contractors Pvt. Ltd. on 27.03.2018. Appointed Date has been declared as
ECI Engineering
section of NH-244 in the State of Jammu & Kashmir LOA date 22.11.2018
6 244 NH(O) 17.00 150.04 225.82 in JV with SRM 0 0 26.03.2021
27.03.2018
contracts pvt ltd
Date of Award
Target for
TPC of Contract/ Total Length
Sl. Road Estimated Cost Contractor/Auth completion Target Date of
NH Funding Name of project Including LA Job No. Date of Completed As Status
No. Length (km) (Rs. in crore) ority Engineer (length in km) completion
(In Cr) Commencem On 31.12.2018
for FY 2018-19
ent
Rehabilitation
Rehabilitation of Batote-Khellani-Kishtwar-SinthanPass-Khanabal Section of NH-
8 244 NH(O)
244
Maintenance
M/s Eimsim
Urgent repairs of Bridge at Hiller in District Anantnag on Kishtwar-Sinthanpass- 10.05.2018/21. Baba’s
11 244 M& R Bridge work 1.05 1.05 20.05.2021 work in progress
Khanabal road NH-244 in the state of Jammu & Kashmir 05.2018 Infrastructure Pvt.
Ltd.
Providing & Installation of Road Safety Measures by fixing of Traffic Sign Board,
construction of Parapets, fixing of Road Delineators, Road Stud & Road Marking
12 244 M& R and Construction/Repair of Retaining walls/ Crate wall from Km 0.000 to Km 170 2.50 2.50 - - - - - 04 nos. of Bids were received on 26.11.2018.
170.000 on Batote-Kishtwar-Sinthanpass road of NH-244 in the state of Jammu &
Kashmir
In-Principle approval for execution of Emergent /Ordinary Maintenance/Periodic
M/s JAI Buildcon Works awarded Under four pkg.
13 244 M& R Repair/Rehabilitation work and snow clearance of National Highways entrusted to 170 4.25 4.25 31.10.2018 30.10.2021
Pvt Ltd.
NHIDCL in J&K
D Total (Maintenance & Repair) 394.00 12.71 12.71
Bharatmala
E Total (Bharatmala) 0.00 0.00 0.00
NH-In Principle
Consultancy Services for Feasibility Study, Preparation of Detailed Project Report
and providing pre-construction services for up gradation of newly declared
In M/s Almondz
National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District- Doda, J&K) to
14 principle 80 05.10.2018 Global Infra 04.10.2021 The work has been awarded on 05.10.2018.
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with
NH Consultant Ltd.
paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4
km near Kahaljugasar in the state of Jammu and Kashmir
Date of Award
Target for
TPC of Contract/ Total Length
Sl. Road Estimated Cost Contractor/Auth completion Target Date of
NH Funding Name of project Including LA Job No. Date of Completed As Status
No. Length (km) (Rs. in crore) ority Engineer (length in km) completion
(In Cr) Commencem On 31.12.2018
for FY 2018-19
ent
DPR Work
Sl.
No.
Feasibility Report Draft DPR Final DPR
Road Status Of Pre-Construction Activity
Total Project Alignment
NH Funding Name of project / Consultant Length
Cost Approval Status
(km)
Actual Date Target Date Actual Date Target Date LA FC Utility Shifting Actual Date Target Date
Estimate
Preparation of DPR for two lanning with paved shoulders of Chenani-
Sudhmahadev-Goha-Khellani-Kishtwar-SinthanPass-Khanabal Section of NH-244
(Excluding Tunnel at Sudhmahadev and Sinthan pass) Under
1 244 NH(O) Consultant : M/s Wadia Techno Engineering Services In association With 274 3708 _ _ _ _ _ _ _ _ 30.10.2017
Process
M/s Zoma Engineers
Consultancy Services for Preparation of Detailed Project Report and providing Pre-
Construction activities:
(i) For construction of Approach Roads with Avalanche Protection Works to West
and East portal of the proposed Zojila Tunnel between (between Baltal and
3 1 NH(O) Minamarg) from km 82.00 to km 95.00 on Srinagar-Leh road (NH-1) and; 20.00 250.00 - 25.07.2018 - 08.09.2018 09.08.2018 28.10.2018 - - 08.10.2018
(ii) For making the NH-1 from Z-Morh Tunnel to proposed Zojila Tunnel (approx.
20 km) all weather road in the State of Jammu & Kashmir
Consultant : SMEC International Pvt Ltd in JV with SMEC(India) Pvt Ltd. in
Association with Anandjawala Technical Consultancy
Target for
Road Date of Award Total Length
Sl. Estimated Cost completion Target Date of
NH Funding Name of project Length TPC Job No. of Contract/ Contractor/Authority Engineer Completed As Status
No. (Rs. in crore) (length in km) completion
(km) Appointed date On 31.12.2018
for FY 2018-19
Civil Work
(a). LOA issued to BIPL on 01.12.2016
(b)Appointment date given on 27.04.2017.
1 53 NH(O) Barak Makru Bridge 1.2 109 141 27.04.2017 M/s Bhartiya Infra Project Ltd. 0 0 26.04.2020 (C) Milestone -I achieved.
(d) Work in progress
8 150 Moirang-Imphal 42 525 609 23.01.2017 M/s SM Consultant In DPR Stage DPR under Progress. Draft DPR received on 03.08.2018
EC
150 Jessami-Yaingangpopki 170 2125 2465
9 M/s SM Consultant In DPR Stage DPR under Progress. Draft DPR received on 03.08.2018
EC
39 Mao-Imphal 106 1325 1537 02.12.2015 In feasibility
10 M/s Stanley DPR under Progress. Feasibility report submitted.
EC Stage
DPR
11 39 ICR Alternate Alignment 59 738 826 M/s Sheladia Inc. DPR Completed
Completed (i) Work of Imphal-Moreh Pkg-II Km 350.00 to Km 395.680 was awarded to
M/s GR Infra projects and "Appointed Date" was fixed as 16.10.2018 and work
is in progress.
(ii) Due to high LA rate and delay, re-tender for Imphal-Moreh Pkg-I Km
DPR
12 39 ICR Imphal -Moreh 49 1188 1330 M/s Sheladia Inc. 330.00 to Km 350.00 has been called with bid due date 09 Jan 2019. Revision
Completed of LAP is under progress by ADB TA Consultant.
19 NH-150 M & R From 0.00 to Km 185 185 6.4 _ 07.05.2018 M/s NDS Construction _ 06.05.2020 (i) Work started on 07.05.2018 and work is in progress.
20 NH-150 M & R From 185 to Km 262 77 36 _ 17.09.2018 M/s Nidhi Creative Infrastructure Pvt. Ltd _ 16.09.2020 (ii) Appointed date fixed on 17.09.2018 and work is in progress.
Target for
Road Date of Award Total Length
Sl. Estimated Cost completion Target Date of
NH Funding Name of project Length TPC Job No. of Contract/ Contractor/Authority Engineer Completed As Status
No. (Rs. in crore) (length in km) completion
(km) Appointed date On 31.12.2018
for FY 2018-19
21 NH-37 M&R From Yaingangpokpi to Finch Corner (Km 488.125 to Km 522.86). 35 11 _ M/s L K & Sons 7 18.04.2020 (i) Work started on 19.04.2018 and work is in progress.
19.04.2018
22 NH-37 M&R Ukhrul- Jessami-Nagaland Border (km 126) 126 19 _ 01.08.2018 M/s HVS Construction Materials Pvt. Ltd. _ 30.07.2020 (ii) Work Started on 01.08.2018 and work is in progress.
DPR Work
Sl. Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
Road Total Alignment
No.
NH Funding Name of project / Consultant Length Project Approval Utility Shifting
(km) Cost Status Actual Date Target Date Actual Date Target Date LA FC/WC/EC Actual Date Target Date
Estimate
Draft
2 laning with paved shoulder from Tamenglong in Manipur to Final Feasibility
feasibility EOT up to
3 NK Peren in Nagaland via Longdi Pabram 100 1329 finalized - report received 07.03.2018 - 06.05.2018 - - - -
received on 31.03.2021
Consultant : M/s CE Testing Pvt.Ltd. on 11.10.2018
21.07.2018
FC Stage-I
received.
Draft MSPDCL:
2 laning of Tamenglong- Khonsang road Final Feasibility Working
feasibility 17.08.2018 EOT up to
4 137 SARDP Consultant : M/s PNG Planning & Structural Consultant 40 156 finalized 04.03.2017 report recevied 16.04.2017 28.06.2017 31.08.2016 - Permission 28.11.2017
received on PHED: 30.11.2017
Pvt.Ltd. on 18.04.2017 received. WC:
04.03.2017 26.09.2018
NA. EC:
NA
Draft FC & WC
Final Feasibility PHED:
Ukhrul -Toloi- Tadubi feasibility LA estimate Stage-I
5 102A ADB 115 1610 finalized 30.06.2016 report recevied 14.04.2017 02.08.2016 31.07.2016 08.07.2016 15.09.2016 31.08.2016
Consultant : M/s CE Testing Pvt.Ltd. received on awaited received.
on 30.06.2016
12.04.2016 EC: NA
Two laning with paved shoulders from Hafflong-Tamenglong Draft Final Feasibility
State Under Under EOT up to
6 NK Via Lia Sang & Tausem 150 2100 Feasibility report recevied 30.06.2017 - 30.07.2017 - - - -
Road finalization finalization 30.04.2018
Consultant : M/s L.N.Malviya report on 03.08.2018
submitted on
State Two laning with paved shoulders from Jiribam to Tipaimukh Under Under 13.01.2018. Final Feasibility EOT up to
7 NK 105 1470 report recevied 30.06.2017 - 30.07.2017 - - - -
Road Consultant : M/s L.N.Malviya finalization finalization 30.04.2018
on 03.08.2019
Draft
FC & WC
Two laning with paved shoulders from Jessami to Nagaland Feasibility Final Feasibility LAP
applied. PHED: EOT up to
8 202 NK Border 12 168 finalized - report report on 22.07.2018 29.12.2017 22.08.2017 Submitted: -
EC on process 04.08.2018 11.06.2018
Consultant : M/s SM Consultant submitted on 29.07.2017 14.04.2018
of application.
27.04.2017
WC Stage-I
PHED:
received. FC-
Moreh Bypass Feasibility report submitted on LA estimate 26.12.2016
9 39 NH(O) 3 42 finalized 09.12.2016 21.10.2017 14.01.2017 10.10.2016 REC approval 12.06.2017 20.10.2016
Consultant : M/s Choice Consultancy 19.12.2016 awaited MSPDCL:
received.
18.03.2017
EC-NA
DPR Work
Sl. Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
No. Road Contract
Total Project DPR Initiated Alignment Approval
NH Funding Name of project / Consultant Length Agreement Target
Cost By Status Actual Date Actual Date Target Date LA FC
(km) Date Date Utility Shifting Actual Date Target Date
Estimate
11 SH SARDP Ranikor - Maheshkhola - Baghmara 129 1193.25 NHIDCL Approved by State Govt. ● Final DPR Submitted to MoRTH on 24.04.2014.
Consultant : M/s Holtec Consulting ● TSA was signed between NHIDCL, PWD Meghalaya and the Consultant on 09.05.2017
Pvt. Ltd ●The Proposal for the 1st pkg. from 0km to 30km submitted by the Consultant along with estimate for LA, Utility Shifting.
●The proposal cleared in PATSC on 31.07.2018.The proposal sent to MoRTH for SFC on 13.09.2018..
● Rs 5.05Cr paid against LA on the adhoc payment.
● variation proposal approved for Rs.14.40 Lakh in 44th EC meeting held on 03.01.2018
● The proposal for obtaining AA & FS has been concurred by IFD and the same has been proposed for HPC Meeting by Ministry.
● Bid for tthe Civil work for the package 1 (from chainage 0 Km to 30 Km) has been invited on 24.12.2018 with Bid due date 05.02.2019
● 76th HPC held on 17.12.2018. Minutes of the meeting for SARDP-NE is awaited.
Sl. Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
No. Road Contract
Total Project DPR Initiated Alignment Approval
NH Funding Name of project / Consultant Length Agreement Target
Cost By Status Actual Date Actual Date Target Date LA FC
(km) Date Date Utility Shifting Actual Date Target Date
Estimate
12 40 JICA Shillong- Dawki 71.5 1431.91 NHIDCL Approved by State Govt. i) Final DPR submitted on 23.08.2017
Consultant :M/s Transys Consulting ii) JICA loan agreement signed on 29.03.2018. The loan effectuation date has been extended upto November 2018.
Pvt Ltd iii) Alignment issues raised by Forest Department on 21.12.2017 from chainage km 2+500 to km 3+500 (3rd Mile Bypasses) taken up with State Government. Forest has in-principle
approved alignment from 1.9km to 2.50km.
iv) Part of SIA/LA for East Khasi Hill Dist. submitted to DC and the remaining stretch falling under Jentia Dist in progress
v) NOC recived from BSF for BOP area land on 06.07.2018.
vi) Review meeting held on 25.05.2018 and 04.07.2018 the subject project have been splitted into 5 packages based on the RoW, NoC and other clearances from the local authority.
(vii) NOC recieved from all the District Hill Councils for the entire length of the project.
(viii) PIB note submitted to Ministry on 17.09.2018 for the complete package excluding Peninsula Bypass.
(ix) Meeting held with Hon'ble CM on 14.09.2018 with MD NHIDCL to expedite land for ROW & US estimate submission by the utiltiy owing agency.
(x) The draft bidding document based on NH-51 and the Technical Schedule for all the packages except Bypass shared through e-mail 14.09.2018 and by letter no 05.10.2018.
(xi) Bid has been invited for RAP consultant on 06.11.2018 with bid due date 27.11.2018
(x) Technical Bid has been opened on 28.11.2018
(xi) Technical evaluation is under progress
13 40 SARDP 2-laning with paved shoulder of Western 42.40 258.37 NHIDCL (i) Based on the review meeting held on 25.05.2018 at Shillong under Chairmanship of Hon'ble Chief Minister, Meghalaya and MD, NHIDCL it was deliberated to engage fresh
Bypass of Shillong from km 0.000 (Km Consultant for preparation of DPR keeping in view future developmental aspect of the area.
60.900 of NH-40) to Km 42.405 (Km (ii) Accordingly, the RFP for invitation of Consultant for the DPR prpeparation has been uploaded on 14.08.2018 with bid submission extended to 17.10.2018. Total 7Nos of bid
87.850 of NH-40) received.
(iii) Evaluation is under progress.
Upgradation of Mawshynrut - Athiabari Project not on Priority list. Under SARDP-NE, Phase-B.
(Hahim) road to 2 lane.
14 SH NK 38.00 1862.00 PWD
Consultant : M/s Chaitanaya Projects
Consulting Pvt.Ltd
15 SARDP Upgradation to 2-lane of State road 43.06 365.66 PWD Approved by State Govt.
Stretches from Nongstoin - Wahkaji. (i) Based on review meeting held on 04.07.2018 at HQ, Proposal sent to MoRTH for de-sanction of the Project on 10.07.2018.
SH
Consultant : M/s Chaitanaya Projects
(ii)The proposal shall be re-invited by splitting it in two Packages
Consulting Pvt.Ltd
i.e. from 0+00km to 43.06km and 43.06km to 61.50km depending upon the availability of RoW and clearances from various local authorities.
16 SH SARDP Upgradation of Wahkaji – Phlangdiloin - 30 259.37 PWD Approved by State Govt. (iii) The Consultant has been asked to sign TSA and submit modifications to the Cost & bidding documents on 13.07.2018.
Ranikor (iv) Meeting with DPR Consultant held on 20.08.2018, the variation proposal submitted by the Consultant recommended for approved in the 57th EC meeting held on 10.09.2018
(Tentative Length = 30.00 Km) subject to signing of the TSA .
Consultant : M/s Chaitanaya Projects (v) Draft TSA has been legally vetted by GC (Legal) and approved by the Compertent Authority.
Consulting Pvt.Ltd
17 SH SARDP Detailed Project Preparation for 69.5 426 PWD 1. Approved by State Govt. (i)The TSA between NHIDCL, PWD Meghalaya and Consultant was signed on 09.05.2017.
Upgradation of Nongstoin-Rambrai- up to Kryshai. (ii)The Branch Office directed to submit the status of ROW and the LA details, FC and Utility related estimates
Kyrshai road upto Meghalaya – Assam (iii) Cosultant submited the variation proposal for additional scope of work to connect Kryshai - Chaayyagaon and updation and modification of the DPR as per the meeting held on
border to 2-lane - Tentative length = 2. Alignmt from Kryshai to 29.05.2018.
69.50 Km. chayyagaon to be approved (iv) The variation proposal of the consultant was put up in 56th EC meeting held on 27.08.2018 and the same has been recommended by EC. The variation proposal approved by
Consultant : M/s Hotlec Consulting based on the feasibility Competent Authority and communicated to Consultant.
Pvt.Ltd. report. (v) Accordingly, the Consultant has submitted tyhe Inception Report for the additional scope connecting Kryshai - Chaayagaon on 26.10.2018
18 SH NK Detailed Project Preparation for 52 754 NHIDCL
(i) RFP for preparation of DPR invited, last date of submission due date extended from 22.10.2018 to 29.10.2018.
Garobdha (on NH 127B)-Ampati-Zigzag-
(ii) Technical Bids has been opened on 30.11.2018.
Mahendraganj (near Bangladesh border)
(iii) Technical evaluation in progress.
19 SH NK Detailed Project Preparation for 96 1392 NHIDCL
Mawngap (on old NH 44E)-Mawphlang- (i) RFP for preparation of DPR invited, last date of submission due date extended from 22.10.2018 to 29.10.2018.
Laitmusiang-Mawkyrwat-Rangthong- (ii) Technical Bids has been opened on 30.11.2018.
Nongnah-Dirang-Khadphra (Ranikor) (iii) Technical evaluation in progress.
(near Bangladesh border)
20 NH-62 JICA Assam/Meghalaya border to Dalu via 194.5 2983 PWD To be approved by State (i)DPR in progress. The draft feasibility report received 23.08.2017 subject to approval of alignment.
Baghmara Govt. (ii)Meeting held with state Govt. of Meghalaya on 09.08.2018. The comments of forest department on the above alignment is awaited.
Consultant : M/s Stanley Consultant (iii) Consultant asked expedite the LA and to obtain clerances for forest.
(iv) Branch Office Shillong asked to get the Land & Utiltity estimate expedited
(v) Meeting held with Hon'ble CM on 14.09.2018 with MD NHIDCL to expedite land for ROW & US estimate submission by the utiltiy owing agency.
21 127B JICA Fakirganj- Phulbari-Rajabala-Tura and 79 1363 PWD (i) TSA signed between PWD,Meghalaya, NHIDCL and Consultant on 18.05.2018.
(Phulbari-Rajbala to Hatsinamari.: 4Lane) (ii) Presentation held on 23.05.2018 at HQ Consultant accordingly requested to do additional work for modification of DPR from 4Lane from Phulbari - Rajbala- Hatsingamari.
Consultant : M/s EDMAC Engineering (iii) The Consultant asked to follow the orignal allignment of 127B
Consultant Pvt.Ltd. (ii) Variation Proposal submitted by the Consultant on 24.08.2018 for the additional work examined and agenda note prepared.
(v) MoRTH sought the alignment approval letter in response to NHIDCL letter dated 13.09.2018.
(vi) Letter for the Approval of alignment from State Govt. in process.
(vii) Physical progress 48.46%
(viii) Financial pogress 41.61%
Target for
Road TPC Date of Total Length
Sl. Estimated Cost Contractor/Authority completion Target Date
NH Funding Name of project Length Including LA Job No. Award of Completed As On Status
No. (Rs. in crore) Engineer (length in km) of completion
(km) (In Cr) Contract 31.12.2018
for FY 2018-19
Civil work
A Total (Civil work) 0.00 0.00 0.00 0
Bharatmala Projects
Kawlkulh- Champhai ● DPR for Kawlkulh- Champhai has already been completed. Tripartite Agreement has been
1 6 ICR 70 875 1015 signed between MoRTH, NHIDCL and Consultant.
2 302 ICR Lunglei- Tlabung 97 1212.5 1406.5 ● DPR Completed by PWD. To be transferred
Tlabung -Kawarpuchiah ● Stretch has been de-scoped from the existing contract as already under implementation by
3 ICR 14 175 203 State PWD Mizoram.
Seling-Kawlkulh ● DPR completed by State PWD. Tripartite Agreement has been signed between MoRTH,
4 6 EC 78 975 1131 NHIDCL and Consultant.
Kawlkulh-Tuivai ● Total 8 Bids received with Bid Due Date as 11.09.2018
5 102B EC 122 1525 1769 ● Technical Evaluation is under progress.
● Contract Agreement signed on 19.06.2018. Consultant has commenced the services on
6 54 EC Vairengte - Sairang 111 1387.5 1609.5 02.07.2018. DPR Consultant has submitted the final Inception and QAP report on 18.10.2018
at BO, Aizawl.
B Total (Bharatmala) 492 6150 7134
NH-In Principle
C Total (NH-In Principle) 0 0 0.0
Rehabilitation Work
D Total (Rehabilitation Work) 0 0 0
Maintenance & Repair
E Total (Maintenance & Repair) 0 0 0
DPR Work
Sl. No. Feasibility Report Draft DPR Final DPR
Status Of Pre-Construction Activity
Road
Total Project Alignment
NH Funding Name of project / Consultant Length Targe
Cost Approval Status Actual Date Target Date Actual Date LA FC Actual Date Target Date
(km) t Date
Utility Shifting Estimate
1. Land Acquisition Demand Note from the Forest The estimates for utility
is being done as per Department for Compensatory shifting by Public Health
NH Act, 1956. Afforestation & NPV is Rs Engineering Department
(i) km 8-125 2,42,48,560/- and Extraction & (PHED) (Rs. 7.4 Crore) and
12.0
(Civil Pkg. 1 & 2) Tree Cutting is Rs. Power & Electricity (P&E) 08.12.2015
1 EAP/BMP 110.26 1917.44 20.08.2010 28.09.2009 07.08.2014 1.20 2. 3G is under 12.02.2010
Consultant : M/s Archtech Consultant 10 progress. BO 24,87,104/- for Package 1 (Rs. 31.54 Crores) have
India Pvt.Ltd. Based on the (Mizoram) is (Area=11.61ha), 2 (Area=0.48Ha) already been sanctioned by
result of regularly pursuing & 3 (Area=11.18Ha) has been NHIDCL.
Additional with CALA to received on 27.08.2018 and the
Survey the expedite the process same has been paid to the forestStatus of Utility Shifting and
revised design of 3G. department on 13.09.2018. Forest Approval may also
has been NH-54- vary to some extent due to
54 (ii) Km 125-250 carried out by Miz-2017- 30.0 2nd Stage (final) approval for change in the Alignment.
2 EAP/BMP (Civil Pkg. 3 to 5) 118.30 2238.55 the Additional 18.08.2010 18-158 30.03.2010 12.10.2010 6.20 Package 1 & 3 is still awaited. 12.10.2015 30.08.2010
Consultant : M/s Holtech Consultant Survey 10
Consultant in Final Approval for Package 2 has
Consultation been received.
with JICA study
(iii) km 250-380
team for optimal
design.
(Civil Pkg. 6 to 8) 21.0
3 EAP/BMP Consultant : M/s CM Engineering & 122.60 2011.59 19.06.2012 21.02.2012 20.12.2012 3.20 08.12.2015 20.04.2012
Solutions 12
(ii) Construction of Dimapur Bypass (Assam Portion) of 4/6 (i) Revised 3(A) published, 3D published in Gazzette of
lane pavement on EPC basis from existing Km 159.400 of NH- M/s Gawar - Singh (JV) / M/s India on dated 22.03.2018 and 3G proposal awaited from
NH- 36 to existing Km 102.500 of NH-39 and upto end point of NHIDCL Cell/Assam/NH- Yongma Engineering Co. Ltd in GM(P). Additional 3A uploaded on Bhoomi Rashi by
5 SARDP 14.33 394.39 500.09 19.03.2018/ -- 0.00 18.03.2021
39 Assam portion [Design Km 118.050 to design Km 132.375] 36/39/2017-18/12 association with M/s Sterling Indo GM(P) / CALA.
(length 14.325 Km) Tech consultants Pvt Ltd (ii) Appointed date yet to be declared.
NHIDCL Cell/Chak- Civil Work Contract Agreement signed on- 11.05.2018; (ii)
10 702A SARDP Chakabama-Zunheboto (C-Z) road Km 95-115.534 20.534 188.10 240.64 28.03.2018 Zunhe/Pkg-5 (RCE)/2017- M/s Madhucon Projects Limited 0.00 27.03.2021 Appointed date yet to be declared. Bids for AE opened
18/35 on 24.07.2018 and evaluation is under process
M/s SSR Crest Engineers and Civil Work Contract Agreement signed on 09.04.2018;
NHIDCL Cell/Merang- Constructions Limited/M/s Appointed date yet to be declared. Bids for AE opened
16 702A SARDP Merangkong-Tamlu-Mon (MTM) Road Km 40-59 19 187.00 272.89 28.03.2018 Tamlu-Mon/Pkg-3/2017- Almonds Global Infra Consultant 0.00 27.03.2021 on 18.04.2018 and M/s Almonds Global Infra Consultant
18/21 Limited-M/s Manglam Associates Limited-M/s Manglam Associates (JV) emerged as the
(JV) successful bidder. Letter of commencement issued.
20 BMP Akegwo - Avangkhu 91 1137.5 1319.5 Bharatmala cell may please furnish
21 39 BMP Khatkhati-Chumukedeima 23 287.5 333.5 06.04.2018 M/s. Voyants Solutions Pvt. Ltd Assam Division may please reply
Consultancy Services for Feasibility Study and Detailed Final DPR has been
NH- Alignment Draft DPR
24 SARDP Project Report for 4 laninig of of Kohima bypass connecting 36 Under Progress - Under Progress submitted on 31.10.18.
39 approved. submitted
NH-39,NH-150, NH-61 on EPC mode in the state of Nagaland
1. Finalized Alignment by
M/s Alliance to be
submitted shortly for the
First Section.
Alignment yet
25 702 SARDP Changtongya-Longleng (CL) road 38.5 2. M/s RITES to give a
to be finalized
presentation for finalizing
alignment shortly for the
second section.
DPR Work
Feasibility Report Draft DPR
Sl. Road Total Alignment Status Of Pre-Construction Activity Final DPR
No. NH Funding Name of project / Consultant Length Project Approval
Actual Date Target Date Actual Date Target Date LA FC Actual Date Target Date
(km) Cost Status Utility Shifting Estimate
Draft 3(A) received. Forest Revenue
Uploading Land will be
Bhoomirashi is in completed after
progress 3(A) verification (i) Joint verification
28.09.2017
PKG II : Rongli -Rolep (NH-717B) Alignment completed for electric lines
1 717 B SARDP 26.788 437.45 (Submitted) 08.06.2015 work is not in scope work is not in scope
Consultant : M/s SA Infrastructure Pvt.Ltd Approved and water pipelines.
and revised
(ii) Estimate awaited
Draft 3(D)
received on (i) Joint verification
to be There is no Forest
PKG III : Rolep-Menla (NH-717B) Alignment 24/11/2018. completed for electric lines
2 717 B SARDP 47.992 635.68 submitted 08.06.2015 work is not in scope land only Revenue work is not in scope
Consultant : M/s SA Infrastructure Pvt.Ltd Approved Uploading in and water pipelines.
30.05.2018 forest land
Bhoomirashi is (ii) Estimate awaited
in progress
Project has been forwarded by State PWD, Sikkim . No tripartite agreement is signed with NHIDCL so the contractor is providing the details on liaisoning basis.
3 510 SARDP Rabongla-Gyalshing
47 495
02/E-in- (i) This stretch has been included in the Bharatmala Proyajana. Final DPR has been received from the Consultant.
4 208 BR Kailashahar to Teliamura 106.319 1262.09 - C/PWD(R&B)/SE(NH)/ - M/s C.E. Testing Company Pvt. Ltd. 0 (ii) 3A Notified for Unakoti District, Khowai District and Dhalai District.
2014-15 (iii)Forest proposal is pending at MoEF&CC,Shillong.
(i) This stretch has been included in the Externally Aided Scheme (World Bank). Final DPR has been received from the Consultant.
10.12.2015/ (ii) Land acquisition, clearances etc. in progress.
6 44 A EC Manu- Simlung 85 1232.5 1436.5 - M/s Lion Engineering Consultants 0
28.12.2015 (III) 3D pending due to issues in Land Party. (iv) Forest online Proposal Submitted and hard copy is submited on 10th Oct 2018.
(v) Joint Field Verification will be started by 14th Nov. with Revenue & Forest Department for Forest Proposal.
M/s Technocrats Advisory Services a) Work awarded to M/s Technocrats Advisory Services Pvt. Ltd. .on 30.05.2018 as Addl. Scope of work.
Pvt. Ltd. in association with b) Final Feasibility Report submitted. c) Alignment finalised on 22.05.2018 and 3a is Pending at CE Office
8 208 SARDP Kumarghat- Kailashahar 18.3 176.36 235.66 - - 0
Vaishnavi Infratech Services Pvt. for press. d) Maintenece Work of Kumarghat Kailasahar Road by Contractor M/S Dipak
Ltd. Chandra Kar - 98% physical progress.
Rehabilitation work
i) Work is in progress.
Proposed Protection work at Bareti landslide zone km. 100.300 to km. NHIDCL Cell/ Bareti/ 18.09.2017/ DPR Consultant - (ii) Physical Progress - 39.60 %
1 34 NH(O) 0.75 28 40.89 M/s Bharat Construction 0 0 03.01.2020
101.060 2016-17/3 04.01.2018 M/s. AECOM (iii) Financial Progress - 29.11 %
i) Work is in progress.
Proposed Protection work at Nalupani Landslide (Km. 123+080 to Km. NHIDCL Cell/NH-34/ 16.06.2017/ DPR Consultant - (ii) Physical Progress - 57.26 %
2 34 NH(O) 0.68 34.9 47.13 M/s KCC Buildcon Pvt. Ltd. 0 0 10.09.2019
123+480,123.665to 123.740& km. 123+770 to Km. 123+970) Nalupani/2016-17/2 11.09.2017 M/s. AECOM (iii) Financial Progress - 57.07%
Rehabilitation/ Treatment of Landslide location with slope protection and (i) Project has been transferred from PIU, MoRTH
Drainage improvement at Helang (Km 468.200), Govindghat-II (Km to NHIDCL.
06.04.2016/ M/S R.G. Buildwell (ii) Tripartite Supplementary agreement has been
58 NH(O) 497.000) and Govindghat-III (km 500.000) on NH-58 (New NH 07) with 0.58 34.52 34.52 0 0 03.11.2019
04.11.2017 Engineers LTD signed on 21.08.2018 between MoRTH, NHIDCL
proposed length of 275m, 150m & 150m respectively in Chamoli District in
the state of Uttarakhand and Contractor.
13 BMP Bhaironghati-Nelang-Naga- Angar-PDA-Medikay 70.00 1050 1050 Bids for DPR to be invited.
Almora (NH-109) - Kausani-Baijnath-Tharali-Karn Prayag (NH-109A) M/s Voyants (i) DPR in progress
14 BRT 164.00 1572.35 1572.35
(BMP) Solutions Pvt. Ltd. (ii) Final Feasibility Report submitted on June 2017
Civil Work
(i)AA&FS issued from the Ministry on 23.03.2017.
(ii) No Forest Clearance required.
Construction of Mechi Bridge and Approaches on India- (iii) MOU with Nepal done on 24.08.2017
Nepal border linking Kakarvitta in Nepal and Panitnaki 23.11.2017/ (iv) 3G done.
1 327 B EAP 1.5 114.74 158.65 M/s DRA Infracon Pvt. Ltd 0 0 30.09.2021
in India under Engineering Procurement and 01.02.2018 (v) Contract Agreement signed on 12.12.2017 with M/s DRA Infracon Pvt.
Construction (EPC) Mode Ltd for Rs1,03,78,00,000/- .
(vi) Appointed date declared as 01.02..2018
(vii) Civil work under progress.
DPR Work
Sl. Feasibility Report Draft DPR Final DPR
Total Alignment Status Of Pre-Construction Activity
No. Road
NH Funding Name of project / Consultant Project Approval Utility Shifting
Length (km) Actual Date Target Date Actual Date Target Date LA FC Actual Date Target Date
Cost Status Estimate
Connection between Sagar Island & Kakdwip
1 117A NH(O) 9.5 1000 10.05.2016 Alignment Finalised.
Consultant : M/s RITES Ltd.
Online
3(D) has been FP/WB/Road/3047
Utility shifting
published. 1/2017 submission
PKG IV C : Bagrakot-Kafer (NH-717A) estimate received for
2 717 A SARDP 0.5 77.44 28.03.2017 25.03.2017 08.06.2015 work is not in scope Payment of 3(G) was done on work is not in scope
Consultant : M/s SA Infrastructure Pvt.Ltd PHE and Power
has been made to 27.04.2018. Forest
Deptt
BO clearance is still
awaited
Total 149 91 91
Rehabilitation
Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road Comencement/Start date 27.10.2016. Work completed on
10 102A NH(O) section from Km 0.00 to Km 28.00 covering 28 Km length 28 3.0 3.8 27.10.2016 M/s Bhartiya Infra Project Ltd. 18.07.2018
on NH-102A in the state of Manipur.
Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road
Comencement/Start date 31.10.2016. Work completed on
11 102A NH(O) section from Km 28.00 to Km 50.00 covering 22 Km length 22 11.1 12 31.10.2016 M/s Shongvah Thanmi 31.10.2018
on NH-102A in the state of Manipur.
Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road Comencement/Start date 27.10.2016. Work completed on
12 102A NH(O) section from Km 50.00 to Km 70.00 covering 20 Km length 20 11.4 13 27.10.2016 M/s Bhartiya Infra Project Ltd. 06.11.2018
on NH-102A in the state of Manipur.
Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road
(i) Work Started on 12.05.2017
13 102A NH(O) section from Km 70.00 to Km 90.00 covering 20 Km length 20 13.1 18 12.05.2017 M/s Haokhotinlen Vaiphei (ii). Work completed on 28.11.2018
on NH-102A in the state of Manipur.
Restoration/Reconstruction of Ukhrul-Toloi-Tadubi road
(i) Work Started on 12.05.2017.
14 102A NH(O) section from Km 90.00 to Km 115.00 covering 25 Km length 25 12.9 18 12.05.2017 M/s Haokhotinlen Vaiphei (ii) Work completed on 15.11.2018.
on NH-102A in the state of Manipur.
Temporary Restoration of Tamenlong Khonsang of about 40
15 NH 137 NH(O) 40 17.5 19 08.02.2017 M/s K .Morung & sons. (i) Start date 06.02.2017
km length. (Work-I) (ii) work completed on 16.08.2018
Balance Construction of unfinished RCC Culverts and (i)Date of commencement of the project was 30.08.2017.
16 Manipur NH 137 NH(O) retaining walls and their maintenance along Imphal-Jiribam 0 2.8 3 30.08.2017 M/s NDS Construction (ii) Work completed on 30.04.2018
road of NH-37 between Km3.00 to Km 220.00
Short Term Improvement & Routine Maintenance of Imphal- (i) Contract agreement signed on 26.04.2017.
M/s HVS Construction Materials
17 NH-37 NH(O) Jiribam Road from Km 3.00 to Km 75.00 (Length=72 Km) of 28 45.5 52 01.04.2017 (ii) Commencement /Start date is 01.04.2017
Pvt. Ltd. (iii) work completed on 19.06.2018
NH-53 (New NH-37) (Package-I)
Short Term Improvement & Routine Maintenance of Imphal-
M/s Nidhi Creative Infrastructure
18 NH-37 NH(O) Jiribam Road from Km 75.00 to Km 145.00 (Length=70 Km) 28 38.1 43 11.03.2017 (i) Commencement /Start date is 11.03.2017
Pvt. Ltd (ii) work completed on 10.03.2018.
of NH-53 (New NH-37) (Package-II)
Short Term Improvement & Routine Maintenance of Imphal-
19 NH-37 NH(O) Jiribam Road from Km 145.00 to Km 220.00 21 60.1 67 01.04.2017 M/s Bhartia Infra Pvt. Ltd. (i) Commencement /Start date is 01.04.2017
(Length=75Km) of NH-53 (New NH-37) (Package-III) (ii) work completed on 13.06.2018.
De-launching and replacement of Bailey Bridge at Km
(i) Work started on 14.03.2018.
70.300 at Churachandpur-Singhat-Sinzawal road of span
20 NH-102B 1.7 14.03.2018 M/s Bhartia Infra Pvt. Ltd. (ii) Work completed on 10.06.2018.
140 feet (DDR) Standard width IRC Class 40R loading
complete width bearing and Steel decking in the State of
Imphal-Jiribam Road from Km 3.00 to Km 220.00 (NH-37)
Uttarakhand
Construction of Road and Slope Protection works at Gholteer Landslide from km. 379.100 to km.
2 7 380.275 of NH-07 under “Chardham Pariyojna” on EPC mode in the state of Uttarakhand. NH(O) 10.12.2018/ - 1.175 89.27