I. BUILDING
S.N. Description Nos. Length
A. Eathworks
A.01.
Earthwork in excavation in foundation etc. in hard clay or gravel
mixed sandy soils including dressing of sides, timbering, ramming
of bottom, lift of upto 1.5m and disposal of upto 10m
Isolated Footing F1 12.000 1.829
Wall Footing 1.000 47.396
B. Concreting Works
B.01. Providing and laying 1:1.5:3 cement-sand-aggregate concrete in
the structure including haulage upto 30m all complete
Upto Plinth Level
Isolated Footing F1 12.000 1.524
Columns 12.000 0.305
Plinth Beams 1.000 47.396
From GL to First Floor
Columns 12.000 0.305
Wall Band 2.000 36.500
Beams 1.000 47.396
Slab 1.000 62.001
Deduction for Beam -1.000 47.396
Deduction for Staircase -1.000 6.8890515
Staircase
Triangular Portion 12.000 0.018
Rectangular Inclined Portion 2.000 0.234
Flat Portion 1.000 0.308
From First Floor to Second Floor
Columns 12.000 0.305
Wall Band 2.000 36.576
Beams 1.000 40.970
Slab 1.000 45.422
Deduction for Beam -1.000 40.970
B.02.
Providing, laying, fixing, bending and binding reinforcement Fe500
in position including all necessary binding wire all complete
Below Plinth Level
Foundation
Isolated Footing F1
Along X 132.000 1.445
Along Y 132.000 1.445
Columns
C1
Longitudinal Bars 96.000 2.424
Ties 480.000 1.049
C2
Plinth Beam
1.000 518.4850007053
C.02. Providing and laying first class chimney made brick masonry walls
in 1:4 cement-sand mortar in the super-structure including haulage
upto 30m all complete
From GL to First Floor 1.000 36.500
Deductions for Openings
W1 -3.000 1.219
D1 -4.000 0.914
W2 -2.000 2.083
D2 -1.000 1.029
From GL to First Floor
1.000 36.576
Deductions for Openings
D1 -3.000 0.914
W1 -3.000 1.219
E. Flooring Works
E.01.
Providing and laying 150mm thick stone soiling layers all complete
Foundation
F1 12.000 1.829
Floor 1.000 55.475
E.03.
Providing and laying 75mm thick 1:2:4 cement-sand-aggregate
concrete on the floor including haulage of up to 10m all complete
Floor 1.000 55.475
E.04.
Providing and laying 20mm thick Screeding on floor all complete
Ground Floor 1.000 55.475
First Floor 1.000 55.112
Second Floor 1.000 45.422
E.06. Providing and laying a layer of sand on the floor all complete
1.000 55.475
E.07. Providing and laying a layer of 500 gauge polythene sheet on the
floor all complete
Ground Floor 1.000 55.475
First Floor 1.000 55.112
Second Floor 1.000 45.422
E.08. Providing and laying a 6mm thick Mosaic tile on the floor all
complete
Ground Floor 1.000 55.475
First Floor 1.000 55.112
Second Floor 1.000 45.422
F.05. Providing and laying 2 coats of plastic emulsion paint over one coat
of primer on internal walls and ceiling of uniform finishing all
complete
Above Ground Level 1.000 29.820
From GL to First Floor
Walls 2.000 36.500
Ceiling 1.000 55.11211482
Deductions for Openings
W1 -6 1.2192
D1 -8 0.9144
W2 -4 2.0828
D2 -2 1.0287
G. Door/Window Works
G.01.
Supplying and installing Aluminium framed Sliding Windows with
fixed ventilation on top with naturally anodized coating of approved
colour including 5mm thick glass, silicon sealant and accessories
all complete
W1 6.000 1.219
W2 2.000 2.083
G.02.
Supplying and installing single panel Wooden framed Casement
Doors with naturally anodized coating of approved colour including
9mm thick pre-laminated board, silicon sealant and accessories all
complete
D1 7.000 0.914
D2 1.000 1.029
H Miscellaneous Works
H.01. Providing Handrail for Staircase and Parapet with coating of
approved colour and accessories all complete
Handrail 6.000 1.800
Posts 8.000 1.300
H.01. Providing Handrail for Parapet with coating of approved colour and
accessories all complete
Handrail 3.000 6.500
Posts 6.000 1.300
MATE - CIVIL WORKS
80.757 80.757
55.475 0.457 25.363
TOTAL 106.120 m3
0.018 0.212
0.234 0.467
0.308 0.308
0.888 169.318 12
0.888 169.318 12
1.578 367.285 16
0.395 198.719 8
518.4850007053 518.485
1.578 583.050 16
0.395 327.886 8
106.48 106.476
756.123959362 756.124
549.440228698 549.440
116.28 116.284
1.578 583.050 16
0.395 327.886 8
106.698 106.698
653.606 653.606
452.8330801385 452.833
299.323 5%
TOTAL 6285.781 kg
0.457 33.445
0.305 28.893
1.524 22.297
3.048 44.593
0.102 14.834
0.356 33.708
0.229 10.835
55.112 55.112
0.200 6.330
0.914 3.066
2.021 4.041
0.250 2.743
3.048 44.593
0.102 14.864
0.356 33.708
0.300 14.219
45.422 45.422
0.200 6.330
41.903 10%
TOTAL 460.936 m2
0.374 17.703
0.450 0.540
TOTAL 18.243 m3
1.829 40.134
55.475 55.475
TOTAL 95.609 m2
0.000
1.829 40.134
0.600 81.739
1.250 1.500
TOTAL 123.373 m2
55.475 55.475
TOTAL 55.475 m2
55.475 55.475
55.112 55.112
45.422 45.422
TOTAL 156.009 m2
55.475 55.475
TOTAL 55.475 m3
55.475 55.475
55.112 55.112
45.422 45.422
TOTAL 156.009
55.475 55.475
55.112 55.112
45.422 45.422
TOTAL 156.009
0.500 14.910
0.305 0.305
0.549 0.549
3.048 222.503
55.112 55.112
5.5741824 5.574
1.2192 -8.919
2.0574 -15.050
1.2192 -10.157
2.0574 -4.233
3.048 222.967
45.422 45.422
5.5741824 5.574
2.0574 -11.288
1.2192 -8.919
TOTAL 514.350 m2
0.500 14.910
3.048 222.503
55.11211482 55.112
1.2192 -8.919
2.0574 -15.050
1.2192 -10.157
2.0574 -4.233
3.048 222.967
45.42184464 45.422
2.0574 -11.288
1.2192 -8.919
TOTAL 502.348 m2
1.219 8.919
1.219 5.079
TOTAL 13.998 m2
2.057 13.169
2.057 2.116
TOTAL 15.285 m2
10.800
10.400
TOTAL 21.200 rm
19.500
7.800
TOTAL 27.300 rm