PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN Dl PUSAT TAHANAN SEMENTARA (PM) KOTA

KINABALU SABAH.

Summary Of Tender

Bill Description Bill No. Amount (RM)

1 PRELIMINARIES BQ 1 - 11/11

2 SLOPE REMEDIAL WORK BQ 2 - 4/4

3 DRAINAGE WORK BO 3 - 3/3

4 PROVISIONAL SUM BQ 4 -111

TOTAL TENDER SUM CARRIED TO FORM OF TENDER

ST11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

PART I - GENERAL INFORMATION TO BILL OF QUANTITIES

1.0 GENERAL

1.1 The Works contained in the Contract shall include the provision of all labour, materials constructional
plant, temporary or permanent works as required in the Contract.

1.2 The Bill of Quantities shall be read in conjunction with the Conditions of Contract, the
Specification and the Drawings in the Contract Documents.

1.3 The items as set out in the Bill of Quantities shall apply to the whole of the Works contained in the
Contract and the Contractor shall allow for compliance with the same and for any cost incurred in
connection therewith.

1.4 Headings are not comprehensive and do not necessarily reflect or modify the meaning of the
items in the B.O. The exact nature and extent of the work to be carried out shall be
ascertained by reference to the Contract as a whole, in particular the Conditions of
Contract, the Specification and the Drawings. It shall be read together with the relevant
"Method of Payment'.

1.5 The amounts inserted by the Contractor for such items shall be deemed to apply to the whole of the
Works carried out under this Contract.

1.6 Each item shall be individually priced. Bulk pricing for sections, trades, groups or pages of items shall
not be allowed and no subsequent claims for loss or expense and/or profit shall be entertained for
failure to comply with this clause.

1.7 The rates and prices inserted in the Bill of Quantities shall include cost of the works described, all risks,
liabilities and obligations set forth or implied in the Contract Document and shall be deemed to include
the following, unless expressly stated otherwise:

(a) the provision of labour and all costs in connection therewith;

(b) the supply of materials, goods, equipment and storage thereof including
delivery to site and all costs in connection therewith;

(c) taking delivery of materials, goods and equipment necessary for the Works
and including those supplied by others, loading and unloading, storage and
all costs in connection therewith;

(d) the usage of plants and machineries and all casts in connection therewith;

(e) the fixing, erecting and installing or placing in position of materials, goods
and equipment including around obstruction, tolerances, penetration, working space,
over-breaks etc. and all costs in connection therewith;
(f) the provision of all temporary works and all costs in connection therewith
unless separately provided for in the Bill of Quantities;

I
TO COLLECTION

BQ 1- 1 /11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

- ,
ITEM DESCRIPTION AMOUNT

(g) the phasing requirements of the Works including the effect on the
programming of the Works of all traffic and drainage diversions, special structural
requirements, earthwork restrictions, alterations to services and street lighting
(executed under the Contract or in conjunction with it) and all other requirements of
the Contract and all costs in connection therewith;

(h) all cast of testing to show proof of compliance with the Specification on
materials and workmanship inclusive of samples of materials and
submission of tests results. Should the frequency of testing and sampling not specified,
then it shall be in accordance with the relevant Malaysian/British
Standards and Codes of Practice. Where there is no such relevant
Standards and Codes of Practice for reference, it shall then be as instructed by the
S.O.:

(i) all royalties and dues which the Contractor may be required to pay;

6) wastage;

(k) establishment charges, overheads and profit;

(I) whatsoever method of construction the Contractor may adopt.

1.8 Where any priced item in the B.C. but has not been executed on site by the Contractor, the cost of such
priced item shall accordingly be deducted from the Contract Sum.

1.9 All items priced shall be deemed to include compliance with the provisions of the contract, statutes,
regulation, by-laws or any order or directive issued by public authority or public service company and
other related legislaton currently in force.

1 10 Notwithstanding the above clauses, the S.O. reserves the right to request from the
Contractor the detailed breakdown of the pricing for items or rates in the B.Q. for his perusal. The
detailed breakdown pricing may be used as a basis for the administration of the Contract

2.0 MEASUREMENT

2.1 Quantities in the Bills of Quantities are measured in accordance with the Malaysian
Standard Method of Measurement of Building Works (2nd Edition Metric 2000). Where departure have
been made from the standards mentioned, the method adopted in the Bills shall be adhered to for the
purposes of ascertaining the value of ail variations and

3.0 UNPRICED ITEMS

31 Where any item is left unpriced, it shall be deemed that the cost of such item has been allowed for
elsewhere within this document. No subsequent claims arising out of expense and/or loss incurred
against such unpriced item shall be entertained

TO COLLECTION

BQ 1 - 2.'11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT


- _

4.0 GENERAL ATTENDANCE FOR NOMINATED SUB-CONTRACTORS AND NOMINATED

4,1 Attendance and facilities for Nominated Sub-contractors and nominated suppliers shall

(a) in the case of works or services executed : for allowing the use of existing
working space, access, temporary roads, erected scaffolding, sanitary, welfare and
other facilities existing on Site and the provision of protection, water, electricity
for lighting and clearing away rubbish and debris arising from the work;

(13) in the case of goods, materials or services supplied: for taking delivery,
unloading, storing, protection and returning crates, cartons and packing
materials,

all as specified in the specification

5.0 PHASING SEQUENCE OF OPERATIONS AND METHODS OF CONSTRUCTION

5.1 The rates and prices shall, unless otherwise stated, include for the costs of compliance with any
restrictions imposed on the programming of the Works by the Government and Local
Authorities and other relevant authorities dealing with phasing sequence of operations, method
of construction, safety and health and liaison and access.

6.0 TRIALS, SAMPLES, TESTS AND INSPECTION

6.1 The rates and prices shall include for a testing laboratory or an accredited leboretory approved by
SIRIM, equipment and staff for carrying out the tests, tests and the effects on the progress of the
Works for the carrying out of ail trials, sampling and tests whether specified in the Contract
Document or otherwise in order to ensure compliance with the requirements of the Specification
except where separately itemised in the Bill of Quantities.

7.0 EXISTING SERVICES AND MAINS

7.1 The Contractor shall include in his rates and prices for taking measures to locate the actual position and
provide support and full protection of existing services and mains and other equipment and machineries
during the progress of the Works. The Contractor shall inform the S.C. of all arrangements with all
Statutory and Public Utility Authorities.

3.0 WORK UNDER WATER

8.1 The rates shall include any costs arising from and in connection with the execution of work under water
wherever required unless otherwise stated.

9.0 PHRASEOLOGY

9.1 Differences in the method of billing and in phraseology used in various parts of the Bill of
Quantities and/or Schedule of Rates shall not be a basis of any claim for an increase in the rates and
prices.

TO COLLECTION

BO 1- 3/11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

10.0 PROVISIONAL SUMS

10.1 All provisional sums included in the Bill of Quantities are intended to be approximate indications
only of the amounts to be expended in respect of the work described and may be omitted entirely
or substantially varied without entitling the Contractor to any claim .for compensation. No part of
the Contractor's overhead, expenses or profit should be included in these sums when the bill is
priced unless items for profit and attendance are specifically allowed for.

11.0 CURRENCY OF PAYMENT

11.1 Pricing of the Contract shall be in Malaysian Ringgit to two decimal place. Payment to the
Contractor under the Contract shall be in Malaysian Ringgit.

12.0 TEMPORARY DIVERSIONS

12.1 Work in connection with the temporary diversion and relocation of existing overhead and
underground services, whether detailed in the Contract or not shall be covered by the
appropriate Lump Sum Items in Bill No. 1 : Preliminaries and General Conditions unless
separately measured in other parts of the Bill of Quantities.

13.0 ABBREVIATIONS

13.1 The following abbreviations or symbols are generally used in the Contract Document and shall be read
as follows:
a) mm. : milimetre
b) m ; metre
c) m2 ! square metre
d) rri3 : cubic metre
e) kg : kilogramme
f) tonne : metric ton
g) No. ! number
h) L.S. : Lump Sum
i) P.C. Sum : Prime Cost Sum
I) P.S. : Provisional Sum
k) RM : Ringgit Malaysia

14.0 SCOPE OF WORKS

14.1 The works included under this Contract comprises :

i) Preliminaries
ii) Slope Remedial Work
iii) Drainage Work
iv) Miscellaneous
v) Provisional Sum

15.0 LOCATION OF SITE

15 1 The site for the proposed Works is located at Pusat Tahanan Sementara, Menggatal, Kota
Kinabalu, Sabah

TO COLLECTION

BQ 1- 4/11
PROJEK PEN1BAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

PART 11 - PRICING OF PRELIMINARIES ITEMS

Project Signboard

A The Contractor shat provide, erect. and maintain a project signboard as specified. Site Survey `,1 , 00 , 4C)

and Setting Out

B The Contractor shall employ a licensed surveyor to carry out site surveys before G,Qcab .00
commencement and setting out of the Works.

Temporary Diversion And Relocation Of Existing Overhead And Underground

C The Contractor shall enquire from the various authorities and make arrangements for the disconnection, i 9- 0 ,M)
removal, relocation and reconnection of services and pay all necessary cost and fees in connection
therewith and make good all damage as specified.

Construction Plan
1
D The Contractor shall submit to the S.O. for his approval the following as specified .: %S 6 ,t)()

a) Programme of Works
h) Method statements
c) Contractor's organisation chart
d) Schedules
Plan for Works Contract R-1141-0 Million
0—Quaky-Assurance
1)- Provide Acsurancc Team full time worth Site for the inst;tution
and aboveT•admidistFatton

a quality 04;
the Quality Assurance Plan a4=i4 the
and maAtenanee of proparaben and submiasien of all,
Qualitsf Ass•blEE.EFIse-RePone-as--aPesftecirthr-014hautthe-duratiOn-ef-441e-sentrack
ii-)-- TContractor and to
-be shall appoint a suitably qua-44d expcnenced person act solely
as a Quality Assuf-ance Officer full time en site to lead Quality Assurance 'Team, (Refer
....
............... - - -- :- - : , -_• ,-- 40-Million-andabove),

Contractors Plant

E The Contractor shall provide, erect, keep insured, maintain and remove on completion all requisite
tif4 . in
scaffolding, hoist, cranage, construction plant, ladder, staging, tarpaulins, et cetera (excluding piling, pile
testing equipment and specialist equipment), as necessary for the execution of the Works

Temporary Water And Power Supplies For The Works

The Contractor shall provide adequate power and water supplies for the execution of the works
F including paying all associated costs and fees as specified. 4, cop() . 66

Site Security

The Contractor shall provide all necessary personnel and lighting for the security of the site at all times
G until completion of the whole Works as specified. 1, ‘i iN b.

TO COLLECTION `-1/411,750 ,(A

BO 1- 5111
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

Temporary Access And Maintenance Of Existing Roads

A The Contractor shall provide and maintain alt necessary temporary roads, culverts, tracks, bridges, et
cetera fur access to and within the Site as specified,

B The Contractor shall maintain all access including existing roads, bridges, drains, culverts, roadside
furniture, and all other appurtenances and services on such roads tnroughout the construction period_
The Contractor shall make good any above mentioned item damaged by any work carried out by him.

C The Contractor shall locate the actual position and provide support and full protection Of existing
services and mains during the progress of the Works, The Contractor shall inform the 5.0. of all
arrangements with the various authorities.

Control Of Workmen, Plant And Machinery At Site

D The Contractor shall ensure the safety, health and welfare at work of all his workmen as specified.

Contractor's Temporary Accommodation And Facilities For Workmen Living On Site

E The Contractor shall provide and maintain all temporary accommodation and facilities including
temporary lighting, plumbing, water storage, sanitary and sewerage for his labour and staff living on
Site as specified.

Contractor's Office And Storage

F The Contractor shall provide and maintain Contractor's office and storage on the Site in positions as
approved by the 5.0, and as specified.

Care And Protection Of Materials And Works

3 The Contractor shall provide and maintain everything necessary for proper protection of materials and
Works from any damage by weather.

Shop Drawings, Samples And Mock-ups

H The Contractor shall submit relevant shop drawings, samples of materials or workmanship and mock-
ups units as specified for the S.O.'s approval.

Progress Photographs

I The Contractor shall take progress photographs and submit to the 5.0. as specified.

Material Testing Laboratory And Staff

J The Contractor shall provide/erect a testing laboratory within the site or rent a premise or propose an
accredited laboratory approved by SIRM as specified. The Laboratory shall be equipped with the
necessary equipment and staff required to carry out the tests as identified in APPENDIX A./4 (List of
Laboratory Equipment).

TO COLLECTION

BQ 1- 6/11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. I - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

Office Accommodation Far S.O.

A .The Contractor shall provide and maintain a site office or relocatable site office or rent a Premise
for the use of the JKR supervisory staff which shall meet the requirement of the JKR design as
specified.

Telephone For S.O.

B The Contractor shall provide a permanent telephone at the S.D.'s site office for the sole use of the
S.O. and his representatives as specified.

SuFvey-Instruments-And-Personnet

The Contractor shall


provide all suchinstruments, equipment and suRey personnel as
C specified throughout the duration the originalContract Period until6
of months after the
 -r..,- '_- ,repletion as-per-SG-required.

Site Items For S.O./Office Equipment And Facilities

D The Contractor shall provide all Personal Protective Equipment required for the use of the
S.O. and his supervisory staff complete as specified and complying with COSH

E The Contractor shall provide suitable types of fire extinguishers as specified.


Tho Contractor shall
provide one 41-) set of computer systenfi insluding penal:era-is and
F
equipment as listed and specified iP, APPEAL ENX N2 for the use of the S.O, his
representahves-andetaff throughout-the-sluration-ofthe original Contract Period.
The C.shall suitable transportation CCI -ViCC by means vehicie(e)

G -entracte+
inoluding provide driver(s)
licensed and competent of
specified in APPENDIX N3 throughout the
as
duration-of-the.original-Gentraeit-I2erieel.

Safe Working Area

H The Contractor shall supply, erect, maintain and remove on completion of the Works, scaffolding
and working platform with safety nettings, catch platforms, safety barricades, fencing, railing,
screen wire netting and toe board, guardrails or board fences and sufficient illuminations, all as
specified.

I The Contractor shall supply, erect, maintain and remove on completion of the Works, adequate,
protective and security hoarding, scaffolding and working platform with safety nettings and such
other safety measures necessary to ensure the safety of the workers, personnel, public and others
at or within the vicinity of the Site, all as specified.

Safety, Health And Welfare

J The Contractor shall ensure the safety, health and welfare at work site as specified

a) Provision of First Aid Kit


b) Pest control including keeping the site clean and dry to prevent breeding of mosquitoes,
rodents, insects and vermin of any kind.
c) Fogging at regular intervals

TO COLLECTION

BQ1 -711 1
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. I - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

Safety, Health And Welfare (cont'd)


snail employ a Safety and Health Officer (SHO) registered with COSH for
A !TheContraetertheentire
contrastmilien-oontrast- period to be stationed fulltime at the site (ter works exceeding RIO 20
vaiue,
 Dapplicable
elete if not
B shall employ a Site Safety Supervisor (855) registered with DOSH to be minimum of
TheContractorstationed15 hours a week at the site for the entire duration of the
aconstructionperiod.

C TheContractor shall submit 5 copies of Safety and Health Plan (S-Plan} as required in as specified.
APPENDIXA/5
shall submit 5 copies of monthly Safety and Health Report as required in as
0 TheContractor specified.
APPENDIXA/6
shall provide and maintain adequate traffic safety and control including lights and
E TheContractor flagmen as necessary.
signages,warning
Site Tidy
Keeping The
shall make every effort to keep the Site in a reasonably clean and tidy duration of
F TheContractor the Works as specified
conditionforthe

The-Gentraoter-ohall lae-respecoailaie-far eeereinating-the-implernentation-of-all-M-&-E-works-


G

Project Cost Minimum-RequiFecnent-Cif-


RIAI- M & E Coordinator
laelweeR 1-0 1-Engineer&IGeW
te-50-R11111-0FT
mere than SO 4-E-ngineeF84-2-G4.4
million

As-built Drawings

H The Contractor shall provide four (4) sets of the approved As-built drawings after completion of each
section of the Works in the form as specified.

Clearing, Cleaning And Making Good On Completion

I Before handing over of the works to the 5.0 , the Contractor shall scrub all floors, pavings,
staircase, etc and clean out all gutters, gulleys, manholes, sumps and drains. The
Contractors shall also cut shorts grass within the site, clear ail areas from rubbish and debris, and
leave every part of the completed works included in this Contract in clean, sound and tidy condition.
The Contractor shalt ensure all affected structures are reinstated to its original condition.

TO COLLECTION

BQ 1 - 8/1 1
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

Form of Contract

Pk The Contractor shall refer to the Standard Form of Contract for further information The
Contractor may price here for all the expenses involved in complying with the terms of these Clauses.
otherwise such expenses are deemed to be included elsewhere

Clause No. 13
Performance Bond

For due observance and performance of this contract tne Contractor shall have to provicie:

B Performance Bond in the form of an approved Bank or Insurance Guarantee equal to five percent
(5%) of the contract sum to be deposited with the Government as a condition precedent to the
commencement of any work under this contract.

Clause No.15
C Insurance Against Personal Injuries And Damage To Property Clause
No.16
D Indemnities to Government in Respect of Claim by Workmen Clause

No.17
E Employees' Social Security Act, 1969 Clause
No.18
F Insurance of Works.

Clause No.22
G Design, Sub-clause No. 22,2 - Design Guarantee Bond Clause
No.35
H Materials, Goods And Workmanship - Opening up of work for inspection or testing of materials or goods

Clause No. 59 - Site Agent And Assistants

I The Contractor shall keep constantly on the Site for the full duration of the Contract a competent,
efficient, suitably qualified, experienced and good character Site Agent and his assistants in each
trade as may be necessary, who must be capable of receiving instructions in Bahasa Malaysia, and in
default it shall be the responsibility of the Contractor to provide replacement for them and all wages
and other expenses in connection with the employment of such replacement site agent and
assistants. Any directions, explanations or instructions given to such site agent by the S.O. shall be
deemed to have been given to the Contractor under this contract. provide all necessary
superintending order

4-ti1lUes-MaPPIng
1

J Garry out underground uitilitics mapping to determine all-undergrekine-lattiiities-4-nelvaing


cables and pipings.

Inspection and testing

K Ali quality control and testing requirement far material/quality including preparation of report, test records
complete with colour photograph etc. throughout the contract period

TO COLLECTION

BO 1- 9/11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO.1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

Temporary Protection Works

A Provide temporary silt surnpfsediment traps,earth drain etc to contain possible spillage of silt to
adjacent site and to maintain during the construction stage.

B Provide planking and strutting arid shoaring or any temporary stability system where
necessary to sides of excavation and remove and clear away on completion

C Supply, lay and maintain class 'A plastic sheeting for slope protection during construction works as
directed by the SO.

Compliances

D All items priced shall be deemed to include compliance with the provisions of the contract, statutes,
regulation, by-laws or any order or directive issued by public authority or public service company
and other related legislation currently in force.

TO COLLECTION

BQ 1- 10/11
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN
SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO.1 - PRELIMINARIES

ITEM DESCRIPTION AMOUNT

COLLECTION
1
+1,15(5 .b1;)

e:1,:44.40

ck.Goo•oo

kk‘, 4,-\
, Z O O • 0 0 P a g e B Q
1 - 5 / 1 1 P a g e B Q 1 - 5 300 .Ci0 Ci
6 / 1 1 P a g e B Q 1 - 1 / 1 1
P a g e B Q 1 - B / 1 1
P a g e B Q I - 9 / 1 1
P a g e B Q 1 - 1 0 1 1 1

TOTAL CARRIED TO SUMMARY A.SG,Strs•CA

BO1-11111
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (Pl KOTA KINABALU SABAH

BILL NO. 2 - SLOPE REMEDIAL WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (RM) (R1111)

2.0 SLOPE REMEDIAL WORKS

2.1 Site Clearing and Cleaning


Clear and remove from site al! obstacles over the areas for the
construction of slope protection works and drains including trees,
shrubs, fence, roots and existing structures, drainage and disposal of
all materials to Contractors own tip or site.
Refer drawing no.JKR/CitC/IVIKNiS/PTSKK/2018/005 LS
2.2 Excavation and Trimming
Excavate in all material including rock to required platform level
and stockpile the suitable excavated material for reuse as directed
by the S.O. and dispose surplus material from site to Contractor's
own tip. Refer drawing no.
JKR/CKDIVIKN/S/PTSKK/2018/005 3
0_1 900

2.3 Backfilling & Compaction


Supply and lay graded imported earthfill material include
compaction every 300mm layer. and additional filling
necessitated by settlement or penetration into underlying
material as applicable. Refer drawing no
JKR/CKC/MKN/S/PTSKK/2018/005 m3 2000

2.4 Micro Pile


2.4.1 Allow for provision of all drilling equipment, plant, toll, ancillary
equipment, labour including mobilization to site, handling,
assembling and removal off site after completion of piling work_
LS

2.4.2 Rate for micropile shall be deemed to include drilling of borehole


through any strata (rock and soil), permanent casing, spacer, steel bars
and reinforcement, concrete grout of Grade
30, and all other accessories. The rate shall also include cutting of
access bars, wastages of all materials, dumping of all unused
material off site, and submission of report of microoile

150mm diameter pile at 300mm centre to centre horizontally with


3-T25 reinforcement bar and Rio link at 150mm centre to centre, as
shown in drawing
AR/CKC/MKNIS/PTSKIQ2018/01084011

i. 12.00m long No 535

2.4.3 Reinforced concrete Grade 30 as skin wall comprising of 2 layers


BRC of A10 including formwork, reinforcement and all
other work nn3 50

2.4 4 Reinforced concrete Grade 30 as capping beam including 7-


T20 bar reinforcement, R8 bar as links at 250mrn centre to
centre, 50mm chamfered edge, formwork and al! other
accessories as per shown in the drawing. Refer drawing i
JKIR(CKC/MKN/SiPTSKK/2018/010&011 m 18

2.4.5 Carry out pile integrity test (PIT), rate to include all necessary
equipment and submission of procedure, records, and report. No 3

To Collection

BC1 2 - 1/4
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PTE KOTA KINABALU
SABAH
BILL NO. 2 - SLOPE REMEDIAL WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


..-NO. (RM) (RM)

2.5 Soil Nailing


2.5 1 Provide the necessary drilling and grouting equipment and all other
appliances required for the installation of the soil nails including
staging, storage of the above on Site during the progress of work and
removal from the site on completion as directed by the S,O.
LS

2.5.2 Rate for soil nailing shall be deemed to include drilling of borehole
through any strata (rock or soil), corrugated HOPE pipe, pipe sleeve, end
cap, centraliser, coupler if required, concrete grouting of Grade 30,
sealant compound, galvanised steel bars, bolts, nuts, plates and other
members, and all other accessories. The rate shall also include
installation of coupler if required. wastages, loss of grout, pre-grouting,
water tightness test, or other approved method to prevent loss of grout
due to water gushing out of drill hole or loss of drilling fiuid/arout
during installation.

100mm diameter soil nail with T25 reinforcement bar at 1.50m


centre to centre horizontally as shown in drawing
J KR/CKC/fv1KN/S/PTSKK/2018/0 i 0 and
JKR/CKO/MKN/S/PTSKK/2018/01 1

I. 9.00m long (Working Load = 410N/rnm2) No 100

2.5.3 Pull out test on soil nail, rate to include all necessary equipment and
submission of procedure, records, and report

i. To 1.5 times the working load. No 2

2.6 Waler Beam


Reinforced concrete Grade 30 as waler beam including 4-T20 bar
reinforcement, R8 bar as links at 200mm centre to centre, formwork
and ail other accessories as per shown in the
drawing. Refer drawing JKR/CKC/MKN/S/PTSKK12018/011 m3 8

Location 2

2.7 Gabion Mattress


2.7 1 Reinforced concrete Grade 25 as base consisting of 1 layer of
SRC Al 0 including excavation, formwork and all other
necessary accessories as drawing no_
JKR/CKC/MKN/S/PTSKK/2018/016 m3 2

2 7.2 Supply and install PVC-coated gabion box overall size 1.00m x 1.00m x
1.00m,fabricated from a double-twist, hexagonal mesh of soft annealed.
heavily zinc coated wire as specified in the drawings. Rate shall include
include workmanship, supply and lay granite block (average size 150mm
to 250mm) and details which made up the complete system as per
drawing no
Refer drawing no. JKR/CKC/MKNIS/PTSKK/2018/016
No 4

To Collection

BQ 2 - 2/4
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PT! KOTA KINABALU SABAH

BILL NO. 2 - SLOPE REMEDIAL WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


(RM)
NO. _ (RM)

2.7 Gabion Mattress (cont'd)


2 7.3 Supply and install PVC-coated gabion box overall size 2.00m x 1 00m x
0.30m, fabricated from a double-twist, hexagonal mesh of soft
annealed, heavily zinc coated wire as specified in the drawings. Rate
shall include include workmanship, supply and lay granite block
(average size 150mm to 250mm) and details which made up the
complete system as per drawing no
Refer drawing no.JKR1CKC/MKNI/S/PTSKK/2018/016
No 12

2.7 4 Supply and lay non-woven geotextile as separator with tensile


strength equivalent to 30KNi1rn Refer drawing ,
no.JKRICKC/MKN/S/PTSKK/20181016 30

To Collection

BQ 2 - 3/4
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PT2 KOTA KINABALU SABAH

BILL NO. 2 - SLOPE REMEDIAL WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (m)_ (RM)

Collection

Page BO 2 - 1/4

Page BQ 2 - 2/4

Page BQ 2 - 3/4

To Summary of Tender

Bo 2-4/4
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PTS)
KOTA KINABALU SABAH

BILL NO. 3 - DRAINAGE WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (RM) (RM)

3_0 DRAINAGE WORK

3.1 Sump
200mm Thick reinforced concrete Grade 25 as sump overall size
1000mm x 1000mm average depth not exceeding
1000mm comprising of 50mm thick lean concrete, T12
reinforcement at 100mm bothways including mild steel grating
cover and all necessary excavation. formwork, reinforcement and
removal of surplus material as per drawing
Refer drawing no JKR/CKCIMKNIS/PTSKK/2018/013 and No 6

3.2 interceptor Drain


75mm Thick reinforced concrete Grade 25 as interceptor top
width not exceeding 300mm and depth to invert level not
exceeding 300mm comprising of 50mm thick lean concrete, BRC
A8 mesh fabric including all necessary excavation, formwork,
reinforcement and removal of surplus material as per drawing.
Refer drawing
JKRICKCIMKNI/S/PTSKKI2018/5/013 m 150

3.3 uPVC Ripe


Supply and install 7.7mm thick uPVC pipe minimum outside
diametre 150mm including galvanised steel saddle clamp bolted
to anchor block (measured separately).
Refer drawing no, J KR/CKCillAKN/SIPTSKK/20181014 m 160

3.4 Anchor Block


Reinforce concrete Grade 25 as block overall size 300mm x
250mm x 200mm thick cast to shape to receive pipe comprising
of 1 layer of BRC A8 including formwork as per
shown in the drawing.JKRICKCIMKNiS/PTSKK12018/014 No 50

3.5 Berm Drain


100mm Thick reinforced concrete Grade 25 as berm drain top
width not exceeding 300mm and depth to invert level not
exceeding 300mm comprising of 50mm thick lean concrete, BRC
A10 mesh fabric including all necessary excavation, formwork,
reinforcement and removal of surplus material.
Refer drawing no,JKR/CKC/MKNiS/PTSKIC/20113/013 m 150

Location 1

3.6 Galion Mattress


3.6.1 Reinforced concrete Grade 25 as base consisting 1 layer of
BRC A10 including excavation, formwork, removal of surplus
material and all other necessary accessories as drawing no.
JKRICKC/MKN/SIPTSKK/2018/015 m3 2

3.6.2 Supply and install PVC-coated gabion box overall size 2 00m x 1
00m x 0.30m, fabricated from a double-twist, hexagonal mesh of
soft annealed, heavily zinc coated wire as specified in the drawings
Rate shall include include workmanship, supply and lay granite
block (average size 150mm to 250mm} and details which made up
the complete system as per drawing no Refer drawing no.

JKRICKCIMKN/SIPTSKIV2018/015 No 4

To Collection

BO 3 - 9 /3/Add
PROJEK PEMSAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PTS)
KOTA KINABALU SABAH
BILL NO. 3 - DRAINAGE WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (Rh11) (RM)

3.0 DRAINAGE WORK Iconrc11

3.7 Handrail at Existing Cascade Drain


38mm diarnetre galvanised iron handrail, pole and other steel
members welded and painted in anti-rust paint and embedded in
concrete as approved and directed by S 0 m 7

3.8 Concrete Drain Cover (Location 2)


Reinforced concrete Grade 25 as grating overall size 600mm x
500mm x 75mm thick comprising of 1 layer of SRC A10 with notch at
both ends including formwork and all other accessories as per S O's
instruction and refer drawing no.JKR/CKCA4KN/SePTSKKI20181016
No 17

To Collection

BQ 3 - 2/3
PRQJ EK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN Dl PUSAT TAHANAN SEMENTARA (PTS)
KOTA KINABALU SABAH

BILL NO. 3 - DRAINAGE WORK (ALL PROVISIONAL)

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (RM) (RM)

Collection

Page BQ 3 - 113

Page BQ 3 - 213

To Summary of Tender

BQ 3 - 3/3
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA BERKAITAN DI PUSAT TAHANAN SEMENTARA (PTS) KOTA KINABALU SABAH

BILL NO. 4 - PROVISIONAL SUM

ITEM DESCRIPTION OF WORK UNIT QUANTITY RATE AMOUNT


NO. (RM) (RM)

4.0 PROVISIONAL SUM

4.1 Slope Contingencies Repair Work


Allow for provisional sum amounting RM50,000.00 for
unforeseen slope failure during construction period 50,000.00

4.2 Building Rectification Work


Allow for provisional sum amounting RM50,000.00 for building
rectification work. 50.000_00

4.3 Anti-Climb Fencing


Allow for provisional sum amounting RM250,000.00 for anti-
climb fencing 250,000.00