Fundamentals of Technology Project Management Project Plan Template

Project Name

Project Plan

PROJECT NAME

Confidential and Proprietary Information


This document contains information that is proprietary to <COMPANY NAME>. Transmittal, receipt, or possession of this
document does not express license, or imply rights to use, sell, design, manufacture, or to have manufactured, any
product, concept, or service from this information. No reproduction, publication, or disclosure of this information, in whole
or in part, electronic or otherwise, shall be made without prior written authorization of an officer of <COMPANY NAME>
Authorized transfer of this document from the custody and control of <COMPANY NAME> constitutes a loan for limited
purpose(s), and this document must be returned to <COMPANY NAME> upon request, and in all events, upon completion
of the purpose(s) of the loan.

Page 1 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

Document Change Log

Prepared By Title Date Version

Revisions

Modified By Reason Date Version

Page 2 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

Table of Contents

1. Introduction........................................................................................................... 4
2. Project Definition Overview...................................................................................4
3. Changes Since Project Definition Was Approved.................................................4
4. Staffing Plan.........................................................................................................4
5. Development Environment...................................................................................4
6. High-Level Schedule............................................................................................4
7. Deliverables and Milestones.................................................................................4
8. Functional Requirements......................................................................................5
9. Technical Requirements.......................................................................................5
10. Decision Support System (DSS) Plan...............................................................5
11. Quality Assurance (QA) Plan............................................................................5
12. Communications Plan.......................................................................................5
13. Deployment Plan..............................................................................................5
14. Operations Plan................................................................................................5
15. Training Plan....................................................................................................5
16. Risk Management Plan.....................................................................................5
17. Measurement Plan...........................................................................................5
18. Client Acceptance Criteria................................................................................6
19. Project Plan Approval.......................................................................................6

Page 3 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

1. Introduction
The project name is Café IT–Build IT and Café IT is the name of the coffee internet shop
located in the heart of LA City in CA State. Our group name is Café IT –Build IT, in this
project we care about all the IT and technical staff in this coffee internet shop.

2. Project Definition Overview


~$oject_DefinitionHINDZ_draft_3.doc

3. Changes Since Project Definition Was Approved

3.1. The Problem:


-Technical service café IT contains certain conditions in addition to
customer requests.
-area 1: Need always to have a new set of games.
-area 2: Computer needs to be a variety of programmers and specific
for this purpose.
-Internet speed must be to serve the high end.
-our client looks to be the "No. 1" in coffee shop in the Los Angeles
downtown.
-Technical should serve this goal by watch quality and price of
competing for others all the time.
-Provision of high quality and at the same time maintains the low
price.
-Harness the technology in Café IT to Sell the largest number of the
membership of the café IT and Sell the largest number of hours
online.

3.2. The Solution


-Providing technical allow competition, through the provision of
appropriate high speed internet to play.
-The Games also provide modern developed that will attract the
public, which may not be available in their homes.
-Building official page for the project shows the services provided by
the most potential.
-Connecting the site to Google and yahoo because search engines that
cause an increase in customers.
-Lower prices for this technical reason to attract customers.

Page 4 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

3.3. Time and Costs:

Work on this project will start in 01- 14-08 and end in 03-16-

08. As well as the initial budget and schedule estimated and described

in this project in schedule document and budget document.

4. Staffing Plan
See it in Staffing Plan Document

5. Development Environment
http://home.comcast.net/~todd_lara_smith/Marathon03.html#

6. High-Level Schedule
Assignment Starting Finishing Name Roles Position
Date Date
Floor 01/14/08 01/18/08 Kevin Project Working
Duffy leader representative
Wall 01/14/08 01/20/08 Archie Project Project
River Assistant Consultant
Painting 01/21/08 01/23/08 Cooler Project Project
Knight Assistant Consultant
Windows 01/21/08 01/22/08 Jack Project Project
Chen Manager specialist
Tables 01/23/08 01/23/08 Jessie Advisor Client
Miller representative
Chairs 01/23/08 01/23/08 Page Bell Advisor Client
Representative
Coffee 01/24/08 01/25/08 Monica Quality QA consulting
Machine Phuong Assurance
Manager
Electricity 01/26/08 01/31/08 Cindy Technical Electricity
Dodge Manager representative
department
Computers 02/01/08 02/22/08 Scott Computer Computer
Wood Sponsor CEO
TVs 02/23/08/ 03/15/08 Edwin Business Business
Drood Manager Representative

7. Deliverables and Milestones


Milestone Date Status Responsible Issue/Comments
Initiating

Page 5 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

Project Manager 01/14/08 Completed Joe


determined/assigned
Business case 01/18/08 Completed Erica
created
Project charter 01/22/08 Completed Edwin
signed
Planning
Project kickoff 01/12/08 Completed Tiger Went well
meeting held
Project contract 01/12/08 Completed Erica
signed
Scope statement 01/15/08 Completed Haley
completed
List of risks 01/17/08 Completed Norris Reviewed with
completed sponsor and
team
Schedule and cost 01/21/08 Completed Todd
baseline completed
Executing
Coffee shop 01/25/08 Completed Hind
blueprint completed
TV area completed 01/26/08 Completed Todd
Internet area 01/27/08 Completed Todd
completed
Print area completed 01/28/08 Completed Hind
User inputs collected 01/31/08 Completed Jessie
User requests 02/05/08 Completed Michael
completed
Internet testing 02/10/08 Completed Scott
completed
TV testing 02/18/08 Completed Edwin
completed
Electricity testing 02/26/08 Completed Cindy
completed
Monitoring and
Controlling
Status reports Every Friday All
Closing
Final project 03/06/08 Edison
presentation
Sponsor sign-off on 03/07/08 Archie
project completion
Final project report 03/12/08 Page
completed
Project hand off 03/14/08 All

Page 6 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

8. Functional Requirements
See it in Functional Requirements Document

9. Technical Requirements
See it in Technical Requirements Document

10. Decision Support System (DSS) Plan

11. Quality Assurance (QA) Plan


See it in Quality Assurance Plan Document

12. Communications Plan


017 Communication Plan.doc

13. Deployment Plan


See it in Deployment Plan Document

14. Operations Plan


See it in Operations Plan Document

15. Training Plan


Training Name Role Position Contact Information
Coffee Edison Human HR president Edi_Chen@hotmail.com
Makers Chen Resource
Leader
Computer Tiger Technical IT Tig_Wds@hotmail.com
Developer Woods Manager representative
Coding Woody QA advisor IT Manager Wd_Alen@gmail.com
Testers Allen
Shop Yale Sponsor Business CEO Yale_Fd@gmail.com
manager Fonda

16. Risk Management Plan

Risk Categories Budget and Roles and Methodology


Schedule Responsibilities
Errors in Time Due date: Manager: Joe Add more
estimating time 03/16/08 Fleming workers or

Page 7 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

or resource Cost: 40,000$ more resource


availability to finish it
Absence of Human 2,000$ HR leader: Find a person
leadership Resource Michael Chen who are able to
handle his job
Lack of Communication 1,000$ Group leader: Build up a good
consultation Erica Bell relationship by
with key communicating
stakeholders them with good
manners and
good
conversation
skills
Poor attitude Quality 5,000$ QA leader: Rang up
toward quality Kevin Faue employee’s
paycheck

17. Measurement Plan

18. Client Acceptance Criteria


Our goal is to product a project, which must be acceptable as "complete" by the client.
This project is to complete with 2 months for no more then $40,000. The Client
representatives has responsibilities to supervise the project, and check out its design,
inputs, financial status, benefits, development, investment, test and deployment. If the
project does not meet their requirement, like takes a little longer to complete or costs a
little more than planned, the client will still accept it as a success if it has a good quality,
a good potential in investment and helps the client’s benefits on rise.

19. Project Plan Approval

Client Sponsor: Signature:


Print Name:
Title:
Date:
Signature:
Print Name:
Sponsor:
Title:
Date:

Signature:

Page 8 of 9
Created by "Author"
Fundamentals of Technology Project Management Project Plan Template
Project Name

Print Name:
Title:
Project Manager:
Date:

Page 9 of 9
Created by "Author"