INTERPRETATION CENTER
DEHRADUN, UTTARAKHAND
Prepared by:
ECBC CELL, UTTARAKHAND
GreenTree Global
INDEX
1. EXECUTIVE SUMMARY .................................................................................................................................................. 5
2. Suggesstion of Energy Conservation Measures to Owner / Architect: ........................................................................ 5
3. SUMMARY OF ECBC COMPLIANCE ............................................................................................................................... 5
ENVELOPE ................................................................................................................................................................... 5
3.1.1. Building opaque envelope ................................................................................................................... 5
3.1.2. Glazing Recommendation .................................................................................................................... 5
COMFORT SYSTEMS AND CONTROLS ......................................................................................................................... 6
3.1.3. Building HVAC design and systems ...................................................................................................... 6
3.1.4. Ventilation ........................................................................................................................................... 6
3.1.5. Equipment and total system efficiency ............................................................................................... 6
3.1.6. Controls ................................................................................................................................................ 6
3.1.7. Piping and duct insulation ................................................................................................................... 6
3.1.8. Condensers .......................................................................................................................................... 6
LIGHTING .................................................................................................................................................................... 7
3.1.9. Lighting power density......................................................................................................................... 7
2.3.2 Lighting control .................................................................................................................................... 7
2.3.2 Exterior lighting detail .......................................................................................................................... 7
2.3.3 Exterior lighting control ....................................................................................................................... 7
2.3.4 Summary of recommendations for lighting ......................................................................................... 7
SERVICE WATER HEATING .......................................................................................................................................... 7
2.4.1. Hot water requirement in the building ................................................................................................ 7
ELECTRICAL ................................................................................................................................................................. 7
3.1.10. Transformer ........................................................................................................................................ 7
3.1.11. Motors (type, efficiency) .................................................................................................................... 7
3.1.12. Diesel generator sets .......................................................................................................................... 7
3.1.13. Check metering and monitoring ......................................................................................................... 8
3.1.14. Power factor correction ...................................................................................................................... 8
3.1.15. Power distribution system .................................................................................................................. 8
3.1.16. Uninterruptable Power Supply (UPS) ................................................................................................. 8
RENEWABLE ENERGY .................................................................................................................................................. 8
3.1.17. System information ............................................................................................................................ 8
4. WHOLE BUILDING PERFORMANCE: .............................................................................................................................. 9
ENERGY MODELLING AND SIMULATION ................................................................................................................................ 9
SUMMARY .................................................................................................................................................................. 9
DESCRIPTION ENERGY MODELLING SOFTWARE ........................................................................................................ 9
BUILDING MODEL DESCRIPTION ................................................................................................................................ 9
4.1.1. Model details ....................................................................................................................................... 9
WEATHER FILE ............................................................................................................................................................ 9
SIMULATION OUTPUT .............................................................................................................................................. 10
Techno Feasibility Report
List of Figures
Figure 1: 3D View .................................................................................................................................................................. 10
Figure 2: Energy use comparison between different components....................................................................................... 11
Figure 3: Energy use comparison between different components....................................................................................... 12
Figure 4:eQUEST output of Baseline-0-degree rotation ....................................................................................................... 13
Figure 5: eQUEST output of Baseline-90-degree rotation .................................................................................................... 13
Figure 6: eQUEST output of Baseline-180-degree rotation .................................................................................................. 14
Figure 7: eQUEST output of Baseline-270-degree rotation .................................................................................................. 14
Figure 8: eQUEST output of Proposed .................................................................................................................................. 15
List of Tables
Table 1: Opaque envelope specification ................................................................................................................................. 5
Table 2: Glazing recommendation .......................................................................................................................................... 5
Table 3: Equipment Efficiency ................................................................................................................................................ 6
Table 4: Piping Insulation R-Value requirements ................................................................................................................... 6
Table 5: Ducting Insulation R-Value requirements ................................................................................................................. 6
Table 6: Interior lighting power density.................................................................................................................................. 7
Table 7: Exterior lighting power density ................................................................................................................................. 7
Table 8: Model input summary ............................................................................................................................................... 9
Table 9: Energy End Use – Proposed & Baseline in kWh – Total Buildings ........................................................................... 11
Table 10: Unmet Load Hours Summary ................................................................................................................................ 11
Table 11: Schedules considered for Whole Building Performance Method for Assembly Building ..................................... 16
1. EXECUTIVE SUMMARY
BUILDING NAME Interpretation Center, Dehradun
BUILDING TYPE Assembly
LOCATION Dehradun, Uttarakhand
CLIMATIC ZONE Composite
FAR AREA (m2) 550
OCCUPANCY TYPE Assembly
ECBC compliance achieved UK-ECBC 2017
EPI (Baseline Case), kWh/m2/year 370.56
EPI (Proposed Case), kWh/m2/year 366.08
ENERGY SAVING ACHIEVED, kWh/ YEAR 2467
EPI Ratio Achieved 0.98
LIGHTING
3.1.9. Lighting power density
Building area method has been adopted in the calculation.
Table 6: Interior lighting power density
BUILDING TYPE ECBC recommended LPD (W/m2) LPD as per design (W/m2)
Convention Centre 12.5 9.4
Basement Parking 3 3
ELECTRICAL
3.1.10. Transformer
The maximum total losses of the proposed transformer at 100% loading and 50% loading has been
determined as per ECBC 2017 Table 7-2. Additional metering class current transformers (CTs) and potential
transformers (PTs) shall be provided.
Voltage drop for feeders shall not exceed 2% at design load. Voltage drop for branch circuit shall not exceed
3% at design load.
3.1.11. Motors (type, efficiency)
IE-2 High Efficiency Motors has been recommended as per ECBC 2017 Section 7.2.2 and shall be followed.
3.1.12. Diesel generator sets
BEE 3 Star Rated Diesel Generator sets have been recommended as per ECBC 2017 Section 7.2.3 and shall be
followed.
RENEWABLE ENERGY
3.1.17. System information
Solar PV panels facing south direction at 30-degree tilt shall be installed and the capacity would be
equivalent to 1% of the total demand/ connected load compensated by the installed capacity of the solar PV
panels (or) 25% of the roof area shall be provided with solar PV.
Description Baseline
Wall U-value 0.40 Refer Table 1: Opaque W/m2 K
envelope specification
Roof U-value 0.33 Refer Table 1: Opaque W/m2 K
envelope specification
Roof Reflectivity 0.3 0.9
Glazing U-value 3.0 1.6 W/m2 K
Glazing SHGC Non-north 0.27 0.18
Glazing SHGC North 0.5 0.18
Glazing VLT 0.27 0.26
Window Shading As per design As per design
HVAC System Type Split system VRV system
Cooling Capacity Sizing 1.15 1
Heating Capacity Sizing 1.25 1
Cooling COP As per ECBC 3.8
Lighting Power Density 12.5 9.4 W/ m2
Process Loads 0.5 0.5 W/ ft2
Zone Cooling set point 78 78 deg F
Zone Heating set point 68 68 deg F
WEATHER FILE
The project is located at Dehradun and thus ISHRAE weather file of Dehradun has been used.
SIMULATION OUTPUT
Figure 1: 3D View
Table 9: Energy End Use – Proposed & Baseline in kWh – Total Buildings
SPACE
DESCRIPTI MISC PUMPS &
UNITS LIGHTS CONDITIO VENT FANS TOTAL
ON EQUIP AUX
NING
PROPOSED KWH 11348 2299 54108 113 20784 201342
BASELINE -
KWH 14044 2299 54859 113 20941 204579
0 DEG
BASELINE -
KWH 14044 2299 56214 113 21490 207788
90 DEG
BASELINE -
KWH 14044 2299 54473 113 20776 200090
180 DEG
BASELINE -
KWH 14044 2299 54902 113 20929 202781
270 DEG
BASELINE -
KWH 14044 2299 55112 113 21034 203809
AVG
11348, 4%
2299, 1%
BASE CASE
LIGHTS
54108, 19% MISC EQUIP
113, 0% SPACE CONDITIONING
20784, 7% PUMPS & AUX
201342, 69%
VENT FANS
TOTAL
11348, 4%
2299, 1%
PROPOSED CASE
LIGHTS
54108, 19% MISC EQUIP
113, 0% SPACE CONDITIONING
20784, 7% PUMPS & AUX
201342, 69%
VENT FANS
TOTAL
Building Schedule
Assembly Building time schedule as per ECBC has been considered
Table 11: Schedules considered for Whole Building Performance Method for Assembly
Abbreviations