BOBOT AKTUAL

100
BOBOT AKTUAL
96
BOBOT AKTUAL
93
BOBOT AKTUAL
90
BOBOT AKTUAL
86
BOBOT AKTUAL
81
BOBOT AKTUAL
73
BOBOT AKTUAL
59
BOBOT AKTUAL
48
BOBOT AKTUAL
39
BOBOT AKTUAL
29
BOBOT AKTUAL
20
BOBOT AKTUAL
14
BOBOT AKTUAL
9
BOBOT AKTUAL
5
BOBOT AKTUAL
0.5
HARGA
NO PEKERJAAN SATUAN VOLUME SATUAN

A PERSIAPAN
1 PEMBERSIHAN & PERATAAN LAHAN LS 1.00 100,000
2 MOBILISASI & DEMOBILISASI LS 1.00 150,000
B PASANGAN
1 GALIAN TANAH M3 5.00 29,000
2 URUGAN PASIR M3 2.00 130,000
3 PASANGAN BATU KOSONG / AANSTAMPING M3 2.00 246,500
4 PASANGAN BATU KALI 1:4 M3 8.00 621,000
5 PLESTERAN 1:3 M2 15.00 27,500
6 SIARAN 1:2 M2 15.00 25,000
C AKHIR
1 PEMBERSIHAN AKHIR LS 1.00 100,000
TOTAL

RENCANA / PLANNING
PROGRESS
DEVIASI
WAKTU PELAKSANAAN PEKERJAAN (12
JUMLAH HARGA BOBOT BULAN 1 BULAN 2
M1 M2 M3 M4 M5 M6 M7 M8

100,000.00 1.43 0.71 0.71


150,000.00 2.14 0.71 0.71

145,000.00 2.07 2.07


260,000.00 3.71 3.71
493,000.00 7.04 7.04
4,968,000.00 70.94 7.88 7.88 7.88 7.88
412,500.00 5.89
375,000.00 5.35

100,000.00 1.43
100.00 1.43 3.50 3.71 7.04 7.88 7.88 7.88 7.88

1.43 4.93 8.64 15.68 23.56 31.44 39.32 47.20


0.5 5 9 14 20 29 39 48
-0.93 0.07389 0.36146 -1.67788 -3.55965 -2.44142 -0.3232 0.79503
7,003,500.00
LAKSANAAN PEKERJAAN (120) HK
KETERANGAN
BULAN 3 BULAN 4
M9 M10 M11 M12 M13 M14 M15 M16 120

0.71

7.88 7.88 7.88 7.88 7.88


2.94 2.94
2.68 2.68

1.43
7.88 7.88 7.88 7.88 7.88 5.62 5.62 2.14

55.09 62.97 70.85 78.73 86.61 92.24 97.86 100.00


59 73 81 86 90 93 96 100
3.91326 10.0315 10.1497 7.26794 3.38616 0.76398 -1.85821 0