DAFTAR HARGA BAHAN DAN UPAH

URAIAN HARGA BAHAN

A. TIMBUNAN/GALIAN
1 Air Liter 45.00
2 Kerikil Beton Uk. ≥ 4 cm M3 112,500.00
3 Kerikil Beton Uk. 3 cm s/d 4 cm M3 112,500.00
4 Pasir Pasang M3 120,000.00
5 Pasir Beton M3 110,000.00
6 Pasir Urug/Timbun Pilihan M3 67,500.00
7 Sirtu M3 108,000.00
8 Tanah Urug/Timbun Pilihan M3 67,500.00
9 Tanah Urug/Timbun Biasa M3 49,500.00

B. BAHAN PEREKAT
1 Lem Kayu Kg 19,485.00
2 Lem Vinyl/Karet Kg 28,485.00
3 Semen Portland @40 kg Kg 1,350.00
4 Semen Warna @50 kg Kg 2,520.00
5 Sealant Silicon M' 11,250.00
6 Waterproof Kg 27,000.00

C BATU/BATU CETAKAN
1 Batu Pecah 1-2 cm M3 225,000.00
2 Batu Pecah 2-3 cm M3 225,000.00
3 Batu Kali/Sungai 5 - 20 cm M3 112,500.00
4 Batu Bata Mesin 5x10x20 cm Buah 750.00
5 Batu Bata Merah 5 x 11 x 22 cm Buah 750.00
6 Batu Paras M2 130,500.00
7 Batu tempel hitam M2 126,000.00
8 Conblock/HB 20 M2 193,500.00
9 Kolom Beton Pra Cetak Batang 6,750,000.00
10 Kapur Padam M3 148,500.00
11 Panel Beton Pra Cetak Lembar 7,425,000.00
12 Batu Rooster Buah 8,100.00

D KAYU/LANGIT-LANGIT
1 Balok Kayu setara Kuat kayu kelas I M3 4,950,000.00
2 Balok Kayu Kelas II M3 4,050,000.00
3 Balok Kayu 5/7 Kelas IV M3 2,700,000.00
4 Bambu Ø 6-8/600 cm Batang 36,000.00
5 Asbes semen 1 M x 1 M M2 22,500.00
6 Gypsum 120x240 cm tebal 9 mm Lembar 72,000.00
7 Gypsum 120x240 cm tebal 12 mm Lembar 81,900.00
8 Calsyboard 120x240 cm tebal 6 mm Lembar 85,500.00
9 List Profil Gypsum/List Profil Kayu M' 25,650.00
10 Insulasi/Glasswool M2 31,500.00
11 Kayu Dolken/Kayu laut Ø 7,5-10/400 cm Btg 18,000.00
12 Papan Kayu Sembarang M3 3,600,000.00
13 Papan Kayu setara Kuat kayu kelas I M3 4,950,000.00
14 Papan Kayu setara Kuat kayu kelas II M3 4,050,000.00
15 Papan Kayu setara Kuat kayu kelas IV M3 2,700,000.00
16 Plywood 120x240 cm tebal 6 mm Lembar 103,500.00
17 Plywood 120x240 cm tebal 9 mm Lembar 162,000.00
18 Garuda Form 12 mm Lembar 211,500.00
19 Tali Ijuk M3 31,500.00

E. BESI/ALUMINIUM
1 Atap Type Metal Sheet 0,35 M2 65,250.00
2 Alumunium Foil M2 36,000.00
3 Rabung Type Metal Sheet 0,35 M' 24,750.00
4 Baut SDS 12 x 50 mm Buah 990.00
5 Baut Trust ukuran 12 (14 x 20 mm) Buah 315.00
6 Baut Reng ukuran 10 (16 x 16 mm) Buah 360.00
7 Besi Beton Polos Kg 10,400.00
8 Besi beton Ulir Kg 12,750.00
9 Besi Strip Kg 10,800.00
10 Besi Profil Kg 10,800.00
11 Besi Hollow Btg 126,000.00
12 Besi Siku 40.40.4 Kg 21,600.00
13 Besi Square Tube M 21,000.00
14 Besi List Kaca (1 x 1) cm M 9,000.00
15 Pengelasan Cm 6,750.00
16 Furing Channel btg 5,400.00
17 Frame Alumunium Kwalitas Menengah M1 31,500.00
18 Glass Block M2 427,500.00
19 Jendela Naco Buah 202,500.00
20 Main Truss C75 x 0,75 mm Galvalum Panjang 6 M' M1 9,900.00
21 Reng 121 Galvalum Panjang 6 M' M1 9,000.00
22 Kawat Beton Kg 16,200.00
23 Kawat Duri Kg 12,690.00
24 Kawat Jaring Kg 133,200.00
25 Kawat Las Kg 9,000.00
26 Kawat Las Listrik Kg 8,100.00
27 Kalsiplank Lbr 49,500.00
28 Paku Beton 2" - 5" Kg 28,800.00
29 Paku Biasa 0,5" - 2" Kg 14,400.00
30 Paku Biasa 2" - 5" Kg 14,400.00
31 Sekrup 0,5" - 2" Kg 19,800.00
32 Paku Triplek Kg 14,400.00
33 Paku Ulir Kg 25,200.00
34 Penjaga Jarak Bekisting Buah 12,600.00
35 Plat Baja Kg 12,600.00
36 Kusen Alumunium Kwalitas Menengah M' 45,000.00
37 Profil Kaca M' 23,400.00
38 Alluminium Strip Kwalitas Menengah M' 31,500.00
39 Railing tangga (stainless Steel) M2 198,000.00
40 Ramset Buah 2,565.00
41 Roof Light 90 x 180 Lembar 315,000.00
42 Skrup Fixer Buah 270.00
43 Seng Gelombang Lembar 58,500.00
44 Seng Plat Lembar 67,500.00
45 Venetion Blinds dan Vertical Blinds (Tirai) M2 1,350,000.00

F. PENUTUP LANTAI DAN DINDING


1 Keramik 20 x 20 cm Buah 1,350.00
2 Keramik 20 x 25 cm Buah 1,710.00
3 Keramik 10 x 33 cm Buah 1,170.00
4 Keramik 30 x 30 cm Anti Slip Buah 3,150.00
5 Keramik 30 x 60 cm Buah 8,120.00
6 Keramik Anti Slip 30 x 60 cm Buah 8,300.00
7 Keramik Mozaik 30 x 30 cm Buah 3,150.00
8 Keramik 33 x 33 cm Buah 5,850.00
9 Keramik 10 x 20 cm Buah 720.00
10 Keramik 10 x 60 cm Buah 2,025.00
11 Keramik dinding 20 x 20 cm Buah 2,160.00
12 Keramik 60 x 60 cm Buah 26,200.00
13 Keramik Anti Slip 60 x 60 cm Buah 26,550.00
14 Marmar 100 x 100 cm M2 1,440,000.00
15 Plint Ubin Keramik 10 x 50 cm Buah 1,800.00
16 Siku Keramik/Bonbon M1 4,500.00
17 Karpet M2 67,500.00
18 Underlayer M2 49,500.00
19 Parquet M2 247,500.00
20 Porselin 11 x 11 cm Buah 720.00
21 Wallpaper M2 265,500.00

G. KUNCI DAN KACA


1 Door Holder Stainless Steel Setara Dekson Set 225,000.00
2 Door Stop Setara Dekson Buah 108,000.00
3 Pintu Gulung Besi M2 495,000.00
4 Pintu Lipat M2 405,000.00
5 Engsel Pintu Setara Dekson Buah 65,250.00
6 Engsel Pintu Tanam Setara Dekson Buah 85,500.00
7 Engsel Pintu Rolling/Lipat Setara SES Buah 87,750.00
8 Engsel Jendela Setara Dekson Buah 56,250.00
9 Frame Daun Pintu Aluminium Tanpa Kaca M' 42,750.00
10 Hak Angin Setara Dekson Buah 33,750.00
11 Spring Knip Buah 166,500.00
12 Kait Agin Setara Dekson Buah 33,750.00
13 Door Closer Setara Dekson Buah 112,500.00
14 Daun Pintu Kayu Uk. (0,64 x 2,55)m Fin. Cat Infra Buah 810,000.00
15 Daun Pintu Kayu Uk. (0,80 x 2,55)m Fin. Cat Infra Buah 1,012,500.00
16 Daun Pintu Kayu Uk. (0,8 x 2,10)m Fin. Cat Infra Buah 832,500.00
17 Daun Pintu Kayu Uk. (0,8 x 2,15)m Fin. Cat Infra Buah 851,400.00
18 Daun Pintu Alumunium Uk. (0,70 x 2,10)m Buah 742,500.00
19 Daun Pintu Kaca Tempered 12 mm Lengkap Ls 3,240,000.00
20 Kaca Buram Tebal 8 mm ( Asahimas ) M2 157,500.00
21 Kaca Buram Tebal 12 mm ( Asahimas ) M2 236,250.00
22 Kaca Cermin Tebal 5 mm ( Asahimas ) M2 180,000.00
23 Kaca Cermin Tebal 8 mm ( Asahimas ) M2 270,000.00
24 Kaca Polos Tebal 5 mm ( Asahimas ) + Stiker Etsa M2 67,500.00
25 Kaca Polos tebal 3 mm ( Asahimas ) M2 85,500.00
26 Kaca Polos tebal 8 mm ( Asahimas ) M2 126,000.00
27 Kaca Patri tebal 5 mm ( Asahimas ) M2 1,575,000.00
28 Kunci Tanam Antik Buah 300,000.00
29 Kunci Tanam Double Silinder Setara Dekson Buah 270,000.00
30 Kunci Tanam Silinder Setara Dekson Buah 225,000.00
31 Kunci Pintu Setara Dekson Buah 202,500.00
32 Kunci Slot Setara Dekson Buah 166,500.00
33 Kunci Lemari Set 40,500.00
34 Rel Pintu Sorong M' 112,500.00
35 Rolling Door Alluminium M2 495,000.00
36 Sun Screen Alluminium M2 405,000.00
37 Pengunci/Grendel Pintu Setara Dekson Buah 67,500.00
38 Pengunci/Grendel Jendela Setara Dekson Buah 54,000.00
39 Tarikan Pintu Setara Dekson Buah 108,000.00
40 Pull Handle/Tarikan Pintu As 35 Buah 94,500.00

H. CAT/MINYAK
1 Amplas/Kertas Pasir Lembar 2,700.00
2 Cat Dasar Kg 50,400.00
3 Cat Tembok Emultion Paint (Dalam) Kg 59,400.00
4 Cat Tembok Wethershield (Luar) Kg 75,600.00
5 Cat Minyak Kayu Kg 13,500.00
6 Cat Menie Kayu/Besi Kg 13,500.00
7 Dempul Gypsum Kg 13,500.00
8 Dempul Cat Kg 22,500.00
9 Kalkarium Kg 13,500.00
10 Kain Kasa M' 90.00
11 Minyak Cat Liter 18,000.00
12 Minyak Bekisting Liter 18,000.00
13 Plamur Kg 19,800.00
14 Residu Liter 10,800.00
15 Sabun Buah 3,600.00
16 Soda Api Kg 10,800.00
17 Solar Industri Liter 8,280.00
18 Minyak Pelumas Liter 40,500.00
19 Kuas Buah 13,500.00
20 Teak Oil Liter 10,800.00
21 Vernis Liter 45,000.00

I. SANITASI/PIPA
1 Bak Fibreglass 1 m³ Buah 292,500.00
2 Bathcup Buah 2,565,000.00
3 Bak Cuci Piring Stainless Steel Buah 382,500.00
4 Closet duduk Buah 2,925,000.00
5 Closet Jongkok Porselen Buah 292,500.00
6 Floor Drain Stainless Steel Buah 135,000.00
7 Instalasi Air Bersih ttk 135,000.00
8 Instalasi Air Kotor/Limbah ttk 135,000.00
9 Kran Air Diameter ½" - ¾" Buah 112,500.00
10 Kran Leher Angsa Buah 202,500.00
11 Jet Washer Buah 261,000.00
12 Pipa PVC tipe AW Ø ½" M' 3,600.00
13 Pipa PVC tipe AW Ø 3/4" M' 5,400.00
14 Pipa PVC tipe AW Ø 1" M' 6,750.00
15 Pipa PVC tipe AW Ø 1½" M' 7,200.00
16 Pipa PVC tipe AW Ø 2" M' 7,875.00
17 Pipa PVC tipe AW Ø 2 ½" M' 9,000.00
18 Pipa PVC tipe AW Ø 3" M' 9,900.00
19 Pipa PVC tipe AW Ø 4" M' 15,300.00
20 Pipa Galvanis diameter ½" M' 21,600.00
21 Pipa Galvanis diameter ¾" M' 28,800.00
22 Pipa Galvanis diameter 1" M' 39,600.00
23 Pipa Galvanis diameter 1 ½" M' 52,200.00
24 Pipa Galvanis diameter 3" M' 104,400.00
25 Pipa Galvanis diameter 4" M' 122,400.00
26 Pipa Beton diameter 15 - 20 cm Buah 270,000.00
27 Pipa Beton diameter 30 - 100 cm Buah 540,000.00
28 Seal tape Buah 6,300.00
29 Septick tank + Resapan Buah 4,500,000.00
30 Soap dispenser bh 31,500.00
31 Tempat Sabun Keramik bh 76,500.00
32 Tempat Tissu bh 103,500.00
33 Water drain Asesories Set 148,500.00
34 Wastafel Buah 585,000.00
35 Urinoir + Sekat Urinoir Buah 1,125,000.00

J. LISTRIK/AKSESORIS
1 Lampu SL 18 Watt + Fitting Set 121,500.00
2 Lampu TL 2 x 40 watt Lengkap kotak Reflektor Set 315,000.00
3 Lampu Downlight 23 watt Lengkap Set 130,500.00
4 Instalasi Listrik Titik Api/Lampu Nyala titik 135,000.00
5 Panel Box Listrik Lengkap set 607,500.00
6 Stop Kontak Tanam bh 40,500.00
7 Saklar Tunggal Buah 22,500.00
8 Saklar Ganda Buah 31,500.00

K. LISTRIK/AKSESORIS
1 Crane Diesel Jam 473,500.00
2 Vibro Hammer Jam 282,000.00
3 Water Jet Pump Jam 215,000.00
Terjemahan kedalam kalimat

13,280,730,000.00 1 <=== Bahasa <1> Indonesia, <2> Inggris

erbilang = Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.

BASIC => satu dua tiga empat lima enam tujuh delapan s @@@@@
ribu juta milyar triliyun @@@@@
013280730000 @@@@@
@ @@@@@@@@@@@ @@@@@ @@@@@ @@@@@ @@@@@@@@@@@
basic @ 000 1 @@@@@
erhitungan @ 0 @@@@@
angka @ sepuluh @@@@@
@ 0 @@@@@
@ 0 @@@@@
@ @@@@@
@ @@@@@
@ @@@@@
@ @@@@@
@ 730 2 @@@@@
@ 7 tiga puluh @@@@@
@ tujuh ratus sepuluh @@@@@
@ 3 @@@@@
@ 0 tiga puluh @@@@@
@ tiga puluh tiga puluh @@@@@
@ tujuh ratus tiga puluh ribu @@@@@
@ @@@@@
@ @@@@@
@ 280 3 @@@@@
@ 2 delapan puluh @@@@@
@ dua ratus sepuluh @@@@@
@ 8 @@@@@
@ 0 delapan puluh @@@@@
@ delapan puluh delapan puluh @@@@@
@ dua ratus delapan puluh juta @@@@@
@ @@@@@
@ @@@@@
@ 013 4 @@@@@
@ 0 @@@@@
@ tiga belas @@@@@
@ 1 tiga @@@@@
@ 3 tiga @@@@@
@ tiga belas tiga belas @@@@@
@ tiga belas milyar @@@@@
@ @@@@@
@ 000 1 @@@@@
@ 0 @@@@@
@ sepuluh @@@@@
@ 0 @@@@@@@@@@@
@ 0 @@@@@
@ @@@@@
@ @@@@@
@ ***
@
@ 82 00
@ tiga belas milyar dua ratus dtiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
@ tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
@ Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA
SESUDAH KLARIFIKASI NEGOSIASI

PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

NO JENIS PEKERJAAN

1 PEKERJAAN PERSIAPAN

2 PEK. GALIAN TANAH PONDASI

3 PEKERJAAN PONDASI/STRUKTUR BAWAH

4 PEKERJAAN STRUKTUR

5 PEKERJAAN PASANGAN DAN PLESTERAN

6 PEKERJAAN BAJA DAN PENUTUP ATAP

7 PEKERJAAN PLAFOND

8 PEK. KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI

9 PEKERJAAN LANTAI

10 PEKERJAAN PENGECATAN

11 PEKERJAAN SANITASI

12 PEKERJAAN MEKANIKAL & ELEKTRIKAL

13 PEKERJAAN LAIN-LAIN
JUMLAH

PPN 10 %

JUMLAH TOTAL

DIBULATKAN

Terbilang : Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA
ESUDAH KLARIFIKASI NEGOSIASI

OP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


EKATRONIKA)

TOTAL HARGA

Rp.

Rp 186,352,024.00

Rp 156,111,441.75

Rp 1,381,606,995.38

Rp 4,796,770,964.98

Rp 654,508,796.72

Rp 1,101,897,756.10

Rp 144,200,700.00

Rp 931,050,220.00

Rp 520,765,953.46

Rp 238,956,980.62

Rp 80,240,592.00

Rp 892,096,105.80

Rp 988,835,800.00
Rp 12,073,394,330.80

Rp 1,207,339,433.08

Rp 13,280,733,763.88

Rp 13,280,730,000.00

elapan puluh juta tujuh ratus tiga puluh ribu rupiah.

Jakarta,11 Mei 2018


Penawar,
PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
RENCANA ANGGARAN BIAYA
SESUDAH KLARIFIKASI NEGOSIASI

PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

KONSTRU

NO JENIS PEKERJAAN
VOL SAT

1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 150.00 M
b. Pemasangan Pagar Pengaman 80.00 m'
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 1.00 Pkt
d. Test Mutu Beton 1.00 Pkt
e. Direksi Keet 24.00 M2
f. Gudang Semen dan Peralatan 24.00 M2
g. Bedeng Pekerja 40.00 M2
h. Sewa Scafolding 1.00 Pkt
i. Perizinan 1.00 Pkt

2. PEK. GALIAN TANAH PONDASI


a. Galian Tanah Pondasi 319.90 M3
b. Urugan Kembali Bekas Galian Tanah 39.91 M3
c. Urugan Pasir Alas Dipadatkan 26.80 M3
d. Timbunan Tanah Bawah Lantai 1,166.45 M3

3. PEKERJAAN PONDASI/STRUKTUR BAWAH


a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm
- Mobilisasi dan Demobilisasi Peralatan Borepile 1.00 Ls
- Beton K-250 212.89 M3
- Besi Ulir 26,513.19 Kg
- Besi Polos 4,210.38 Kg
- Biaya Pengeboran Permeter 1,695.00 m'

b. Pondasi Pile Cape


Pondasi Pile Cape (PC 1)
- Mutu Beton K-250 111.13 M3
- Besi Ulir 6,247.46 Kg
- Bakesting Pile Cape 282.24 M2

Pondasi Pile Cape (PC 2)


- Mutu Beton K-250 31.75 M3
- Besi Ulir 1,996.49 Kg
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

- Bakesting Pile Cape 74.88 M2

c. Pasangan Pondasi batu Gunung


Pas. Pondasi Batu Gunung 5.94 M3
Pas. Batu Kosong (Aanstamping) 2.02 M3

4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 98.10 M3
- Besi Ulir 12,893.15 Kg
- Besi Polos 4,427.37 Kg
- Bakesting Sloof 817.50 M2

Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3
- Besi Ulir 968.35 Kg
- Besi Polos 377.71 Kg
- Bakesting Sloof 78.09 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3
- Besi Ulir 9,419.52 Kg
- Besi Polos 1,774.93 Kg
- Bakesting Kolom 323.40 M2

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3
- Besi Ulir 10,347.20 Kg
- Besi Polos 1,774.93 Kg
- Bakesting Kolom 323.40 M2

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.44 M3
- Besi Ulir 426.60 Kg
- Besi Polos 142.08 Kg
- Bakesting Kolom 28.80 M2

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.13 M3
- Besi Polos 944.61 Kg
- Bakesting Kolom 65.52 M2

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 6.12 M3
- Besi Polos 668.98 Kg
- Bakesting Balok 124.84 M2

Plat Lantai Dasar T = 12 cm


- Mutu Beton K-250 195.62 M3
- Tulangan Utama Polos 10,107.01 Kg
- Bakesting Lantai 248.89 M2

Plat Canopy T = 7 cm
- Mutu Beton K-200 2.65 M3
- Besi Polos 233.10 Kg
- Bakesting Lantai 44.24 M2

b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.86 M3
- Besi Ulir 2,954.27 Kg
- Besi Polos 854.70 Kg
- Bakesting Balok 152.19 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 68.62 M3
- Besi Ulir 10,994.23 Kg
- Besi Polos 3,159.76 Kg
- Bakesting Balok 484.90 M2

Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 15.84 M3
- Besi Ulir 3,038.02 Kg
- Besi Polos 1,058.20 Kg
- Bakesting Balok 211.14 M2

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 5.66 M3
- Besi Polos 624.62 Kg
- Bakesting Balok 115.31 M2

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 33.00 M3
- Besi Ulir 5,298.48 Kg
- Besi Polos 1,448.92 Kg
- Bakesting Kolom 284.20 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 29.00 M3
- Besi Ulir 6,467.00 Kg
- Besi Polos 1,273.29 Kg
- Bakesting Kolom 284.20 M2

Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.48 M3
- Besi Ulir 189.60 Kg
- Besi Polos 47.36 Kg
- Bakesting Kolom 9.60 M2

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.16 M3
- Besi Polos 965.03 Kg
- Bakesting Kolom 66.56 M2

Plat Lantai T = 12 cm
- Mutu Beton K-250 236.14 M3
- Besi Polos 27,047.96 Kg
- Bakesting Lantai 1,967.80 M2

Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3
- Besi Polos 349.65 Kg
- Bakesting Lantai 66.29 M2

c. STRUKTUR LT. ATAP


Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 4.88 M3
- Besi Ulir 1,245.80 Kg
- Besi Polos 278.02 Kg
- Bakesting Balok 65.01 M2

Rink Balk 30 x 40 cm (RB1)


- Mutu Beton K-250 54.28 M3
- Besi Ulir 7,153.13 Kg
- Besi Polos 2,633.16 Kg
- Bakesting Balok 361.86 M2

Rink Balk 13 x 20 cm (RB2)


- Mutu Beton K-250 8.17 M3
- Besi Polos 1,674.29 Kg
- Bakesting Balok 61.33 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3
- Besi Ulir 915.77 Kg
- Besi Polos 47.36 Kg
- Bakesting Kolom 9.60 M2

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.50 M3
- Besi Polos 406.54 Kg
- Bakesting Kolom 15.34 M2

Plat Lantai Daag T = 12 cm


- Mutu Beton K-250 5.90 M3
- Besi Polos 1,957.12 Kg
- Bakesting Lantai 49.17 M2

Plat Talang Beton T = 12 cm


- Mutu Beton K-250 6.78 M3
- Tulangan Utama Polos 1,023.70 Kg
- Bakesting Lantai 56.49 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

5. PEKERJAAN PASANGAN DAN PLESTERAN


LANTAI . 1
a. Pas Bata 1 Pc : 4 Ps (Dinding) 1,127.22 M2
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 2,254.44 M2
c. Pasangan Bata Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2
d. PLesteran Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2

LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 661.03 M2
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 1,322.05 M2

LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 355.32 M2
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 710.64 M2

6. PEKERJAAN BAJA DAN PENUTUP ATAP


RANGKA ATAP BAJA BERAT
a. Plat Tumpu 50 x 50 cm T = 12 MM 1,023.73 Kg
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 312.00 Buah
c. Kuda-Kuda Baja IWF 200 x 100 x 5,5 x 8mm- 8,943.06 Kg
d. Baut Ikatan Kaki Kuda-Kuda 3/4 Inci 372.00 Buah
e. Gording Baja CNP 100 X 50 5,598.33 Kg
f. Siku 40 X 40 Penahan Baja CNP 164.16 Kg
g. Trestang 14 mm Terpasang 76.00 Psng
h. Plat Buhul T = 10 MM 278.51 Kg
i. Perakitan Baja 15,877.12 Kg

PENUTUP ATAP
a. Seng Spandek 0.40 mm 1,446.79 M2
b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar 54.00 M2
c. Rabung Seng Spandek 72.24 M'

TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 54.00 Buah
c. Besi Baja UNP 250 x 90 x 9 mm 2,500.92 Kg
d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M'
e. Bordes Baja 51.60 M2
f. Perakitan Baja 2,598.14 Kg

7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

b. Profil Gipsum Terpasang 187.60 M

LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2
b. Profil Gipsum Terpasang 385.80 M

8. PEK. KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI


LANTAI. 1
Pintu
a. Pintu Kaca Tempered 12 mm + Aksesoris+ Kusen aluminium kaca warna biru+
Beton Gawang + Granit Lengkap Terpasang (PJ1) 2.00 Bh
b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 3.00 Bh
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 3.00 Bh
d. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 1.00 Bh
e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm + 3.00
Aksesoris lengkap Terpasang (P4) Bh

f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh
g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
3.00 Bh
Terpasang sesuai Gambar (P6)
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

h. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL1)


2.00 Bh
i. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL2)
8.00 Bh
j. Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) 1.00 Bh

Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.00 Bh
b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.00 Bh
c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka + kaca
+ Aksesoris lengkap Terpasang (J3) 2.00 Bh

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 15.00 Bh

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 119.72 M2
b. Dinding Kaca 5 mm + Rangka Alumunium Putih (sesuai Gambar) 124.99 M2

LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh
b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 4.00 Bh
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 5.00 Bh
e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm 3.00
+ Aksesoris lengkap Terpasang (P4) Bh

f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh

Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh
b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh
c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J6) 4.00 Bh
d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J7) 2.00 Bh

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 7.00 Bh

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

b. Dinding Kaca 5 mm Rangka Alumunium Putih (sesuai Gambar) 176.26 M2

9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3
b. Lantai Granit 60 x 60 cm (Unpolishet) 107.03 M2
c. Lantai Granit 30 x 60 cm + Stop Nosing 18.94 M2
d. Dinding Granit 60 x 60 cm (Polishet) 297.95 M2
e. Pekerjaan Floor Hardener + Trowel 1,258.82 M2
f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 152.58 M2

LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2
b. Dinding Granit 60 x 60 cm (Polishet) 13.45 M2
c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 852.11 M2

10. PEKERJAAN PENGECATAN


Pengecatan Permurkaan Dinding Bata dan Beton
a. Cat Dinding Tembok LT. 1 2,363.12 M2
b. Cat Dinding Tembok LT. 2 1,322.05 M2
c. Cat Dinding Tembok LT. Atap 710.64 M2
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap 945.64 M2
b.Pengecatan Permurkaan Tangga Baja 112.24 M2

11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah
5 Washtafel Lengkap Setara TOTO 5.00 Buah
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah
8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah
10 Floor Drain Stainless 10.00 Buah
11 Tempat Sabun Dalam Toilet 9.00 Buah
12 Tempat Tissue Stailess 9.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 2.00 Buah

B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah
5 Washtafel Lengkap Setara TOTO 4.00 Buah
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah
8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah
10 Floor Drain Stainless 8.00 Buah
11 Tempat Sabun Dalam Toilet 7.00 Buah
12 Tempat Tissue Stailess 7.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 6.00 Buah

12 MEKANIKAL DAN ELEKTRIKAL


A INSTALASI AIR BERSIH
1. SITE PLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( pipa dari Sumber Air ke Tangki Atas ) 200.00 m
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

B INSTALASI AIR KOTOR


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 30.00 m

C INSTALASI AIR BEKAS


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 32.00 m

D PEKERJAAN INSTALASI TATA UDARA (VAC)


PERALATAN UTAMA EXHAUST FAN
Pengadaan dan pemasangan unit Peralatan Utama
a LANTAI 1
Pemasangan Exhaust Fan Plafond (EFP) 12.00 unit
Pemasangan Exhaust Fan Dinding Type 1 12.00 unit
Pemasangan Exhaust Fan Dinding Type 2 10.00 unit

b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit
Pemasangan Exhaust Fan Dinding Type 1 28.00 unit
Pemasangan Exhaust Fan Dinding Type 2 2.00 unit
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

c LANTAI ATAP
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit

E. INSTALASI AIR BERSIH


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 7.00 m
dia. 3/4 Inch ( Pipa Tegak ) 7.00 m
dia. 1/2 Inch 30.00 m

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m
dia. 3/4 Inch ( Pipa Tegak ) 8.00 m
dia. 1/2 Inch 30.00 m

F INSTALASI AIR KOTOR


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m
dia. 4 Inch 10.00 m

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m

G INSTALASI AIR BEKAS


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m
dia. 3 Inch 10.00 m

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

H INSTALASI AIR HUJAN


INSTALASI PADA BANGUNAN
1. LANTAI-1 s/d Talang
a. Pemipaan PVC class AW Wavin
dia. 3 Inch ( Pipa Tegak Down Spoud ) 132.00 m
dia. 4 Inch 107.00 m
Roof Drain, Cast Iron Dia 4 Inchi 11.00 Bh

I PEKERJAAN PEMADAM KEBAKARAN


a. HYDRANT BOX DAN INSTALASI

1. LANTAI-1
Hydrant Box + selang 2.00 bh
Pipa dia. 3 Inch 50.00 m

b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh

J PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m
Alarm Led min-Max 3 gas 1.00 Unit
Cabinet For Area Valve dan Alarm 1.00 Unit
Fitting-Fitting pipa 1.00 Lot

K PEKERJAAN MESIN POMPA DAN TANKI AIR BERSIH


Pengadaan material, pembuatan dudukan / pondasi pompa, dan -
pemasangan unit sampai berfungsi dengan baik.
1 Mesin
SpesifikPompa Jetpump Grundfos JPD 4 - 47 2.00 unit
asi :
1. Jenis Pompa : Jetpump
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
4. Daya Dorong : 30 Meter
5. Daya Listrik P1 : 850 Watt
7. Pipa Outlet/Inket : 1/1 inch
8. Suhu Cairan : 0 – 35 C

2 Tanki Air Atas


Tangki Air atas isi 2000 liter terpasang 4.00 Unit

PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan

2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

M PEKERJAAN ELEKTRIKAL PADA BANGUNAN


1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
a Lantai-1
- P-MDB Lengkap 1.00 Pkt
- MCCB 3 Phase 125A EZC400N3400N
- Box Panel ukuran 40 cm x 60 cm

b Lantai-1 (Panel Pembagi) DB-LT.1 Lengkap 2.00 Pkt


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 100 cm x 80 cm + lengkap assesoris

c Lantai-1 (Panel Pembagi) DB Mesin Lengkap 3.00 Pkt


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 60 cm x 40 cm + lengkap assesoris

N PEKERJAAN PENGKABELAN

1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m

B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

C Dari DB-LT.1 ke Stop Kontak dan Saklar Penerangan


NYY 3 x 2,5 mm2 1,092.00 m

2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m

O PEKERJAAN PENERANGAN DAN INSTALASI


1 Lantai-1TL 2 x 36 Watt Recessed Mounted
LAMPU
- c/w Alumunium Louver 11.00 bh
- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 46.00 bh
- LAMPU Sorot LED 100 Watt 11.00 bh
- Lampu Down Light LED 16 Watt 14.00 bh
- Lampu Down Light LED 13 Watt 15.00 bh
- Lampu Down Light LED 13 Watt Outbow 22.00 bh
- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 119.00 ttk
in konduit HI dia 20 m2

2 Lantai-2TL 2 x 36 Watt Recessed Mounted


LAMPU
- c/w Alumunium Louver 55.00 bh
- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 6.00 bh
- Lampu Gantung LED Industri 50 Watt 5.00 bh
- Lampu Down Light LED 13 Watt 17.00 bh
- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 83.00 ttk
in konduit HI dia 20 m2

P PEKERJAAN STOP KONTAK DAN INSTALASI


1 Lantai-1
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 30.00 bh
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 30.00 ttk

2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 57.00 ttk

Q PEKERJAAN CABLE TRAY

1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m

2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m

R PEKERJAAN PENANGKAL PETIR

- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

( Dipasang Diatap )
- Kabel NYY 70 mm2 25.00 m
- Termination & Supporting Material 1.00 lot
- Grounding Box 1.00 lot
- Grounding Rod ( R < 3 Ohm ) 1.00 lot

13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M'
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M'
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt
h Pemasangan Logo sesuai gambar 1.00 Pkt
KONSTRU

NO JENIS PEKERJAAN
VOL SAT

i Tangga Inspeksi 2.00 Unit


j Septictank + Resapan + Box Kontrol 2.00 Pkt
k Pembersihan Akhir (Finishing) 1.00 Pkt
NA ANGGARAN BIAYA
AH KLARIFIKASI NEGOSIASI

KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.2.2.1.4. 69,344.00 10,401,600.00


Taksir 95,000.00 7,600,000.00
Taksir 2,000,000.00 2,000,000.00
Ls 16,000,000.00 16,000,000.00
A.2.2.1.5. 1,225,840.00 29,420,160.00
A.2.2.1.7. 1,049,708.50 25,193,004.00
A.2.2.1.8. 1,080,931.50 43,237,260.00
Ls 42,500,000.00 42,500,000.00
Ls 10,000,000.00 10,000,000.00
Jumlah 1 186,352,024.00

A.2.3.1.1. 64,212.50 20,541,578.75


A.2.3.1.9. 45,925.00 1,832,866.75
A.2.3.1.11. 137,885.00 3,695,318.00
A.2.3.1.11.a 111,485.00 130,041,678.25
Jumlah 2 156,111,441.75

Taksir 25,000,000.00 25,000,000.00


A.4.1.1.8.a 1,273,633.63 271,143,862.43
A.4.1.1.17a. 16,726.60 443,475,523.85
A.4.1.1.17. 13,608.10 57,295,272.08
Taksir 108,000.00 183,060,000.00

A.4.1.1.8.a 1,273,633.63 141,538,904.75


A.4.1.1.17a. 16,726.60 104,498,764.44
A.4.1.1.20. 213,334.00 60,211,388.16

A.4.1.1.8.a 1,273,633.63 40,437,867.59


A.4.1.1.17a. 16,726.60 33,394,489.63
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.1.1.20. 213,334.00 15,974,449.92

A.3.2.1.1. 816,222.00 4,848,358.68


A.3.2.1.9. 360,452.40 728,113.85
Jumlah 3 1,381,606,995.38

A.4.1.1.8.a 1,273,633.63 124,943,458.61


A.4.1.1.17a 16,726.60 215,658,562.79
A.4.1.1.17. 13,608.10 60,248,093.70
A.4.1.1.21. 154,621.50 126,403,076.25

A.4.1.1.8.a 1,273,633.63 7,960,210.16


A.4.1.1.17a 16,726.60 16,197,203.11
A.4.1.1.17. 13,608.10 5,139,915.45
A.4.1.1.21. 154,621.50 12,074,392.94
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.1.1.8.a 1,273,633.63 51,493,007.46


A.4.1.1.17a 16,726.60 157,556,543.23
A.4.1.1.17. 13,608.10 24,153,424.93
A.4.1.1.22. 245,432.00 79,372,708.80

A.4.1.1.8.a 1,273,633.63 45,252,202.70


A.4.1.1.17a 16,726.60 173,073,475.52
A.4.1.1.17. 13,608.10 24,153,424.93
A.4.1.1.22. 245,432.00 79,372,708.80

A.4.1.1.8.a 1,273,633.63 1,834,032.42


A.4.1.1.17a 16,726.60 7,135,567.56
A.4.1.1.17. 13,608.10 1,933,438.85
A.4.1.1.22. 245,432.00 7,068,441.60

A.4.1.1.6. 1,023,321.18 2,179,674.12


A.4.1.1.17. 13,608.10 12,854,347.34
A.4.1.1.22. 245,432.00 16,080,704.64

A.4.1.1.6. 1,023,321.18 6,262,725.64


A.4.1.1.17. 13,608.10 9,103,546.74
A.4.1.1.23. 251,042.00 31,340,083.28

A.4.1.1.8.a 1,273,633.63 249,148,209.72


A.4.1.1.17. 13,608.10 137,537,202.78
A.4.1.1.24. 286,132.00 71,215,393.48

A.4.1.1.6. 1,023,321.18 2,711,801.13


A.4.1.1.17. 13,608.10 3,172,048.11
A.4.1.1.24. 286,132.00 12,658,479.68

A.4.1.1.8.a 1,273,633.63 24,020,730.17


A.4.1.1.17a 16,726.60 49,414,892.58
A.4.1.1.17. 13,608.10 11,630,843.07
A.4.1.1.23. 251,042.00 38,206,081.98
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.1.1.8.a 1,273,633.63 87,396,739.35


A.4.1.1.17a 16,726.60 183,896,087.52
A.4.1.1.17. 13,608.10 42,998,330.06
A.4.1.1.23. 251,042.00 121,730,265.80

A.4.1.1.8.a 1,273,633.63 20,174,356.62


A.4.1.1.17a 16,726.60 50,815,745.33
A.4.1.1.17. 13,608.10 14,400,091.42
A.4.1.1.23. 251,042.00 53,005,007.88

A.4.1.1.6. 1,023,321.18 5,791,997.89


A.4.1.1.17. 13,608.10 8,499,891.42
A.4.1.1.23. 251,042.00 28,947,653.02

A.4.1.1.8.a 1,273,633.63 42,029,909.63


A.4.1.1.17a 16,726.60 88,625,555.57
A.4.1.1.17. 13,608.10 19,717,048.25
A.4.1.1.22. 245,432.00 69,751,774.40
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.1.1.8.a 1,273,633.63 36,935,375.13


A.4.1.1.17a 16,726.60 108,170,922.20
A.4.1.1.17. 13,608.10 17,327,057.65
A.4.1.1.22. 245,432.00 69,751,774.40

A.4.1.1.8.a 1,273,633.63 611,344.14


A.4.1.1.17a 16,726.60 3,171,363.36
A.4.1.1.17. 13,608.10 644,479.62
A.4.1.1.22. 245,432.00 2,356,147.20

A.4.1.1.6. 1,023,321.18 2,210,373.75


A.4.1.1.17. 13,608.10 13,132,224.74
A.4.1.1.22. 245,432.00 16,335,953.92

A.4.1.1.8.a 1,273,633.63 300,755,844.21


A.4.1.1.17. 13,608.10 368,071,344.48
A.4.1.1.24. 286,132.00 563,050,549.60

A.4.1.1.6. 1,023,321.18 4,062,585.09


A.4.1.1.17. 13,608.10 4,758,072.17
A.4.1.1.24. 286,132.00 18,967,690.28

A.4.1.1.8.a 1,273,633.63 6,215,332.09


A.4.1.1.17a 16,726.60 20,837,998.28
A.4.1.1.17. 13,608.10 3,783,323.96
A.4.1.1.23. 251,042.00 16,320,240.42

A.4.1.1.8.a 1,273,633.63 69,132,833.17


A.4.1.1.17a 16,726.60 119,647,544.26
A.4.1.1.17. 13,608.10 35,832,304.60
A.4.1.1.23. 251,042.00 90,842,058.12

A.4.1.1.8.a 1,273,633.63 10,405,586.72


A.4.1.1.17. 13,608.10 22,783,905.75
A.4.1.1.23. 251,042.00 15,396,405.86
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.1.1.8.a 1,273,633.63 3,846,373.55


A.4.1.1.17a 16,726.60 15,317,718.48
A.4.1.1.17. 13,608.10 644,479.62
A.4.1.1.22. 245,432.00 2,356,147.20

A.4.1.1.6. 1,023,321.18 511,660.59


A.4.1.1.17. 13,608.10 5,532,236.97
A.4.1.1.22. 245,432.00 3,764,926.88

A.4.1.1.8.a 1,273,633.63 7,514,438.39


A.4.1.1.17. 13,608.10 26,632,684.67
A.4.1.1.24. 286,132.00 14,069,110.44

A.4.1.1.8.a 1,273,633.63 8,635,235.98


A.4.1.1.17. 13,608.10 13,930,611.97
A.4.1.1.24. 286,132.00 16,163,596.68
Jumlah 4 4,796,770,964.98
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.4.1.3. 186,360.35 210,069,113.73


A.4.4.2.4. 54,661.20 123,230,395.73
A.4.4.1.7. 130,403.35 14,172,236.08
A.4.4.2.2. 59,996.64 6,520,434.84

A.4.4.1.3. 186,360.35 123,189,782.16


A.4.4.2.4. 54,661.20 72,264,839.46

A.4.4.1.3. 186,360.35 66,217,559.56


A.4.4.2.4. 54,661.20 38,844,435.17
Jumlah 5 654,508,796.72

A.4.2.1.1. 37,768.50 38,664,746.51


Taksir 69,000.00 21,528,000.00
A.4.2.1.1. 37,768.50 337,765,961.61
Taksir 6,900.00 2,566,800.00
A.4.2.1.1. 37,768.50 211,440,526.61
A.4.2.1.1. 37,768.50 6,200,076.96
Taksir 308,000.00 23,408,000.00
A.4.2.1.1. 37,768.50 10,518,904.94
A.4.2.1.3. 3,492.50 55,450,841.60

A.4.2.1.19.a 126,021.50 182,326,645.99


Taksir 728,000.00 39,312,000.00
A.4.2.1.20.a 85,789.00 6,197,397.36

A.4.2.1.1. 37,768.50 3,671,853.57


Taksir 69,000.00 3,726,000.00
A.4.2.1.1. 37,768.50 94,455,997.02
Taksir 345,000.00 41,400,000.00
Taksir 275,000.00 14,190,000.00
A.4.2.1.3. 3,492.50 9,074,003.95
Jumlah 6 1,101,897,756.10

Taksir 175,000.00 35,035,000.00


KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

Taksir 10,500.00 1,969,800.00

Taksir 175,000.00 103,145,000.00


Taksir 10,500.00 4,050,900.00
Jumlah 7 144,200,700.00

Ls 22,148,530.25 44,297,060.50

Ls 6,408,520.80 19,225,562.40

Ls 6,305,919.40 18,917,758.20

Ls 3,304,075.50 3,304,075.50

Ls 2,915,000.00 8,745,000.00

Ls 1,551,000.00 13,959,000.00

Ls 3,685,000.00 11,055,000.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

Ls 13,000,000.00 26,000,000.00

Ls 9,700,000.00 77,600,000.00

Ls 20,515,275.00 20,515,275.00

Ls 6,932,970.00 27,731,880.00
Ls 5,457,870.00 32,747,220.00

Ls 5,431,085.00 10,862,170.00

Ls 1,649,489.60 6,597,958.40
Ls 546,114.80 8,191,722.00

Taksir 410,000.00 49,085,200.00


Taksir 745,000.00 93,117,550.00

Ls 6,408,520.80 25,634,083.20

Ls 6,305,919.40 25,223,677.60

Ls 3,304,075.50 16,520,377.50

Ls 2,915,000.00 8,745,000.00

Ls 1,551,000.00 7,755,000.00

Ls 4,991,738.40 19,966,953.60
Ls 7,107,888.70 92,402,553.10
Ls 2,517,504.00 10,070,016.00
Ls 2,323,282.50 4,646,565.00

Ls 1,649,489.60 6,597,958.40
Ls 546,114.80 3,822,803.60

Ls 410,000.00 106,399,100.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

Ls 745,000.00 131,313,700.00
Jumlah 8 931,050,220.00

A.4.1.1.3. 831,334.69 3,558,112.48


A.4.4.3.36B. 362,982.40 38,850,006.27
A.4.4.3.35B. 523,926.15 9,923,161.28
A.4.4.3.35A. 196,566.15 58,566,884.39
Taksir 171,000.00 215,258,220.00
Taksir 185,000.00 28,227,300.00

A.4.4.3.36B. 362,982.40 6,098,104.32


A.4.4.3.35A. 196,566.15 2,643,814.72
Taksir 185,000.00 157,640,350.00
Jumlah 9 520,765,953.46

A.4.7.1.10. 42,459.06 100,335,852.69


A.4.7.1.10. 42,459.06 56,132,999.61
A.4.7.1.10. 42,459.06 30,173,106.04
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

A.4.7.1.17. 49,452.70 46,764,451.23


A.4.7.1.17. 49,452.70 5,550,571.05
Jumlah 10 238,956,980.62

A.5.1.1.1. 3,715,140.00 7,430,280.00


Taksir 325,000.00 1,300,000.00
A.5.1.1.4. 2,890,712.00 8,672,136.00
Taksir 1,650,000.00 4,950,000.00
A.5.1.1.5. 1,443,937.00 7,219,685.00
Taksir 428,000.00 428,000.00
Taksir 295,000.00 590,000.00
A.5.1.1.19. 110,143.00 1,321,716.00
A.5.1.1.19B. 269,643.00 539,286.00
A.5.1.1.14. 119,570.00 1,195,700.00
Taksir 85,000.00 765,000.00
Taksir 65,000.00 585,000.00
Taksir 62,000.00 124,000.00

A.5.1.1.1. 3,715,140.00 18,575,700.00


Taksir 325,000.00 1,300,000.00
A.5.1.1.4. 2,890,712.00 8,672,136.00
Taksir 1,650,000.00 4,950,000.00
A.5.1.1.5. 1,443,937.00 5,775,748.00
Taksir 428,000.00 428,000.00
Taksir 295,000.00 590,000.00
A.5.1.1.19. 110,143.00 1,101,430.00
A.5.1.1.19B. 269,643.00 1,348,215.00
A.5.1.1.14. 119,570.00 956,560.00
Taksir 85,000.00 595,000.00
Taksir 65,000.00 455,000.00
Taksir 62,000.00 372,000.00
Jumlah 11 80,240,592.00

54,366.00 10,873,200.00
Sub Jumlah 10,873,200.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

71,406.00 2,142,180.00
Sub Jumlah 2,142,180.00

71,406.00 2,284,992.00
Sub Jumlah 2,284,992.00

683,286.00 8,199,432.00
523,686.00 6,284,232.00
1,694,800.00 16,948,000.00

683,286.00 5,466,288.00
523,686.00 14,663,208.00
1,694,800.00 3,389,600.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

3,925,000.00 43,175,000.00
Sub Jumlah 98,125,760.00

54,366.00 380,562.00
47,886.00 335,202.00
43,926.00 1,317,780.00

54,366.00 434,928.00
47,886.00 383,088.00
43,926.00 1,317,780.00
Sub Jumlah 4,169,340.00

111,846.00 782,922.00
111,846.00 1,118,460.00

111,846.00 1,118,460.00
Sub Jumlah 3,019,842.00

111,846.00 782,922.00
71,406.00 714,060.00

71,406.00 714,060.00
Sub Jumlah 2,211,042.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

71,406.00 9,425,592.00
111,846.00 11,967,522.00
42,000.00 462,000.00
Sub Jumlah 21,855,114.00

4,261,886.00 8,523,772.00
158,686.00 7,934,300.00

736,086.00 2,944,344.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

736,086.00 2,944,344.00
Sub Jumlah 22,346,760.00

392,000.00 7,840,000.00
19,200,000.00 19,200,000.00
3,500,000.00 3,500,000.00
22,500,000.00 22,500,000.00
Sub Jumlah 53,040,000.00

4,224,966.00 8,449,932.00

4,710,000.00 18,840,000.00
Sub Jumlah 27,289,932.00

141,000,000.00 141,000,000.00

13,719,366.00 13,719,366.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

Sub Jumlah 154,719,366.00

13,719,366.00 13,719,366.00

10,944,966.00 21,889,932.00

8,394,966.00 25,184,898.00

Sub Jumlah 60,794,196.00

1,088,166.00 163,224,900.00

360,966.00 54,144,900.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

38,046.00 41,546,232.00

38,046.00 37,741,632.00
Sub Jumlah 296,657,664.00

433,946.00 4,773,406.00
378,286.00 17,401,156.00
381,916.00 4,201,076.00
179,846.00 2,517,844.00
168,956.00 2,534,340.00
168,956.00 3,717,032.00
87,160.00 10,372,040.00

433,946.00 23,867,030.00
378,286.00 2,269,716.00
1,109,126.00 5,545,630.00
168,956.00 2,872,252.00
87,160.00 7,234,280.00

Sub Jumlah 87,305,802.00

46,156.00 1,384,680.00

108,246.00 3,247,380.00

46,156.00 2,630,892.00

108,246.00 6,170,022.00
Sub Jumlah 13,432,974.00

228,966.00 10,303,470.00

228,966.00 10,303,470.00
Sub Jumlah 20,606,940.00

5,160,966.00 5,160,966.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

179,241.00 4,481,025.00
349,966.00 349,966.00
444,966.00 444,966.00
784,078.80 784,078.80
Sub Jumlah 11,221,001.80
Jumlah 12 892,096,105.80

Taksir 615,000.00 638,370,000.00


Taksir 485,000.00 82,197,800.00

Taksir 108,000,000.00 108,000,000.00


Taksir 41,500,000.00 41,500,000.00

Taksir 325,000.00 18,200,000.00


Taksir 165,000.00 13,068,000.00
Taksir 46,500,000.00 46,500,000.00
Taksir 6,250,000.00 6,250,000.00
Taksir 3,750,000.00 3,750,000.00
KONSTRUKSI FISIK WORKSHOP

HARGA SATUAN JUMLAH HARGA


ANALISA
(Rp.) (Rp.)

Taksir 3,250,000.00 6,500,000.00


Taksir 10,000,000.00 20,000,000.00
Taksir 4,500,000.00 4,500,000.00
Jumlah 13 988,835,800.00

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
DAFTAR HARGA BAHAN DAN UPAH

NO. URAIAN UPAH DAN BAHAN KODE SATUAN

I. URAIAN HARGA UPAH


1 Pekerja L.01 OH
2 Tukang L.02 OH
3 Tukang Gali L.02 OH
4 Tukang Batu/Tembok L.02 OH
5 Tukang Kayu L.02 OH
6 Tukang Besi/Besi Beton L.02 OH
7 Tukang Cat/Pelitur L.02 OH
8 Tukang Pipa/Operator Pompa L.02 OH
9 Tukang Listrik L.02 OH
10 Tukang Tebas L.02 OH
11 Tukang Las L.02 OH
12 Kepala Tukang L.03 OH
13 Mandor L.04 OH
14 Juru Ukur L.05 OH
15 Pembantu Juru Ukur L.06 OH
16 Ahli Alat Berat (Mekanik) L.07 OH
17 Operator Alat Berat L.08 OH
18 Pembantu Operator L.09 OH
19 Sopir Truck L.10 OH
20 Kenek Truk L.11 OH
21 Penjaga Malam L.12 OH
22 Kepala Tukang Pemancangan L.17 JAM
23 Mandor Pemancang L.18 JAM
24 Pekerjan Pemancang L.19 JAM
25 Operator L.20 OH
26 Pembantu Operator L.21 OH
27 Mekanik L.22 OH
II. URAIAN HARGA BAHAN
A. TIMBUNAN/GALIAN
1 Air Liter
2 Kerikil Beton Uk. ≥ 4 cm M3
3 Kerikil Beton Uk. 3 cm s/d 4 cm M3
4 Pasir Pasang M3
5 Pasir Beton M3
6 Pasir Urug/Timbun Pilihan M3
7 Sirtu M3
8 Tanah Timbun M3
B. BAHAN PEREKAT
1 Lem Kayu Kg
2 Lem Vinyl/Karet Kg
3 Beton Readymix K-300 M3
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

4 Beton Readymix K-250 M3


5 Semen Portland @40 kg Kg
6 Semen Warna @50 kg Kg
7 Sealant Silicon M'
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

C BATU/BATU CETAKAN
1 Batu Pecah 1-2 cm M3
2 Batu Pecah 2-3 cm M3
3 Batu Kali/Sungai 5 - 20 cm M3
4 Batu Bata Mesin 5x10x20 cm Buah
5 Batu Bata Merah 5 x 11 x 22 cm Buah
D KAYU/LANGIT-LANGIT
1 Balok Kayu setara Kuat kayu kelas I M3
2 Balok Kayu Kelas II M3
3 Balok Kayu 5/7 Kelas IV M3
4 Kayu Dolken/Kayu laut Ø 7,5-10/400 cm Btg
5 Papan Kayu Sembarang M3
6 Kayu setara Kuat kayu kelas I M3
7 Kayu setara Kuat kayu kelas II M3
8 Kayu setara Kuat kayu kelas III M3
9 Kayu setara Kuat kayu kelas IV M3
10 Plywood 120x240 cm tebal 6 mm Lembar
11 Plywood 120x240 cm tebal 9 mm Lembar
12 Kalsiplank M'
E. BESI/ ALUMINIUM
1 Besi Beton Polos Kg
2 Besi beton Ulir Kg
3 Besi Strip Kg
4 Besi Baja Profil/Gording CNP Kg
4 Jendela Naco Buah
5 Kawat Beton Kg
6 Paku Beton 2" - 5" Kg
7 Paku Biasa 0,5" - 2" Kg
8 Paku Biasa 2" - 5" Kg
9 Sekrup 0,5" - 2" Kg
10 Sekrup 0,5" - 2" Bh
10 Paku Triplek Kg
11 Paku Ulir Kg
12 Penjaga Jarak Bekisting Buah
13 Plat Baja Kg
14 Seng Gelombang Lembar
15 Seng Plat Lembar
16 Seng Spndek 0.35 mm M'
17 Seng Plat M'
18 Wiremesh Kg
F. PENUTUP LANTAI DAN DINDING
1 Keramik 30 x 30 cm Anti Slip Buah
2 Keramik Dinding 30 x 60 cm Buah
3 Granit Anti Slip + Stop Nosing 30 x 60 cm Buah
4 Granit 60 x 60 cm Buah
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

5 Granit Anti Slip 60 x 60 cm Buah


G. KACA DAN KUNCI
1 Kaca Polos tebal 3 mm ( Asahimas ) M2
2 Kunci Tanam Double Silinder Setara Dekson Buah
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

H. CAT/MINYAK
1 Amplas/Kertas Pasir Lembar
2 Cat Dasar Kg
3 Cat Tembok Emultion Paint Setara Jotun Kg
4 Cat Minyak Kayu Kg
5 Cat Menie Kayu/Besi Kg
6 Dempul Gypsum Kg
7 Dempul Cat Kg
8 Kalkarium Kg
9 Kain Kasa M'
10 Minyak Cat Liter
11 Minyak Bekisting Liter
12 Plamur Kg
13 Residu Liter
14 Soda Api Kg
15 Solar Industri Liter
16 Minyak Pelumas Liter
17 Kuas Buah
18 Teak Oil Liter
19 Vernis Liter
I. SANITASI
1 Closet duduk setara TOTO Buah
2 Closet Jongkok setara TOTO Buah
3 Floor Drain Stainless Steel setara TOTO Buah
4 Kran Air Diameter ½" - ¾" setara TOTO Buah
5 Jet Washer setara TOTO Buah
6 Seal tape Buah
7 Wastafel setara TOTO Buah
8 Urinoir setara TOTO Buah
9 Penyekat Urinoir Porselein Setara TOTO Buah
10 Cermin Pada Washtafel Ukuran Besar Buah
11 Cermin Pada Washtafel Ukuran Kecil Buah
12 Tempat Sabun Dalam Toilet Buah
13 Tempat Tissue Stailess Buah
14 Gantungan Pakaian Stailess Belakang Pintu Toilet Buah
J. LISTRIK/AKSESORIS
1 Crane Diesel Jam
2 Vibro Hammer Jam
3 Water Jet Pump Jam
K TATA UDARA
1 Fan Wall Mounted Exhaust Type 1 / Unit
2 Fan Wall Mounted Exhaust Type 2 / Unit
3 Fan Ceilling Mounted Exhaust / Unit
4 Pipa Liquid 6,4 mm /m
5 Isolasi Liquid 6,4 mm /m
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

6 Pipa Liquid 12,4 mm /m


7 Isolasi Liquid 12,4 mm /m
8 Pipa Liquid 15,8 mm /m
9 Isolasi Liquid 15,8 mm /m
10 Pipa Drain 15 mm /m
11 Isolasi Liquid 15 mm /m
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

12 Pipa Drain 20 mm /m
13 Isolasi Liquid 20 mm /m
14 Louver Grille 150X150 / bh
L PLAMBING
1 pipa GIP dia. 3 Inch /m
2 pipa dia. 1/2 Inch PVC AW /m
3 pipa dia. 3/4 Inch PVC AW /m
4 pipa dia. 1 Inch PVC AW /m
5 pipa dia. 4 Inch PVC AW /m
6 pipa dia. 3 Inch PVC AW /m
7 pipa dia. 2 Inch PVC AW /m
8 Clean Out-100 TOTO TX 1 AN / Unit
9 Roof Drain dia.100 / Unit
10 Tangki air fiber kap. 1000 liter / Unit
11 Tangki air fiber panel kap. 2000 liter / Unit
M PEMADAM KEBAKARAN
1 DCP-3 kg / Unit
2 Indoor Hydrant Box c/w Accessories / set
3 JET NOZZLE Ukuran 1.5" / set
4 Selang Hydrant KANVAS 1,5 x 20 m setara ROYAL / set
N LAMPU
1 Lampu TL 2 x 36 w Recessed Mounted c/w Alumunium Louver / Unit
2 LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. / Unit
3 LAMPU Sorot LED 100 Watt / Unit
4 Lampu downlight LED -16 W / Unit
5 Lampu downlight LED -13 W / Unit
6 Lampu Gantung LED Industri 50 Watt / Unit
O PANEL
1 P-MDB / Unit
2 DB-LT/1 / Unit
3 DB-LT Mesin / Bh
P KABEL
1 NYY 240 mm2 / meter
2 NYY 4x50 mm2 / meter
3 NYY 3x2,5 mm2 / meter
4 NYM 3x2,5 mm2 / meter
Q STOP KONTAK DAN SAKLAR
1 SAKLAR 1 GANG / Unit
2 SAKLAR 2 GANG / Unit
3 SAKLAR 3 GANG / Unit
4 STOP KONTAK 13 A / Unit
5 STOP KONTAK 25 A / Unit
6 INBOW DOS / Unit
R PENANGKAL PETIR
1 PENANGKAL PETIR RADIUS 97 METER / Unit
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

2 NYY 70 MM2 / Unit


S TRAY
1 TRAY W=600, D=100 / Unit
2 TRAY W=300, D=100 / Unit
3 ELBOW W=300, D=100 / Unit
NO. URAIAN UPAH DAN BAHAN KODE SATUAN

4 TEE W=300, D=100 / Unit


5 TRAY W=200, D=100 / Unit
6 ELBOW W=200, D=100 / Unit
7 TEE W=200, D=100 / Unit
T HARGA BAHAN
1 Minyak Solar Ltr
2 Minyak Pelumas Ltr
3 Minyak Hidraulik Ltr
4 Minyak Transmisi Ltr
5 Grease (Gemuk) Kg
U HARGA PERALATAN
1 Excavator Jam
2 Pompa Mixer Readymix M3
3 Sewa Peralatan Jam
4 Alat Bantu Jam

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
TAR HARGA BAHAN DAN UPAH

HARGA SATUAN

Rp 75,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 100,000.00
Rp 90,000.00
Rp 90,000.00
Rp 75,000.00
Rp 125,000.00
Rp 120,000.00
Rp 75,000.00
Rp 100,000.00
Rp 70,000.00
Rp 60,000.00
Rp 18,000.00
Rp 15,000.00
Rp 10,000.00
Rp 125,000.00
Rp 75,000.00
Rp 90,000.00

Rp 25.00
Rp 143,000.00
Rp 143,000.00
Rp 132,000.00
Rp 143,000.00
Rp 85,000.00
Rp 204,000.00
Rp 65,000.00

Rp 16,000.00
Rp 26,500.00
Rp 1,121,000.00
HARGA SATUAN

Rp 1,023,000.00
Rp 1,350.00
Rp 2,600.00
Rp 8,500.00
HARGA SATUAN

Rp 285,000.00
Rp 345,000.00
Rp 179,000.00
Rp 750.00
Rp 780.00

Rp 3,850,000.00
Rp 3,400,000.00
Rp 2,400,000.00
Rp 18,500.00
Rp 2,350,000.00
Rp 3,750,000.00
Rp 3,300,000.00
Rp 3,050,000.00
Rp 2,350,000.00
Rp 98,000.00
Rp 148,000.00
Rp 51,500.00

Rp 10,400.00
Rp 13,100.00
Rp 8,500.00
Rp 15,200.00
Rp 146,000.00
Rp 15,000.00
Rp 17,000.00
Rp 17,000.00
Rp 17,000.00
Rp 18,500.00
Rp 250.00
Rp 17,000.00
Rp 22,500.00
Rp 8,000.00
Rp 11,300.00
Rp 47,000.00
Rp 26,500.00
Rp 58,500.00
Rp 39,000.00
Rp 15,800.00
NG
Rp 11,500.00
Rp 23,400.00
Rp 61,300.00
Rp 67,900.00
HARGA SATUAN

Rp 72,500.00

Rp 72,000.00
Rp 225,000.00
HARGA SATUAN

Rp 5,000.00
Rp 25,500.00
Rp 51,600.00
Rp 38,000.00
Rp 38,000.00
Rp 5,500.00
Rp 18,000.00
Rp 11,800.00
Rp 180.00
Rp 14,000.00
Rp 8,000.00
Rp 13,750.00
Rp 8,000.00
Rp 6,000.00
Rp 12,000.00
Rp 32,000.00
Rp 18,000.00
Rp 9,000.00
Rp 38,000.00

Rp 2,850,000.00
Rp 325,000.00
Rp 98,000.00
Rp 85,000.00
Rp 230,000.00
Rp 4,000.00
Rp 955,000.00
Rp 1,880,000.00
Rp 1,650,000.00
Rp 428,000.00
Rp 295,000.00
Rp 85,000.00
Rp 65,000.00
Rp 62,000.00

Rp 295,000.00
Rp 210,000.00
Rp 135,000.00

Rp 415,000.00
Rp 1,180,000.00
Rp 548,000.00
Rp 33,400.00
Rp 9,700.00
HARGA SATUAN

Rp 88,000.00
Rp 26,900.00
Rp 76,500.00
Rp 32,500.00
Rp 17,600.00
Rp 29,700.00
HARGA SATUAN

Rp 23,400.00
Rp 48,000.00
Rp 105,500.00

Rp 665,000.00
Rp 15,200.00
Rp 18,500.00
Rp 23,900.00
Rp 71,800.00
Rp 38,100.00
Rp 34,600.00
Rp 389,000.00
Rp 205,500.00
Rp 1,925,000.00
Rp 4,710,000.00

Rp 592,000.00
Rp 1,486,000.00
Rp 530,000.00
Rp 1,700,000.00

Rp 338,000.00
Rp 292,000.00
Rp 295,000.00
Rp 128,000.00
Rp 119,000.00
Rp 896,000.00

Rp 11,412,000.00
Rp 9,100,000.00
Rp 6,975,000.00

Rp 886,000.00
Rp 280,000.00
Rp 10,900.00
Rp 8,200.00

Rp 16,900.00
Rp 20,100.00
Rp 25,600.00
Rp 13,900.00
Rp 17,300.00
Rp 4,100.00

Rp 4,280,000.00
HARGA SATUAN

Rp 62,700.00

Rp 200,000.00
Rp 170,000.00
Rp 176,000.00
HARGA SATUAN

Rp 182,000.00
Rp 169,000.00
Rp 159,000.00
Rp 172,000.00

Rp 9,800.00
Rp 58,000.00
Rp 58,000.00
Rp 58,000.00
Rp 53,000.00

Rp 322,500.00
Rp 95,500.00
Rp 17,500.00
Rp 150.00

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
ANALISA TEKNIS
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN
LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank
1 Volume Pekerjaan = 150.00 M
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.100 Oh
Tukang = 0.100 Oh
Kepala Tukang = 0.010 Oh
Mandor = 0.005 Oh
0.215 Oh

4 Jumlah Tenaga Kerja = 35.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu 5/7 Kelas IV = 0.012 M3 x 150.00 M = 1.80 M3
Paku 2" - 3" = 0.02 Kg x 150.00 M = 3.00 Kg
Kayu Papan 3/20 Kelas IV = 0.007 M3 x 150.00 M = 1.05 M3

6 Produktivitas Kerja Perhari = 35.00 = 162.791 M


0.215

7 Waktu yang dibutuhkan 150.00 = 0.921 Hari


162.791
8 Waktu Penyelesaian Pekerjaan dibulatkan
b. Pemasangan Pagar Pengaman
1 Volume Pekerjaan = 80.00 m'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel.
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.286 Minggu
Dibulatkan = 1.00 Minggu
d. Test Mutu Beton

Page 69 of 682
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.000 Minggu
Dibulatkan = 1.00 Minggu
e. Direksi Keet
1 Volume Pekerjaan = 24.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 2.000 Oh
Tukang = 2.000 Oh
Kepala Tukang = 1.000 Oh
Mandor = 0.300 Oh
5.300 Oh

4 Jumlah Tenaga Kerja = 20.00 Org =

5 Jumlah Bahan Yang Digunakan


Dolken Kayu Ø 8-10/400 cm = 1.25 Btg x 24.00 M2 = 30.00 Btg
Kayu 5/7 Kelas IV = 0.18 M3 x 24.00 M2 = 4.32 M3
Paku Biasa = 0.08 Kg x 24.00 M2 = 1.92 Kg

Page 70 of 682
Besi Strip = 1.1 Kg x 24.00 M2 = 26.40 Kg
Semen Portland = 35 Kg x 24.00 M2 = 840.00 Kg
Pasing Pasang = 0.15 M3 x 24.00 M2 = 3.60 M3
Pasir Beton = 0.1 M3 x 24.00 M2 = 2.40 M3
Kerikil Beton Uk. 3 cm s/d 4 cm = 0.15 M3 x 24.00 M2 = 3.60 M3
Bata Merah = 30 Bh x 24.00 M2 = 720.00 Bh
Seng Plat = 0.25 Lbr x 24.00 M2 = 6.00 Lbr
Jendela Naco = 0.2 Bh x 24.00 M2 = 4.80 Bh
Kaca Polos tebal 3 mm ( Asahimas ) = 0.08 M2 x 24.00 M2 = 1.92 M2
Kunci Tanam = 0.15 Bh x 24.00 M2 = 3.60 Bh
Plywood 4 mm = 0.06 Lbr x 24.00 M2 = 1.44 Lbr

6 Produktivitas Kerja Perhari = 20.00 = 3.774 M2


5.300

7 Waktu yang dibutuhkan 24.00 = 6.360 Hari


3.774
8 Waktu Penyelesaian Pekerjaan dibulatkan
f. Gudang Semen dan Peralatan
1 Volume Pekerjaan = 24.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.000 Oh
Tukang = 2.000 Oh
Kepala Tukang = 0.200 Oh
Mandor = 0.050 Oh
3.250 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Dolken Kayu Ø 8-10/400 cm = 1.7 Btg x 24.00 M2 = 40.80 Btg
Kayu 5/7 Kelas IV = 0.21 M3 x 24.00 M2 = 5.04 M3
Paku Biasa = 0.3 Kg x 24.00 M2 = 7.20 Kg
Semen Portland = 10.5 Kg x 24.00 M2 = 252.00 Kg
Pasir Beton = 0.03 M3 x 24.00 M2 = 0.72 M3
Kerikil Beton Uk. 3 cm s/d 4 cm = 0.05 M3 x 24.00 M2 = 1.20 M3
Seng Gelombang = 1.5 Lbr x 24.00 M2 = 36.00 Lbr
Seng Plat = 0.25 Lbr x 24.00 M2 = 6.00 Lbr

6 Produktivitas Kerja Perhari = 18.00 = 5.538 M2


3.250

7 Waktu yang dibutuhkan 24.00 = 4.333 Hari


5.538
8 Waktu Penyelesaian Pekerjaan dibulatkan
g. Bedeng Pekerja
1 Volume Pekerjaan = 40.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 71 of 682
3 Faktor Tenaga Kerja = Pekerja = 1.000 Oh
Tukang = 2.000 Oh
Kepala Tukang = 0.200 Oh
Mandor = 0.050 Oh
3.250 Oh

4 Jumlah Tenaga Kerja = 20.00 Org =

5 Jumlah Bahan Yang Digunakan


Dolken Kayu Ø 8-10/400 cm = 1.25 Btg x 40.00 M2 = 50.00 Btg
Kayu 5/7 Kelas IV = 0.186 M3 x 40.00 M2 = 7.44 M3
Paku Biasa = 0.3 Kg x 40.00 M2 = 12.00 Kg
Semen Portland = 18 Kg x 40.00 M2 = 720.00 Kg
Pasir Beton = 0.03 M3 x 40.00 M2 = 1.20 M3
Kerikil Beton Uk. 3 cm s/d 4 cm = 0.05 M3 x 40.00 M2 = 2.00 M3
Seng Gelombang = 1.5 Lbr x 40.00 M2 = 60.00 Lbr
Plywood 6 mm = 1.35 Lbr x 40.00 M2 = 54.00 Lbr

6 Produktivitas Kerja Perhari = 20.00 = 6.154 M2


3.250
7 Waktu yang dibutuhkan 40.00 = 6.500 Hari
6.154
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 72 of 682
h. Sewa Scafolding
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari (Mobilisasi)
= 0.143 Minggu
Dibulatkan = 1.00 Minggu
Digunakan selama 189 hari kerja
i. Perizinan
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.143 Minggu
Dibulatkan = 1.00 Minggu
2. PEK. GALIAN TANAH PONDASI
a. Galian Tanah Pondasi
1 Volume Pekerjaan = 319.90 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.750 Oh
Tukang = 0.025 Oh

0.775 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan

6 Produktivitas Kerja Perhari = 18.00 = 23.226 M3


0.775

7 Waktu yang dibutuhkan 319.90 = 13.773 Hari


23.226
8 Waktu Penyelesaian Pekerjaan dibulatkan
b. Urugan Kembali Bekas Galian Tanah
1 Volume Pekerjaan = 39.91 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.500 Oh
Tukang = 0.050 Oh

0.550 Oh

Page 73 of 682
4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan

6 Produktivitas Kerja Perhari = 18.00 = 32.727 M3


0.550

7 Waktu yang dibutuhkan 39.91 = 1.219 Hari


32.727
8 Waktu Penyelesaian Pekerjaan dibulatkan
c. Urugan Pasir Alas Dipadatkan
1 Volume Pekerjaan = 26.80 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.300 Oh
Tukang = 0.010 Oh

0.310 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Pasir Urug/Tanah Urug = 1.200 M3 x 26.80 M3 = 32.16 M3

Page 74 of 682
6 Produktivitas Kerja Perhari = 6.00 = 19.355 M3
0.310

7 Waktu yang dibutuhkan 26.80 = 1.385 Hari


19.355
8 Waktu Penyelesaian Pekerjaan dibulatkan
d. Timbunan Tanah Bawah Lantai
1 Volume Pekerjaan = 1,166.45 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.300 Oh
Tukang = 0.010 Oh

0.310 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Tanah Timbun = 1.200 M3 x 1,166.45 M3 = 1,399.74 M3

6 Produktivitas Kerja Perhari = 30.00 = 96.774 M3


0.310

7 Waktu yang dibutuhkan 1,166.45 = 12.053 Hari


96.774
8 Waktu Penyelesaian Pekerjaan dibulatkan
3. PEKERJAAN PONDASI/STRUKTUR BAWAH
a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm
- Mobilisasi dan Demobilisasi Peralatan Borepile
1 Volume Pekerjaan = 1.00 Ls
2 Tenaga yang digunakan = Truck angkut dan Peralatan Borepile
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.143 Minggu
Dibulatkan = 1.00 Minggu
- Beton K-250
1 Volume Pekerjaan = 212.89 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.413 Oh
Tukang = 0.069 Oh
Kepala Tukang = 0.007 Oh
Mandor = 0.021 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

Page 75 of 682
5 Jumlah Bahan Yang Digunakan
Beton Ready Mix K-250 = 1.000 M3 x 212.89 M3 = 212.89 M3
Pompa = 1.000 M3 x 212.89 M3 = 212.89 M3

6 Produktivitas Kerja Perhari = 24.00 = 47.151 M3


0.509

7 Waktu yang dibutuhkan 212.89 = 4.515 Hari


47.151
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Ulir
1 Volume Pekerjaan = 26,513.19 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

Page 76 of 682
5 Jumlah Bahan Yang Digunakan
Besi Beton Ulir = 1.050 Kg x 26,513.19 Kg = 27,838.85 Kg
Kawat Beton = 0.015 Kg x 26,513.19 Kg = 397.70 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 26,513.19 = 13.345 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 4,210.38 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0250 Oh
Tukang = 0.0250 Oh
Kepala Tukang = 0.0250 Oh
Mandor = 0.0010 Oh
0.076 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 4,210.38 Kg = 4,420.90 Kg
Kawat Beton = 0.015 Kg x 4,210.38 Kg = 63.16 Kg

6 Produktivitas Kerja Perhari = 30.00 = 394.737 Kg


0.076

7 Waktu yang dibutuhkan 4,210.38 = 10.666 Hari


394.737
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Biaya Pengeboran Permeter


1 Volume Pekerjaan = 1,695.00 m'
2 Tenaga yang digunakan = Tenaga Manusia dan Alat bantu kerja
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.000 Minggu
Dibulatkan = 2.00 Minggu

b. Pondasi Pile Cape


Pondasi Pile Cape (PC 1)
- Mutu Beton K-250
1 Volume Pekerjaan = 111.13 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 77 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.413 Oh
Tukang = 0.069 Oh
Kepala Tukang = 0.007 Oh
Mandor = 0.021 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 111.13 M3 = 111.13 M3
Pompa = 1.000 M3 x 111.13 M3 = 111.13 M3

6 Produktivitas Kerja Perhari = 18.00 = 35.363 M3


0.509

7 Waktu yang dibutuhkan 111.13 = 3.143 Hari


35.363
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 78 of 682
- Besi Ulir
1 Volume Pekerjaan = 6,247.46 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 6,247.46 Kg = 6,559.83 Kg
Kawat Beton = 0.015 Kg x 6,247.46 Kg = 93.71 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 6,247.46 = 3.145 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Pile Cape


1 Volume Pekerjaan = 282.24 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.040 M3 x 282.24 M2 = 11.29 M3
Paku 5 - 10 cm = 0.300 Kg x 282.24 M2 = 84.67 Kg
Minyak Bekisting = 0.100 Liter x 282.24 M2 = 28.22 Liter

6 Produktivitas Kerja Perhari = 30.00 = 36.058 M3


0.832

7 Waktu yang dibutuhkan 282.24 = 7.827 Hari


36.058
8 Waktu Penyelesaian Pekerjaan dibulatkan

Pondasi Pile Cape (PC 2)


- Mutu Beton K-250
1 Volume Pekerjaan = 31.75 M3

Page 79 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.413 Oh
Tukang = 0.069 Oh
Kepala Tukang = 0.007 Oh
Mandor = 0.021 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 Kg x 31.75 M3 = 31.75 Kg
Pompa = 1.000 Kg x 31.75 M3 = 31.75 Kg

6 Produktivitas Kerja Perhari = 6.00 = 11.788 Kg


0.509

7 Waktu yang dibutuhkan 31.75 = 2.693 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 80 of 682
- Besi Ulir
1 Volume Pekerjaan = 1,996.49 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 1,996.49 Kg = 2,096.31 Kg
Kawat Beton = 0.015 Kg x 1,996.49 Kg = 29.95 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,996.49 = 2.512 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Pile Cape


1 Volume Pekerjaan = 74.88 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.040 M3 x 74.88 M2 = 3.00 M3
Paku 5 - 10 cm = 0.300 Kg x 74.88 M2 = 22.46 Kg
Minyak Bekisting = 0.100 Liter x 74.88 M2 = 7.49 Liter

6 Produktivitas Kerja Perhari = 18.00 = 21.635 M3


0.832

7 Waktu yang dibutuhkan 74.88 = 3.461 Hari


21.635
8 Waktu Penyelesaian Pekerjaan dibulatkan

c. Pasangan Pondasi batu Gunung


Pas. Pondasi Batu Gunung
1 Volume Pekerjaan = 5.94 M3

Page 81 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.5000 Oh
Tukang = 0.7500 Oh
Kepala Tukang = 0.0750 Oh
Mandor = 0.0750 Oh
2.400 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Batu Kali/Sungai 5 - 20 cm = 1.200 M3 x 5.94 M3 = 7.13 M3
Semen Portland = 202.000 Kg x 5.94 M3 = 1,199.88 Kg
Pasir Pasang = 0.485 M3 x 5.94 M3 = 2.88 M3

6 Produktivitas Kerja Perhari = 18.00 = 7.500 M3


2.400

7 Waktu yang dibutuhkan 5.94 = 0.792 Hari


7.500
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 82 of 682
Pas. Batu Kosong (Aanstamping)
1 Volume Pekerjaan = 2.02 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7800 Oh
Tukang = 0.3900 Oh
Kepala Tukang = 0.0390 Oh
Mandor = 0.0390 Oh
1.248 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Kerikil Beton Uk. ≥ 4 cm = 1.200 M3 x 2.02 M3 = 2.42 M3
Pasir Pasang = 0.432 M3 x 2.02 M3 = 0.87 M3

6 Produktivitas Kerja Perhari = 6.00 = 4.808 M3


1.248

7 Waktu yang dibutuhkan 2.02 = 0.420 Hari


4.808
8 Waktu Penyelesaian Pekerjaan dibulatkan

4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250
1 Volume Pekerjaan = 98.10 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 98.10 M3 = 98.10 M3
Pompa = 1.000 M3 x 98.10 M3 = 98.10 M3

6 Produktivitas Kerja Perhari = 18.00 = 35.363 M3


0.509

7 Waktu yang dibutuhkan 98.10 = 2.774 Hari


35.363
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Ulir

Page 83 of 682
1 Volume Pekerjaan = 12,893.15 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 12,893.15 Kg = 13,537.81 Kg
Kawat Beton = 0.015 Kg x 12,893.15 Kg = 193.40 Kg

6 Produktivitas Kerja Perhari = 24.00 = 1,589.404 Kg


0.015

7 Waktu yang dibutuhkan 12,893.15 = 8.112 Hari


1,589.404
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 84 of 682
- Besi Polos
1 Volume Pekerjaan = 4,427.37 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 4,427.37 Kg = 4,648.74 Kg
Kawat Beton = 0.015 Kg x 4,427.37 Kg = 66.41 Kg

6 Produktivitas Kerja Perhari = 18.00 = 1,192.053 Kg


0.015

7 Waktu yang dibutuhkan 4,427.37 = 3.714 Hari


1,192.053
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Sloof
1 Volume Pekerjaan = 817.50 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh

4 Jumlah Tenaga Kerja = 36.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.045 M3 x 817.50 M2 = 36.79 M3
Paku 5 - 10 cm = 0.300 Kg x 817.50 M2 = 245.25 Kg
Minyak Bekisting = 0.100 Liter x 817.50 M2 = 81.75 Liter

6 Produktivitas Kerja Perhari = 36.00 = 43.269 M3


0.832

7 Waktu yang dibutuhkan 817.50 = 18.893 Hari


43.269
8 Waktu Penyelesaian Pekerjaan dibulatkan

Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250
1 Volume Pekerjaan = 6.25 M3

Page 85 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 6.25 M3 = 6.25 M3
Pompa = 1.000 M3 x 6.25 M3 = 6.25 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 6.25 = 0.530 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 86 of 682
- Besi Ulir
1 Volume Pekerjaan = 968.35 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 968.35 Kg = 1,016.77 Kg
Kawat Beton = 0.015 Kg x 968.35 Kg = 14.53 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 968.35 = 1.219 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 377.71 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 377.71 Kg = 396.60 Kg
Kawat Beton = 0.015 Kg x 377.71 Kg = 5.67 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 377.71 = 0.951 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Sloof
1 Volume Pekerjaan = 78.09 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh

Page 87 of 682
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.045 M3 x 78.09 M2 = 3.51 M3
Paku 5 - 10 cm = 0.300 Kg x 78.09 M2 = 23.43 Kg
Minyak Bekisting = 0.100 Liter x 78.09 M2 = 7.81 Liter

6 Produktivitas Kerja Perhari = 18.00 = 21.635 M3


0.832

7 Waktu yang dibutuhkan 78.09 = 3.609 Hari


21.635
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 88 of 682
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250
1 Volume Pekerjaan = 40.43 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 40.43 M3 = 40.43 M3
Pompa = 1.000 M3 x 40.43 M3 = 40.43 M3

6 Produktivitas Kerja Perhari = 12.00 = 23.576 M3


0.509

7 Waktu yang dibutuhkan 40.43 = 1.715 Hari


23.576
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Ulir
1 Volume Pekerjaan = 9,419.52 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 9,419.52 Kg = 9,890.50 Kg
Kawat Beton = 0.015 Kg x 9,419.52 Kg = 141.29 Kg

6 Produktivitas Kerja Perhari = 24.00 = 1,589.404 Kg


0.015

7 Waktu yang dibutuhkan 9,419.52 = 5.926 Hari


1,589.404
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 1,774.93 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 89 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 1,774.93 Kg = 1,863.68 Kg
Kawat Beton = 0.015 Kg x 1,774.93 Kg = 26.62 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,774.93 = 2.233 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 90 of 682
- Bakesting Kolom
1 Volume Pekerjaan = 323.40 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.040 M3 x 323.40 M2 = 12.94 M3
Paku 5 - 12 cm = 0.400 Kg x 323.40 M2 = 129.36 Kg
Minyak Bekisting = 0.200 Liter x 323.40 M2 = 64.68 Liter
Balok Kayu Kelas II = 0.015 M3 x 323.40 M2 = 4.85 M3
Plywood Tebal 9 mm = 0.350 Lembar x 323.40 M2 = 113.19 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.000 Batang x 323.40 M2 = 646.80 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056
7 Waktu yang dibutuhkan 323.40 = 11.384 Hari
28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250
1 Volume Pekerjaan = 35.53 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 35.53 M3 = 35.53 M3
Pompa = 1.000 M3 x 35.53 M3 = 35.53 M3

6 Produktivitas Kerja Perhari = 12.00 = 23.576 M3


0.509

7 Waktu yang dibutuhkan 35.53 = 1.507 Hari


23.576
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Ulir

Page 91 of 682
1 Volume Pekerjaan = 10,347.20 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 10,347.20 Kg = 10,864.56 Kg
Kawat Beton = 0.015 Kg x 10,347.20 Kg = 155.21 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 10,347.20 = 5.208 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 92 of 682
- Besi Polos
1 Volume Pekerjaan = 1,774.93 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 1,774.93 Kg = 1,863.68 Kg
Kawat Beton = 0.015 Kg x 1,774.93 Kg = 26.62 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,774.93 = 2.233 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 323.40 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 323.40 M2 = 12.94 M3
Paku 5 - 12 cm = 0.4000 Kg x 323.40 M2 = 129.36 Kg
Minyak Bekisting = 0.2000 Liter x 323.40 M2 = 64.68 Liter
Balok Kayu Kelas II = 0.0150 M3 x 323.40 M2 = 4.85 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 323.40 M2 = 113.19 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 323.40 M2 = 646.80 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 323.40 = 11.384 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 93 of 682
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250
1 Volume Pekerjaan = 1.44 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 1.44 M3 = 1.44 M3
Pompa = 1.000 M3 x 1.44 M3 = 1.44 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 1.44 = 0.122 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 94 of 682
- Besi Ulir
1 Volume Pekerjaan = 426.60 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.050 Kg x 426.60 Kg = 447.93 Kg
Kawat Beton = 0.015 Kg x 426.60 Kg = 6.40 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 426.60 = 1.074 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 142.08 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.050 Kg x 142.08 Kg = 149.18 Kg
Kawat Beton = 0.015 Kg x 142.08 Kg = 2.13 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 142.08 = 0.358 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 28.80 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh

Page 95 of 682
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 28.80 M2 = 1.15 M3
Paku 5 - 12 cm = 0.4000 Kg x 28.80 M2 = 11.52 Kg
Minyak Bekisting = 0.2000 Liter x 28.80 M2 = 5.76 Liter
Balok Kayu Kelas II = 0.0150 M3 x 28.80 M2 = 0.43 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 28.80 M2 = 10.08 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 28.80 M2 = 57.60 Batang

6 Produktivitas Kerja Perhari = 12.00 = 11.364 M3


1.056

7 Waktu yang dibutuhkan 28.80 = 2.534 Hari


11.364
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 96 of 682
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200
1 Volume Pekerjaan = 2.13 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 2.13 M3 = 749.76 Kg
Pasir Beton = 731.000 Kg x 2.13 M3 = 1,557.03 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 2.13 M3 = 2,196.03 Kg
Air = 215.000 Liter x 2.13 M3 = 457.95 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036

7 Waktu yang dibutuhkan 2.13 = 0.723 Hari


2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 944.61 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 944.61 Kg = 991.84 Kg
Kawat Beton = 0.0150 Kg x 944.61 Kg = 14.17 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 944.61 = 2.377 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 65.52 M2

Page 97 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 65.52 M2 = 2.62 M3
Paku 5 - 12 cm = 0.4000 Kg x 65.52 M2 = 26.21 Kg
Minyak Bekisting = 0.2000 Liter x 65.52 M2 = 13.10 Liter
Balok Kayu Kelas II = 0.0150 M3 x 65.52 M2 = 0.98 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 65.52 M2 = 22.93 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 65.52 M2 = 131.04 Batang

6 Produktivitas Kerja Perhari = 24.00 = 22.727 M3


1.056

7 Waktu yang dibutuhkan 65.52 = 2.883 Hari


22.727
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 98 of 682
Balok Latai 13 x 20 cm (BLL)
- Mutu Beton K-200
1 Volume Pekerjaan = 6.12 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 6.12 M3 = 2,154.24 Kg
Pasir Beton = 731.000 Kg x 6.12 M3 = 4,473.72 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 6.12 M3 = 6,309.72 Kg
Air = 215.000 Liter x 6.12 M3 = 1,315.80 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036
7 Waktu yang dibutuhkan 6.12 = 2.077 Hari
2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 668.98 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 668.98 Kg = 702.43 Kg
Kawat Beton = 0.0150 Kg x 668.98 Kg = 10.03 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 668.98 = 1.684 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 124.84 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 99 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 124.84 M2 = 4.99 M3
Paku 5 - 12 cm = 0.4000 Kg x 124.84 M2 = 49.94 Kg
Minyak Bekisting = 0.2000 Liter x 124.84 M2 = 24.97 Liter
Balok Kayu Kelas II = 0.0180 M3 x 124.84 M2 = 2.25 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 124.84 M2 = 43.69 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 124.84 M2 = 249.68 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 124.84 = 4.394 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 100 of 682


Plat Lantai Dasar T = 12 cm
- Mutu Beton K-250
1 Volume Pekerjaan = 195.62 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.000 M3 x 195.62 M3 = 195.62 M3
Pompa = 1.000 M3 x 195.62 M3 = 195.62 M3

6 Produktivitas Kerja Perhari = 30.00 = 58.939 M3


0.509

7 Waktu yang dibutuhkan 195.62 = 3.319 Hari


58.939
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Tulangan Utama Polos
1 Volume Pekerjaan = 10,107.01 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 10,107.01 Kg = 10,612.36 Kg
Kawat Beton = 0.0150 Kg x 10,107.01 Kg = 151.61 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 10,107.01 = 25.436 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 248.89 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh

Page 101 of 682


Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 248.89 M2 = 9.96 M3
Paku 5 - 12 cm = 0.4000 Kg x 248.89 M2 = 99.56 Kg
Minyak Bekisting = 0.2000 Liter x 248.89 M2 = 49.78 Liter
Balok Kayu Kelas II = 0.0150 M3 x 248.89 M2 = 3.73 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 248.89 M2 = 87.11 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 6.0000 Batang x 248.89 M2 = 1,493.34 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 248.89 = 8.761 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 102 of 682


Plat Canopy T = 7 cm
- Mutu Beton K-200
1 Volume Pekerjaan = 2.65 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 2.65 M3 = 932.80 Kg
Pasir Beton = 731.000 Kg x 2.65 M3 = 1,937.15 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 2.65 M3 = 2,732.15 Kg
Air = 215.000 Liter x 2.65 M3 = 569.75 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036
7 Waktu yang dibutuhkan 2.65 = 0.899 Hari
2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 233.10 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 233.10 Kg = 244.76 Kg
Kawat Beton = 0.0150 Kg x 233.10 Kg = 3.50 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 233.10 = 0.587 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 44.24 M2

Page 103 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 44.24 M2 = 1.77 M3
Paku 5 - 12 cm = 0.4000 Kg x 44.24 M2 = 17.70 Kg
Minyak Bekisting = 0.2000 Liter x 44.24 M2 = 8.85 Liter
Balok Kayu Kelas II = 0.0150 M3 x 44.24 M2 = 0.66 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 44.24 M2 = 15.48 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 6.0000 Batang x 44.24 M2 = 265.44 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 44.24 = 1.557 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 104 of 682


b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250
1 Volume Pekerjaan = 18.86 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 18.86 M3 = 18.86 M3
Pompa = 1.0000 M3 x 18.86 M3 = 18.86 M3

6 Produktivitas Kerja Perhari = 30.00 = 58.939 M3


0.509

7 Waktu yang dibutuhkan 18.86 = 0.320 Hari


58.939
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Ulir
1 Volume Pekerjaan = 2954.27 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 2,954.27 Kg = 3,101.98 Kg
Kawat Beton = 0.0150 Kg x 2,954.27 Kg = 44.31 Kg

6 Produktivitas Kerja Perhari = 24.00 = 1,589.404 Kg


0.015

7 Waktu yang dibutuhkan 2,954.27 = 1.859 Hari


1,589.404
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 854.7 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 105 of 682


3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 13.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 854.70 Kg = 897.44 Kg
Kawat Beton = 0.0150 Kg x 854.70 Kg = 12.82 Kg

6 Produktivitas Kerja Perhari = 13.00 = 860.927 Kg


0.015

7 Waktu yang dibutuhkan 854.70 = 0.993 Hari


860.927
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 106 of 682


- Bakesting Balok
1 Volume Pekerjaan = 152.19 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 152.19 M2 = 6.09 M3
Paku 5 - 12 cm = 0.4000 Kg x 152.19 M2 = 60.88 Kg
Minyak Bekisting = 0.2000 Liter x 152.19 M2 = 30.44 Liter
Balok Kayu Kelas II = 0.0180 M3 x 152.19 M2 = 2.74 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 152.19 M2 = 53.27 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 152.19 M2 = 304.38 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 152.19 = 5.357 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Balok 30 x 50 cm (BL2)
- Mutu Beton K-250
1 Volume Pekerjaan = 68.62 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 68.62 M3 = 68.62 M3
Pompa = 1.0000 M3 x 68.62 M3 = 68.62 M3

6 Produktivitas Kerja Perhari = 30.00 = 58.939 M3


0.509

7 Waktu yang dibutuhkan 68.62 = 1.164 Hari


58.939
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 107 of 682


- Besi Ulir
1 Volume Pekerjaan = 10,994.23 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 10,994.23 Kg = 11,543.94 Kg
Kawat Beton = 0.0150 Kg x 10,994.23 Kg = 164.91 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 10,994.23 = 5.534 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 108 of 682


- Besi Polos
1 Volume Pekerjaan = 3,159.76 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 13.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 3,159.76 Kg = 3,317.75 Kg
Kawat Beton = 0.0150 Kg x 3,159.76 Kg = 47.40 Kg

6 Produktivitas Kerja Perhari = 13.00 = 860.927 Kg


0.015

7 Waktu yang dibutuhkan 3,159.76 = 3.670 Hari


860.927
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 484.90 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 484.90 M2 = 19.40 M3
Paku 5 - 12 cm = 0.4000 Kg x 484.90 M2 = 193.96 Kg
Minyak Bekisting = 0.2000 Liter x 484.90 M2 = 96.98 Liter
Balok Kayu Kelas II = 0.0180 M3 x 484.90 M2 = 8.73 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 484.90 M2 = 169.72 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 484.90 M2 = 969.80 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 484.90 = 17.068 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 109 of 682


Balok 20 x 30 cm (BL3)
- Mutu Beton K-250
1 Volume Pekerjaan = 15.84 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 15.84 M3 = 15.84 M3
Pompa = 1.0000 M3 x 15.84 M3 = 15.84 M3

6 Produktivitas Kerja Perhari = 30.00 = 58.939 M3


0.509

7 Waktu yang dibutuhkan 15.84 = 0.269 Hari


58.939
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 110 of 682


- Besi Ulir
1 Volume Pekerjaan = 3,038.02 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 3,038.02 Kg = 3,189.92 Kg
Kawat Beton = 0.0150 Kg x 3,038.02 Kg = 45.57 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 3,038.02 = 1.529 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 1,058.20 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 0.01 Oh = 0.01 Kg
Kawat Beton = 0.0150 Kg x 0.01 Oh = 0.00 Kg

6 Produktivitas Kerja Perhari = 18.00 = 1,192.053 Kg


0.015

7 Waktu yang dibutuhkan 1,058.20 = 0.888 Hari


1,192.053
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 211.14 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh

Page 111 of 682


Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 211.14 M2 = 8.45 M3
Paku 5 - 12 cm = 0.4000 Kg x 211.14 M2 = 84.46 Kg
Minyak Bekisting = 0.2000 Liter x 211.14 M2 = 42.23 Liter
Balok Kayu Kelas II = 0.0180 M3 x 211.14 M2 = 3.80 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 211.14 M2 = 73.90 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 211.14 M2 = 422.28 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 211.14 = 7.432 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 112 of 682


Balok Latai 13 x 20 cm (BLL)
- Mutu Beton K-200
1 Volume Pekerjaan = 5.66 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 5.66 M3 = 1,992.32 Kg
Pasir Beton = 731.000 Kg x 5.66 M3 = 4,137.46 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 5.66 M3 = 5,835.46 Kg
Air = 215.000 Liter x 5.66 M3 = 1,216.90 Liter

6 Produktivitas Kerja Perhari = 12.00 = 5.894 Kg


2.036

7 Waktu yang dibutuhkan 5.66 = 0.960 Hari


5.894
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 624.62 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 624.62 Kg = 655.85 Kg
Kawat Beton = 0.0150 Kg x 624.62 Kg = 9.37 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 624.62 = 1.572 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 115.31 M2

Page 113 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 115.31 M2 = 4.61 M3
Paku 5 - 12 cm = 0.4000 Kg x 115.31 M2 = 46.12 Kg
Minyak Bekisting = 0.2000 Liter x 115.31 M2 = 23.06 Liter
Balok Kayu Kelas II = 0.0180 M3 x 115.31 M2 = 2.08 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 115.31 M2 = 40.36 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 115.31 M2 = 230.62 Batang

6 Produktivitas Kerja Perhari = 48.00 = 45.455 M3


1.056

7 Waktu yang dibutuhkan 115.31 = 2.537 Hari


45.455
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 114 of 682


Kolom 50 x 50 cm (K1)
- Mutu Beton K-250
1 Volume Pekerjaan = 33.00 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 33.00 M3 = 33.00 M3
Pompa = 1.0000 M3 x 33.00 M3 = 33.00 M3

6 Produktivitas Kerja Perhari = 12.00 = 23.576 M3


0.509

7 Waktu yang dibutuhkan 33.00 = 1.400 Hari


23.576
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Ulir
1 Volume Pekerjaan = 5,298.48 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 5,298.48 Kg = 5,563.40 Kg
Kawat Beton = 0.0150 Kg x 5,298.48 Kg = 79.48 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 5,298.48 = 6.667 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 1,448.92 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh

Page 115 of 682


Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 1,448.92 Kg = 1,521.37 Kg
Kawat Beton = 0.0150 Kg x 1,448.92 Kg = 21.73 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 1,448.92 = 3.646 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 116 of 682


- Bakesting Kolom
1 Volume Pekerjaan = 284.20 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 284.20 M2 = 11.37 M3
Paku 5 - 12 cm = 0.4000 Kg x 284.20 M2 = 113.68 Kg
Minyak Bekisting = 0.2000 Liter x 284.20 M2 = 56.84 Liter
Balok Kayu Kelas II = 0.0150 M3 x 284.20 M2 = 4.26 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 284.20 M2 = 99.47 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 284.20 M2 = 568.40 Batang

6 Produktivitas Kerja Perhari = 24.00 = 22.727 M3


1.056

7 Waktu yang dibutuhkan 284.20 = 12.505 Hari


22.727
8 Waktu Penyelesaian Pekerjaan dibulatkan
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250
1 Volume Pekerjaan = 29.00 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 29.00 M3 = 29.00 M3
Pompa = 1.0000 M3 x 29.00 M3 = 29.00 M3

6 Produktivitas Kerja Perhari = 12.00 = 23.576 M3


0.509

7 Waktu yang dibutuhkan 29.00 = 1.230 Hari


23.576
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 117 of 682


- Besi Ulir
1 Volume Pekerjaan = 6,467.00 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 6,467.00 Kg = 6,790.35 Kg
Kawat Beton = 0.0150 Kg x 6,467.00 Kg = 97.01 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.35 Kg


0.015

7 Waktu yang dibutuhkan 6,467.00 = 16.275 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 118 of 682


- Besi Polos
1 Volume Pekerjaan = 1,273.29 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 1,273.29 Kg = 1,336.95 Kg
Kawat Beton = 0.0150 Kg x 1,273.29 Kg = 19.10 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 1,273.29 = 3.204 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 284.20 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 284.20 M2 = 11.37 M3
Paku 5 - 12 cm = 0.4000 Kg x 284.20 M2 = 113.68 Kg
Minyak Bekisting = 0.2000 Liter x 284.20 M2 = 56.84 Liter
Balok Kayu Kelas II = 0.0150 M3 x 284.20 M2 = 4.26 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 284.20 M2 = 99.47 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 284.20 M2 = 568.40 Batang

6 Produktivitas Kerja Perhari = 30.00 = 28.409 M3


1.056

7 Waktu yang dibutuhkan 284.20 = 10.004 Hari


28.409
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 119 of 682


Kolom 30 x 30 cm (K4)
- Mutu Beton K-250
1 Volume Pekerjaan = 0.48 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 0.48 M3 = 0.48 M3
Pompa = 1.0000 M3 x 0.48 M3 = 0.48 M3

6 Produktivitas Kerja Perhari = 12.00 = 23.576 M3


0.509

7 Waktu yang dibutuhkan 0.48 = 0.020 Hari


23.576
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 120 of 682


- Besi Ulir
1 Volume Pekerjaan = 189.60 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 189.60 Kg = 199.08 Kg
Kawat Beton = 0.0150 Kg x 189.60 Kg = 2.84 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 189.60 = 0.477 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 47.36 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 47.36 Kg = 49.73 Kg
Kawat Beton = 0.0150 Kg x 47.36 Kg = 0.71 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 47.36 = 0.119 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 9.60 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh

Page 121 of 682


Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 9.60 M2 = 0.38 M3
Paku 5 - 12 cm = 0.4000 Kg x 9.60 M2 = 3.84 Kg
Minyak Bekisting = 0.2000 Liter x 9.60 M2 = 1.92 Liter
Balok Kayu Kelas II = 0.0150 M3 x 9.60 M2 = 0.14 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 9.60 M2 = 3.36 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 9.60 M2 = 19.20 Batang

6 Produktivitas Kerja Perhari = 6.00 = 5.682 M3


1.056

7 Waktu yang dibutuhkan 9.60 = 1.690 Hari


5.682
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 122 of 682


Kolom 13 x 13 cm (KP)
- Mutu Beton K-200
1 Volume Pekerjaan = 2.16 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 2.16 M3 = 760.32 Kg
Pasir Beton = 731.000 Kg x 2.16 M3 = 1,578.96 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 2.16 M3 = 2,226.96 Kg
Air = 215.000 Liter x 2.16 M3 = 464.40 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036

7 Waktu yang dibutuhkan 2.16 = 0.733 Hari


2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 965.03 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.0151 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 965.03 Kg = 1,013.28 Kg
Kawat Beton = 0.0150 Kg x 965.03 Kg = 14.48 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 965.03 = 2.429 Hari


397.351
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 66.56 M2

Page 123 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 66.56 M2 = 2.66 M3
Paku 5 - 12 cm = 0.4000 Kg x 66.56 M2 = 26.62 Kg
Minyak Bekisting = 0.2000 Liter x 66.56 M2 = 13.31 Liter
Balok Kayu Kelas II = 0.0150 M3 x 66.56 M2 = 1.00 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 66.56 M2 = 23.30 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 66.56 M2 = 133.12 Batang

6 Produktivitas Kerja Perhari = 12.00 = 11.364 M3


1.056

7 Waktu yang dibutuhkan 66.56 = 5.857 Hari


11.364
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 124 of 682


Plat Lantai T = 12 cm
- Mutu Beton K-250
1 Volume Pekerjaan = 236.14 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 236.14 M3 = 236.14 M3
Pompa = 1.0000 M3 x 236.14 M3 = 236.14 M3

6 Produktivitas Kerja Perhari = 24.00 = 47.151 M3


0.509

7 Waktu yang dibutuhkan 236.14 = 5.008 Hari


47.151
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 27,047.96 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 27,047.96 Kg = 28,400.36 Kg
Kawat Beton = 0.0150 Kg x 27,047.96 Kg = 405.72 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 27,047.96 = 13.614 Hari


1,986.75
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 1,967.80 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 125 of 682


3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 100.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 1,967.80 M2 = 78.71 M3
Paku 5 - 12 cm = 0.4000 Kg x 1,967.80 M2 = 787.12 Kg
Minyak Bekisting = 0.2000 Liter x 1,967.80 M2 = 393.56 Liter
Balok Kayu Kelas II = 0.0150 M3 x 1,967.80 M2 = 29.52 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 1,967.80 M2 = 688.73 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 6.0000 Batang x 1,967.80 M2 = 11,806.80 Batang

6 Produktivitas Kerja Perhari = 100.00 = 94.697 M3


1.056

7 Waktu yang dibutuhkan 1,967.80 = 20.780 Hari


94.697
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 126 of 682


Plat Canopy T = 7 cm
- Mutu Beton K-250
1 Volume Pekerjaan = 3.97 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 3.97 M3 = 3.97 M3
Pompa = 1.0000 M3 x 3.97 M3 = 3.97 M3

6 Produktivitas Kerja Perhari = 24.00 = 47.151 M3


0.509

7 Waktu yang dibutuhkan 3.97 = 0.084 Hari


47.151
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 349.65 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 349.65 Kg = 367.13 Kg
Kawat Beton = 0.0150 Kg x 349.65 Kg = 5.24 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 349.65 = 0.880 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 66.29 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 127 of 682


3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 66.29 M2 = 2.65 M3
Paku 5 - 12 cm = 0.4000 Kg x 66.29 M2 = 26.52 Kg
Minyak Bekisting = 0.2000 Liter x 66.29 M2 = 13.26 Liter
Balok Kayu Kelas II = 0.0150 M3 x 66.29 M2 = 0.99 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 66.29 M2 = 23.20 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 6.0000 Batang x 66.29 M2 = 397.74 Batang

6 Produktivitas Kerja Perhari = 24.00 = 22.727 M3


1.056

7 Waktu yang dibutuhkan 66.29 = 2.917 Hari


22.727
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 128 of 682


d. STRUKTUR LT. ATAP
Balok 20 x 30 cm (BL3)
- Mutu Beton K-250
1 Volume Pekerjaan = 4.88 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 4.88 M3 = 4.88 M3
Pompa = 1.0000 M3 x 4.88 M3 = 4.88 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 4.88 = 0.414 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Ulir
1 Volume Pekerjaan = 1,245.80 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 1,245.80 Kg = 1,308.09 Kg
Kawat Beton = 0.0150 Kg x 1,245.80 Kg = 18.69 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,245.80 = 1.568 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 278.02 Kg

Page 129 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 278.02 Kg = 291.92 Kg
Kawat Beton = 0.0150 Kg x 278.02 Kg = 4.17 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 278.02 = 0.700 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 130 of 682


- Bakesting Balok
1 Volume Pekerjaan = 65.01 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 65.01 M2 = 2.60 M3
Paku 5 - 12 cm = 0.4000 Kg x 65.01 M2 = 26.00 Kg
Minyak Bekisting = 0.2000 Liter x 65.01 M2 = 13.00 Liter
Balok Kayu Kelas II = 0.0180 M3 x 65.01 M2 = 1.17 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 65.01 M2 = 22.75 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 65.01 M2 = 130.02 Batang

6 Produktivitas Kerja Perhari = 18.00 = 17.045 M3


1.056

7 Waktu yang dibutuhkan 65.01 = 3.814 Hari


17.045
8 Waktu Penyelesaian Pekerjaan dibulatkan

Rink Balk 30 x 40 cm (RB1)


- Mutu Beton K-250
1 Volume Pekerjaan = 54.28 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 54.28 M3 = 54.28 M3
Pompa = 1.0000 M3 x 54.28 M3 = 54.28 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 54.28 = 4.605 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 131 of 682


- Besi Ulir
1 Volume Pekerjaan = 7,153.13 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 7,153.13 Kg = 7,510.79 Kg
Kawat Beton = 0.0150 Kg x 7,153.13 Kg = 107.30 Kg

6 Produktivitas Kerja Perhari = 30.00 = 1,986.755 Kg


0.015

7 Waktu yang dibutuhkan 7,153.13 = 3.600 Hari


1,986.755
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 132 of 682


- Besi Polos
1 Volume Pekerjaan = 2,633.16 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 2,633.16 Kg = 2,764.82 Kg
Kawat Beton = 0.0150 Kg x 2,633.16 Kg = 39.50 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 2,633.16 = 6.627 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 361.86 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 361.86 M2 = 14.47 M3
Paku 5 - 12 cm = 0.4000 Kg x 361.86 M2 = 144.74 Kg
Minyak Bekisting = 0.2000 Liter x 361.86 M2 = 72.37 Liter
Balok Kayu Kelas II = 0.0180 M3 x 361.86 M2 = 6.51 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 361.86 M2 = 126.65 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 361.86 M2 = 723.72 Batang

6 Produktivitas Kerja Perhari = 18.00 = 17.045 M3


1.056

7 Waktu yang dibutuhkan 361.86 = 21.229 Hari


17.045
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 133 of 682


Rink Balk 13 x 20 cm (RB2)
- Mutu Beton K-250
1 Volume Pekerjaan = 8.17 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 8.17 M3 = 8.17 M3
Pompa = 1.0000 M3 x 8.17 M3 = 8.17 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 8.17 = 0.693 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 134 of 682


- Besi Polos
1 Volume Pekerjaan = 1,674.29 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 1,674.29 Kg = 1,758.00 Kg
Kawat Beton = 0.0150 Kg x 1,674.29 Kg = 25.11 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,674.29 = 2.107 Hari


794.70
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Balok
1 Volume Pekerjaan = 61.33 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 61.33 M2 = 2.45 M3
Paku 5 - 12 cm = 0.4000 Kg x 61.33 M2 = 24.53 Kg
Minyak Bekisting = 0.2000 Liter x 61.33 M2 = 12.27 Liter
Balok Kayu Kelas II = 0.0180 M3 x 61.33 M2 = 1.10 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 61.33 M2 = 21.46 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 61.33 M2 = 122.65 Batang

6 Produktivitas Kerja Perhari = 18.00 = 17.045 M3


1.056

7 Waktu yang dibutuhkan 61.33 = 3.598 Hari


17.045
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 135 of 682


Kolom 20 x 20 cm (K3)
- Mutu Beton K-250
1 Volume Pekerjaan = 3.02 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 3.02 M3 = 3.02 M3
Pompa = 1.0000 M3 x 3.02 M3 = 3.02 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 3.02 = 0.256 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 136 of 682


- Besi Ulir
1 Volume Pekerjaan = 915.77 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Ulir = 1.0500 Kg x 915.77 Kg = 961.56 Kg
Kawat Beton = 0.0150 Kg x 915.77 Kg = 13.74 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 915.77 = 1.152 Hari


794.702
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 47.36 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 47.36 Kg = 49.73 Kg
Kawat Beton = 0.0150 Kg x 47.36 Kg = 0.71 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 47.36 = 0.119 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 9.60 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh

Page 137 of 682


Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 9.60 M2 = 0.38 M3
Paku 5 - 12 cm = 0.4000 Kg x 9.60 M2 = 3.84 Kg
Minyak Bekisting = 0.2000 Liter x 9.60 M2 = 1.92 Liter
Balok Kayu Kelas II = 0.0150 M3 x 9.60 M2 = 0.14 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 9.60 M2 = 3.36 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 9.60 M2 = 19.20 Batang

6 Produktivitas Kerja Perhari = 6.00 = 5.682 M3


1.056

7 Waktu yang dibutuhkan 9.60 = 1.690 Hari


5.682
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 138 of 682


Kolom 13 x 13 cm (KP)
- Mutu Beton K-200
1 Volume Pekerjaan = 0.50 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 352.000 Kg x 0.50 M3 = 176.00 Kg
Pasir Beton = 731.000 Kg x 0.50 M3 = 365.50 Kg
Batu Pecah 1-2 cm = 1,031.000 Kg x 0.50 M3 = 515.50 Kg
Air = 215.000 Liter x 0.50 M3 = 107.50 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036

7 Waktu yang dibutuhkan 0.50 = 0.170 Hari


2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan
- Besi Polos
1 Volume Pekerjaan = 406.54 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 406.54 Kg = 426.87 Kg
Kawat Beton = 0.0150 Kg x 406.54 Kg = 6.10 Kg

6 Produktivitas Kerja Perhari = 6.00 = 397.351 Kg


0.015

7 Waktu yang dibutuhkan 406.54 = 1.023 Hari


397.35
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Kolom
1 Volume Pekerjaan = 15.34 M2

Page 139 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 15.34 M2 = 0.61 M3
Paku 5 - 12 cm = 0.4000 Kg x 15.34 M2 = 6.14 Kg
Minyak Bekisting = 0.2000 Liter x 15.34 M2 = 3.07 Liter
Balok Kayu Kelas II = 0.0150 M3 x 15.34 M2 = 0.23 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 15.34 M2 = 5.37 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 2.0000 Batang x 15.34 M2 = 30.68 Batang

6 Produktivitas Kerja Perhari = 12.00 = 11.364 M3


1.056

7 Waktu yang dibutuhkan 15.34 = 1.350 Hari


11.364
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 140 of 682


Plat Lantai Daag T = 12 cm
- Mutu Beton K-250
1 Volume Pekerjaan = 5.90 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 5.90 M3 = 5.90 M3
Pompa = 1.0000 M3 x 5.90 M3 = 5.90 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 5.90 = 0.501 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Besi Polos
1 Volume Pekerjaan = 1,957.12 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 1,957.12 Kg = 2,054.98 Kg
Kawat Beton = 0.0150 Kg x 1,957.12 Kg = 29.36 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,957.12 = 2.463 Hari


794.70
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 49.17 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 141 of 682


3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 49.17 M2 = 1.97 M3
Paku 5 - 12 cm = 0.4000 Kg x 49.17 M2 = 19.67 Kg
Minyak Bekisting = 0.2000 Liter x 49.17 M2 = 9.83 Liter
Balok Kayu Kelas II = 0.0150 M3 x 49.17 M2 = 0.74 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 49.17 M2 = 17.21 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 0.0150 Batang x 49.17 M2 = 0.74 Batang

6 Produktivitas Kerja Perhari = 18.00 = 17.045 M3


1.056

7 Waktu yang dibutuhkan 49.17 = 2.885 Hari


17.045
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 142 of 682


Plat Talang Beton T = 12 cm
- Mutu Beton K-250
1 Volume Pekerjaan = 6.78 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Beton Ready Mix K-250 = 1.0000 M3 x 6.78 M3 = 6.78 M3
Pompa = 1.0000 M3 x 6.78 M3 = 6.78 M3

6 Produktivitas Kerja Perhari = 6.00 = 11.788 M3


0.509

7 Waktu yang dibutuhkan 6.78 = 0.575 Hari


11.788
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Tulangan Utama Polos


1 Volume Pekerjaan = 1,023.70 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Beton Polos = 1.0500 Kg x 1,023.70 Kg = 1,074.89 Kg
Kawat Beton = 0.0150 Kg x 1,023.70 Kg = 15.36 Kg

6 Produktivitas Kerja Perhari = 12.00 = 794.702 Kg


0.015

7 Waktu yang dibutuhkan 1,023.70 = 1.288 Hari


794.70
8 Waktu Penyelesaian Pekerjaan dibulatkan

- Bakesting Lantai
1 Volume Pekerjaan = 56.49 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 143 of 682


3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Kayu Kelas III = 0.0400 M3 x 56.49 M2 = 2.26 M3
Paku 5 - 12 cm = 0.4000 Kg x 56.49 M2 = 22.60 Kg
Minyak Bekisting = 0.2000 Liter x 56.49 M2 = 11.30 Liter
Balok Kayu Kelas II = 0.0150 M3 x 56.49 M2 = 0.85 M3
Plywood Tebal 9 mm = 0.3500 Lembar x 56.49 M2 = 19.77 Lembar
Dolken Kayu Ø 8 - 10 cm - 4 m = 0.0150 Batang x 56.49 M2 = 0.85 Batang

6 Produktivitas Kerja Perhari = 18.00 = 17.045 M3


1.056

7 Waktu yang dibutuhkan 56.49 = 3.314 Hari


17.045
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 144 of 682


5. PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI . 1
a. Pas Bata 1 Pc : 4 Ps (Dinding)
1 Volume Pekerjaan = 1,127.22 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6000 Oh
Tukang = 0.2000 Oh
Kepala Tukang = 0.0200 Oh
Mandor = 0.0300 Oh
0.850 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Bata Merah = 70.0000 Buah x 1,127.22 M2 = 78,905.40 Buah
Semen Portland = 26.5500 Kg x 1,127.22 M2 = 29,927.69 Kg
Pasir Pasang = 130.2000 Kg x 1,127.22 M2 = 146,764.04 Kg

6 Produktivitas Kerja Perhari = 48.00 = 56.471 Buah


0.850

7 Waktu yang dibutuhkan 1,127.22 = 19.961 Hari


56.471
8 Waktu Penyelesaian Pekerjaan dibulatkan
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding)
1 Volume Pekerjaan = 2,254.44 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.3000 Oh
Tukang = 0.1500 Oh
Kepala Tukang = 0.0150 Oh
Mandor = 0.0150 Oh
0.480 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 6.2400 Kg x 2,254.44 M2 = 14,067.71 Kg
Pasir Pasang = 33.6000 Kg x 2,254.44 M2 = 75,749.18 Kg

6 Produktivitas Kerja Perhari = 48.00 = 100.000 Kg


0.480

7 Waktu yang dibutuhkan 2,254.44 = 22.544 Hari


100.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

c. Pasangan Bata Trasraam 1 Pc : 2 Ps (Selasar)


1 Volume Pekerjaan = 108.68 M2

Page 145 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.3000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.0150 Oh
0.425 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Bata Merah = 70.0000 Buah x 108.68 M2 = 7,607.60 Buah
Semen Portland = 18.9500 Kg x 108.68 M2 = 2,059.49 Kg
Pasir Pasang = 53.2000 Kg x 108.68 M2 = 5,781.78 Kg

6 Produktivitas Kerja Perhari = 12.00 = 28.235 Buah


0.425

7 Waktu yang dibutuhkan 108.68 = 3.849 Hari


28.235
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 146 of 682


d. PLesteran Trasraam 1 Pc : 2 Ps (Selasar)
1 Volume Pekerjaan = 108.68 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.3000 Oh
Tukang = 0.1500 Oh
Kepala Tukang = 0.0150 Oh
Mandor = 0.0150 Oh
0.480 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 10.2240 Kg x 108.68 M2 = 1,111.14 Kg
Pasir Pasang = 28.0000 Kg x 108.68 M2 = 3,043.04 Kg

6 Produktivitas Kerja Perhari = 12.00 = 25.000 Kg


0.480

7 Waktu yang dibutuhkan 108.68 = 4.347 Hari


25.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding)
1 Volume Pekerjaan = 661.03 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6000 Oh
Tukang = 0.2000 Oh
Kepala Tukang = 0.0200 Oh
Mandor = 0.0300 Oh
0.850 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Bata Merah = 70.0000 Buah x 661.03 M2 = 46,272.10 Buah
Semen Portland = 26.5500 Kg x 661.03 M2 = 17,550.35 Kg
Pasir Pasang = 130.2000 Kg x 661.03 M2 = 86,066.11 Kg

6 Produktivitas Kerja Perhari = 48.00 = 56.471 Buah


0.850

7 Waktu yang dibutuhkan 661.03 = 11.706 Hari


56.471
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding)


1 Volume Pekerjaan = 1,322.05 M2

Page 147 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.3000 Oh
Tukang = 0.1500 Oh
Kepala Tukang = 0.0150 Oh
Mandor = 0.0150 Oh
0.480 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 6.2400 Kg x 1,322.05 M2 = 8,249.59 Kg
Pasir Pasang = 33.6000 Kg x 1,322.05 M2 = 44,420.88 Kg

6 Produktivitas Kerja Perhari = 48.00 = 100.000 Kg


0.480

7 Waktu yang dibutuhkan 1,322.05 = 13.221 Hari


100.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 148 of 682


LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding)
1 Volume Pekerjaan = 355.32 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6000 Oh
Tukang = 0.2000 Oh
Kepala Tukang = 0.0200 Oh
Mandor = 0.0300 Oh
0.850 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Bata Merah = 70.0000 Buah x 355.32 M2 = 24,872.40 Buah
Semen Portland = 26.5500 Kg x 355.32 M2 = 9,433.75 Kg
Pasir Pasang = 130.2000 Kg x 355.32 M2 = 46,262.66 Kg

6 Produktivitas Kerja Perhari = 30.00 = 35.294 Buah


0.850

7 Waktu yang dibutuhkan 355.32 = 10.067 Hari


35.294
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding)


1 Volume Pekerjaan = 710.64 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.3000 Oh
Tukang = 0.1500 Oh
Kepala Tukang = 0.0150 Oh
Mandor = 0.0150 Oh
0.480 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 6.2400 Kg x 710.64 M2 = 4,434.39 Kg
Pasir Pasang = 33.6000 Kg x 710.64 M2 = 23,877.50 Kg

6 Produktivitas Kerja Perhari = 48.00 = 100.000 Kg


0.480

7 Waktu yang dibutuhkan 710.64 = 7.106 Hari


100.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

6. PEKERJAAN BAJA DAN PENUTUP ATAP


RANGKA ATAP BAJA BERAT

Page 149 of 682


a. Plat Tumpu 50 x 50 cm T = 12 MM
1 Volume Pekerjaan = 1,023.73 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 1,023.73 Kg = 1,074.92 Kg

6 Produktivitas Kerja Perhari = 12.00 = 240.000 Kg


0.050

7 Waktu yang dibutuhkan 1,023.73 = 4.266 Hari


240.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 150 of 682


b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi)
1 Volume Pekerjaan = 312.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

c. Kuda-Kuda Baja IWF 200 x 100 x 5,5 x 8mm-


1 Volume Pekerjaan = 8,943.06 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 36.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 8,943.06 Kg = 9,390.21 Kg

6 Produktivitas Kerja Perhari = 36.00 = 720.000 Kg


0.050

7 Waktu yang dibutuhkan 8,943.06 = 12.421 Hari


720.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

d. Baut Ikatan Kaki Kuda-Kuda 3/4 Inci


1 Volume Pekerjaan = 372.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

e. Gording Baja CNP 100 X 50


1 Volume Pekerjaan = 5,598.33 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh

Page 151 of 682


0.050 Oh

4 Jumlah Tenaga Kerja = 36.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 5,598.33 Kg = 5,878.25 Kg

6 Produktivitas Kerja Perhari = 36.00 = 720.000 Kg


0.050

7 Waktu yang dibutuhkan 5,598.33 = 7.775 Hari


720.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

f. Siku 40 X 40 Penahan Baja CNP


1 Volume Pekerjaan = 164.16 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

Page 152 of 682


5 Jumlah Bahan Yang Digunakan
Besi Baja Profil = 1.0500 Kg x 164.16 Kg = 172.37 Kg

6 Produktivitas Kerja Perhari = 6.00 = 120.000 Kg


0.050

7 Waktu yang dibutuhkan 164.16 = 1.368 Hari


120.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

g. Trestang 14 mm Terpasang
1 Volume Pekerjaan = 76.00 Psng
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu

h. Plat Buhul T = 10 MM
1 Volume Pekerjaan = 278.51 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 278.51 Kg = 292.44 Kg

6 Produktivitas Kerja Perhari = 6.00 = 120.000 Kg


0.050

7 Waktu yang dibutuhkan 278.51 = 2.321 Hari


120.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

i. Perakitan Baja
1 Volume Pekerjaan = 15,877.12 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.1000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0010 Oh

Page 153 of 682


Mandor = 0.0050 Oh
0.206 Oh

4 Jumlah Tenaga Kerja = 70.00 Org =

5 Jumlah Bahan Yang Digunakan


Solar = 1.0000 Liter x 15,877.12 Kg = 15,877.12 Liter
Minyak Pelumas = 0.1000 Liter x 15,877.12 Kg = 1,587.71 Liter

6 Produktivitas Kerja Perhari = 70.00 = 339.806 Liter


0.206

7 Waktu yang dibutuhkan 15,877.12 = 46.724 Hari


339.806
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 154 of 682


PENUTUP ATAP
a. Seng Spandek 0.40 mm
1 Volume Pekerjaan = 1,446.79 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.1500 Oh
Tukang = 0.3000 Oh
Kepala Tukang = 0.0300 Oh
Mandor = 0.0080 Oh
0.488 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Seng Plat = 1.0500 M x 1,446.79 M2 = 1,519.13 M
Paku Skrup 1 cm - 2,5 cm = 0.0100 Kg x 1,446.79 M2 = 14.47 Kg
Papan Kayu Kelas IV = 0.5000 M3 x 1,446.79 M2 = 723.40 M3

6 Produktivitas Kerja Perhari = 30.00 = 61.475 M


0.488

7 Waktu yang dibutuhkan 1,446.79 = 23.534 Hari


61.475
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar


1 Volume Pekerjaan = 54.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

c. Rabung Seng Spandek


1 Volume Pekerjaan = 72.24 M'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.1000 Oh
Mandor = 0.0010 Oh
0.401 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Seng Spandek 0,35 mm = 1.1000 M' x 72.24 M' = 79.46 M'
Paku Sekrup = 6.0000 Buah x 72.24 M' = 433.44 Buah

Page 155 of 682


6 Produktivitas Kerja Perhari = 12.00 = 29.925 M'
0.401

7 Waktu yang dibutuhkan 72.24 = 2.414 Hari


29.925
8 Waktu Penyelesaian Pekerjaan dibulatkan

TANGGA BAJA
a. Plat Tumpu T = 12 MM
1 Volume Pekerjaan = 97.22 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 97.22 Kg = 102.08 Kg

Page 156 of 682


6 Produktivitas Kerja Perhari = 6.00 = 120.000 Kg
0.050

7 Waktu yang dibutuhkan 97.22 = 0.810 Hari


120.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi)


1 Volume Pekerjaan = 54.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

c. Besi Baja UNP 250 x 90 x 9 mm


1 Volume Pekerjaan = 2,500.92 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Besi Baja Profil = 1.0500 Kg x 2,500.92 Kg = 2,625.97 Kg

6 Produktivitas Kerja Perhari = 18.00 = 360.000 Kg


0.050

7 Waktu yang dibutuhkan 2,500.92 = 6.947 Hari


360.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar


1 Volume Pekerjaan = 120.00 M'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

Page 157 of 682


e. Bordes Baja
1 Volume Pekerjaan = 51.60 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu

f. Perakitan Baja
1 Volume Pekerjaan = 2,598.14 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.1000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0010 Oh
Mandor = 0.0050 Oh
0.206 Oh

4 Jumlah Tenaga Kerja = 36.00 Org =

5 Jumlah Bahan Yang Digunakan


Solar = 1.0000 Liter x 2,598.14 Kg = 2,598.14 Liter
Minyak Pelumas = 0.1000 Liter x 2,598.14 Kg = 259.81 Liter

Page 158 of 682


6 Produktivitas Kerja Perhari = 36.00 = 174.757 Liter
0.206

7 Waktu yang dibutuhkan 2,598.14 = 14.867 Hari


174.757
8 Waktu Penyelesaian Pekerjaan dibulatkan

7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang
1 Volume Pekerjaan = 200.20 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

b. Profil Gipsum Terpasang


1 Volume Pekerjaan = 187.60 M
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 13.00 Hari
= 1.86 Minggu
Dibulatkan = 2.00 Minggu
LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang
1 Volume Pekerjaan = 589.40 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu
b. Profil Gipsum Terpasang
1 Volume Pekerjaan = 385.80 M
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

Page 159 of 682


Pintu
a. Pintu Kaca Tempered 12 mm + Aksesoris+ Kusen aluminium kaca warna biru+
Beton Gawang + Granit Lengkap Terpasang (PJ1)
1 Volume Pekerjaan = 2.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 160 of 682


c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

d. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P3)
1 Volume Pekerjaan = 1.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram


5 mm + Aksesoris lengkap Terpasang (P4)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

f. Kusen Aluminium putih + Pintu aluminium KM/WC +


Aksesoris lengkap Terpasang (P5)
1 Volume Pekerjaan = 9.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi +


Aksesoris lengkap Terpasang sesuai Gambar (P6)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 161 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

h. Pintu Folding Gate + Aksesoris lengkap Terpasang


sesuai Gambar (PL1)
1 Volume Pekerjaan = 2.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 162 of 682


i. Pintu Folding Gate + Aksesoris lengkap Terpasang
sesuai Gambar (PL2)
1 Volume Pekerjaan = 8.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 4.00 Hari
= 0.57 Minggu
Dibulatkan = 1.00 Minggu

j. Kusen UPVC + Pintu Ambang UPVC +


Kaca warna biru 5 mm (PS)
1 Volume Pekerjaan = 1.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm +
Aksesoris lengkap Terpasang (J1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

b. Kusen Aluminium putih + Kaca warna biru 5 mm +


Aksesoris lengkap Terpasang (J2)
1 Volume Pekerjaan = 6.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka


+ kaca + Aksesoris lengkap Terpasang (J3)
1 Volume Pekerjaan = 2.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu

Page 163 of 682


3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 164 of 682


b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2)
1 Volume Pekerjaan = 15.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar)
1 Volume Pekerjaan = 119.72 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

b. Dinding Kaca 5 mm + Rangka Alumunium Putih (sesuai Gambar)


1 Volume Pekerjaan = 124.99 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu
LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P2)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 165 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P3)
1 Volume Pekerjaan = 5.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Page 166 of 682


e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram
5 mm + Aksesoris lengkap Terpasang (P4)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

f. Kusen Aluminium putih + Pintu aluminium KM/WC +


Aksesoris lengkap Terpasang (P5)
1 Volume Pekerjaan = 5.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris
lengkap (J4)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru +


Aksesoris lengkap (J5)
1 Volume Pekerjaan = 13.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu

c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris


lengkap (J6)
1 Volume Pekerjaan = 4.00 Bh

Page 167 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris


lengkap (J7)
1 Volume Pekerjaan = 2.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Page 168 of 682


Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris
lengkap Terpasang (V1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris


lengkap Terpasang (V2)
1 Volume Pekerjaan = 7.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 4.00 Hari
= 0.57 Minggu
Dibulatkan = 1.00 Minggu

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar)
1 Volume Pekerjaan = 259.51 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

b. Dinding Kaca 5 mm Rangka Alumunium Putih (sesuai Gambar)


1 Volume Pekerjaan = 176.26 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja
1 Volume Pekerjaan = 4.28 M3

Page 169 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Semen Portland = 299.000 Kg x 4.28 M3 = 1,279.72 Kg
Pasir Beton = 799.000 Kg x 4.28 M3 = 3,419.72 Kg
Kerikil Beton Uk. ≥ 4 cm = 1,017.000 Kg x 4.28 M3 = 4,352.76 Kg
Air = 215.000 Liter x 4.28 M3 = 920.20 Liter

6 Produktivitas Kerja Perhari = 6.00 = 2.947 Kg


2.036

7 Waktu yang dibutuhkan 4.28 = 1.452 Hari


2.947
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 170 of 682


b. Lantai Granit 60 x 60 cm (Unpolishet)
1 Volume Pekerjaan = 107.03 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7000 Oh
Tukang = 0.3500 Oh
Kepala Tukang = 0.0350 Oh
Mandor = 0.0350 Oh
1.120 Oh

4 Jumlah Tenaga Kerja = 18.00 Org =

5 Jumlah Bahan Yang Digunakan


Granit Anti Slip 60 x 60 cm = 3.055 Buah x 107.03 M2 = 326.98 Buah
Semen Portland = 8.190 Kg x 107.03 M2 = 876.58 Kg
Pasir Pasang = 63.000 Kg x 107.03 M2 = 6,742.89 Kg
Semen Warna = 1.000 Kg x 107.03 M2 = 107.03 Kg

6 Produktivitas Kerja Perhari = 18.00 = 16.071 Buah


1.120

7 Waktu yang dibutuhkan 107.03 = 6.660 Hari


16.071
8 Waktu Penyelesaian Pekerjaan dibulatkan

c. Lantai Granit 30 x 60 cm + Stop Nosing


1 Volume Pekerjaan = 18.94 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7000 Oh
Tukang = 0.3500 Oh
Kepala Tukang = 0.0350 Oh
Mandor = 0.0350 Oh
1.120 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Granit Anti Slip 30 x 60 cm = 6.000 Buah x 18.94 M2 = 113.64 Buah
Semen Portland = 8.190 Kg x 18.94 M2 = 155.12 Kg
Pasir Pasang = 63.000 Kg x 18.94 M2 = 1,193.22 Kg
Semen Warna = 1.000 Kg x 18.94 M2 = 18.94 Kg

6 Produktivitas Kerja Perhari = 12.00 = 10.714 Buah


1.120

7 Waktu yang dibutuhkan 18.94 = 1.768 Hari


10.714
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 171 of 682


d. Dinding Granit 60 x 60 cm (Polishet)
1 Volume Pekerjaan = 297.95 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7000 Oh
Tukang = 0.3500 Oh
Kepala Tukang = 0.0350 Oh
Mandor = 0.0350 Oh
1.120 Oh

4 Jumlah Tenaga Kerja = 24.00 Org =

5 Jumlah Bahan Yang Digunakan


Keramik Dinding 30 x 60 cm = 3.000 Buah x 297.95 M2 = 893.85 Buah
Semen Portland = 8.190 Kg x 297.95 M2 = 2,440.21 Kg
Pasir Pasang = 63.000 Kg x 297.95 M2 = 18,770.85 Kg
Semen Warna = 1.000 Kg x 297.95 M2 = 297.95 Kg

6 Produktivitas Kerja Perhari = 24.00 = 21.429 Buah


1.120

7 Waktu yang dibutuhkan 297.95 = 13.904 Hari


21.429
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 172 of 682


e. Pekerjaan Floor Hardener + Trowel
1 Volume Pekerjaan = 1,258.82 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai


1 Volume Pekerjaan = 152.58 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu
LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet)
1 Volume Pekerjaan = 16.80 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7000 Oh
Tukang = 0.3500 Oh
Kepala Tukang = 0.0350 Oh
Mandor = 0.0350 Oh
1.120 Oh

4 Jumlah Tenaga Kerja = 20.00 Org =

5 Jumlah Bahan Yang Digunakan


Granit Anti Slip 60 x 60 cm = 3.0550 Buah x 16.80 M2 = 51.32 Buah
Semen Portland = 8.1900 Kg x 16.80 M2 = 137.57 Kg
Pasir Pasang = 63.0000 Kg x 16.80 M2 = 1,058.22 Kg
Semen Warna = 1.0000 Kg x 16.80 M2 = 16.80 Kg

6 Produktivitas Kerja Perhari = 20.00 = 17.857 Buah


1.120

7 Waktu yang dibutuhkan 16.80 = 0.941 Hari


17.857
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Dinding Granit 60 x 60 cm (Polishet)


1 Volume Pekerjaan = 13.45 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7000 Oh

Page 173 of 682


Tukang = 0.3500 Oh
Kepala Tukang = 0.0350 Oh
Mandor = 0.0350 Oh
1.120 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Keramik Dinding 30 x 60 cm = 3.0000 Buah x 13.45 M2 = 40.36 Buah
Semen Portland = 8.1900 Kg x 13.45 M2 = 110.18 Kg
Pasir Pasang = 63.0000 Kg x 13.45 M2 = 847.56 Kg
Semen Warna = 1.0000 Kg x 13.45 M2 = 13.45 Kg

6 Produktivitas Kerja Perhari = 6.00 = 5.357 Buah


1.120

7 Waktu yang dibutuhkan 13.45 = 2.511 Hari


5.357
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 174 of 682


c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai
1 Volume Pekerjaan = 852.11 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu

10. PEKERJAAN PENGECATAN


Pengecatan Permurkaan Dinding Bata dan Beton
a. Cat Dinding Tembok LT. 1
1 Volume Pekerjaan = 2,363.12 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2000 Oh
Tukang = 0.0630 Oh
Kepala Tukang = 0.0063 Oh
Mandor = 0.0030 Oh
0.272 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Plamuur = 0.1000 Kg x 2,363.12 M2 = 236.31 Kg
Cat Dasar = 0.1000 Kg x 2,363.12 M2 = 236.31 Kg
Cat Tembok Emultion Paint Setara Jotun = 0.2600 Kg x 2,363.12 M2 = 614.41 Kg

6 Produktivitas Kerja Perhari = 48.00 = 176.252 Kg


0.272

7 Waktu yang dibutuhkan 2,363.12 = 13.408 Hari


176.252
8 Waktu Penyelesaian Pekerjaan dibulatkan

b. Cat Dinding Tembok LT. 2


1 Volume Pekerjaan = 1,322.05 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2000 Oh
Tukang = 0.0630 Oh
Kepala Tukang = 0.0063 Oh
Mandor = 0.0030 Oh
0.272 Oh

4 Jumlah Tenaga Kerja = 48.00 Org =

5 Jumlah Bahan Yang Digunakan


Plamuur = 0.1000 Kg x 1,322.05 M2 = 132.21 Kg

Page 175 of 682


Cat Dasar = 0.1000 Kg x 1,322.05 M2 = 132.21 Kg
Cat Tembok Emultion Paint Setara Jotun = 0.2600 Kg x 1,322.05 M2 = 343.73 Kg

6 Produktivitas Kerja Perhari = 48.00 = 176.252 Kg


0.272

7 Waktu yang dibutuhkan 1,322.05 = 7.501 Hari


176.252
8 Waktu Penyelesaian Pekerjaan dibulatkan

c. Cat Dinding Tembok LT. Atap


1 Volume Pekerjaan = 710.64 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2000 Oh
Tukang = 0.0630 Oh
Kepala Tukang = 0.0063 Oh
Mandor = 0.0030 Oh
0.272 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

Page 176 of 682


5 Jumlah Bahan Yang Digunakan
Plamuur = 0.1000 Kg x 710.64 M2 = 71.06 Kg
Cat Dasar = 0.1000 Kg x 710.64 M2 = 71.06 Kg
Cat Tembok Emultion Paint Setara Jotun = 0.2600 Kg x 710.64 M2 = 184.77 Kg

6 Produktivitas Kerja Perhari = 30.00 = 110.158 Kg


0.272

7 Waktu yang dibutuhkan 710.64 = 6.451 Hari


110.158
8 Waktu Penyelesaian Pekerjaan dibulatkan

Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap
1 Volume Pekerjaan = 945.64 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2500 Oh
Tukang = 0.2250 Oh
Kepala Tukang = 0.0225 Oh
Mandor = 0.0075 Oh
0.505 Oh

4 Jumlah Tenaga Kerja = 30.00 Org =

5 Jumlah Bahan Yang Digunakan


Menie Besi = 0.1000 Kg x 945.64 M2 = 94.56 Kg
Pengencer = 0.0100 Liter x 945.64 M2 = 9.46 Liter
Kuas = 0.0100 Bh x 945.64 M2 = 9.46 Bh
Perancah Kayu = 0.0020 M3 x 945.64 M2 = 1.89 M3

6 Produktivitas Kerja Perhari = 30.00 = 59.406 Kg


0.505

7 Waktu yang dibutuhkan 945.64 = 15.918 Hari


59.406
8 Waktu Penyelesaian Pekerjaan dibulatkan

b.Pengecatan Permurkaan Tangga Baja


1 Volume Pekerjaan = 112.24 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2000 Oh
Tukang = 0.0630 Oh
Kepala Tukang = 0.0063 Oh
Mandor = 0.0030 Oh
0.272 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

Page 177 of 682


5 Jumlah Bahan Yang Digunakan
Menie Besi = 0.1000 Kg x 112.24 M2 = 11.22 Kg
Pengencer = 0.0100 Liter x 112.24 M2 = 1.12 Liter
Kuas = 0.0100 Bh x 112.24 M2 = 1.12 Bh
Perancah Kayu = 0.0020 M3 x 112.24 M2 = 0.22 M3

6 Produktivitas Kerja Perhari = 12.00 = 44.069 Kg


0.272

7 Waktu yang dibutuhkan 112.24 = 2.547 Hari


44.069
8 Waktu Penyelesaian Pekerjaan dibulatkan

11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap
1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 3.3000 Oh
Tukang = 1.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.1600 Oh
4.570 Oh

Page 178 of 682


4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Closet Duduk = 1.0000 Buah x 2.00 Buah = 2.00 Buah
Perlengkapan = 6.0000 % x 2.00 Buah = 12.00 %

6 Produktivitas Kerja Perhari = 12.00 = 2.626 Buah


4.570

7 Waktu yang dibutuhkan 2.00 = 0.762 Hari


2.626
8 Waktu Penyelesaian Pekerjaan dibulatkan

2 Closet Jongkok Setara TOTO Lengkap


1 Volume Pekerjaan = 4.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

3 Urinoir Setara TOTO Type Muslim Lengkap


1 Volume Pekerjaan = 3.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.0000 Oh
Tukang = 1.0000 Oh
Kepala Tukang = 0.1000 Oh
Mandor = 0.0500 Oh
2.150 Oh

4 Jumlah Tenaga Kerja = 8.00 Org =

5 Jumlah Bahan Yang Digunakan


Urinoir = 1.0000 Unit x 3.00 Buah = 3.00 Unit
Semen Portland = 6.0000 Kg x 3.00 Buah = 18.00 Kg
Pasir Pasang = 14.0000 Kg x 3.00 Buah = 42.00 Kg
Perlengkapan = 30.0000 % x 3.00 Buah = 90.00 %

6 Produktivitas Kerja Perhari = 8.00 = 3.721 Unit


2.150

7 Waktu yang dibutuhkan 3.00 = 0.806 Hari


3.721
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 179 of 682


4 Penyekat Urinoir Porselein Setara TOTO
1 Volume Pekerjaan = 3.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

5 Washtafel Lengkap Setara TOTO


1 Volume Pekerjaan = 5.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.2000 Oh
Tukang = 1.4500 Oh
Kepala Tukang = 0.1500 Oh
Mandor = 0.0600 Oh
2.860 Oh

4 Jumlah Tenaga Kerja = 16.00 Org =

Page 180 of 682


5 Jumlah Bahan Yang Digunakan
Wastafel = 1.0000 Unit x 5.00 Buah = 5.00 Unit
Semen Portland = 6.0000 Kg x 5.00 Buah = 30.00 Kg
Pasir Pasang = 14.0000 Kg x 5.00 Buah = 70.00 Kg
Perlengkapan = 12.0000 % x 5.00 Buah = 60.00 %

6 Produktivitas Kerja Perhari = 16.00 = 5.594 Unit


2.860

7 Waktu yang dibutuhkan 5.00 = 0.894 Hari


5.594
8 Waktu Penyelesaian Pekerjaan dibulatkan

6 Cermin Pada Washtafel Ukuran Besar


1 Volume Pekerjaan = 1.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

7 Cermin Pada Washtafel Ukuran Kecil


1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

8 Kran tembok Stainless Setara TOTO dia 1/2 "


1 Volume Pekerjaan = 12.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0540 Oh
Tukang = 0.0900 Oh
Kepala Tukang = 0.0090 Oh
Mandor = 0.0270 Oh
0.180 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Kran air = 1.0000 Buah x 12.00 Buah = 12.00 Buah
Sealtape = 0.0250 Buah x 12.00 Buah = 0.30 Buah

Page 181 of 682


6 Produktivitas Kerja Perhari = 6.00 = 33.333 Buah
0.180

7 Waktu yang dibutuhkan 12.00 = 0.360 Hari


33.333
8 Waktu Penyelesaian Pekerjaan dibulatkan

9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap


1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0540 Oh
Tukang = 0.0900 Oh
Kepala Tukang = 0.0090 Oh
Mandor = 0.0270 Oh
0.180 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Jet Washer = 1.0000 Buah x 2.00 Buah = 2.00 Buah
Sealtape = 0.0250 Buah x 2.00 Buah = 0.05 Buah

Page 182 of 682


6 Produktivitas Kerja Perhari = 6.00 = 33.333 Buah
0.180

7 Waktu yang dibutuhkan 2.00 = 0.060 Hari


33.333
8 Waktu Penyelesaian Pekerjaan dibulatkan

10 Floor Drain Stainless


1 Volume Pekerjaan = 10.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0100 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.0050 Oh
0.125 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Floor Drain = 1.0000 Buah x 10.00 Buah = 10.00 Buah

6 Produktivitas Kerja Perhari = 6.00 = 48.000 Buah


0.125

7 Waktu yang dibutuhkan 10.00 = 0.208 Hari


48.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

11 Tempat Sabun Dalam Toilet


1 Volume Pekerjaan = 9.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

12 Tempat Tissue Stailess


1 Volume Pekerjaan = 9.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 183 of 682


13 Gantungan Pakaian Stailess Belakang Pintu Toilet
1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap
1 Volume Pekerjaan = 5.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 3.3000 Oh
Tukang = 1.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.1600 Oh
4.570 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Closet Duduk = 1.0000 Buah x 5.00 Buah = 5.00 Buah
Perlengkapan = 6.0000 % x 5.00 Buah = 30.00 %

6 Produktivitas Kerja Perhari = 12.00 = 2.626 Buah


4.570

7 Waktu yang dibutuhkan 5.00 = 1.904 Hari


2.626
8 Waktu Penyelesaian Pekerjaan dibulatkan

2 Closet Jongkok Setara TOTO Lengkap


1 Volume Pekerjaan = 4.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

3 Urinoir Setara TOTO Type Muslim Lengkap


1 Volume Pekerjaan = 3.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.0000 Oh
Tukang = 1.0000 Oh

Page 184 of 682


Kepala Tukang = 0.1000 Oh
Mandor = 0.0500 Oh
2.150 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Urinoir = 1.0000 Unit x 3.00 Buah = 3.00 Unit
Semen Portland = 6.0000 Kg x 3.00 Buah = 18.00 Kg
Pasir Pasang = 14.0000 Kg x 3.00 Buah = 42.00 Kg
Perlengkapan = 30.0000 % x 3.00 Buah = 90.00 %

6 Produktivitas Kerja Perhari = 12.00 = 5.581 Unit


2.150

7 Waktu yang dibutuhkan 3.00 = 0.538 Hari


5.581
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 185 of 682


4 Penyekat Urinoir Porselein Setara TOTO
1 Volume Pekerjaan = 3.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

5 Washtafel Lengkap Setara TOTO


1 Volume Pekerjaan = 4.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.2000 Oh
Tukang = 1.4500 Oh
Kepala Tukang = 0.1500 Oh
Mandor = 0.0600 Oh
2.860 Oh

4 Jumlah Tenaga Kerja = 12.00 Org =

5 Jumlah Bahan Yang Digunakan


Wastafel = 1.0000 Unit x 4.00 Buah = 4.00 Unit
Semen Portland = 6.0000 Kg x 4.00 Buah = 24.00 Kg
Pasir Pasang = 14.0000 Kg x 4.00 Buah = 56.00 Kg
Perlengkapan = 12.0000 % x 4.00 Buah = 48.00 %

6 Produktivitas Kerja Perhari = 12.00 = 4.196 Unit


2.860

7 Waktu yang dibutuhkan 4.00 = 0.953 Hari


4.196
8 Waktu Penyelesaian Pekerjaan dibulatkan

6 Cermin Pada Washtafel Ukuran Besar


1 Volume Pekerjaan = 1.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

7 Cermin Pada Washtafel Ukuran Kecil


1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 186 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

8 Kran tembok Stainless Setara TOTO dia 1/2 "


1 Volume Pekerjaan = 10.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0540 Oh
Tukang = 0.0900 Oh
Kepala Tukang = 0.0090 Oh
Mandor = 0.0270 Oh
0.180 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Kran air = 1.0000 Buah x 10.00 Buah = 10.00 Buah
Sealtape = 0.0250 Buah x 10.00 Buah = 0.25 Buah

6 Produktivitas Kerja Perhari = 6.00 = 33.333 Buah


0.180

Page 187 of 682


7 Waktu yang dibutuhkan 10.00 = 0.300 Hari
33.333
8 Waktu Penyelesaian Pekerjaan dibulatkan

9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap


1 Volume Pekerjaan = 5.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0540 Oh
Tukang = 0.0900 Oh
Kepala Tukang = 0.0090 Oh
Mandor = 0.0270 Oh
0.180 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Jet Washer = 1.0000 Buah x 5.00 Buah = 5.00 Buah
Sealtape = 0.0250 Buah x 5.00 Buah = 0.13 Buah

6 Produktivitas Kerja Perhari = 6.00 = 33.333 Buah


0.180

7 Waktu yang dibutuhkan 5.00 = 0.150 Hari


33.333
8 Waktu Penyelesaian Pekerjaan dibulatkan

10 Floor Drain Stainless


1 Volume Pekerjaan = 8.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0100 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.0050 Oh
0.125 Oh

4 Jumlah Tenaga Kerja = 6.00 Org =

5 Jumlah Bahan Yang Digunakan


Floor Drain = 1.0000 Buah x 8.00 Buah = 8.00 Buah

6 Produktivitas Kerja Perhari = 6.00 = 48.000 Buah


0.125

7 Waktu yang dibutuhkan 8.00 = 0.167 Hari


48.000
8 Waktu Penyelesaian Pekerjaan dibulatkan

Page 188 of 682


11 Tempat Sabun Dalam Toilet
1 Volume Pekerjaan = 7.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

12 Tempat Tissue Stailess


1 Volume Pekerjaan = 7.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 189 of 682


13 Gantungan Pakaian Stailess Belakang Pintu Toilet
1 Volume Pekerjaan = 6.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

12 MEKANIKAL DAN ELEKTRIKAL


A INSTALASI AIR BERSIH
1. SITE PLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( pipa dari Sumber Air ke Tangki Atas )
1 Volume Pekerjaan = 200.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

B INSTALASI AIR KOTOR


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch
1 Volume Pekerjaan = 30.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

C INSTALASI AIR BEKAS


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch
1 Volume Pekerjaan = 32.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =

Page 190 of 682


5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

D PEKERJAAN INSTALASI TATA UDARA (VAC)


PERALATAN UTAMA EXHAUST FAN
Pengadaan dan pemasangan unit Peralatan Utama
a LANTAI 1
Pemasangan Exhaust Fan Plafond (EFP)
1 Volume Pekerjaan = 12.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Page 191 of 682


Pemasangan Exhaust Fan Dinding Type 1
1 Volume Pekerjaan = 12.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Pemasangan Exhaust Fan Dinding Type 2


1 Volume Pekerjaan = 10.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP)
1 Volume Pekerjaan = 8.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Pemasangan Exhaust Fan Dinding Type 1


1 Volume Pekerjaan = 28.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu

Pemasangan Exhaust Fan Dinding Type 2


1 Volume Pekerjaan = 2.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari

Page 192 of 682


= 0.14 Minggu
Dibulatkan = 1.00 Minggu

c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar
1 Volume Pekerjaan = 11.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 193 of 682


E. INSTALASI AIR BERSIH
INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 7.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

dia. 3/4 Inch ( Pipa Tegak )


1 Volume Pekerjaan = 7.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

dia. 1/2 Inch


1 Volume Pekerjaan = 30.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 8.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 194 of 682


dia. 3/4 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 8.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

dia. 1/2 Inch


1 Volume Pekerjaan = 30.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 195 of 682


G INSTALASI AIR KOTOR
INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 7.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

dia. 4 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

H INSTALASI AIR BEKAS


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 7.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu

Page 196 of 682


Dibulatkan = 1.00 Minggu

dia. 3 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 197 of 682


I INSTALASI AIR HUJAN
INSTALASI PADA BANGUNAN
1. LANTAI-1 s/d Talang
a. Pemipaan PVC class AW Wavin
dia. 3 Inch ( Pipa Tegak Down Spoud )
1 Volume Pekerjaan = 132.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

dia. 4 Inch
1 Volume Pekerjaan = 107.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Roof Drain, Cast Iron Dia 4 Inchi


1 Volume Pekerjaan = 11.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

J PEKERJAAN PEMADAM KEBAKARAN


a. HYDRANT BOX DAN INSTALASI
1. LANTAI-1
Hydrant Box + selang
1 Volume Pekerjaan = 2.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Pipa dia. 3 Inch

Page 198 of 682


1 Volume Pekerjaan = 50.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless
1 Volume Pekerjaan = 4.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 199 of 682


2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless
1 Volume Pekerjaan = 4.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan
1 Volume Pekerjaan = 20.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Alarm Led min-Max 3 gas


1 Volume Pekerjaan = 1.00 Unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Cabinet For Area Valve dan Alarm


1 Volume Pekerjaan = 1.00 Unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Fitting-Fitting pipa
1 Volume Pekerjaan = 1.00 Lot

Page 200 of 682


2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Page 201 of 682


K PEKERJAAN MESIN POMPA DAN TANKI AIR BERSIH
Pengadaan material, pembuatan dudukan / pondasi pompa, dan -
pemasangan unit sampai berfungsi dengan baik.
1 Mesin Pompa Jetpump Grundfos JPD 4 - 47
Spesifikasi :
1. Jenis Pompa : Jetpump
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
4. Daya Dorong : 30 Meter
5. Daya Listrik P1 : 850 Watt
7. Pipa Outlet/Inket : 1/1 inch
8. Suhu Cairan : 0 – 35 C
1 Volume Pekerjaan = 2.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

2 Tanki Air Atas


Tangki Air atas isi 2000 liter terpasang
1 Volume Pekerjaan = 4.00 Unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Page 202 of 682


2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Page 203 of 682


M PEKERJAAN ELEKTRIKAL PADA BANGUNAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
a Lantai-1
- P-MDB Lengkap
- MCCB 3 Phase 125A EZC400N3400N
- Box Panel ukuran 40 cm x 60 cm
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

b Lantai-1 (Panel Pembagi) DB-LT.1 Lengkap


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 100 cm x 80 cm + lengkap assesoris
- MCCB 3 Phase 125A EZC400N3400N
- Box Panel ukuran 40 cm x 60 cm
1 Volume Pekerjaan = 2.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

c Lantai-1 (Panel Pembagi) DB Mesin Lengkap


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 60 cm x 40 cm + lengkap assesoris
1 Volume Pekerjaan = 3.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

N PEKERJAAN PENGKABELAN
1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm
1 Volume Pekerjaan = 150.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =

Page 204 of 682


6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2
1 Volume Pekerjaan = 150.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 205 of 682


C Dari DB-LT.1 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2
1 Volume Pekerjaan = 1,092.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2
1 Volume Pekerjaan = 992.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

O PEKERJAAN PENERANGAN DAN INSTALASI


1 Lantai-1
LAMPU TL 2 x 36 Watt Recessed Mounted
-
c/w Alumunium Louver
1 Volume Pekerjaan = 11.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang.


1 Volume Pekerjaan = 46.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- LAMPU Sorot LED 100 Watt


1 Volume Pekerjaan = 11.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 206 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Lampu Down Light LED 16 Watt


1 Volume Pekerjaan = 14.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Lampu Down Light LED 13 Watt


1 Volume Pekerjaan = 15.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 207 of 682


- Lampu Down Light LED 13 Watt Outbow
1 Volume Pekerjaan = 22.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Sakral + Instalasi penerangan NYM 3 x 2,5 m2


in konduit HI dia 20 m2
1 Volume Pekerjaan = 119.00 ttk
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 4.00 Hari
= 0.57 Minggu
Dibulatkan = 1.00 Minggu

2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
-
c/w Alumunium Louver
1 Volume Pekerjaan = 55.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang.


1 Volume Pekerjaan = 6.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Lampu Gantung LED Industri 50 Watt


1 Volume Pekerjaan = 5.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu

Page 208 of 682


Dibulatkan = 1.00 Minggu

- Lampu Down Light LED 13 Watt


1 Volume Pekerjaan = 17.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Sakral + Instalasi penerangan NYM 3 x 2,5 m2


in konduit HI dia 20 m2
1 Volume Pekerjaan = 83.00 ttk
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Page 209 of 682


P PEKERJAAN STOP KONTAK DAN INSTALASI
1 Lantai-1
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type
1 Volume Pekerjaan = 30.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

- Instalasi Stop Kontak, NYM 3 x 2,5 mm2


in conduit HI dia 20 mm2
1 Volume Pekerjaan = 30.00 ttk
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type
1 Volume Pekerjaan = 57.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

- Instalasi Stop Kontak, NYM 3 x 2,5 mm2


in conduit HI dia 20 mm2
1 Volume Pekerjaan = 57.00 ttk
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

Q PEKERJAAN CABLE TRAY


Lantai -1
Pekerjaan Gantungan Listrik (Sesuai Gambar)
1 Volume Pekerjaan = 45.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 210 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

Lantai -2
Pekerjaan Gantungan Listrik (Sesuai Gambar)
1 Volume Pekerjaan = 45.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

R PEKERJAAN PENANGKAL PETIR


- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan)
( Dipasang Diatap )
1 Volume Pekerjaan = 1.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =

Page 211 of 682


6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

- Kabel NYY 70 mm2


1 Volume Pekerjaan = 25.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Termination & Supporting Material


1 Volume Pekerjaan = 1.00 lot
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

- Grounding Box
1 Volume Pekerjaan = 1.00 lot
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
- Grounding Rod ( R < 3 Ohm )
1 Volume Pekerjaan = 1.00 lot
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris
Lengkap Terpasang
1 Volume Pekerjaan = 1,038.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group

Page 212 of 682


4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 15.00 Hari
= 2.14 Minggu
Dibulatkan = 3.00 Minggu

b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar.
1 Volume Pekerjaan = 169.48 M'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 4.00 Hari
= 0.57 Minggu
Dibulatkan = 1.00 Minggu

Page 213 of 682


c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
- Kanopi Type 2 Sesuai Gambar
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
1 Volume Pekerjaan = 56.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang


sesuai gambar
1 Volume Pekerjaan = 79.20 M'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu

f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang


1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =

Page 214 of 682


6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang


1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

h Pemasangan Logo sesuai gambar


1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu

Page 215 of 682


i Tangga Inspeksi
1 Volume Pekerjaan = 2.00 Unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu

j Septictank + Resapan + Box Kontrol


1 Volume Pekerjaan = 2.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu

k Pembersihan Akhir (Finishing)


1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu

Jakarta,11
PT. MIRTADA

John Kirain
Direktur

Page 216 of 682


LISA TEKNIS

5.83 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 217 of 682


3.33 Group

Page 218 of 682


= 7.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

= 5.00 Hari

dibulatkan = 1.00 Minggu

Page 219 of 682


3.33 Group

= 7.00 Hari

dibulatkan = 1.00 Minggu

Page 220 of 682


3.00 Group

= 14.00 Hari

dibulatkan = 2.00 Minggu

Page 221 of 682


3.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Page 222 of 682


= 2.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

= 13.00 Hari

dibulatkan = 2.00 Minggu

4.00 Group

Page 223 of 682


= 5.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Page 224 of 682


= 14.00 Hari

dibulatkan = 2.00 Minggu

5.00 Group

= 11.00 Hari

dibulatkan = 2.00 Minggu

Page 225 of 682


3.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 226 of 682


5.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Liter

= 8.00 Hari

dibulatkan = 2.00 Minggu

Page 227 of 682


1.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 228 of 682


2.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

Liter

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 229 of 682


3.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 230 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 231 of 682


4.00 Group

= 9.00 Hari

dibulatkan = 2.00 Minggu

Page 232 of 682


3.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

6.00 Group

Liter

= 19.00 Hari

dibulatkan = 3.00 Minggu

Page 233 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 234 of 682


2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 235 of 682


3.00 Group

Liter

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 236 of 682


2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

4.00 Group

= 6.00 Hari

dibulatkan = 1.00 Minggu

Page 237 of 682


2.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 238 of 682


5.00 Group

Liter

Lembar
Batang

= 12.00 Hari

dibulatkan = 2.00 Minggu

2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 239 of 682


5.00 Group

= 6.00 Hari

dibulatkan = 1.00 Minggu

Page 240 of 682


2.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Liter

Lembar
Batang

= 12.00 Hari

dibulatkan = 2.00 Minggu

Page 241 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 242 of 682


1.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 243 of 682


2.00 Group

Liter

Lembar
Batang

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 244 of 682


1.00 Group

Liter

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 245 of 682


4.00 Group

Liter

Lembar
Batang

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 246 of 682


1.00 Group

Liter

= 3.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 247 of 682


5.00 Group

Liter

Lembar
Batang

= 5.00 Hari

dibulatkan = 1.00 Minggu

Page 248 of 682


5.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 26.00 Hari

dibulatkan = 4.00 Minggu

Page 249 of 682


5.00 Group

Liter

Lembar
Batang

= 9.00 Hari

dibulatkan = 2.00 Minggu

Page 250 of 682


1.00 Group

Liter

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 251 of 682


5.00 Group

Liter

Lembar
Batang

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 252 of 682


5.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

4.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 253 of 682


2.17 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 254 of 682


5.00 Group

Liter

Lembar
Batang

= 6.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 255 of 682


5.00 Group

= 6.00 Hari

dibulatkan = 1.00 Minggu

Page 256 of 682


2.17 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Liter

Lembar
Batang

= 18.00 Hari

dibulatkan = 3.00 Minggu

Page 257 of 682


5.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 258 of 682


5.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 259 of 682


5.00 Group

Liter

Lembar
Batang

= 8.00 Hari

dibulatkan = 2.00 Minggu

Page 260 of 682


2.00 Group

Liter

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 261 of 682


8.00 Group

Liter

Lembar
Batang

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 262 of 682


2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

2.00 Group

= 7.00 Hari

dibulatkan = 1.00 Minggu

Page 263 of 682


1.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 264 of 682


4.00 Group

Liter

Lembar
Batang

= 13.00 Hari

dibulatkan = 2.00 Minggu

2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 265 of 682


1.00 Group

= 17.00 Hari

dibulatkan = 3.00 Minggu

Page 266 of 682


1.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Liter

Lembar
Batang

= 11.00 Hari

dibulatkan = 2.00 Minggu

Page 267 of 682


2.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 268 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 269 of 682


1.00 Group

Liter

Lembar
Batang

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 270 of 682


1.00 Group

Liter

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 271 of 682


2.00 Group

Liter

Lembar
Batang

= 6.00 Hari

dibulatkan = 1.00 Minggu

Page 272 of 682


4.00 Group

= 6.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

= 14.00 Hari

dibulatkan = 2.00 Minggu

Page 273 of 682


16.67 Group

Liter

Lembar
Batang

= 21.00 Hari

dibulatkan = 3.00 Minggu

Page 274 of 682


4.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 275 of 682


4.00 Group

Liter

Lembar
Batang

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 276 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 277 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 278 of 682


3.00 Group

Liter

Lembar
Batang

= 4.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 5.00 Hari

dibulatkan = 1.00 Minggu

Page 279 of 682


5.00 Group

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 280 of 682


1.00 Group

= 7.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

Liter

Lembar
Batang

= 22.00 Hari

dibulatkan = 4.00 Minggu

Page 281 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 282 of 682


2.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

Liter

Lembar
Batang

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 283 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 284 of 682


2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 285 of 682


1.00 Group

Liter

Lembar
Batang

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 286 of 682


1.00 Group

Liter

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 287 of 682


2.00 Group

Liter

Lembar
Batang

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 288 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

2.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 289 of 682


3.00 Group

Liter

Lembar
Batang

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 290 of 682


1.00 Group

= 1.00 Hari

dibulatkan = 1.00 Minggu

2.00 Group

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 291 of 682


3.00 Group

Liter

Lembar
Batang

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 292 of 682


8.00 Group

Buah

= 20.00 Hari

dibulatkan = 3.00 Minggu

8.00 Group

= 23.00 Hari

dibulatkan = 4.00 Minggu

Page 293 of 682


2.00 Group

Buah

= 4.00 Hari

dibulatkan = 1.00 Minggu

Page 294 of 682


2.00 Group

= 5.00 Hari

dibulatkan = 1.00 Minggu

8.00 Group

Buah

= 12.00 Hari

dibulatkan = 2.00 Minggu

Page 295 of 682


8.00 Group

= 14.00 Hari

dibulatkan = 2.00 Minggu

Page 296 of 682


5.00 Group

Buah

= 11.00 Hari

dibulatkan = 2.00 Minggu

8.00 Group

= 8.00 Hari

dibulatkan = 2.00 Minggu

Page 297 of 682


2.00 Group

= 5.00 Hari

dibulatkan = 1.00 Minggu

Page 298 of 682


6.00 Group

= 13.00 Hari

dibulatkan = 2.00 Minggu

Page 299 of 682


6.00 Group

= 8.00 Hari

dibulatkan = 2.00 Minggu

1.00 Group

Page 300 of 682


= 2.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 301 of 682


11.67 Group

Liter
Liter

= 47.00 Hari

dibulatkan = 7.00 Minggu

Page 302 of 682


5.00 Group

= 24.00 Hari

dibulatkan = 4.00 Minggu

2.00 Group

Buah

Page 303 of 682


= 3.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Page 304 of 682


= 1.00 Hari

dibulatkan = 1.00 Minggu

3.00 Group

= 7.00 Hari

dibulatkan = 1.00 Minggu

Page 305 of 682


6.00 Group

Liter
Liter

Page 306 of 682


= 15.00 Hari

dibulatkan = 3.00 Minggu

Page 307 of 682


Page 308 of 682
Page 309 of 682
Page 310 of 682
Page 311 of 682
Page 312 of 682
Page 313 of 682
Page 314 of 682
Page 315 of 682
Page 316 of 682
Page 317 of 682
1.00 Group

Liter

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 318 of 682


3.00 Group

Buah

= 7.00 Hari

dibulatkan = 1.00 Minggu

2.00 Group

Buah

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 319 of 682


4.00 Group

Buah

= 14.00 Hari

dibulatkan = 2.00 Minggu

Page 320 of 682


3.33 Group

Buah

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 321 of 682


1.00 Group

Buah

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 322 of 682


8.00 Group

= 14.00 Hari

dibulatkan = 2.00 Minggu

8.00 Group

Page 323 of 682


= 8.00 Hari

dibulatkan = 2.00 Minggu

5.00 Group

Page 324 of 682


= 7.00 Hari

dibulatkan = 1.00 Minggu

5.00 Group

Liter

= 16.00 Hari

dibulatkan = 3.00 Minggu

2.00 Group

Page 325 of 682


Liter

= 3.00 Hari

dibulatkan = 1.00 Minggu

Page 326 of 682


2.00 Group

Buah

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.33 Group

Unit

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 327 of 682


2.67 Group

Page 328 of 682


Unit

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Buah
Buah

Page 329 of 682


= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Buah
Buah

Page 330 of 682


= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Buah

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 331 of 682


2.00 Group

Buah

= 2.00 Hari

dibulatkan = 1.00 Minggu

Page 332 of 682


2.00 Group

Unit

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 333 of 682


2.00 Group

Unit

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 334 of 682


1.00 Group

Buah
Buah

Page 335 of 682


= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Buah
Buah

= 1.00 Hari

dibulatkan = 1.00 Minggu

1.00 Group

Buah

= 1.00 Hari

dibulatkan = 1.00 Minggu

Page 336 of 682


Page 337 of 682
Page 338 of 682
Page 339 of 682
Page 340 of 682
Page 341 of 682
Page 342 of 682
Page 343 of 682
Page 344 of 682
Page 345 of 682
Page 346 of 682
Page 347 of 682
Page 348 of 682
Page 349 of 682
Page 350 of 682
Page 351 of 682
Page 352 of 682
Page 353 of 682
Page 354 of 682
Page 355 of 682
Page 356 of 682
Page 357 of 682
Page 358 of 682
Page 359 of 682
Page 360 of 682
Page 361 of 682
Jakarta,11 Mei 2018
PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama

Page 362 of 682


RE SCHEDULE
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN
LABORATORIUM BENGKEL MEKATRONIKA)

LOKASI : SMK/SMTI BANDA ACEH


TAHUN : 2018

JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 192.00 M 0.1133 0.113
b. Pemasangan Pagar Pengaman 25.00 m' 0.0202 0.020
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 1.00 Pkt 0.0170 0.017
d. Test Mutu Beton 1.00 Pkt 0.1362
e. Direksi Keet 24.00 M2 0.2504 0.250
f. Gudang Semen dan Peralatan 24.00 M2 0.2145 0.214
g. Bedeng Pekerja 40.00 M2 0.3681 0.368
h. Sewa Scafolding 1.00 Pkt 0.3618 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
i. Perizinan 1.00 Pkt 0.0851 0.085

2. PEK. GALIAN TANAH PONDASI


a. Galian Tanah Pondasi 216.23 M3 0.1182 0.059 0.059
b. Urugan Kembali Bekas Galian Tanah 54.06 M3 0.0211 0.021
c. Urugan Pasir Alas Dipadatkan 197.70 M3 0.2321 0.232
d. Timbunan Tanah Bawah Lantai 1,124.65 M3 1.0673

3. PEKERJAAN PONDASI/STRUKTUR BAWAH


a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm
- Mobilisasi dan Demobilisasi Peralatan Borepile 1.00 Ls 0.2128 0.213
- Beton K-250 225.67 M3 2.4467 1.223 1.223
- Besi Ulir 32,137.20 Kg 4.5760 1.144 1.830 1.602
- Besi Polos 11,193.01 Kg 1.2966 0.324 0.519 0.454
- Biaya Pengeboran Permeter 1,796.70 m' 1.6518 0.826 0.826

b. Pondasi Pile Cape


Pondasi Pile Cape (PC 1)
- Mutu Beton K-250 67.72 M3 0.7342 0.367 0.367
- Besi Ulir 4,412.00 Kg 0.6282 0.471 0.157
- Bakesting Pile Cape 171.60 M2 0.3116 0.156 0.156

Pondasi Pile Cape (PC 2)


- Mutu Beton K-250 87.70 M3 0.9508 0.475 0.475
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

- Besi Ulir 5,488.20 Kg 0.7815 0.586 0.195


- Bakesting Pile Cape 180.96 M2 0.3286 0.164 0.164

c. Pasangan Pondasi batu Gunung


Pas. Pondasi Batu Gunung 6.17 M3 0.0428 0.043
Pas. Batu Kosong (Aanstamping) 9.41 M3 0.0289 0.029

4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 100.37 M3 1.0882 0.544 0.544
- Besi Ulir 12,627.02 Kg 1.7980 0.899 0.899
- Besi Polos 5,432.88 Kg 0.6294 0.315 0.315
- Bakesting Sloof 669.12 M2 0.8807 0.440 0.440

Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3 0.0678 0.034 0.034
- Besi Ulir 969.09 Kg 0.1380 0.069 0.069
- Besi Polos 472.29 Kg 0.0547 0.027 0.027
- Bakesting Sloof 78.15 M2 0.1029 0.051 0.051

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3 0.4383 0.219 0.219
- Besi Ulir 9,419.52 Kg 1.3412 0.671 0.671
- Besi Polos 1,774.93 Kg 0.2056 0.103 0.103
- Bakesting Kolom 323.40 M2 0.6757 0.338 0.338

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3 0.3852 0.193 0.193
- Besi Ulir 10,347.20 Kg 1.4733 0.737 0.737
- Besi Polos 1,781.54 Kg 0.2064 0.103 0.103
- Bakesting Kolom 284.20 M2 0.5938 0.297 0.297

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.28 M3 0.0139 0.008 0.006
- Besi Ulir 362.61 Kg 0.0516 0.026 0.026
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

- Besi Polos 114.27 Kg 0.0132 0.007 0.007


- Bakesting Kolom 25.56 M2 0.0534 0.032 0.021

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 3.40 M3 0.0296 0.018 0.012
- Besi Polos 1,148.46 Kg 0.1330 0.067 0.067
- Bakesting Kolom 104.47 M2 0.2183 0.131 0.087

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 7.60 M3 0.0662
- Besi Polos 946.07 Kg 0.1096 0.055
- Bakesting Balok 154.98 M2 0.3312

Plat Lantai Dasar T = 12 cm


- Mutu Beton K-250 193.63 M3 2.0993
- Tulangan Utama Polos 10,143.89 Kg 1.1751 0.294

Plat Canopy T = 7 cm
- Mutu Beton K-200 2.76 M3 0.0240
- Besi Polos 324.12 Kg 0.0375
- Bakesting Lantai 46.13 M2 0.1124

b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.03 M3 0.1954
- Besi Ulir 2,645.67 Kg 0.3767 0.188
- Besi Polos 778.58 Kg 0.0902 0.045
- Bakesting Balok 147.69 M2 0.3156 0.158 0.158

Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 48.97 M3 0.5309
- Besi Ulir 10,981.64 Kg 1.5637 0.782
- Besi Polos 2,850.51 Kg 0.3302 0.165
- Bakesting Balok 553.02 M2 1.1818 0.591 0.591

Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 9.58 M3 0.1039
- Besi Ulir 3,003.52 Kg 0.4277 0.214
- Besi Polos 1,024.53 Kg 0.1187 0.059
- Bakesting Balok 212.86 M2 0.4549 0.227 0.227

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 5.90 M3 0.0514
- Besi Polos 734.25 Kg 0.0851
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

- Bakesting Balok 120.27 M2 0.2570

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 31.00 M3 0.3361
- Besi Ulir 4,977.36 Kg 0.7087
- Besi Polos 1,361.11 Kg 0.1577
- Bakesting Kolom 223.20 M2 0.4663

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 28.00 M3 0.3036
- Besi Ulir 5,619.60 Kg 0.8002
- Besi Polos 1,400.67 Kg 0.1623
- Bakesting Kolom 224.00 M2 0.4680

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 0.14 M3 0.0016
- Besi Ulir 43.61 Kg 0.0062
- Besi Polos 12.88 Kg 0.0015
- Bakesting Kolom 2.88 M2 0.0060

Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.97 M3 0.0105
- Besi Ulir 174.43 Kg 0.0248
- Besi Polos 65.27 Kg 0.0076
- Bakesting Kolom 8.64 M2 0.0181

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 1.45 M3 0.0127
- Besi Polos 539.59 Kg 0.0625
- Bakesting Kolom 28.08 M2 0.0587

Plat Lantai T = 12 cm
- Mutu Beton K-250 112.75 M3 1.2225
- Besi Polos 22,650.17 Kg 2.6239 0.918
- Bakesting Lantai 749.32 M2 1.8252 0.821 0.548

Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3 0.0346
- Besi Polos 349.84 Kg 0.0405
- Bakesting Lantai 66.29 M2 0.1615
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

d. STRUKTUR LT. ATAP


Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 3.07 M3 0.0333
- Besi Ulir 1,240.02 Kg 0.1766
- Besi Polos 328.52 Kg 0.0381
- Bakesting Balok 68.17 M2 0.1457

Rink Balk 30 x 40 cm (RB1)


- Mutu Beton K-250 46.67 M3 0.5060
- Besi Ulir 6,150.94 Kg 0.8758
- Besi Polos 2,264.50 Kg 0.2623
- Bakesting Balok 427.79 M2 0.9142

Rink Balk 13 x 20 cm (RB2)


- Mutu Beton K-250 6.29 M3 0.0682
- Besi Polos 1,193.42 Kg 0.1382
- Bakesting Balok 128.14 M2 0.2738

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3 0.0328
- Besi Ulir 915.77 Kg 0.1304
- Besi Polos 270.40 Kg 0.0313
- Bakesting Kolom 60.48 M2 0.1264

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.45 M3 0.0039
- Besi Polos 269.23 Kg 0.0312
- Bakesting Kolom 13.81 M2 0.0288

Plat Lantai Daag T = 12 cm


- Mutu Beton K-250 5.90 M3 0.0640
- Besi Polos 1,957.12 Kg 0.2267
- Bakesting Lantai 49.17 M2 0.1198

Plat Talang Beton T = 12 cm


- Mutu Beton K-250 6.78 M3 0.0735
- Tulangan Utama Polos 1,023.70 Kg 0.1186
- Bakesting Lantai 56.49 M2 0.1376

5. PEKERJAAN PASANGAN DAN PLESTERAN


LANTAI . 1
a. Pas Bata 1 Pc : 4 Ps (Dinding) 1,102.52 M2 1.7491
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 2,205.04 M2 1.0260
c. Pasangan Bata Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2 0.1206
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

d. PLesteran Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2 0.0555

LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 607.53 M2 0.9638
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 1,215.06 M2 0.5654

LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 399.76 M2 0.6342
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 799.52 M2 0.3720

6. PEKERJAAN BAJA DAN PENUTUP ATAP


RANGKA ATAP BAJA BERAT
a. Plat Tumpu 50 x 50 cm T = 12 MM 1,385.39 Kg 0.4454
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 456.00 Buah 0.2678
c. Kuda-Kuda Baja IWF 200 x 100 x 5,5 x 8mm- 9,315.33 Kg 2.9950
d. Baut Ikatan Kaki Kuda-Kuda 3/4 Inci 372.00 Buah 0.0219
e. Gording Baja CNP 100 X 50 5,778.35 Kg 1.8578
f. Siku 40 X 40 Penahan Baja CNP 164.16 Kg 0.0528
g. Trestang 14 mm Terpasang 82.00 Psng 0.2150
h. Plat Buhul T = 10 MM 278.51 Kg 0.0895
i. Perakitan Baja 16,921.74 Kg 0.5031

PENUTUP ATAP
a. Seng Spandek 0.40 mm 1,446.79 M2 1.5521
b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar 54.00 M2 0.3347
c. Rabung Seng Spandek 72.24 M' 0.0528

TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg 0.0313
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 54.00 Buah 0.0317
c. Besi Baja UNP 250 x 90 x 9 mm 4,516.67 Kg 1.4522
d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M' 0.3524
e. Bordes Baja 51.60 M2 0.1208
f. Perakitan Baja 4,613.89 Kg 0.1372
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2 0.2982
b. Profil Gipsum Terpasang 187.60 M 0.0168

LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2 0.8780
b. Profil Gipsum Terpasang 385.80 M 0.0345

8. PEK. KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI


LANTAI. 1
Pintu
a. Pintu Kaca Tempered 12 mm + Aksesoris+ Kusen aluminium kaca warna biru+
Beton Gawang + Granit Lengkap Terpasang (PJ1) 2.00 Bh 0.3771
b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 3.00 Bh 0.1637
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 3.00 Bh 0.1610
d. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 1.00 Bh 0.0281

e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca


3.00 Bh 0.0744
Buram 5 mm + Aksesoris lengkap Terpasang (P4)

f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh 0.1188
g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
Terpasang sesuai Gambar (P6) 3.00 Bh 0.0941

h. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL1) 2.00 Bh 0.2213

i. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL2) 8.00 Bh 0.6606

j. Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) 1.00 Bh 0.1746

Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.000 Bh 0.2361
b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.000 Bh 0.2788
c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka + kaca
+ Aksesoris lengkap Terpasang (J3) 2.000 Bh 0.0925

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh 0.0562
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 15.00 Bh 0.0697

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 128.79 M2 0.4495
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

b. Dinding Kaca 5 mm + Rangka Alumunium Putih (sesuai Gambar) 116.71 M2 0.7402

LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh 0.2182
b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 4.00 Bh 0.2147
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 5.00 Bh 0.1406
e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm
3.00 Bh 0.0744
+ Aksesoris lengkap Terpasang (P4)
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh 0.0660

Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh 0.1700
b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh 0.7866
c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J6) 4.00 Bh 0.0857
d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J7) 2.00 Bh 0.0396

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh 0.0562
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 7.00 Bh 0.0325

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2 0.9058
b. Dinding Kaca 5 mm Rangka Alumunium Putih (sesuai Gambar) 176.26 M2 1.1178

9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3 0.0303
b. Lantai Granit 60 x 60 cm (Unpolishet) 107.03 M2 0.3307
c. Lantai Granit 30 x 60 cm + Stop Nosing 18.94 M2 0.0845
d. Dinding Granit 60 x 60 cm (Polishet) 297.95 M2 0.4986
e. Pekerjaan Floor Hardener + Trowel 1,258.82 M2 1.8324
f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 152.58 M2 0.2403
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2 0.0519
b. Dinding Granit 60 x 60 cm (Polishet) 13.45 M2 0.0225
c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 852.11 M2 1.3420

10. PEKERJAAN PENGECATAN


Pengecatan Permurkaan Dinding Bata dan Beton
a. Cat Dinding Tembok LT. 1 2,363.12 M2 0.8541
b. Cat Dinding Tembok LT. 2 1,322.05 M2 0.4778
c. Cat Dinding Tembok LT. Atap 710.64 M2 0.2569
Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap 945.64 M2 0.3981
b.Pengecatan Permurkaan Tangga Baja 112.24 M2 0.0473

11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah 0.0633
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah 0.0111
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah 0.0738
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah 0.0421
5 Washtafel Lengkap Setara TOTO 5.00 Buah 0.0615
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah 0.0036
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah 0.0050
8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah 0.0113
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah 0.0046
10 Floor Drain Stainless 10.00 Buah 0.0102
11 Tempat Sabun Dalam Toilet 9.00 Buah 0.0065
12 Tempat Tissue Stailess 9.00 Buah 0.0050
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 2.00 Buah 0.0011

B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah 0.1581
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah 0.0111
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah 0.0738
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah 0.0421
5 Washtafel Lengkap Setara TOTO 4.00 Buah 0.0492
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah 0.0036
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah 0.0050
8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah 0.0094
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah 0.0115
10 Floor Drain Stainless 8.00 Buah 0.0081
11 Tempat Sabun Dalam Toilet 7.00 Buah 0.0051
12 Tempat Tissue Stailess 7.00 Buah 0.0039
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

13 Gantungan Pakaian Stailess Belakang Pintu Toilet 6.00 Buah 0.0032

12 MEKANIKAL DAN ELEKTRIKAL


A INSTALASI AIR BERSIH
1. SITE PLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( pipa dari Sumber Air ke Tangki Atas ) 200.00 m 0.0926

B INSTALASI AIR KOTOR


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 30.00 m 0.0182

C INSTALASI AIR BEKAS


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 32.00 m 0.0195

D PEKERJAAN INSTALASI TATA UDARA (VAC)


PERALATAN UTAMA EXHAUST FAN
Pengadaan dan pemasangan unit Peralatan Utama
a LANTAI 1
Pemasangan Exhaust Fan Plafond (EFP) 12.00 unit 0.0698
Pemasangan Exhaust Fan Dinding Type 1 12.00 unit 0.0535
Pemasangan Exhaust Fan Dinding Type 2 10.00 unit 0.1443

b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit 0.0465
Pemasangan Exhaust Fan Dinding Type 1 28.00 unit 0.1248
Pemasangan Exhaust Fan Dinding Type 2 2.00 unit 0.0289

c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit 0.3675
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

E. INSTALASI AIR BERSIH


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 7.00 m 0.0032 0.003
dia. 3/4 Inch ( Pipa Tegak ) 7.00 m 0.0029 0.003
dia. 1/2 Inch 30.00 m 0.0112 0.011

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m 0.0037
dia. 3/4 Inch ( Pipa Tegak ) 8.00 m 0.0033
dia. 1/2 Inch 30.00 m 0.0112

G INSTALASI AIR KOTOR


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m 0.0067 0.007
dia. 4 Inch 10.00 m 0.0095 0.010

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m 0.0095

H INSTALASI AIR BEKAS


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m 0.0067 0.007
dia. 3 Inch 10.00 m 0.0061 0.006

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m 0.0061

I INSTALASI AIR HUJAN


INSTALASI PADA BANGUNAN
1. LANTAI-1 s/d Talang
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

a. Pemipaan PVC class AW Wavin


dia. 3 Inch ( Pipa Tegak Down Spoud ) 132.00 m 0.0802
dia. 4 Inch 107.00 m 0.1019
Roof Drain, Cast Iron Dia 4 Inchi 11.00 Bh 0.0039

J PEKERJAAN PEMADAM KEBAKARAN


a. HYDRANT BOX DAN INSTALASI

1. LANTAI-1
Hydrant Box + selang 2.00 bh 0.0726
Pipa dia. 3 Inch 50.00 m 0.0675

b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh 0.0251

2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh 0.0251

K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m 0.0667 0.067
Alarm Led min-Max 3 gas 1.00 Unit 0.1634 0.163
Cabinet For Area Valve dan Alarm 1.00 Unit 0.0298 0.030
Fitting-Fitting pipa 1.00 Lot 0.1915 0.192

K PEKERJAAN MESIN POMPA DAN TANKI AIR BERSIH


Pengadaan material, pembuatan dudukan / pondasi pompa, dan -
pemasangan unit sampai berfungsi dengan baik.
1 Mesin Pompa Jetpump Grundfos JPD 4 - 47 2.00 unit 0.0719
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

Spesifikasi :
1. Jenis Pompa : Jetpump
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
4. Daya Dorong : 30 Meter
5. Daya Listrik P1 : 850 Watt
7. Pipa Outlet/Inket : 1/1 inch
8. Suhu Cairan : 0 – 35 C

2 Tanki Air Atas


Tangki Air atas isi 2000 liter terpasang 4.00 Unit 0.1604

PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt 1.2003
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan

2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt 0.1168
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap

M PEKERJAAN ELEKTRIKAL PADA BANGUNAN


1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
a Lantai-1
- P-MDB Lengkap 1.00 Pkt 0.1168
- MCCB 3 Phase 125A EZC400N3400N
- Box Panel ukuran 40 cm x 60 cm

b Lantai-1 (Panel Pembagi) DB-LT.1 Lengkap 2.00 Pkt 0.1863


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 100 cm x 80 cm + lengkap assesoris

c Lantai-1 (Panel Pembagi) DB Mesin Lengkap 3.00 Pkt 0.2144


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 60 cm x 40 cm + lengkap assesoris

N PEKERJAAN PENGKABELAN

1 Lantai-1
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m 1.3895

B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m 0.4609

C Dari DB-LT.1 ke Stop Kontak dan Saklar Penerangan


NYY 3 x 2,5 mm2 1,092.00 m 0.3537

2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m 0.3213

O PEKERJAAN PENERANGAN DAN INSTALASI


1 Lantai-1
LAMPU TL 2 x 36 Watt Recessed Mounted
- 11.00 bh 0.0406
c/w Alumunium Louver
- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 46.00 bh 0.1481
- LAMPU Sorot LED 100 Watt 11.00 bh 0.0358
- Lampu Down Light LED 16 Watt 14.00 bh 0.0214
- Lampu Down Light LED 13 Watt 15.00 bh 0.0216
- Lampu Down Light LED 13 Watt Outbow 22.00 bh 0.0316
- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 119.00 ttk 0.0883
in konduit HI dia 20 m2

2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
- 55.00 bh 0.2032
c/w Alumunium Louver
- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 6.00 bh 0.0193
- Lampu Gantung LED Industri 50 Watt 5.00 bh 0.0472
- Lampu Down Light LED 13 Watt 17.00 bh 0.0245
- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 83.00 ttk 0.0616
in konduit HI dia 20 m2

P PEKERJAAN STOP KONTAK DAN INSTALASI


1 Lantai-1
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 30.00 bh 0.0118
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 30.00 ttk 0.0276
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13

2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh 0.0224
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 57.00 ttk 0.0525

Q PEKERJAAN CABLE TRAY

1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m 0.0877

2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m 0.0877

R PEKERJAAN PENANGKAL PETIR

- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit 0.0439
( Dipasang Diatap )
- Kabel NYY 70 mm2 25.00 m 0.0381
- Termination & Supporting Material 1.00 lot 0.0030
- Grounding Box 1.00 lot 0.0038
- Grounding Rod ( R < 3 Ohm ) 1.00 lot 0.0067

13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2 5.4343
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M' 0.6997
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt 0.9194
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt 0.3533
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2 0.1549
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M' 0.1112
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt 0.3958
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt 0.0532
h Pemasangan Logo sesuai gambar 1.00 Pkt 0.0319
i Tangga Inspeksi 2.00 Unit 0.0553
j Septictank + Resapan + Box Kontrol 2.00 Pkt 0.1703
k Pembersihan Akhir (Finishing) 1.00 Pkt 0.0383

TOTAL JUMLAH HARGA 11,747,057,417.98


TOTAL BOBOT 100.00
PROGRES RENCANAN MINGGUAN (%) 0.337 0.619 0.850 2.367 3.188 3.524 2.315 2.363 3.556 3.244 2.772 3.145 4.430

PROGRES RENCANAN KOMULATIF MINGGUAN (%) 0.337 0.955 1.806 4.172 7.360 10.885 13.200 15.563 19.119 22.362 25.134 28.280 32.710
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
DULE

JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.136

0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

0.356 0.356 0.356


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.033 0.033
0.055
0.166 0.166

2.099
0.294 0.294 0.294

0.024
0.038
0.112

0.195
0.188
0.045

0.531
0.782
0.165

0.104
0.214
0.059

0.051
0.085
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.257

0.336
0.496 0.213
0.110 0.047
0.210 0.256

0.304
0.240 0.560
0.049 0.114
0.281 0.187

0.011
0.017 0.007
0.005 0.002
0.009 0.009

0.006 0.006
0.031 0.031
0.029 0.029

1.222
1.706
0.456

0.035
0.041
0.161
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.033
0.177
0.038
0.146

0.506
0.876
0.262
0.305 0.305 0.305

0.068
0.138
0.274

0.033
0.130
0.031
0.126

0.004
0.031
0.029

0.064
0.227
0.120

0.073
0.119
0.138

0.583 0.583 0.583


0.342 0.342 0.342
0.121
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.056

0.482 0.482
0.283 0.283

0.317 0.317
0.186 0.186

0.445
0.268
1.498 1.498
0.022
0.929 0.929
0.053
0.215
0.090
0.101 0.101 0.101 0.101 0.101

0.517 0.517 0.517


0.335
0.053

0.031
0.032
1.452
0.352
0.121
0.069 0.069
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.149 0.149
0.008 0.008

0.439 0.439
0.017 0.017

0.377

0.164

0.161

0.028

0.074

0.119

0.094

0.221

0.661

0.175

0.236
0.279

0.092

0.056
0.070

0.450
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.740

0.218

0.215

0.141

0.074

0.066

0.170
0.787
0.086
0.040

0.056
0.033

0.589 0.317
0.727 0.391

0.030
0.331
0.084
0.174 0.324
0.641 1.191
0.084 0.156
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.052
0.023
0.470 0.872

0.427 0.427
0.478
0.257

0.398
0.047

0.063
0.011
0.074
0.042
0.061
0.004
0.005
0.011
0.005
0.010
0.007
0.005
0.001

0.158
0.011
0.074
0.042
0.049
0.004
0.005
0.009
0.011
0.008
0.005
0.004
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.003

0.093

0.018

0.019

0.070
0.053
0.144

0.047
0.125
0.029

0.368
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.004
0.003
0.011

0.010

0.006
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.080
0.102
0.004

0.073
0.068

0.025

0.025

0.072
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.160

1.200

0.117

0.117

0.186

0.214
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1.389

0.461

0.354

0.321

0.041
0.148
0.036
0.021
0.022
0.032
0.088

0.203
0.019
0.047
0.024
0.062

0.012

0.028
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.022

0.053

0.088

0.088

0.044

0.038
0.003
0.004
0.007

1.902 1.087 1.359 1.087


0.455 0.245

0.919
0.353

0.155
0.111
0.396
0.053
0.032
0.055
0.170
0.038

4.210 3.454 2.435 3.765 2.853 3.131 2.969 4.210 3.476 4.097 5.436 5.438 5.282 5.232 5.267 4.620 1.400

36.920 40.373 42.809 46.573 49.427 52.558 55.527 59.737 63.213 67.310 72.746 78.184 83.465 88.697 93.964 98.584 99.985
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII KET

14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
JADWAL PENGUNAAN BAHAN MATERIAL LAPANGAN

PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 150.00 M
Kayu 5/7 Kelas IV
Paku 2" - 3"
Kayu Papan 3/20 Kelas IV

b. Pemasangan Pagar Pengaman 80.00 m'


c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 1.00 Pkt
d. Test Mutu Beton 1.00 Pkt
e. Direksi Keet 24.00 M2
Dolken Kayu Ø 8-10/400 cm
Kayu 5/7 Kelas IV
Paku Biasa
Besi Strip
Semen Portland
Pasing Pasang
Pasir Beton
Kerikil Beton Uk. 3 cm s/d 4 cm
Bata Merah
Seng Plat
Jendela Naco
Kaca Polos tebal 3 mm ( Asahimas )
Kunci Tanam
Plywood 4 mm

f. Gudang Semen dan Peralatan 24.00 M2


Dolken Kayu Ø 8-10/400 cm
Kayu 5/7 Kelas IV
Paku Biasa
Semen Portland
Pasir Beton
Kerikil Beton Uk. 3 cm s/d 4 cm
Seng Gelombang
Seng Plat
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

g. Bedeng Pekerja 40.00 M2


Dolken Kayu Ø 8-10/400 cm
Kayu 5/7 Kelas IV
Paku Biasa
Semen Portland
Pasir Beton
Kerikil Beton Uk. 3 cm s/d 4 cm
Seng Gelombang
Plywood 6 mm

h. Sewa Scafolding 1.00 Pkt


i. Perizinan 1.00 Pkt

2. PEK. GALIAN TANAH PONDASI


a. Galian Tanah Pondasi 319.90 M3
b. Urugan Kembali Bekas Galian Tanah 39.91 M3
c. Urugan Pasir Alas Dipadatkan 26.80 M3
Pasir Urug/Tanah Urug
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

d. Timbunan Tanah Bawah Lantai 1,166.45 M3


Tanah Timbun

3. PEKERJAAN PONDASI/STRUKTUR BAWAH


a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm
- Mobilisasi dan Demobilisasi Peralatan Borepile 1.00 Ls

- Beton K-250 212.89 M3


Beton Ready Mix K-250

- Besi Ulir 26,513.19 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 4,210.38 Kg


Besi Beton Polos
Kawat Beton

- Biaya Pengeboran Permeter 1,695.00 m'

b. Pondasi Pile Cape


Pondasi Pile Cape (PC 1)
- Mutu Beton K-250 111.13 M3
Beton Ready Mix K-250

- Besi Ulir 6,247.46 Kg


Besi Beton Ulir
Kawat Beton

- Bakesting Pile Cape 282.24 M2


Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting

Pondasi Pile Cape (PC 2)


- Mutu Beton K-250 31.75 M3
Beton Ready Mix K-250

- Besi Ulir 1,996.49 Kg


Besi Beton Ulir
Kawat Beton

- Bakesting Pile Cape 74.88 M2


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Kayu Kelas III


Paku 5 - 10 cm
Minyak Bekisting

c. Pasangan Pondasi batu Gunung


Pas. Pondasi Batu Gunung 5.94 M3
Batu Kali/Sungai 5 - 20 cm
Semen Portland
Pasir Pasang

Pas. Batu Kosong (Aanstamping) 2.02 M3


Kerikil Beton Uk. ≥ 4 cm
Pasir Pasang

4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 98.10 M3
Beton Ready Mix K-250
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Besi Ulir 12,893.15 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 4,427.37 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Sloof 817.50 M2


Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting

Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3
Beton Ready Mix K-250

- Besi Ulir 968.35 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 377.71 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Sloof 78.09 M2


Kayu Kelas III
Paku 5 - 10 cm
Minyak Bekisting

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3
Beton Ready Mix K-250

- Besi Ulir 9,419.52 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 1,774.93 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 323.40 M2


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Kayu Kelas III


Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3
Beton Ready Mix K-250

- Besi Ulir 10,347.20 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 1,774.93 Kg


Besi Beton Polos
Kawat Beton
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Bakesting Kolom 323.40 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.44 M3
Beton Ready Mix K-250

- Besi Ulir 426.60 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 142.08 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 28.80 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.13 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Besi Polos 944.61 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 65.52 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 6.12 M3
- Besi Polos 668.98 Kg
- Bakesting Balok 124.84 M2

Plat Lantai Dasar T = 12 cm


- Mutu Beton K-250 195.62 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Tulangan Utama Polos 10,107.01 Kg


Besi Beton Polos
Kawat Beton
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Bakesting Latai 248.89 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Plat Canopy T = 7 cm
- Mutu Beton K-200 2.65 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Besi Polos 233.10 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Lantai 44.24 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.86 M3
Beton Ready Mix K-250

- Besi Ulir 2,954.27 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 854.70 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Balok 152.19 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Balok Kayu Kelas II


Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 68.62 M3
Beton Ready Mix K-250

- Besi Ulir 10,994.23 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 3,159.76 Kg


Besi Beton Polos
Kawat Beton
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Bakesting Balok 484.90 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 15.84 M3
Beton Ready Mix K-250

- Besi Ulir 3,038.02 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 1,058.20 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Balok 211.14 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Balok Latai 13 x 20 cm (BLL)


- Mutu Beton K-200 5.66 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Besi Polos 624.62 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Balok 115.31 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 33.00 M3
Beton Ready Mix K-250

- Besi Ulir 5,298.48 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 1,448.92 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 284.20 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Balok Kayu Kelas II


Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 29.00 M3
Beton Ready Mix K-250

- Besi Ulir 6,467.00 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 1,273.29 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 284.20 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.48 M3
Beton Ready Mix K-250

- Besi Ulir 189.60 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 47.36 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 9.60 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.16 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Besi Polos 965.03 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 66.56 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Plat Lantai T = 12 cm
- Mutu Beton K-250 236.14 M3
Beton Ready Mix K-250

- Besi Polos 27,047.96 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Lantai 1,967.80 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3
Beton Ready Mix K-250

- Besi Polos 349.65 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Lantai 66.29 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

d. STRUKTUR LT. ATAP


Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 4.88 M3
Beton Ready Mix K-250

- Besi Ulir 1,245.80 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 278.02 Kg


Besi Beton Polos
Kawat Beton
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Bakesting Balok 65.01 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Rink Balk 30 x 40 cm (RB1)


- Mutu Beton K-250 54.28 M3
Beton Ready Mix K-250

- Besi Ulir 7,153.13 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 2,633.16 Kg


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Besi Beton Polos


Kawat Beton

- Bakesting Balok 361.86 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Rink Balk 13 x 20 cm (RB2)


- Mutu Beton K-250 8.17 M3
Beton Ready Mix K-250

- Besi Polos 1,674.29 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Balok 61.33 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3
Beton Ready Mix K-250

- Besi Ulir 915.77 Kg


Besi Beton Ulir
Kawat Beton

- Besi Polos 47.36 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 9.60 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.50 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Besi Polos 406.54 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Kolom 15.34 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Plat Lantai Daag T = 12 cm


- Mutu Beton K-250 5.90 M3
Beton Ready Mix K-250

- Besi Polos 1,957.12 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Lantai 49.17 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

Plat Talang Beton T = 12 cm


- Mutu Beton K-250 6.78 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air

- Tulangan Utama Polos 1,023.70 Kg


Besi Beton Polos
Kawat Beton

- Bakesting Lantai 56.49 M2


Kayu Kelas III
Paku 5 - 12 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m

5. PEKERJAAN PASANGAN DAN PLESTERAN


LANTAI . 1
a. Pas Bata 1 Pc : 4 Ps (Dinding) 1,127.22 M2
Bata Merah
Semen Portland
Pasir Pasang
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 2,254.44 M2


Semen Portland
Pasir Pasang

c. Pasangan Bata Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2


Bata Merah
Semen Portland
Pasir Pasang

d. PLesteran Trasraam 1 Pc : 2 Ps (Selasar) 108.68 M2


Semen Portland
Pasir Pasang

LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 661.03 M2
Bata Merah
Semen Portland
Pasir Pasang
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 1,322.05 M2


Semen Portland
Pasir Pasang

LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 355.32 M2
Bata Merah
Semen Portland
Pasir Pasang

b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 710.64 M2


Semen Portland
Pasir Pasang

6. PEKERJAAN BAJA DAN PENUTUP ATAP


RANGKA ATAP BAJA BERAT
a. Plat Tumpu 50 x 50 cm T = 12 MM 1,023.73 Kg
Besi Baja Profil

b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 312.00 Buah

c. Kuda-Kuda Baja IWF 200 x 100 x 5,5 x 8mm- 8,943.06 Kg


Besi Baja Profil

d. Baut Ikatan Kaki Kuda-Kuda 3/4 Inci 372.00 Buah


Besi Baja Profil

e. Gording Baja CNP 100 X 50 5,598.33 Kg


Besi Baja Profil

f. Siku 40 X 40 Penahan Baja CNP 164.16 Kg


Besi Baja Profil

g. Trestang 14 mm Terpasang 76.00 Psng

h. Plat Buhul T = 10 MM 278.51 Kg


Besi Baja Profil

i. Perakitan Baja 15,877.12 Kg


Solar
Minyak Pelumas

PENUTUP ATAP
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

a. Seng Spandek 0.40 mm 1,446.79 M2


Seng Spandek 0,40 mm
Paku Sekrup

b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar 54.00 M2

c. Rabung Seng Spandek 72.24 M'


Seng Spandek 0,35 mm
Paku Sekrup

TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg
Besi Baja Profil

b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 54.00 Buah

c. Besi Baja UNP 250 x 90 x 9 mm 2,500.92 Kg


Besi Baja Profil
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M'

e. Bordes Baja 51.60 M2

f. Perakitan Baja 2,598.14 Kg


Solar
Minyak Pelumas

7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2
b. Profil Gipsum Terpasang 187.60 M

LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2
b. Profil Gipsum Terpasang 385.80 M

8. PEK. KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI


LANTAI. 1
Pintu
a. Pintu Kaca Tempered 12 mm + Aksesoris+ Kusen aluminium kaca warna biru+
Beton Gawang + Granit Lengkap Terpasang (PJ1) 2.00 Bh
Daun Pintu Kaca Tempered 12 mm Lengkap
Granit + Beton
Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 3.00 Bh
Daun Ambang aluminium + Kaca 5 mm
Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P2) 3.00 Bh
Daun Pintu Aluminium Lengkap
Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

d. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P3) 1.00 Bh
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Daun Pintu kaca + Aluminium Lengkap


Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca


3.00 Bh
Buram 5 mm + Aksesoris lengkap Terpasang (P4)
Daun Pintu kaca Buram 5 mm + Aluminium Lengkap
Aksesories (10% dari bahan)

f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh
Daun Pintu aluminium km/wc
Aksesories (10% dari bahan)

g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
Terpasang sesuai Gambar (P6) 3.00 Bh

Kusen Pintu Hollow + Plat Besi Lengkap


Aksesories (10% dari bahan)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

h. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL1) 2.00 Bh

i. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL2) 8.00 Bh

j. Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) 1.00 Bh
Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS)
Aksesories (10% dari bahan)

Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)

b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)

c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka + kaca


+ Aksesoris lengkap Terpasang (J3) 2.00 Bh
Daun Jendela + kaca warna hijau
Jendela + assessoris
Aksesories (10% dari bahan)

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
kosen + Kaca warna hijau Tebal 5 mm
Aksesories (10% dari bahan)

b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 15.00 Bh


kosen aluminium + jendela Kaca hijsu Tebal 5 mm
Aksesories (10% dari bahan)

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 119.72 M2

b. Dinding Kaca 5 mm + Rangka Alumunium Putih (sesuai Gambar) 124.99 M2


Kusen aluminium + Kaca Mati

LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh
Daun Ambang aluminium + Kaca 5 mm
Ventlasi Kusen aluminium + Kaca Mati
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Aksesories (10% dari bahan)

b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P2) 4.00 Bh
Daun Pintu Aluminium Lengkap
Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm


+ Aksesoris lengkap Terpasang (P3) 5.00 Bh
Daun Pintu kaca + Aluminium Lengkap
Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)

e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm


3.00 Bh
+ Aksesoris lengkap Terpasang (P4)
Daun Pintu kaca Buram 5 mm + Aluminium Lengkap
Aksesories (10% dari bahan)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh
Daun Pintu aluminium km/wc
Aksesories (10% dari bahan)

Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)

b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh
Daun Jendela
Kosen aluminium + Kaca
Aksesories (10% dari bahan)

c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J6) 4.00 Bh


Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)

d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J7) 2.00 Bh


Kosen aluminium + kaca warna hijau
Aksesories (10% dari bahan)

Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
kosen + Kaca warna hijau Tebal 5 mm
Aksesories (10% dari bahan)

b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 7.00 Bh


kosen aluminium + jendela Kaca hijsu Tebal 5 mm
Aksesories (10% dari bahan)

Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2

b. Dinding Kaca 5 mm Rangka Alumunium Putih (sesuai Gambar) 176.26 M2


Kusen aluminium + Kaca Mati

9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3
Semen Portland
Pasir Beton
Kerikil Beton Uk. ≥ 4 cm
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Air

b. Lantai Granit 60 x 60 cm (Unpolishet) 107.03 M2


Granit Anti Slip 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

c. Lantai Granit 30 x 60 cm + Stop Nosing 18.94 M2


Granit Anti Slip 30 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

d. Dinding Granit 60 x 60 cm (Polishet) 297.95 M2


Keramik Dinding 30 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

e. Pekerjaan Floor Hardener + Trowel 1,258.82 M2


f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 152.58 M2

LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2
Granit Anti Slip 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

b. Dinding Granit 60 x 60 cm (Polishet) 13.45 M2


Keramik Dinding 30 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna

c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 852.11 M2

10. PEKERJAAN PENGECATAN


Pengecatan Permurkaan Dinding Bata dan Beton
a. Cat Dinding Tembok LT. 1 2,363.12 M2
Plamuur
Cat Dasar
Cat Tembok Emultion Paint Setara Jotun

b. Cat Dinding Tembok LT. 2 1,322.05 M2


Plamuur
Cat Dasar
Cat Tembok Emultion Paint Setara Jotun

c. Cat Dinding Tembok LT. Atap 710.64 M2


Plamuur
Cat Dasar
Cat Tembok Emultion Paint Setara Jotun

Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap 945.64 M2
Menie Besi
Pengencer
Kuas
Perancah Kayu
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

b.Pengecatan Permurkaan Tangga Baja 112.24 M2


Menie Besi
Pengencer
Kuas
Perancah Kayu

11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah
Closet Duduk
Perlengkapan

2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah

3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah


Urinoir
Semen Portland
Pasir Pasang
Perlengkapan
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah

5 Washtafel Lengkap Setara TOTO 5.00 Buah


Wastafel
Semen Portland
Pasir Pasang
Perlengkapan

6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah

7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah

8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah
Kran air
Sealtape

9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah
Jet Washer
Sealtape

10 Floor Drain Stainless 10.00 Buah


Floor Drain

11 Tempat Sabun Dalam Toilet 9.00 Buah


12 Tempat Tissue Stailess 9.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 2.00 Buah

B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah
Closet Duduk
Perlengkapan

2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah

3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah


Urinoir
Semen Portland
Pasir Pasang
Perlengkapan

4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah

5 Washtafel Lengkap Setara TOTO 4.00 Buah


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Wastafel
Semen Portland
Pasir Pasang
Perlengkapan

6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah

7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah

8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah
Kran air
Sealtape

9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah
Jet Washer
Sealtape
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

10 Floor Drain Stainless 8.00 Buah


Floor Drain

11 Tempat Sabun Dalam Toilet 7.00 Buah


12 Tempat Tissue Stailess 7.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 6.00 Buah

12 MEKANIKAL DAN ELEKTRIKAL


A INSTALASI AIR BERSIH
1. SITE PLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( pipa dari Sumber Air ke Tangki Atas ) 200.00 m
PVC AW dia.1 Inch
Perlengkapan (10% harga barang)

B INSTALASI AIR KOTOR


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 30.00 m
PVC AW 3 Inch
Perlengkapan (10% harga barang)

C INSTALASI AIR BEKAS


1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 32.00 m
PVC AW 3 Inch
Perlengkapan (10% harga barang)

D PEKERJAAN INSTALASI TATA UDARA (VAC)


PERALATAN UTAMA EXHAUST FAN
Pengadaan dan pemasangan unit Peralatan Utama
a LANTAI 1
Pemasangan Exhaust Fan Plafond (EFP) 12.00 unit
Memasang Fan Ceilling Mounted Exhaust
Perlengkapan (10% harga barang)

Pemasangan Exhaust Fan Dinding Type 1 12.00 unit


Memasang Fan Wall Mounted Exhaust
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Pemasangan Exhaust Fan Dinding Type 2 10.00 unit


Memasang Fan Wall Mounted Exhaust
Perlengkapan (10% harga barang)

b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit
Memasang Fan Ceilling Mounted Exhaust
Perlengkapan (10% harga barang)

Pemasangan Exhaust Fan Dinding Type 1 28.00 unit


Memasang Fan Wall Mounted Exhaust
Perlengkapan (10% harga barang)

Pemasangan Exhaust Fan Dinding Type 2 2.00 unit


Memasang Fan Wall Mounted Exhaust
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit

E. INSTALASI AIR BERSIH


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 7.00 m
PVC AW dia.1 Inch
Perlengkapan (10% harga barang)

dia. 3/4 Inch ( Pipa Tegak ) 7.00 m


PVC AW dia.3/4 Inch
Perlengkapan (10% harga barang)

dia. 1/2 Inch 30.00 m


PVC AW dia.1/2 Inch
Perlengkapan (10% harga barang)

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m
PVC AW dia.1 Inch
Perlengkapan (10% harga barang)

dia. 3/4 Inch ( Pipa Tegak ) 8.00 m


PVC AW dia.3/4 Inch
Perlengkapan (10% harga barang)

dia. 1/2 Inch 30.00 m


PVC AW dia.1/2 Inch
Perlengkapan (10% harga barang)

G INSTALASI AIR KOTOR


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m
PVC AW 4 Inch
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

dia. 4 Inch 10.00 m


PVC AW 4 Inch
Perlengkapan (10% harga barang)

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m
PVC AW 4 Inch
Perlengkapan (10% harga barang)

H INSTALASI AIR BEKAS


INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
dia. 4 Inch ( Pipa Tegak ) 7.00 m
PVC AW 4 Inch
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

dia. 3 Inch 10.00 m


PVC AW 3 Inch
Perlengkapan (10% harga barang)

2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m
PVC AW 3 Inch
Perlengkapan (10% harga barang)

I INSTALASI AIR HUJAN


INSTALASI PADA BANGUNAN
1. LANTAI-1 s/d Talang
a. Pemipaan PVC class AW Wavin
dia. 3 Inch ( Pipa Tegak Down Spoud ) 132.00 m
PVC AW 3 Inch
Perlengkapan (10% harga barang)

dia. 4 Inch 107.00 m


PVC AW 4 Inch
Perlengkapan (10% harga barang)

Roof Drain, Cast Iron Dia 4 Inchi 11.00 Bh

J PEKERJAAN PEMADAM KEBAKARAN


a. HYDRANT BOX DAN INSTALASI

1. LANTAI-1
Hydrant Box + selang 2.00 bh
Indoor Hydrant Box 1000x800x180mm
Selang Hydrant KANVAS setara ROYAL
JET NOZZLE Ukuran 1.5"
Perlengkapan (10% harga barang)

Pipa dia. 3 Inch 50.00 m


GIP dia.3 Inch
Perlengkapan (10% harga barang)

b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
DCP 3 kg
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Perlengkapan (10% harga barang)

2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
DCP 3 kg
Perlengkapan (10% harga barang)

K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m
Alarm Led min-Max 3 gas 1.00 Unit
Cabinet For Area Valve dan Alarm 1.00 Unit
Fitting-Fitting pipa 1.00 Lot

K PEKERJAAN MESIN POMPA DAN TANKI AIR BERSIH


Pengadaan material, pembuatan dudukan / pondasi pompa, dan -
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

pemasangan unit sampai berfungsi dengan baik.


1 Mesin Pompa Jetpump Grundfos JPD 4 - 47 2.00 unit
Spesifikasi :
1. Jenis Pompa : Jetpump
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
4. Daya Dorong : 30 Meter
5. Daya Listrik P1 : 850 Watt
7. Pipa Outlet/Inket : 1/1 inch
8. Suhu Cairan : 0 – 35 C
DB-LT.3
Perlengkapan (10% harga barang)

2 Tanki Air Atas


Tangki Air atas isi 2000 liter terpasang 4.00 Unit

PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan

2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
P-MDB
Perlengkapan (10% harga barang)

M PEKERJAAN ELEKTRIKAL PADA BANGUNAN


1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
a Lantai-1
- P-MDB Lengkap 1.00 Pkt
- MCCB 3 Phase 125A EZC400N3400N
- Box Panel ukuran 40 cm x 60 cm
P-MDB
Perlengkapan (10% harga barang)

b Lantai-1 (Panel Pembagi) DB-LT.1 Lengkap 2.00 Pkt


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- MCCB 3 Phase 125A EZC400N3400N


- Box Panel 100 cm x 80 cm + lengkap assesoris
DB-LT.1
Perlengkapan (10% harga barang)

c Lantai-1 (Panel Pembagi) DB Mesin Lengkap 3.00 Pkt


- MCCB 3 Phase 125A EZC400N3400N
- Box Panel 60 cm x 40 cm + lengkap assesoris
DB-LT.2
Perlengkapan (10% harga barang)

N PEKERJAAN PENGKABELAN

1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m
NYY 240 mm2
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m
NYY 4x50 mm2
Perlengkapan (10% harga barang)

C Dari DB-LT.1 ke Stop Kontak dan Saklar Penerangan


NYY 3 x 2,5 mm2 1,092.00 m
NYY 3x2,5 mm2
Perlengkapan (10% harga barang)

2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m
NYY 3x2,5 mm2
Perlengkapan (10% harga barang)

O PEKERJAAN PENERANGAN DAN INSTALASI


1 Lantai-1
LAMPU TL 2 x 36 Watt Recessed Mounted
- 11.00 bh
c/w Alumunium Louver
TL 2x36
Perlengkapan (10% harga barang)

- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 46.00 bh


Lampu TL 1 x 36 w Recessed Mounted c/w Alumunium Louver
Perlengkapan (10% harga barang)

- LAMPU Sorot LED 100 Watt 11.00 bh


LAMPU Sorot LED 100 Watt
Perlengkapan (10% harga barang)

- Lampu Down Light LED 16 Watt 14.00 bh


Downlight LED 18 WATT
Perlengkapan (10% harga barang)

- Lampu Down Light LED 13 Watt 15.00 bh


Downlight LED 13 WATT
Perlengkapan (10% harga barang)

- Lampu Down Light LED 13 Watt Outbow 22.00 bh


Downlight LED 13 WATT
Perlengkapan (10% harga barang)

- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 119.00 ttk


in konduit HI dia 20 m2
1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 9 meter
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Conduit dia.20 @ 9 meter


Perlengkapan (10% harga barang)

2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
- 55.00 bh
c/w Alumunium Louver
TL 2x36
Perlengkapan (10% harga barang)

- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 6.00 bh


Lampu TL 1 x 36 w Recessed Mounted c/w Alumunium Louver
Perlengkapan (10% harga barang)

- Lampu Gantung LED Industri 50 Watt 5.00 bh


Lampu Gantung LED Industri 50 Watt
Perlengkapan (10% harga barang)

- Lampu Down Light LED 13 Watt 17.00 bh


Downlight LED 13 WATT
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 83.00 ttk


in konduit HI dia 20 m2
1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 9 meter
- Conduit dia.20 @ 9 meter
Perlengkapan (10% harga barang)

P PEKERJAAN STOP KONTAK DAN INSTALASI


1 Lantai-1
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 30.00 bh
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
Stop Kontak 13A
Inbow doos
Perlengkapan (10% harga barang)

in conduit HI dia 20 mm2 30.00 ttk


1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 13 meter
- Conduit dia.20 @ 13 meter
Perlengkapan (10% harga barang)

2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh
Stop Kontak 13A
Inbow doos
Perlengkapan (10% harga barang)

- Instalasi Stop Kontak, NYM 3 x 2,5 mm2


in conduit HI dia 20 mm2 57.00 ttk
1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 13 meter
- Conduit dia.20 @ 13 meter
Perlengkapan (10% harga barang)

Q PEKERJAAN CABLE TRAY

1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
TRAY W=300
Perlengkapan (10% harga barang)

2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
TRAY W=300
Perlengkapan (10% harga barang)

R PEKERJAAN PENANGKAL PETIR


JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit
( Dipasang Diatap )
Penangkal Petir
Perlengkapan (10% harga barang)

- Kabel NYY 70 mm2 25.00 m


nyy 70 mm2
PVC-2 inchi
Perlengkapan (10% harga barang)

- Termination & Supporting Material 1.00 lot


Terminal grounding
Perlengkapan (10% harga barang)

- Grounding Box 1.00 lot


Bak Kontrol 400x400x400
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

- Grounding Rod ( R < 3 Ohm ) 1.00 lot


Grounding rod pipa Gip-1" 12 m
Galian 12 meter
Perlengkapan (10% harga barang)

13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M'
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M'
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt
h Pemasangan Logo sesuai gambar 1.00 Pkt
i Tangga Inspeksi 2.00 Unit
j Septictank + Resapan + Box Kontrol 2.00 Pkt
k Pembersihan Akhir (Finishing) 1.00 Pkt
HAN MATERIAL LAPANGAN

JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN VI BULAN VII BULAN VIII

21 22 23 24 25 26 27 28 29 30

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
JADWAL PENGUNAAN PERALATAN LAPANGAN
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO
DAN
LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

JADWAL PELAKSANAAN PEKERJAA

NO JENIS PEKERJAAN JUMLAH SATUAN BULAN I BULAN II BULAN III BULAN IV

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1. Dump Truck 4 Unit

2. Molen 2 Unit

3. Crane 1 Unit

4. Schafollding 500 Set

5. Generator Set 1 Unit

6. Theodolit 1 Unit

7. Pompa Air 2 Unit

8. Mobil Pickup 1 Unit

9. Waterpass 1 Unit
JADWAL PELAKSANAAN PEKERJAA

NO JENIS PEKERJAAN JUMLAH SATUAN BULAN I BULAN II BULAN III BULAN IV

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

10. Mesin Las Listrik 3 Unit

11. Bor Pile 4 Unit

12. Mobil Water Tank 2 Unit

13. Stamper 2 Unit

14. Vibarator 2 Unit

15. Alat Pertukangan 3 Set


PERALATAN LAPANGAN

JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN V BULAN VI BULAN VII BULAN VIII

17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN V BULAN VI BULAN VII BULAN VIII

17 18 19 20 21 22 23 24 25 26 27 28 29 30

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
JADWAL PENGUNAAN P
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN
LABORATORIUM BENGKEL MEKATRONIKA)

LOKASI : SMK/SMTI BANDA ACEH


TAHUN : 2018

NO JENIS PEKERJAAN JUMLAH BULAN I BULAN II BULAN III

1 2 3 4 5 6 7 8 9 10

1. General Superintendent 1 Orang

2. Site Manager 1 Orang

3. Enggineer Struktur 1 Orang

4. Enggineer Arsitektur 1 Orang

5. Tenaga Ahli Manajemen Konstruksi 1 Orang

6. Engginer Elektrikal 1 Orang

7. Ahli Geodesi 1 Orang

8. Ahli Mekanikal 1 Orang

9. Ahli Sanitasi dan Limbah 1 Orang

10. Pelaksana Bangunan Gedung 1 Orang

11. Tukang Pekerjaan Pondasi 1 Orang


NO JENIS PEKERJAAN JUMLAH BULAN I BULAN II BULAN III

1 2 3 4 5 6 7 8 9 10

12. Mandor Pemasangan Rangka Atap Baja Ringan 1 Orang

13. Tenaga Juru Gambar 1 Orang

14. Tenaga Juru Ukur 1 Orang

15. Tenaga Adminstrasi 1 Orang

16. Tenaga Logistik 1 Orang

17. Tukang Besi Beton 1 Orang

18. Tukang Pasang Bata 1 Orang

19. Tukang Pasang Pipa 1 Orang

20. Teknisi Listrik Industri 1 Orang

21. Tukang Rangka Aluminium 1 Orang

22. Tukang Pipa Gas 1 Orang

23. Tukang Pekerjaan Baja 1 Orang


UNAAN PERSONIL INTI

JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA
JADWAL PELAKSANAAN PEKERJAAN 210 HARI

BULAN III BULAN IV BULAN V BULAN VI BULAN VII BULAN VIII

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

John Kiraini, SE. Ak


Direktur Utama
KEBUTUHAN TENAGA KERJA
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN
LABORATORIUM BENGKEL MEKATRONIKA)

LOKASI : SMK/SMTI BANDA ACEH


TAHUN : 2018

PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 0.0860 1.00 35
b. Pemasangan Pagar Pengaman 0.0629 1.00 6
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 0.0165 1.00 6
d. Test Mutu Beton 0.1654
e. Direksi Keet 0.2434 1.00 6
f. Gudang Semen dan Peralatan 0.2084 1.00 6
g. Bedeng Pekerja 0.3577 1.00 20
h. Sewa Scafolding 0.3516
i. Perizinan 0.0827
2. PEK. GALIAN TANAH PONDASI
a. Galian Tanah Pondasi 0.1699 2.00 18 18
b. Urugan Kembali Bekas Galian Tanah 0.0152 1.00 18
c. Urugan Pasir Alas Dipadatkan 0.0306 1.00 6
d. Timbunan Tanah Bawah Lantai 1.0758 2.00
3. PEKERJAAN PONDASI/STRUKTUR BAWAH
a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm 8.1150 3.00 42 42 28
b. Pondasi Pile Cape
Pondasi Pile Cape (PC 1) 2.5343 2.00 39 39
Pondasi Pile Cape (PC 2) 0.7432 1.00 18
c. Pasangan Pondasi batu Gunung 0.0461 1.00 24
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1) 4.3683 2.00 48 32
Sloof 20 x 40 cm (SL2) 0.3428 1.00 12
Kolom 50 x 50 cm (K1) 2.5890 2.00 39 26
Kolom 50 x 50 cm (K2) 2.6658 2.00 42 28
Kolom 20 x 20 cm (K3) 0.1489 1.00 15
Kolom 13 x 13 cm (KP) 0.2584 1.00 9
Balok Latai 13 x 20 cm (BLL) 0.3871 1.00 14
Plat Lantai Dasar T = 12 cm 3.7990 5.00 17 17 33 22
Plat Canopy T = 7 cm 0.1536 1.00
b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1) 1.0211 2.00 32 0 0
Balok 30 x 50 cm (BL2) 3.6119 3.00 34 34 0
Balok 20 x 30 cm (BL3) 1.1464 3.00 36 36 0
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

Balok Latai 13 x 20 cm (BLL) 0.3584 1.00


Kolom 50 x 50 cm (K1) 1.8233 2.00
Kolom 50 x 50 cm (K2) 1.9230 2.00
Kolom 30 x 30 cm (K4) 0.0562 1.00
Kolom 13 x 13 cm (KP) 0.2631 1.00
Plat Lantai T = 12 cm 10.2202 4.00
Plat Canopy T = 7 cm 0.2303 1.00
d. STRUKTUR LT. ATAP
Balok 20 x 30 cm (BL3) 0.3906 2.00
Rink Balk 30 x 40 cm (RB1) 2.6134 4.00
Rink Balk 13 x 20 cm (RB2) 0.4037 2.00
Kolom 20 x 20 cm (K3) 0.1835 1.00
Kolom 13 x 13 cm (KP) 0.0816 1.00
Plat Lantai Daag T = 12 cm 0.4010 1.00
Plat Talang Beton T = 12 cm 0.3215 1.00
5. PEKERJAAN PASANGAN DAN PLESTERAN
LANTAI . 1 2.9284 4.00
LANTAI . 2 1.6169 2.00
LANTAI ATAP 0.8691 2.00
6. PEKERJAAN BAJA DAN PENUTUP ATAP
RANGKA ATAP BAJA BERAT 5.8531 6.00
PENUTUP ATAP 1.8848 3.00
TANGGA BAJA 1.3775 2.00
7. PEKERJAAN PLAFOND
LANTAI. 1 0.3061 2.00
LANTAI. 2 0.8868 2.00
8. PEK. KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI
LANTAI. 1
Pintu 2.0153 1.00
Jendela 0.5902 1.00
Ventilasi 0.1223 1.00
Dinding 1.1764 1.00
LANTAI. 2
Pintu 0.6939 1.00
Jendela 1.0513 1.00
Ventilasi 0.0862 1.00
Dinding 1.9665 2.00
9. PEKERJAAN LANTAI
LANTAI. 1 2.9316 2.00
LANTAI. 2 1.3764 2.00
10. PEKERJAAN PENGECATAN
Pengecatan Permurkaan Dinding Bata dan Beton 1.5440 2.00
Pengecatan Baja 0.4328 1.00
11 PEKERJAAN SANITASI
A Lantai I 0.2905 1.00
B Lantai II (dua) 0.3733 1.00
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

12 MEKANIKAL DAN ELEKTRIKAL


A INSTALASI AIR BERSIH
1. SITE PLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( pipa dari Sumber Air ke Tangki Atas ) 0.0899 1.00
B INSTALASI AIR KOTOR
1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 0.0177 1.00
C INSTALASI AIR BEKAS
1. SITEPLAN
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
- dia.3 Inch 0.0189 1.00
D PEKERJAAN INSTALASI TATA UDARA (VAC)
PERALATAN UTAMA EXHAUST FAN
Pengadaan dan pemasangan unit Peralatan Utama
a LANTAI 1 0.2600 1.00
b LANTAI 2 0.1946 1.00
c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 0.3572 1.00
E. INSTALASI AIR BERSIH
INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories) 0.0168 1.00
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 0.0036 1.00
dia. 3/4 Inch ( Pipa Tegak ) 0.0032 1.00
dia. 1/2 Inch 0.0109 1.00
F INSTALASI AIR KOTOR
INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin 0.0157 1.00
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 0.0093 1.00
G INSTALASI AIR BEKAS
INSTALASI PADA BANGUNAN
1. LANTAI-1
a. Pemipaan PVC class AW Wavin 0.0124 1.00
2. LANTAI-2
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

a. Pemipaan PVC class AW Wavin


dia. 3 Inch 0.0059 1.00
H INSTALASI AIR HUJAN
INSTALASI PADA BANGUNAN
1. LANTAI-1 s/d Talang
a. Pemipaan PVC class AW Wavin 0.1808 1.00
I PEKERJAAN PEMADAM KEBAKARAN
a. HYDRANT BOX DAN INSTALASI
1. LANTAI-1 0.1361 1.00
b. FIRE EXTINGUISHER
1. LANTAI-1 0.0244 1.00
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

2. LANTAI-2 0.0244 1.00


J PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1 0.4388 1.00 6
K PEKERJAAN MESIN POMPA DAN TANKI AIR BERSIH
Pengadaan material, pembuatan dudukan / pondasi pompa, dan -
pemasangan unit sampai berfungsi dengan baik.
1 Mesin Pompa Jetpump Grundfos JPD 4 - 47 0.0699 1.00
2 Tanki Air Atas
Tangki Air atas isi 2000 liter terpasang 0.1559 1.00
PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR ) 1.1664 1.00
2 PEKERJAAN PENGKABELAN 0.1135 1.00
M PEKERJAAN ELEKTRIKAL PADA BANGUNAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
a Lantai-1
- P-MDB Lengkap 0.1135 1.00
b Lantai-1 (Panel Pembagi) DB-LT.1 Lengkap 0.1811 1.00
c Lantai-1 (Panel Pembagi) DB Mesin Lengkap 0.2083 1.00
N PEKERJAAN PENGKABELAN
1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 1.3503 1.00
B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 0.4479 1.00
C Dari DB-LT.1 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 0.3437 1.00
2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 0.3122 1.00
O PEKERJAAN PENERANGAN DAN INSTALASI
1 Lantai-1 0.3765 1.00
2 Lantai-2 0.3457 1.00
P PEKERJAAN STOP KONTAK DAN INSTALASI
1 Lantai-1 0.0383 1.00
2 Lantai-2 0.0728 1.00
Q PEKERJAAN CABLE TRAY
1 Lantai -1 0.0852 1.00
2 Lantai -2 0.0852 1.00
R PEKERJAAN PENANGKAL PETIR 0.0928 1.00
13 PEKERJAAN LAIN-LAIN 8.1801 2.00

TOTAL BOBOT 100.00


12 32 59 18 42 48 46 39 57 72 125 54 55 119 103 22
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112

JLH RATA-RATA KOMULATIF TENAGA KERJA PER MINGGU 2 5 8 3 6 7 7 6 8 10 18 8 8 17 15 3


AN TENAGA KERJA

MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

33
12

32
34
36
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

33
15 10
27 18
8
16
103 103 103 39
18

21 0 0 11
30 30 30 15
18 18
10
8
18
12

40 40 24 24
48 48
39 39

70 36 6 45 40 70
30 30 27
36 39

12 12
12 12

6
6
6
6

6
6
6
12 12

28 24
19 19

48 63
28

10
10
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

6
6

6
6
6

6
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

6
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

6
6

6
6
6

6 0 0 0 6
6 0 0 0 6

6
6

6
6
6
12 12

148 42 52 154 133 191 210 141 69 350 178 333 182 24
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210

21 6 7 22 19 27 30 20 10 50 25 48 26 3

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
DAFTAR PERSONIL INTI
NAMA PERUSAHAAN : PT. MIRTADA SEJAHTERA
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURU
LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

Jabatan Dalam
No. Nama Personil Tgl/Bln/thn lahir
Pekerjaan

1 2 3 4

1. Muhammad Yusuf, ST General Superintendent 01/05/1976

2. Achyarullah, ST Site Manager 25/12/1972

3. Fakhruddin, ST Enggineer Struktur 05/05/1981

4. Setiyo Pambudi, ST Enggineer Arsitektur 17/07/1967

5. Mustafa Ismail, ST Tenaga Ahli Manajemen Konstruksi 21/12/1982

6. Rizka, ST Engginer Elektrikal 06/05/1980

7. Cahaya Danurwendi, ST Ahli Geodesi 31/05/1988

8. Endang Syamsudin, ST Ahli Mekanikal 23/03/1956

9. Andika Eka Prayoga, ST Ahli Sanitasi dan Limbah 20/03/1985

10. Sanneti Hevianis, ST Pelaksana Bangunan Gedung 17/03/1990

11. Rizki Maulana Tukang Pekerjaan Pondasi 11/02/1991

12. Padly Mandor Pemasangan Rangka Atap Baja Ringan 05/06/1961

13. Liana Rahmah, ST Tenaga Juru Gambar 28/01/1989


14. Balya, ST Tenaga Juru Ukur 13/11/1989

15. Yusrizal, SE Tenaga Adminstrasi 07/09/1981


16. Muhammad Alfairusy Tenaga Logistik 04/04/1990
17. Muhammad Hanes Pulungan, ST Tukang Besi Beton 17/04/1977

18. Asrusman Tukang Pasang Bata 11/08/1976

19. Rizki Fahrizal Akbar, ST Tukang Pasang Pipa 28/02/1992

20. Tri Wahono Teknisi Listrik Industri 22/01/1990

21. Erwin Juanda Tukang Rangka Aluminium 19/02/1992

22. Abdul Hadi Abdul Hanan, ST Tukang Pipa Gas 03/04/1980

23. Satria, ST Tukang Pekerjaan Baja 24/03/1976


ERSONIL INTI PROYEK

TORIUM MINIPLANT TURUNAN CPO DAN


)

Pengalaman
Pendidikan
Kerja Ijazah SKA/SKTK
Terakhir
(Tahun)
5 6 7 8

S - I Teknik Sipil 12 Tahun Terlampir


Ahli Teknik Bangunan Gedung
Madya,
Ahli Manajemen Proyek Madya,
Ahli K3 Konstruksi
S - I Teknik Sipil 12 Tahun Terlampir Ahli Teknik Bangunan Gedung
Muda,
Ahli Geoteknik Muda,
Ahli Sistem Manajemen Mutu Muda

S - I Teknik Sipil 8 Tahun Terlampir Ahli Teknik Bangunan Gedung


Muda
S - I Teknik Arsitektur 10 Tahun Terlampir Arsitek Madya

S - I Teknik Sipil 8 Tahun Terlampir Ahli Manajemen Konstruksi Madya

S - I Teknik Elektro 10 Tahun Terlampir Ahli Teknik Tenaga Listrik Madya

S - I Teknik Geodesi dan Geomatika 5 Tahun Terlampir Ahli Geodesi Madya

S - I Teknik Mesin 12 Tahun Terlampir Ahli Teknik Mekanikal Madya

S - I Teknik Lingkungan 6 Tahun Terlampir Ahli Teknik Sanitasi dan Limbah


Madya
S - I Teknik Sipil 6 Tahun Terlampir Pelaksana Bangunan Gedung /
Pekerja Gedung
Juru Hitung Kuantitas

SMK / STM 6 Tahun Terlampir Tukang Pekerja Pondasi /


Foundation Work
SMK / STM 12 Tahun Terlampir Mandor Pemasangan Rangka Atap
Baja Ringan
S - I Teknik Arsitektur 5 Tahun Terlampir Juru Gambar / Draftman
Arsitektur
S - I Teknik Sipil 6 Tahun Terlampir Juru Ukur Kuantitas Bangunan
Gedung
S - I Ekonomi Akuntansi 8 Tahun Terlampir -
SMK / STM 6 Tahun Terlampir -
S - I Teknik Sipil 12 Tahun Terlampir Tukang Besi - Beton / Barbender /
Barbending
SMK / STM 12 Tahun Terlampir Tukang Pasang Bata/ Dinding /
Bricklayer /Bricklaying
(Tukang Bata)

SMK / STM 6 Tahun Terlampir Tukang Pasang Pipa

SMK / STM 5 Tahun Terlampir Teknisi Instalasi Kontrol Terpogram


(Berbasis PLC)
SMK / STM 5 Tahun Terlampir Tukang Rangka Alumunium

S - I Teknik Elektro 8 Tahun Terlampir Tukang Pipa Gas

S - I Teknik Mesin 12 Tahun Terlampir Tukang Pekerja Baja

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
DAFTAR PERALATAN UTAMA PROYEK

NAMA PERUSAHAAN : PT. MIRTADA SEJAHTERA


PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TU
LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

Jenis Fasilitas/Peralatan/ Kapasitas Atau Output Pada Merk dan Tahun


NO. Jumlah
Perlengkapan Saat Ini Tipe Pembuatan

1 2 3 4 5 6

1. Dump Truck 4 5 M3 Mitsubishi 2010

2. Molen 2 5 M3 Fuso 2010

3. Crane 1 5 Ton Mitsubishi 2007

4. Schafollding 500 - Standar 2012

5. Generator Set 1 30 Kva Airman 2013

6. Theodolit 1 - Bosch 2014

7. Pompa Air 2 2.6 kW (3.5 HP) 360 min - 1 rpm Honda 2009

8. Mobil Pickup 1 1 Ton Mitsubishi 2003

9. Waterpass 1 - Bosch 2014

10. Mesin Las Listrik 3 - Dongfeng 2005

11. Bor Pile 4 - P&H 2014

12. Mobil Water Tank 2 8000 L Poly Tank 2012

13. Stamper 2 0.17 Ton Robin 2009

14. Vibarator 2 3 HP Mikasa 2010

15. Alat Pertukangan 3 - - 2014


ALATAN UTAMA PROYEK

KSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


EL MEKATRONIKA)

Status
Kondisi Lokasi
Kepemilikan/
Sekarang
Dukungan Sewa
7 8 9

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Baik Blang Bintang Surat Dukungan Sewa Peralatan

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA
John Kiraini, SE. Ak
Direktur Utama
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Muhammad Yusuf, ST


Tanggal Lahir : Bireuen/ 1 Mei 1976
Alamat : Jl. Pang Raed V Ie Masen Kayee Adang
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Bangunan Gedung Madya
Ahli Manajemen Proyek Madya
Ahli K3 Konstruksi
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Muhammad Yusuf, ST
General Superintendent
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Achyarullah, ST
Tanggal Lahir : Sibreh/ 25 Desember 1972
Alamat : Jl. Tgk. Chik Di Pineung Kp. Pineung
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Bangunan Gedung Muda
Ahli Geoteknik Muda
Ahli Sistem Manajemen Mutu Muda
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Achyarullah, ST
Site Manager
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Fakhruddin, ST
Tanggal Lahir : Seumeureung/ 5 Mei 1981
Alamat : Desa Blang Preh Kec. Simpang Tiga
Kab. Aceh Besar
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Bangunan Gedung Muda
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 8 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Fakhruddin, ST
Enggineer Struktur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Setiyo Pambudi, ST


Tanggal Lahir : Lampung Tengah/ 17 Juli 1967
Alamat : Komp. Chnadra Baru L. Siliwangi III No. 147
Kota Bekasi
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Arsitek Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 10 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Setiyo Pambudi, ST
Enggineer Arsitektur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Mustafa Ismail, ST


Tanggal Lahir : Lhokseumawe/ 21 Desember 1982
Alamat : Jl. Kwarcab No. 6 Dusun PEMDA Kec. Banda Sakti
Kota Lhokseumawe
Pendidikan/ Lembaga Pendidikan : S - I Teknik Arsitektur
Sertifikat Keahlian/ Keterampilan : Ahli Manajemen Konstruksi Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 10 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Mustafa Ismail, ST
Tenaga Ahli Manajemen Konstruksi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Rizka, ST
Tanggal Lahir : Biak/ 6 Mei 1980
Alamat : Jl. T. Chik Di Pineung VI Kec. Syiah Kuala
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Elektro
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Tenaga Listrik Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 10 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Rizka, ST
Engginer Elektrikal
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Cahaya Danurwendi, ST


Tanggal Lahir : Batam/ 31 Mei 1988
Alamat : Jl. Permata Jingga Raya CC 3-A Tunggu Wulung
Kota Malang
Pendidikan/ Lembaga Pendidikan : S - I Teknik Geodesi dan Geomatika
Sertifikat Keahlian/ Keterampilan : Ahli Geodesi Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 5 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Cahaya Danurwendi, ST
Ahli Geodesi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Endang Syamsudin, ST


Tanggal Lahir : Bandung/ 23 Maret 1956
Alamat : Jl. Kesatria Komp Blk I Geuce Komplek
Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Mesin
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Mekanikal Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Endang Syamsudin, ST
Ahli Mekanikal
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Andika Eka Prayoga, ST


Tanggal Lahir : Bandung/ 20 Maret 1985
Alamat : KAV. PTB DKI Blok I. 12 No. 10-11 Pondok Kelapa 007/009
Jakarta Timur
Pendidikan/ Lembaga Pendidikan : S - I Teknik Lingkungan
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Sanitasi dan Limbah Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Andika Eka Prayoga, ST


Ahli Sanitasi dan Limbah
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Sanneti Hevianis, ST


Tanggal Lahir : Banda Aceh/ 17 Maret 1990
Alamat : Jl. Keupula No. 46 Dusun Timur Kopelma Darussalam
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : Pekerja
S - I Teknik Sipil
Gedung
Sertifikat Keahlian/ Keterampilan : Juru Hitung Kuantitas
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA

Juli 2016 Desember 2016 Pembangunan Gedung ICU RSUD (Otsus)


Aceh Tamiang

Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh

PT. MIRTADA SEJAHTERA

September 2009 Desember 2009 Lanjutan Pembangunan Universitas Teuku Umar

PT. MIRTADA SEJAHTERA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Sanneti Hevianis, ST
Pelaksana Bangunan Gedung
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Rizki Maulana


Tanggal Lahir : Banda Aceh/ 11 Februari 1991
Alamat : Jl. Kampus UNMUHA No. 46 B Batoh Lueng Bata
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : SMK
Tukang/ STM
Pekerja Pondasi /
Sertifikat Keahlian/ Keterampilan : Foundation Work
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Rizki Maulana
Tukang Pekerjaan Pondasi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Padly
Tanggal Lahir : Aceh Timur/ 5 Juli 1961
Alamat : Dusun VI Kompl. Abdul Hamid NST
Deli Serdang - Sumut
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : Mandor Pemasangan Rangka Atap Baja Ringan
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Padly
Mandor Pemasangan Rangka Atap
Baja Ringan
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Liana Rahmah, ST


Tanggal Lahir : Suka/ 28 Januari 1989
Alamat : Jl. Soekarno - Hatta Lr. Tgk. Meunara I A
Geuce Meunara Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik
Juru Gambar Arsitektur
/ Draftman
Sertifikat Keahlian/ Keterampilan : Arsitektur
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 5 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Liana Rahmah, ST
Tenaga Juru Gambar
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Balya, ST
Tanggal Lahir : Bireuen/ 23 Februari 1982
Alamat : Dusun Tgk. Di Cot Kel. Cot Keutapang
Kab. Bireuen
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Juru Ukur Kuantitas Bangunan Gedung
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Balya, ST
Tenaga Juru Ukur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Yusrizal, SE
Tanggal Lahir : Teureubue/ 7 September 1981
Alamat : Jl. Sentosa No. 38 C Kp. Laksana
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Ekonomi Akuntansi
Sertifikat Keahlian/ Keterampilan : -
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 8 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Yusrizal, SE
Tenaga Adminstrasi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Muhammad Alfairusy


Tanggal Lahir : Banda Aceh, 4 April 1990
Alamat : Jl. ST. Mansyursyah No. 13 Peuniti
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : -
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Muhammad Alfairusy
Tenaga Logistik
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Muhammad Hanes Pulungan, ST


Tanggal Lahir : Lhokseumawe/ 17 April 1977
Alamat : Jl. T. Iskandar Muda Kp. Jawa
Kota Lhokseumawe
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Tukang Besi - Beton / Barbender / Barbending
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Muhammad Hanes Pulungan, ST


Tukang Besi Beton
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Asrusman
Tanggal Lahir : Samadua/ 11 Agustus 1976
Alamat : Desa Ujung Kampung Kec. Sama Dua
Aceh Selatan
Pendidikan/ Lembaga Pendidikan : SMK / STM
Tukang Pasang Bata/ Dinding / Bricklayer /Bricklaying
Sertifikat Keahlian/ Keterampilan : (Tukang Bata)
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Asrusman
Tukang Pasang Bata
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Rizki Fahrizal Akbar, ST


Tanggal Lahir : Banda Aceh/ 28 Februari 1992
Alamat : Jl. T. Iskandar No. 78 A Lambhuk
Ulee Kareng – Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : Tukang Pasang Pipa
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Rizki Fahrizal Akbar, ST


Tukang Pasang Pipa
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Tri Wahono


Tanggal Lahir : Tulungagung/ 22 Januari 1990
Alamat : Kalangbret Gg. Brojo Musti RT/RW 002/001
Kec. Kauman Kab. Tulungagung - Jawa Timur
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : Teknisi Instalasi Kontrol Terpogram (Berbasis PLC)
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 5 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Tri Wahono
Teknisi Listrik Industri
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Erwin Juanda


Tanggal Lahir : Rayeuk Menje/ 19 Februari 1992
Alamat : Jl. Tgk. Serbajaman Gp. Serba Jaman
Kec. Tanah Luas – Aceh Utara
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : Tukang Rangka Alumunium
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 5 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Erwin Juanda
Tukang Rangka Aluminium
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Abdul Hadi Abdul Hanan, ST


Tanggal Lahir : Jakarta/ 3 April 1980
Alamat : Jl. Kayee Adang No. 4 Gp. Peurada
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Elektro
Sertifikat Keahlian/ Keterampilan : Tukang Pipa Gas
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 8 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Abdul Hadi Abdul Hanan, ST


Tukang Pipa Gas
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA

Nama : Satria, ST
Tanggal Lahir : Jakarta/ 24 Maret 1976
Alamat : Jl. T. Chik Dipineung VI Kp. Pineung
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Mesin
Sertifikat Keahlian/ Keterampilan : Tukang Pekerja Baja
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun

TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI

Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA

Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE

Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA

Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .

Banda Aceh, 28 April 2018

Satria, ST
Tukang Pekerjaan Baja
RENCANA ORGANISASI P
PT. MIRTADA

Rizka, ST Mustafa Ismail, ST Setiyo Pambudi, ST


Engginer Elektrikal Tenaga Ahli Manajemen Konstruksi Enggineer Arsitektur

Liana Rahmah, ST
Tenaga Juru Gambar

Yusrizal, SE
Tenaga Adminstrasi

Rizki Fahrizal Akbar, ST Asrusman Muhammad Hanes Pulungan, ST Padly


Tukang Pasang Pipa Tukang Pasang Bata Tukang Besi Beton Mandor Pemasangan Rangka Atap Baja Ringan
A ORGANISASI PELAKSANAAN PEKERJAAN
PT. MIRTADA SEJAHTERA

Muhammad Yusuf, ST
General Superintendent

Achyarullah, ST
Site Manager

Fakhruddin, ST Cahaya Danurwendi, ST Endang Syamsudin, ST Andika Eka Prayoga, ST


Enggineer Struktur Ahli Geodesi Ahli Mekanikal Ahli Sanitasi dan Limbah

Sanneti Hevianis, ST Balya, ST


Pelaksana Bangunan Gedung Tenaga Juru Ukur

Muhammad Alfairusy
Tenaga Logistik

Rizki Maulana Tri Wahono Erwin Juanda Abdul Hadi Abdul Hanan, ST Satria, ST
Tukang Pekerjaan Pondasi Teknisi Listrik Industri Tukang Rangka Aluminium Tukang Pipa Gas Tukang Pekerjaan Baja

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA
John Kiraini, SE. Ak
Direktur Utama
Satria, ST
Tukang Pekerjaan Baja
FORMULIR REKAPITULASI PERHITUNGAN
TINGKAT KOMPONEN DALAM NEGERI (TKDN)

PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

Nilai Gabungan Barang / Jasa (Rp) TKDN


Uraian Pekerjaan TOTAL Barang / Jasa
DN LN
Rp. % KDN
Barang
I. Material Langsung (Bahan Baku) 7,485,504,485 7,485,504,485 62%
II. Peralatan (Barang Jadi)
A. Sub Total Barang 7,485,504,485 7,485,504,485 62% 7,485,504,485.10
Jasa
III. Manajemen Proyek dan Perekayasaan
IV. Alat Kerja / Fasilitas Kerja 724,403,660 724,403,660 6%
V. Konstruksi dan Fabrikasi
VI. Jasa Umum 3,863,486,186 3,863,486,185.86 32%
B. Sub Total Jasa 4,587,889,846 4,587,889,846 38% 4,587,889,845.70
C. Total Biaya (A + B) 12,073,394,331 100% 12,073,394,330.80

Formulasi Perhitungan
7,485,504,485 Jakarta,11 Mei 2018
62%
12,073,394,331 PT. MIRTADA SEJAHTERA

% TKDN Gabungan Barang dan Jasa = +

4,587,889,846
38%
38%
12,073,394,331
John Kiraini, SE. Ak
100% Direktur Utama
IR REKAPITULASI PERHITUNGAN
KOMPONEN DALAM NEGERI (TKDN)

TKDN
Gabungan

62%

38%
100%

PT. MIRTADA SEJAHTERA


DAFTAR USULAN PEKERJAAN YANG DISUBKONTRAKKAN
NAMA PERUSAHAAN : PT. MIRTADA SEJAHTERA
PEKERJAAN : KONSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DA
LABORATORIUM BENGKEL MEKATRONIKA)
LOKASI : SMK/SMTI BANDA ACEH
TAHUN : 2018

Persentase Persentase
No. Mata Dari Harga Dari Harga
Pembayaran Jenis Pekerjaan Total Item Mata Total Item Mata
Pekerjaan Penawaran
(%) (%)

"N I H I L"
T o t a l (%) 0.00 %

Jakarta,11 Mei 2018


PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


Direktur Utama
AN PEKERJAAN YANG DISUBKONTRAKKAN

NSTRUKSI FISIK WORKSHOP (LABORATORIUM MINIPLANT TURUNAN CPO DAN


BORATORIUM BENGKEL MEKATRONIKA)

Nama
SubKontraktor
(Jika diperlukan)

N I H I L"

PT. MIRTADA SEJAHTERA

John Kiraini, SE. Ak


ANALISA HARGA SATUAN PEKERJAAN
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.4. Pengukuran dan Pemasangan 1 M' Bouwplank
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 75,000.00
Tukang Kayu L.02 OH 0.100 85,000.00
Kepala Tukang L.03 OH 0.010 100,000.00
Mandor L.04 OH 0.005 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Kayu 5/7 Kelas IV M3 0.012 2,400,000.00
Paku 2" - 3" Kg 0.020 17,000.00
Kayu Papan 3/20 Kelas IV M3
0.007 2,350,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.2.1.5. Pembuatan 1 M2 Kantor Sementara Lantai Plesteran


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 2.000 75,000.00
Tukang Kayu L.02 OH 2.000 85,000.00
Tukang Batu L.02 OH 1.000 85,000.00
Kepala Tukang L.03 OH 0.300 100,000.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.250 18,500.00
Kayu 5/7 Kelas IV M3 0.180 2,400,000.00
Paku Biasa Kg 0.080 17,000.00
Besi Strip Kg 1.100 8,500.00
Semen Portland Kg 35.000 1,350.00
Pasing Pasang M 3
0.150 143,000.00
Pasir Beton M3 0.100 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M 3
0.150 143,000.00
Bata Merah Bh 30.000 780.00
Seng Plat Lbr 0.250 26,500.00
Jendela Naco Bh 0.200 146,000.00
Kaca Polos tebal 3 mm ( Asahimas ) M2 0.080 72,000.00
Kunci Tanam Bh 0.150 225,000.00
Plywood 4 mm Lbr 0.060 98,000.00
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.2.1.7. Pembuatan 1 M2 Gudang Semen dan Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 2.000 85,000.00
Kepala Tukang L.03 OH 0.200 100,000.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.700 18,500.00
Kayu 5/7 Kelas IV M 3
0.210 2,400,000.00
Paku Biasa Kg 0.300 17,000.00
Semen Portland Kg 10.500 1,350.00
Pasir Beton M 3
0.030 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M 3
0.050 143,000.00
Seng Gelombang Lbr 1.500 47,000.00
Seng Plat Lbr 0.250 26,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.2.1.8. Pembuatan 1 M2 Bedeng Pekerja


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 2.000 85,000.00
Kepala Tukang L.03 OH 0.200 100,000.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.250 18,500.00
Kayu 5/7 Kelas IV M3 0.186 2,400,000.00
Paku Biasa Kg 0.300 17,000.00
Semen Portland Kg 18.000 1,350.00
Pasir Beton M3 0.030 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M3 0.050 143,000.00
Seng Gelombang Lbr 1.500 47,000.00
Plywood 6 mm Lbr 1.350 98,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 M3 Tanah Biasa Sedalam 1 M
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.750 75,000.00
Tukang Kayu L.02 OH 0.025 85,000.00
JUMLAH TENAGA KERJA

B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.9. Pengurugan kembali 1 M3 Galian tanah
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.500 75,000.00
Tukang Kayu L.02 OH 0.050 85,000.00
JUMLAH TENAGA KERJA

B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 M3 dengan Pasir Urug


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Kayu L.02 OH 0.010 85,000.00
JUMLAH TENAGA KERJA

B BAHAN
Pasir Urug/Tanah Urug M3 1.200 85,000.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11.a Pengurugan 1 M3 dengan Tanah Timbun


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 75,000.00
Tukang Kayu L.02 OH 0.010 85,000.00
JUMLAH TENAGA KERJA

B BAHAN
Tanah Timbun M3 1.200 65,000.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A HARGA SATUAN PEKERJAAN

Jumlah Harga
(Rp)

7,500.00
8,500.00
1,000.00
450.00
17,450.00

28,800.00
340.00
16,450.00
45,590.00

-
63,040.00
6,304.00
69,344.00

Jumlah Harga
(Rp)

150,000.00
170,000.00
85,000.00
30,000.00
4,500.00
439,500.00

23,125.00
432,000.00
1,360.00
9,350.00
47,250.00
21,450.00
14,300.00
21,450.00
23,400.00
6,625.00
29,200.00
5,760.00
33,750.00
5,880.00
674,900.00

-
1,114,400.00
111,440.00
1,225,840.00
Jumlah Harga
(Rp)

75,000.00
170,000.00
20,000.00
4,500.00
269,500.00

31,450.00
504,000.00
5,100.00
14,175.00
4,290.00
7,150.00
70,500.00
6,625.00
643,290.00

-
912,790.00
136,918.50
1,049,708.50

Jumlah Harga
(Rp)

75,000.00
170,000.00
20,000.00
4,500.00
269,500.00

23,125.00
446,400.00
5,100.00
24,300.00
4,290.00
7,150.00
70,500.00
132,300.00
713,165.00

-
982,665.00
98,266.50
1,080,931.50
Jumlah Harga
(Rp)

56,250.00
2,125.00
58,375.00

-
58,375.00
5,837.50
64,212.50
Jumlah Harga
(Rp)

37,500.00
4,250.00
41,750.00

-
41,750.00
4,175.00
45,925.00

Jumlah Harga
(Rp)

22,500.00
850.00
23,350.00

102,000.00

102,000.00

-
125,350.00
12,535.00
137,885.00

Jumlah Harga
(Rp)

22,500.00
850.00
23,350.00

78,000.00

78,000.00

-
101,350.00
10,135.00
111,485.00
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 M 3 Pondasi Batu Belah Campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 75,000.00
Tukang Kayu L.02 OH 0.750 85,000.00
Kepala Tukang L.03 OH 0.075 100,000.00
Mandor L.04 OH 0.075 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Batu Kali/Sungai 5 - 20 cm M3 1.200 179,000.00
Semen Portland Kg 202.000 1,350.00
Pasir Pasang M3 0.485 132,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. Pemasangan 1 M 3 Batu Kosong (Anstamping)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.780 75,000.00
Tukang Kayu L.02 OH 0.390 85,000.00
Kepala Tukang L.03 OH 0.039 100,000.00
Mandor L.04 OH 0.039 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Kerikil Beton Uk. ≥ 4 cm M3 1.200 143,000.00
Pasir Pasang M3
0.432 132,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.11. Pemasangan 1 M3 Pondasi Sumuran


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 2.400 75,000.00
Tukang Kayu L.02 OH 0.800 85,000.00
Kepala Tukang L.03 OH 0.080 100,000.00
Mandor L.04 OH 0.119 90,000.00
JUMLAH TENAGA KERJA

B BAHAN
Batu Kali/Sungai 5 - 20 cm M3 0.450 170,000.00
Semen Portlan Kg 194.000 1,325.00
Pasir Beton M3 0.312 150,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M3
0.468 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

112,500.00
63,750.00
7,500.00
6,750.00
190,500.00

214,800.00
272,700.00
64,020.00
551,520.00

-
742,020.00
74,202.00
816,222.00

Jumlah Harga
(Rp)

58,500.00
33,150.00
3,900.00
3,510.00
99,060.00

171,600.00
57,024.00
228,624.00

-
327,684.00
32,768.40
360,452.40

Jumlah Harga
(Rp)

180,000.00
68,000.00
8,000.00
10,710.00
266,710.00
76,500.00
257,050.00
46,800.00
70,200.00
450,550.00

-
717,260.00
71,726.00
788,986.00
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4. Membuat 1 M 3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 125), slump (3 - 6) cm, w/c = 0,87

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,027.000
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.5. Membuat 1 M 3 Beton Mutu f'c = 12,2 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,029.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.6. Membuat 1 M 3 Beton Mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 352.000
Pasir Beton Kg 731.000
Batu Pecah 1-2 cm Kg 1,031.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.7. Membuat 1 M 3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 371.000
Pasir Beton Kg 698.000
Batu Pecah 1-2 cm Kg 1,047.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.3. Membuat 1 M 3 Beton Mutu f'c = 12,2 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,72

No Uraian Kode Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 299.000
Pasir Beton Kg 799.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,017.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.8.a Membuat 1 M 3 Beton Readymix K-250

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.413
Tukang Batu L.02 OH 0.069
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.021
JUMLAH TENAGA KERJA

B BAHAN
Beton Ready Mix K-250 M3 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Pompa M3 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.10.a Membuat 1 M3 Beton Readymix K-300


No Uraian Kode Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.413
Tukang Batu L.02 OH 0.069
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.021
JUMLAH TENAGA KERJA

B BAHAN
Beton Ready Mix K-300 M3 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Pompa M3 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.17. Pembesian 1 Kg dengan Besi Polos
No Uraian Kode Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.007
Tukang Batu L.02 OH 0.007
Kepala Tukang L.03 OH 0.0007
Mandor L.04 OH 0.0004
JUMLAH TENAGA KERJA

B BAHAN
Besi Beton Polos Kg 1.050
Kawat Beton Kg 0.015

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.17a. Pembesian 1 Kg dengan Besi Ulir


No Uraian Kode Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.007
Tukang Batu L.02 OH 0.007
Kepala Tukang L.03 OH 0.0007
Mandor L.04 OH 0.0004
JUMLAH TENAGA KERJA

B BAHAN
Besi Beton Ulir Kg 1.050
Kawat Beton Kg 0.015

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


No Uraian Kode Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.025
Tukang Besi L.02 OH 0.025
Kepala Tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA

B BAHAN
Jaring kawat baja dilas Kg 10.200
Kawat Beton Kg 0.005
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan /kg (D+E)
A.4.1.1.20. Pemasangan 1 M 2 Bekisting untuk Pondasi

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.520
Tukang L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA

B BAHAN
Kayu Kelas III M3 0.040
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.21. Pemasangan 1 M 2 Bekisting untuk Sloof

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.520
Tukang L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA

B BAHAN
Kayu Kelas III 2x Pakai M3 0.045
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.22. Pemasangan 1 M 2 Bekisting untuk Kolom

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA

B BAHAN
Kayu Kelas III 2x Pakai M3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.200
Balok Kayu Kelas II 2x Pakai M3 0.015
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.23. Pemasangan 1 M 2 Bekisting untuk Balok

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III 2x Pakai M3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.200
Balok Kayu Kelas II 2x Pakai M3 0.018
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.24. Pemasangan 1 M 2 Bekisting untuk Lantai

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III 2x Pakai M3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.200
Balok Kayu Kelas II 2x Pakai M3 0.015
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.26. Pemasangan 1 M 2 Bekisting untuk Tangga

No Uraian Kode Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA

B BAHAN
Kayu Kelas III 2x Pakai M3 0.030
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.150
Balok Kayu Kelas II 2x Pakai M3 0.015
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 90,000.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 5,400.00
JUMLAH TENAGA KERJA 114,400.00

1,350.00 310,500.00
102.14 91,213.57
105.93 108,785.93
25.00 5,000.00
JUMLAH HARGA BAHAN 515,499.50

JUMLAH HARGA ALAT -


629,899.50
10% x D 62,989.95
692,889.45

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00

1,350.00 440,100.00
102.14 77,628.57
105.93 108,997.78
25.00 5,375.00
JUMLAH HARGA BAHAN 632,101.35

JUMLAH HARGA ALAT -


789,496.35
10% x D 78,949.63
868,445.98

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00

1,350.00 475,200.00
102.14 74,666.43
211.11 217,655.56
25.00 5,375.00
JUMLAH HARGA BAHAN 772,896.98

JUMLAH HARGA ALAT -


930,291.98
10% x D 93,029.20
1,023,321.18
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00

1,350.00 500,850.00
102.14 71,295.71
211.11 221,033.33
25.00 5,375.00
JUMLAH HARGA BAHAN 798,554.05

JUMLAH HARGA ALAT -


955,949.05
10% x D 95,594.90
1,051,543.95

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00

1,350.00 403,650.00
102.14 81,612.14
105.93 107,726.67
25.00 5,375.00
JUMLAH HARGA BAHAN 598,363.81

JUMLAH HARGA ALAT -


755,758.81
10% x D 75,575.88
831,334.69

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 30,937.50
85,000.00 5,843.75
100,000.00 700.00
90,000.00 1,867.50
JUMLAH TENAGA KERJA 39,348.75

1,023,000.00 1,023,000.00
JUMLAH HARGA BAHAN 1,023,000.00

95,500.00 95,500.00
JUMLAH HARGA ALAT 95,500.00
1,157,848.75
10% x D 115,784.88
1,273,633.63

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 30,937.50
85,000.00 5,843.75
100,000.00 700.00
90,000.00 1,867.50
JUMLAH TENAGA KERJA 39,348.75

1,121,000.00 1,121,000.00
JUMLAH HARGA BAHAN 1,121,000.00

95,500.00 95,500.00
JUMLAH HARGA ALAT 95,500.00
1,255,848.75
10% x D 125,584.88
1,381,433.63
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 525.00
85,000.00 595.00
100,000.00 70.00
90,000.00 36.00
JUMLAH TENAGA KERJA 1,226.00

10,400.00 10,920.00
15,000.00 225.00

JUMLAH HARGA BAHAN 11,145.00

JUMLAH HARGA ALAT -


12,371.00
10% x D 1,237.10
13,608.10

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 525.00
85,000.00 595.00
100,000.00 70.00
90,000.00 36.00
JUMLAH TENAGA KERJA 1,226.00

13,100.00 13,755.00
15,000.00 225.00

JUMLAH HARGA BAHAN 13,980.00

JUMLAH HARGA ALAT -


15,206.00
10% x D 1,520.60
16,726.60

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 1,875.00
85,000.00 2,125.00
100,000.00 2,500.00
90,000.00 90.00
JUMLAH TENAGA KERJA 6,590.00

15,800.00 161,160.00
15,000.00 75.00
JUMLAH HARGA BAHAN 161,235.00

JUMLAH HARGA ALAT -


167,825.00
10% x D 16,782.50
184,607.50
18,460.75
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 39,000.00
85,000.00 22,100.00
100,000.00 2,600.00
90,000.00 2,340.00
JUMLAH TENAGA KERJA 66,040.00

3,050,000.00 122,000.00
17,000.00 5,100.00
8,000.00 800.00
JUMLAH HARGA BAHAN 127,900.00

JUMLAH HARGA ALAT -


193,940.00
10% x D 19,394.00
213,334.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 39,000.00
85,000.00 22,100.00
100,000.00 2,600.00
90,000.00 2,340.00
JUMLAH TENAGA KERJA 66,040.00

3,050,000.00 68,625.00
17,000.00 5,100.00
8,000.00 800.00
JUMLAH HARGA BAHAN 74,525.00

JUMLAH HARGA ALAT -


140,565.00
10% x D 14,056.50
154,621.50

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00

3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 139,300.00

JUMLAH HARGA ALAT -


223,120.00
10% x D 22,312.00
245,432.00
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00

3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 30,600.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 144,400.00

JUMLAH HARGA ALAT -


228,220.00
10% x D 22,822.00
251,042.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00

3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 55,500.00
JUMLAH HARGA BAHAN 176,300.00

JUMLAH HARGA ALAT -


260,120.00
10% x D 26,012.00
286,132.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00
3,050,000.00 45,750.00
17,000.00 6,800.00
8,000.00 1,200.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 123,650.00

JUMLAH HARGA ALAT -


207,470.00
10% x D 20,747.00
228,217.00
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.3. Pemasangan 1 M 2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP:4PP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA

B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 26.550
Pasir Pasang Kg 130.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.1.7. Pemasangan 1 M 2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu Campuran 1 SP:2PP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA

B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 18.950
Pasir Pasang Kg 53.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.2. Pemasangan 1 M 2 Plesteran 1 SP : 2 PP tebal 15 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 10.224
Pasir Pasang Kg 28.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.4. Pemasangan 1 M 2 Plesteran 1 SP : 4 PP tebal 15 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA

B BAHAN
Semen Portland Kg 6.240
Pasir Pasang Kg 33.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.35. Pemasangan 1 M 2 Lantai Keramik Anti Slip ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Keramik 30 x 30 cm Anti Slip Buah 6.250
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.35A. Pemasangan 1 M 2 Dinding Granit ukuran 60 cm x 60 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Keramik Dinding 30 x 60 cm Buah 3.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.35B. Pemasangan 1 M 2 Lantai Granit Anti Slip ukuran 30 cm x 60 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Granit Anti Slip 30 x 60 cm Buah 6.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.36A. Pemasangan 1 M 2 Lantai Granit ukuran 60 cm x 60 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Granit 60 x 60 cm Buah 3.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.36B. Pemasangan 1 M 2 Lantai Granit Anti Slip ukuran 60 cm x 60 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA

B BAHAN
Granit Anti Slip 60 x 60 cm Buah 3.055
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.21A. Pemasangan 1 M' Kalsiplank


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100
Tukang L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA

B BAHAN
Kalsiplank M' 1.1000
Skrup Fixer Buah 10.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 45,000.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 2,700.00
JUMLAH TENAGA KERJA 66,700.00

780.00 54,600.00
1,350.00 35,842.50
94.29 12,276.00
JUMLAH HARGA BAHAN 102,718.50

JUMLAH HARGA ALAT -


169,418.50
10% x D 16,941.85
186,360.35

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 22,500.00
85,000.00 8,500.00
100,000.00 1,000.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 33,350.00

780.00 54,600.00
1,350.00 25,582.50
94.29 5,016.00
JUMLAH HARGA BAHAN 85,198.50

JUMLAH HARGA ALAT -


118,548.50
10% x D 11,854.85
130,403.35

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 38,100.00

1,350.00 13,802.40
94.29 2,640.00
JUMLAH HARGA BAHAN 16,442.40

JUMLAH HARGA ALAT -


54,542.40
10% x D 5,454.24
59,996.64

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 38,100.00

1,350.00 8,424.00
94.29 3,168.00
JUMLAH HARGA BAHAN 11,592.00

JUMLAH HARGA ALAT -


49,692.00
10% x D 4,969.20
54,661.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00

11,500.00 71,875.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 3,900.00
JUMLAH HARGA BAHAN 92,771.50

JUMLAH HARGA ALAT -


181,671.50
10% x D 18,167.15
199,838.65

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00

23,400.00 70,200.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 89,796.50

JUMLAH HARGA ALAT -


178,696.50
10% x D 17,869.65
196,566.15

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
61,300.00 367,800.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 387,396.50

JUMLAH HARGA ALAT -


476,296.50
10% x D 47,629.65
523,926.15

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00

67,900.00 203,700.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 223,296.50

JUMLAH HARGA ALAT -


312,196.50
10% x D 31,219.65
343,416.15
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00

72,500.00 221,487.50
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 241,084.00

JUMLAH HARGA ALAT -


329,984.00
10% x D 32,998.40
362,982.40

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 7,500.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 450.00
JUMLAH TENAGA KERJA 26,950.00

51,500.00 56,650.00
250.00 2,500.00
JUMLAH HARGA BAHAN 59,150.00

JUMLAH HARGA ALAT -


86,100.00
10% x D 8,610.00
94,710.00
A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A.4.2.1.1. Pemasangan 1 Kg Besi Profil/Gording Baja
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang Las Konstruksi L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH TEN

B BAHAN
Besi Baja Profil Kg

C PERALATAN
Sewa Alat Jam

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.3. Pengerjaan 100 Kg Pekerjaan Perakitan


No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang Las Konstruksi L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
JUMLAH TEN

B BAHAN
Solar Liter
Minyak Pelumas Liter

C PERALATAN
Sewa Alat Jam

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E)/Kg

A.4.2.1.17. Pemasangan 1 M 2 Jendela Naco & Tralis


No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH

B BAHAN
Jendela Naco (Rangka + Kaca 5 mm) M2
Paku Skrup 1 cm - 2,5 cm Buah
Baja Strip M
C PERALATAN

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.18. Pemasangan 1 M ' Talang Datar/Jurai Seng BJLs 28 Lebar 90 cm


No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH

B BAHAN
Seng Plat M
Paku Skrup 1 cm - 2,5 cm Kg
Papan Kayu Kelas IV M3

C PERALATAN

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19. Pemasangan 1 M ' Talang ½ Lingkaran D-15 cm, Seng Plat Bjls 30 Lebar 45 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH

B BAHAN
Seng Plat M
Paku Skrup 1 cm - 2,5 cm Kg
Papan Kayu Kelas IV M3

C PERALATAN

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.19.a Memasang 1 M2 Seng Spandek


No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH

B BAHAN
Seng Spandek 0,40 mm M'
Paku Sekrup Buah

C PERALATAN

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.20.a Memasang 1 M Rabung Seng Spandek 0,35 MM


No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH

B BAHAN
Seng Spandek 0,35 mm M'
Paku Sekrup Buah

C PERALATAN

D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
Koefisien
(Rp) (Rp)

0.030 75,000.00 2,250.00


0.010 85,000.00 850.00
0.006 100,000.00 600.00
0.004 90,000.00 360.00
JUMLAH TENAGA KERJA 4,060.00

1.050 15,500.00 16,275.00

JUMLAH HARGA BAHAN 16,275.00

0.800 17,500.00 14,000.00


JUMLAH HARGA ALAT 14,000.00
34,335.00
10% x D 3,433.50
37,768.50

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.100 75,000.00 7,500.00


0.100 85,000.00 8,500.00
0.001 100,000.00 100.00
0.005 90,000.00 450.00
JUMLAH TENAGA KERJA 16,550.00

1.000 12,000.00 12,000.00


0.100 32,000.00 3,200.00
JUMLAH HARGA BAHAN 15,200.00

0.800
JUMLAH HARGA ALAT -
31,750.00
10% x D 3,175.00
34,925.00
3,492.50

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.200 75,000.00 15,000.00


0.200 85,000.00 17,000.00
0.020 100,000.00 2,000.00
0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 34,090.00

1.100 146,000.00 160,600.00


10.000 18,500.00 185,000.00
7.000 8,500.00 59,500.00
JUMLAH HARGA BAHAN 405,100.00
JUMLAH HARGA ALAT -
439,190.00
10% x D 43,919.00
483,109.00

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.200 75,000.00 15,000.00


0.200 85,000.00 17,000.00
0.020 100,000.00 2,000.00
0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 34,090.00

1.050 26,500.00 27,825.00


0.015 18,500.00 277.50
0.019 2,350,000.00 44,650.00
JUMLAH HARGA BAHAN 72,752.50

JUMLAH HARGA ALAT -


106,842.50
10% x D 10,684.25
117,526.75
Harga Satuan Jumlah Harga
Koefisien
(Rp) (Rp)

0.150 75,000.00 11,250.00


0.300 85,000.00 25,500.00
0.030 100,000.00 3,000.00
0.008 90,000.00 720.00
JUMLAH TENAGA KERJA 40,470.00

1.050 26,500.00 27,825.00


0.010 18,500.00 185.00
0.500 2,350,000.00 1,175,000.00
JUMLAH HARGA BAHAN 1,203,010.00

JUMLAH HARGA ALAT -


1,243,480.00
10% x D 124,348.00
1,367,828.00

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.200 75,000.00 15,000.00


0.100 85,000.00 8,500.00
0.100 100,000.00 10,000.00
0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 33,590.00

1.350 58,500.00 78,975.00


8.000 250.00 2,000.00

JUMLAH HARGA BAHAN 80,975.00

JUMLAH HARGA ALAT -


114,565.00
10% x D 11,456.50
126,021.50

Harga Satuan Jumlah Harga


Koefisien
(Rp) (Rp)

0.200 75,000.00 15,000.00


0.100 85,000.00 8,500.00
0.100 100,000.00 10,000.00
0.001 90,000.00 90.00
JUMLAH TENAGA KERJA 33,590.00

1.100 39,000.00 42,900.00


6.000 250.00 1,500.00

JUMLAH HARGA BAHAN 44,400.00

JUMLAH HARGA ALAT -


77,990.00
10% x D 7,799.00
85,789.00
M PEKERJAAN PANEL
SK SN-S 06-1989-F
1 Memasang 1bh PANEL P-MDB

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)

Bahan P-MDB bh 1.1000 11,412,000


Perlengkapan (10% harga barang) bh 1.0000 1,141,200
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

2 Memasang 1bh DB-LT.1

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)

Bahan DB-LT.1 bh 1.1000 9,100,000


Perlengkapan (10% harga barang) bh 1.0000 910,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

3 Memasang 1bh DB Mesin


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan DB-LT.2 bh 1.1000 6,975,000
Perlengkapan (10% harga barang) bh 1.0000 697,500
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

4 Memasang 1bh DB-LT.3


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan DB-LT.3 bh 1.1000 3,500,000
Perlengkapan (10% harga barang) bh 1.0000 350,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

5 Memasang NYY 240 mm2


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan NYY 240 mm2 M1 1.1000 886,000
Perlengkapan (10% harga barang) Set 1.0000 88,600
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
6 Memasang NYY 4x50 mm2
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan NYY 4x50 mm2 M1 1.1000 280,000
Perlengkapan (10% harga barang) Set 1.0000 28,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

7 Memasang 1M NYY 3x2,5 mm2


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan NYY 3x2,5 mm2 M1 1.1000 10,900
Perlengkapan (10% harga barang) Set 1.0000 1,090
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

CABLE TRAY
8 Memasang 1M TRAY W=600
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TRAY W=600 bh 1.1000 200,000
Perlengkapan (10% harga barang) bh 1.0000 20,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

9 Memasang 1M TRAY W=300


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TRAY W=300 bh 1.1000 170,000
Perlengkapan (10% harga barang) bh 1.0000 17,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

10 Memasang 1M TEE R W=300


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TEE W=300 bh 1.1000 182,000
Perlengkapan (10% harga barang) bh 1.0000 18,200
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
11 Memasang 1M ELBOW R W=300
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan ELBOW W=300 bh 1.1000 159,000
Perlengkapan (10% harga barang) bh 1.0000 15,900
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

12 Memasang 1M TRAY W=200


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TRAY W=200 bh 1.1000 169,000
Perlengkapan (10% harga barang) bh 1.0000 16,900
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

13 Memasang 1M TEE R W=200


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TEE W=200 bh 1.1000 172,000
Perlengkapan (10% harga barang) bh 1.0000 17,200
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

14 Memasang 1M ELBOW R W=200


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan ELBOW W=200 bh 1.1000 159,000
Perlengkapan (10% harga barang) bh 1.0000 15,900
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
Jumlah
(Rp.)

12,553,200
1,141,200
13,500
9,180
1,800
486
13,719,366

Jumlah
(Rp.)

10,010,000
910,000
13,500
9,180
1,800
486
10,944,966

Jumlah
(Rp.)

7,672,500
697,500
13,500
9,180
1,800
486
8,394,966

Jumlah
(Rp.)
3,850,000
350,000
13,500
9,180
1,800
486
4,224,966

Jumlah
(Rp.)
Jumlah
(Rp.)

974,600
88,600
13,500
9,180
1,800
486
1,088,166
Jumlah
(Rp.)
308,000
28,000
13,500
9,180
1,800
486
360,966

Jumlah
(Rp.)

11,990
1,090
13,500
9,180
1,800
486
38,046

Jumlah
(Rp.)
220,000
20,000
13,500
9,180
1,800
486
264,966

Jumlah
(Rp.)
187,000
17,000
13,500
9,180
1,800
486
228,966

Jumlah
(Rp.)

200,200
18,200
13,500
9,180
1,800
486
243,366
Jumlah
(Rp.)

174,900
15,900
13,500
9,180
1,800
486
215,766

Jumlah
(Rp.)

185,900
16,900
13,500
9,180
1,800
486
227,766

Jumlah
(Rp.)

189,200
17,200
13,500
9,180
1,800
486
231,366

Jumlah
(Rp.)

174,900
15,900
13,500
9,180
1,800
486
215,766
M PEKERJAAN SANITASI
SK SN-S 06-1989-F
- Memasang 1 m1 GIP dia.3 Inch

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan GIP dia.3 Inch m1 1.1000 110,833
Perlengkapan (10% harga barang) set 1.0000 11,083
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW dia.2 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW dia.2 Inch m1 1.1000 34,600
Perlengkapan (10% harga barang) set 1.0000 3,460
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW dia.1,5 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW dia.1,5 Inch m1 1.1000 15,200
Perlengkapan (10% harga barang) set 1.0000 1,520
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW dia.1 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW dia.1 Inch m1 1.1000 23,900
Perlengkapan (10% harga barang) set 1.0000 2,390
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW dia.3/4 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW dia.3/4 Inch m1 1.1000 18,500
Perlengkapan (10% harga barang) set 1.0000 1,850
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
- Memasang 1 m1 PVC AW dia.1/2 Inch
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW dia.1/2 Inch m1 1.1000 15,200
Perlengkapan (10% harga barang) set 1.0000 1,520
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 BH Clean Out dia.100 mm (Setara TOTO)


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Clean Out dia.100 mm bh 1.1000 389,000
Perlengkapan (10% harga barang) set 1.0000 38,900
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW 4 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW 4 Inch m1 1.1000 71,800
Perlengkapan (10% harga barang) set 1.0000 7,180
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m1 PVC AW 3 Inch


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan PVC AW 3 Inch m1 1.1000 38,100
Perlengkapan (10% harga barang) set 1.0000 3,810
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 Fire Extinguisher Tabung Type DCP 3 kg


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan DCP 3 kg unit 1.1000 592,000
Perlengkapan (10% harga barang) set 1.0000 59,200
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
- Memasang 1 BH ROOF DRAIN DIA.100
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan RD,100 m1 1.1000 205,500
Perlengkapan (10% harga barang) set 1.0000 20,550
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 set Tanki Air fiber kap.2000 liter


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Tanki Air fiber kap. 2000 liter set 1.0000 1,925,000
Perlengkapan (10% harga barang) set 1.0000 192,500
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Tanki Air Bawah


Kapasitas : 1 m3, type: Panel Fiber + instalasi pada tangki + dudukan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Tanki Air fiber Panel Kap. 1000 liter set 1.0000 4,710,000
Perlengkapan (10% harga barang) set 1.0000 471,000
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 set Louver Grille dia.100


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan 1 set Louver Grille dia.100 set 1.1000 105,500
Perlengkapan (10% harga barang) set 1.0000 10,550
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m dia. 6,4 mm


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Pipa Tembaga 6,4 mm m 1.1000 33,400
Isolasi aeroflex m 1.0000 9,700
Perlengkapan (10% harga barang) set 1.0000 4,310
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
- Memasang 1 m dia. 12,4 mm
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Pipa Tembaga 12,4 mm m 1.1000 88,000
Isolasi aeroflex m 1.0000 26,900
Perlengkapan (10% harga barang) set 1.0000 11,490
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m dia. 15,8 mm


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Pipa Tembaga 15,8 mm m 1.1000 76,500
Isolasi aeroflex m 1.0000 32,500
Perlengkapan (10% harga barang) set 1.0000 10,900
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang 1 m dia. 20
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Pipa dia. 20 m 1.1000 23,400
Isolasi aeroflex m 1.0000 48,000
Perlengkapan (10% harga barang) set 1.0000 7,140
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang Fan Ceilling Mounted Exhaust


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Memasang Fan Ceilling Mounted Exhaust set 1.1000 548,000
Perlengkapan (10% harga barang) set 1.0000 54,800
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang Fan Wall Mounted Exhaust 1


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Memasang Fan Wall Mounted Exhaust set 1.1000 415,000
Perlengkapan (10% harga barang) set 1.0000 41,500
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
- Memasang Indoor Hydrant
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Indoor Hydrant Box 1000x800x180mm set 1.1000 1,486,000
Selang Hydrant KANVAS setara ROYAL set 1.0000 1,700,000
JET NOZZLE Ukuran 1.5" set 1.0000 530,000
Perlengkapan (10% harga barang) set 1.0000 371,600
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

- Memasang Fan Wall Mounted Exhaust 2


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Memasang Fan Wall Mounted Exhaust set 1.0000 1,180,000
Perlengkapan (10% harga barang) set 1.0000 118,000
Tukang OH 1.0000 371,600
Tenaga Kerja Pekerja OH 0.1800 85,000
Kepala Tukang OH 0.1080 75,000
Mandor OH 0.0180 100,000
Jumlah harga per satuan pekerjaan
Jumlah
(Rp.)

121,917
11,083
15,300
8,100
1,800
486
158,686

Jumlah
(Rp.)

38,060
3,460
15,300
8,100
1,800
486
67,206

Jumlah
(Rp.)

16,720
1,520
15,300
8,100
1,800
486
43,926

Jumlah
(Rp.)
26,290
2,390
15,300
8,100
1,800
486
54,366

Jumlah
(Rp.)
20,350
1,850
15,300
8,100
1,800
486
47,886
Jumlah
(Rp.)
16,720
1,520
15,300
8,100
1,800
486
43,926

Jumlah
(Rp.)

427,900
38,900
15,300
8,100
1,800
486
492,486

Jumlah
(Rp.)
78,980
7,180
15,300
8,100
1,800
486
111,846

Jumlah
(Rp.)

41,910
3,810
15,300
8,100
1,800
486
71,406

Jumlah
(Rp.)

651,200
59,200
15,300
8,100
1,800
486
736,086
Jumlah
(Rp.)

226,050
20,550
15,300
8,100
1,800
486
272,286

Jumlah
(Rp.)

1,925,000
192,500
15,300
8,100
1,800
486
2,143,186

Jumlah
(Rp.)

4,710,000
471,000
15,300
8,100
1,800
486
5,206,686

Jumlah
(Rp.)

116,050
10,550
15,300
8,100
1,800
486
152,286

Jumlah
(Rp.)

36,740
9,700
4,310
15,300
8,100
1,800
486
76,436
Jumlah
(Rp.)

96,800
26,900
11,490
15,300
8,100
1,800
486
160,876

Jumlah
(Rp.)

84,150
32,500
10,900
15,300
8,100
1,800
486
153,236

Jumlah
(Rp.)

25,740
48,000
7,140
15,300
8,100
1,800
486
106,566

Jumlah
(Rp.)

602,800
54,800
15,300
8,100
1,800
486
683,286

Jumlah
(Rp.)
Jumlah
(Rp.)

456,500
41,500
15,300
8,100
1,800
486
523,686
Jumlah
(Rp.)

1,634,600
1,700,000
530,000
371,600
15,300
8,100
1,800
486
4,261,886

Jumlah
(Rp.)

1,180,000
118,000
371,600
15,300
8,100
1,800
1,694,800
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 Buah Closet duduk/Monoblock
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.300
Tukang Batu L.02 OH 1.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA

B BAHAN
Closet Duduk Buah 1.000
Perlengkapan % 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.4. Pemasangan 1 Buah Urinoir


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000
Tukang Batu L.02 OH 1.000
Kepala Tukang L.03 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA

B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir Pasang Kg 14.000
Perlengkapan % 30.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.5. Pemasangan 1 Buah Wastafel


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 1.450
Kepala Tukang L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.000
Semen Portland Kg 6.000
Pasir Pasang Kg 14.000
Perlengkapan % 12.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.5.1.1.14. Pemasangan 1 Buah Floor Drain
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.010
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA

B BAHAN
Floor Drain Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.19. Pemasangan 1 Buah Kran Diameter ½" atau ¾"


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.054
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA

B BAHAN
Kran air Buah 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.19B. Pemasangan 1 Buah Jet Washer


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.054
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.027
JUMLAH TENAGA KERJA

B BAHAN
Jet Washer Buah 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 247,500.00
85,000.00 93,500.00
100,000.00 1,000.00
90,000.00 14,400.00
JUMLAH TENAGA KERJA 356,400.00

2,850,000.00 2,850,000.00
2,850,000.00 171,000.00
JUMLAH HARGA BAHAN 3,021,000.00

JUMLAH HARGA ALAT -


3,377,400.00
10% x D 337,740.00
3,715,140.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 75,000.00
85,000.00 85,000.00
100,000.00 10,000.00
90,000.00 4,500.00
JUMLAH TENAGA KERJA 174,500.00

1,880,000.00 1,880,000.00
1,350.00 8,100.00
94.29 1,320.00
1,880,000.00 564,000.00
JUMLAH HARGA BAHAN 2,453,420.00

JUMLAH HARGA ALAT -


2,627,920.00
10% x D 262,792.00
2,890,712.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 90,000.00
85,000.00 123,250.00
100,000.00 15,000.00
90,000.00 5,400.00
JUMLAH TENAGA KERJA 233,650.00
955,000.00 955,000.00
1,350.00 8,100.00
94.29 1,320.00
955,000.00 114,600.00
JUMLAH HARGA BAHAN 1,079,020.00

JUMLAH HARGA ALAT -


1,312,670.00
10% x D 131,267.00
1,443,937.00
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 750.00
85,000.00 8,500.00
100,000.00 1,000.00
90,000.00 450.00
JUMLAH TENAGA KERJA 10,700.00

98,000.00 98,000.00
JUMLAH HARGA BAHAN 98,000.00

JUMLAH HARGA ALAT -


108,700.00
10% x D 10,870.00
119,570.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 4,050.00
85,000.00 7,650.00
100,000.00 900.00
90,000.00 2,430.00
JUMLAH TENAGA KERJA 15,030.00

85,000.00 85,000.00
4,000.00 100.00
JUMLAH HARGA BAHAN 85,100.00

JUMLAH HARGA ALAT -


100,130.00
10% x D 10,013.00
110,143.00

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 4,050.00
85,000.00 7,650.00
100,000.00 900.00
90,000.00 2,430.00
JUMLAH TENAGA KERJA 15,030.00

230,000.00 230,000.00
4,000.00 100.00
JUMLAH HARGA BAHAN 230,100.00
JUMLAH HARGA ALAT -
245,130.00
10% x D 24,513.00
269,643.00
PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI DAN DINDING PARTISI
PINTU
1 Unit Pintu, Type Pj1
2.000 Unit Daun Pintu Kaca Tempered 12 mm Lengkap @Rp
12.480 Ls Granit + Beton @Rp
6.120 M2 Kusen aluminium + Kaca Mati @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P1


2.000 Ls Daun Ambang aluminium + Kaca 5 mm @Rp
0.974 M2 Ventlasi Kusen aluminium + Kaca Mati @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P2


2.000 Ls Daun Pintu Aluminium Lengkap @Rp
0.849 M 2
Ventlasi Kusen aluminium + Kaca Mati @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P3


1.000 Ls Daun Pintu kaca + Aluminium Lengkap @Rp
0.609 M 2
Ventlasi Kusen aluminium + Kaca Mati @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P4


1.000 Ls Daun Pintu kaca Buram 5 mm + Aluminium Lengkap @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P5


1.000 Ls Daun Pintu aluminium km/wc @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Pintu, Type P6


1.000 Ls Kusen Pintu Hollow + Plat Besi Lengkap @Rp
0.100 Aksesories (10% dari bahan) @Rp
1 Unit Pintu, Type Ps
13.815 Ls Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) @Rp
0.100 Aksesories (10% dari bahan) @Rp

JENDELA
1 Unit Jendela, Type J1
8.460 M2 Daun Jendela + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Jendela, Type J2


6.660 M2 Daun Jendela + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Jendela, Type J3


6.030 M2 Daun Jendela + kaca warna hijau @Rp
1.000 Bh Jendela + assessoris @Rp
0.100 Aksesories (10% dari bahan) @Rp
1 Unit Jendela, Type J4
6.091 M2 Daun Jendela + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Jendela, Type J5


4.811 M2 Daun Jendela @Rp
5.800 M 2
Kosen aluminium + Kaca @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Jendela, Type J6


3.072 M2 Daun Jendela + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Jendela, Type J7


2.835 M2 Kosen aluminium + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp

VENTILASI
1 Unit Ventilasi, Type V1
2.013 M2 kosen + Kaca warna hijau Tebal 5 mm @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Ventilasi, Type V2


0.666 M2 kosen aluminium + jendela Kaca hijsu Tebal 5 mm @Rp
0.100 Aksesories (10% dari bahan) @Rp

1 Unit Ventilasi, Type V3


0.750 M2 kosen aluminium + jendela Kaca hijsu Tebal 5 mm @Rp
0.100 Aksesories (10% dari bahan) @Rp
SEN PINTU, JENDELA, VENTILASI DAN DINDING PARTISI

4,980,000.00 Rp. 9,960,000.00


450,000.00 Rp. 5,616,000.00
745,000.00 Rp. 4,559,027.50
2,013,502.75 Rp. 2,013,502.75
Harga Satuan Pekerjaan Rp. 22,148,530.25

2,550,000.00 Rp. 5,100,000.00


745,000.00 Rp. 725,928.00
582,592.80 Rp. 582,592.80
Harga Satuan Pekerjaan Rp. 6,408,520.80

2,550,000.00 Rp. 5,100,000.00


745,000.00 Rp. 632,654.00
573,265.40 Rp. 573,265.40
Harga Satuan Pekerjaan Rp. 6,305,919.40

2,550,000.00 Rp. 2,550,000.00


745,000.00 Rp. 453,705.00
300,370.50 Rp. 300,370.50
Harga Satuan Pekerjaan Rp. 3,304,075.50

2,650,000.00 Rp. 2,650,000.00


265,000.00 Rp. 265,000.00
Harga Satuan Pekerjaan Rp. 2,915,000.00

1,410,000.00 Rp. 1,410,000.00


141,000.00 Rp. 141,000.00
Harga Satuan Pekerjaan Rp. 1,551,000.00

3,350,000.00 Rp. 3,350,000.00


335,000.00 Rp. 335,000.00
Harga Satuan Pekerjaan Rp. 3,685,000.00
1,350,000.00 Rp. 18,650,250.00
1,865,025.00 Rp. 1,865,025.00
Harga Satuan Pekerjaan Rp. 20,515,275.00

745,000.00 Rp. 6,302,700.00


630,270.00 Rp. 630,270.00
Harga Satuan Pekerjaan Rp. 6,932,970.00

745,000.00 Rp. 4,961,700.00


496,170.00 Rp. 496,170.00
Harga Satuan Pekerjaan Rp. 5,457,870.00

745,000.00 Rp. 4,492,350.00


445,000.00 Rp. 445,000.00
493,735.00 Rp. 493,735.00
Harga Satuan Pekerjaan Rp. 5,431,085.00
745,000.00 Rp. 4,537,944.00
453,794.40 Rp. 453,794.40
Harga Satuan Pekerjaan Rp. 4,991,738.40

445,000.00 Rp. 2,140,717.00


745,000.00 Rp. 4,321,000.00
646,171.70 Rp. 646,171.70
Harga Satuan Pekerjaan Rp. 7,107,888.70

745,000.00 Rp. 2,288,640.00


228,864.00 Rp. 228,864.00
Harga Satuan Pekerjaan Rp. 2,517,504.00

745,000.00 Rp. 2,112,075.00


211,207.50 Rp. 211,207.50
Harga Satuan Pekerjaan Rp. 2,323,282.50

745,000.00 Rp. 1,499,536.00


149,953.60 Rp. 149,953.60
Harga Satuan Pekerjaan Rp. 1,649,489.60

745,000.00 Rp. 496,468.00


49,646.80 Rp. 49,646.80
Harga Satuan Pekerjaan Rp. 546,114.80

745,000.00 Rp. 558,750.00


55,875.00 Rp. 55,875.00
Harga Satuan Pekerjaan Rp. 614,625.00
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 M 2 Tembok Baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.200
Tukang Cat L.02 OH 0.063
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA

B BAHAN
Plamuur Kg 0.100
Cat Dasar Kg 0.100
Cat Tembok Emultion Paint Setara Jotun Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.250
Tukang Cat L.02 OH 0.225
Kepala Tukang L.03 OH 0.0225
Mandor L.04 OH 0.0075
JUMLAH TENAGA KERJA

B BAHAN
Menie Besi Kg 0.100
Pengencer Liter 0.010
Kuas Bh 0.010
Perancah Kayu M3 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

75,000.00 15,000.00
85,000.00 5,358.15
100,000.00 630.00
90,000.00 270.00
JUMLAH TENAGA KERJA 21,258.15

13,750.00 1,375.00
25,500.00 2,550.00
51,600.00 13,416.00
JUMLAH HARGA BAHAN 17,341.00

JUMLAH HARGA ALAT -


38,599.15
10% x D 3,859.91
42,459.06

Harga Satuan Jumlah Harga


(Rp) (Rp)

75,000.00 18,750.00
85,000.00 19,125.00
100,000.00 2,250.00
90,000.00 675.00
JUMLAH TENAGA KERJA 40,800.00

38,000.00 3,800.00
14,000.00 140.00
18,000.00 180.00
18,500.00 37.00
JUMLAH HARGA BAHAN 4,157.00

JUMLAH HARGA ALAT -


44,957.00
10% x D 4,495.70
49,452.70
ANALISA HARGA SATUAN ALAT BERAT

I DATA PERALATAN
1. Jenis Peralatan = Eksavator
2. Tenaga =
3. Harga = Rp
4. Umur Kerja =
5. 1 tahun =
6. 1 hari kerja =
7. Umur Ekonomis (TahunUE =
8. Jam kerja per tahun (T h =
9. Harga Pokok HP =
10. Harga Bahan Pokok/ THbp =
11. Harga Sisa (HS) = 10% (HP Hbp)=
12. Harga Penyusutan (HP - Hbp - HS) =

II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam


- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal BM = 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = 2% ) p ((UE + 1)/ (2 UE) x (HP/ h)

III BIAYA OPERASIONAL (OPERATIONAL COST)


- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.15
E = = 0.66
N = = 80.00
Hbbm = (Harga BBM) = 0.00

- Biaya Bahan Oli Pelumas


a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.13
T = (Jam) = 250.00
S = = 0.00
E = = 0.66
N = = 80.00
Hbop = (Harga bahan oli = -

b. Transmisi
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.22
T = (Jam) = 250.00
S = = 0.00
E = = 0.66
N = = 80.00
Hbop = (Harga bahan oli = -
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = 2.88
T = 2,400.00
S = 0.00
E = 0.66
N = 80.00
Hbbh = (Harga bahan hydraulik) -

- Biaya Bahan Gemok (Grease)


BBG = (S/E) x N x Hbbg
S = (Exsavator) 0.00
E = 0.66
N = 80.00
Hbbg = (Harga bahan gemok) -

- Biaya Saringan (filter-filter)


BFF = 0,5 (BBM+BBO+BBH+BBG) 0.5

- Biaya Bahan Pokok/ Ban


BBP = Hbp/ T
Hbp = 20,000,000.00
T = (Jam) 2,400.00

- Biaya Operator/ Jam

- Biaya Pemeliharaan/ Perbaikan (f = 90%)


BBP = f x (HP - Hbp)/ UE 90%

Harga Satuan Pekerjaan/ Jam


Dibulatkan
LISA HARGA SATUAN ALAT BERAT

0.80 M3
80.00 HP
###
6.00 Tahun
100.00 Hari
7.00 Jam
6.00 Thn 14,400.00 Jam
2,400.00
### ###
20,000,000.00
118,000,000.00
###

###
Rp/ jam 73,750.00
Rp/ jam 43,750.00
Rp/ jam 5,833.33

###

14.55 /jam -

0.10 /jam -

0.11 /jam -
0.17 /jam -

0.01 /jam -

0.00 /jam -

8,333.33

120,000.00

81,944.44 /jam 73,750.00

n Pekerjaan/ Jam ###


###
ANALISA PRODUKTIVITAS ALAT

Pekerjaan : Galian Tanah


Satuan Pembayar : M3
Alat : Excavator

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sepanjang Muara
3 Kondisi jalan : sedang baik
4 Jam kerja efektif per - hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA


1 Penggalian dilakukan dengan menggunakan Excavator
2 Hasil galian ditumpuk pada lokasi galian dgn jar L 20.00 M'
dan diratakan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
Tidak ada bahan yang diperlukan (MOB)

2 ALAT
2.a EXCAVATOR 120 HP (E11)
- Kapasitas Bucket V 0.80 M3
- Faktor Bucket Fb 0.85
- Faktor Efesiensi Alat Fa 0.80
- Swell Sw 70.00 %
- Kapasitas Nyata 1/(1 + Sw) x V Kn 0.74 M3

- Waktu Siklus Ts1 0.70 Menit


a. Pengalian (cutting) Ld 0.20 Menit
b. Pengangkatan dan swing (load) Dp 0.20 Menit
c. Pembuangan (Dumping) Uld 0.20 Menit
d. Swing Kembali (Unloaded) Uld 0.10 Menit

Siklus Per Jam ( 60 ) / Ts1 Cm 85.71 Kali


Produksi Maksimum Teoritis (Kn x cm) Fmt 63.03 m3/jam

Faktor Koreksi Fk 0.3968


a. Efisiensi Kerja 0.90
b. Keadaan Cuaca 0.80
c. Faktor Swing 0.85
d. Faktor Muat 0.85
e. Faktor Kondisi Kerja 0.80

Taksiran Produksi Alat Q1 25.01 M3/jam

0.0400 M3/jam

3 TENAGA
Produksi menentukan : EXCAVATOR Q1 25.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 175.06 M3
Kebutuhan tenaga : 7.00
Pekerja P 2.00 orang
Mandor M 1.00 orang
Koefisien tenaga / M3
Pekerja = (Tk x P) : Qt (Lo1) 0.0800 Jam
Mandor = (Tk x M) : Qt (Lo3) 0.0400 Jam
NALISA PRODUKTIVITAS ALAT

KET.
ANALISA PRODUKTIVITAS ALAT

Pekerjaan : Meratakan dan Memadatkan Tanah Pematang


Satuan Pembayar : M3
Alat : Excavator

No. URAIAN KODE KOEF. SATUAN KET.

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sepanjang Muara
3 Kondisi jalan : sedang baik
4 Jam kerja efektif per - hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA


1 Penggalian dilakukan dengan menggunakan Excavator
2 Hasil galian ditumpuk pada lokasi galian dgn L 20.00 M'
dan diratakan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1 BAHAN
Tidak ada bahan yang diperlukan (MOB)

2 ALAT
2.a EXCAVATOR 120 HP (E11)
- Kapasitas Bucket V 0.80 M3
- Faktor Bucket Fb 0.85
- Faktor Efesiensi Alat Fa 0.80
- Swell Sw 70.00 %
- Kapasitas Nyata 1/(1 + Sw) x V Kn 0.74 M3

- Waktu Siklus Ts1 0.70 Menit


a. Pengalian (cutting) Ld 0.20 Menit
b. Pengangkatan dan swing (load) Dp 0.20 Menit
c. Pembuangan (Dumping) Uld 0.20 Menit
d. Swing Kembali (Unloaded) Uld 0.10 Menit

Siklus Per Jam ( 60 ) / Ts1 Cm 85.71 Kali


Produksi Maksimum Teoritis (Kn x cm) Fmt 63.43 m3/jam

Faktor Koreksi Fk 0.40


a. Efisiensi Kerja 1.00
b. Keadaan Cuaca 0.90
c. Faktor Swing 0.80
d. Faktor Muat 0.85
e. Faktor Kondisi Kerja 0.75

Taksiran Produksi Alat Q1 25.37 M3/jam

0.0394 M3/jam

3 TENAGA
Produksi menentukan : EXCAVATOR Q1 25.37 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 177.60 M3
Kebutuhan tenaga : 7.00
Pekerja P 2.00 orang
Mandor M 1.00 orang
Koefisien tenaga / M3
Pekerja = (Tk x P) : Qt (Lo1) 0.0788 Jam
Mandor = (Tk x M) : Qt (Lo3) 0.0394 Jam
ANALISA TAKSIRAN PRODUKSI ALAT BERAT

Pekerjaan : Galian Tanah


Satuan Pembayaran : m3

No Uraian Pekerjaan Kode Koef

I Asumsi
1 Menggunakan Alat Berat
2 Lokasi Pekerjaan : Sepanjang pekerjaan
3 Jam kerja efektif per hari lk 7.00

II Metode Pelaksanaan
1 Menggali dan meratakan hasil galian

III Pemakaian Bahan, Alat dan Tenaga


1 Bahan
Bahan/ Material yang digali adalah tanah berpasir

2 Alat
2.1 Excavator (HER) 120 HP
- Kapasitas Bucket V 0.80
- Faktor Bucket Fb 0.85
- Faktor efisiensi Alat Fa 0.85
- Swell Sw 85.00
- Kapasitas nyata 1/ (1 + sw) x V Kn 0.68

Waktu Siklus Ts1 16.75


a. Penggalian (Cutting) Ld 12.00
b. Pengangkatan & Swing (Loaded) Dp 2.50
c. Pembuangan (Dumping) Uld 2.00
d. Swing kembali (Unloaded) Uld 0.25

Siklus per jam (60 x 60)/ Ts1 Cm 214.93


Produksi max teoritis (Kn x cm) Fmt 145.22

Faktor koreksi Fk 0.46


a. Efisiensi kerja 1.00
b. Keadaan Cuaca 0.90
c. Faktor swing 0.80
d. Faktor muat 0.85
e. Faktor kondisi kerja 0.75

Taksiran Produksi Q1 66.66


Koefisien Alat 0.0150
A TAKSIRAN PRODUKSI ALAT BERAT

Sat Ket

jam

m3
m3
m3
%
m3

Menit
Menit
Menit
Menit
Menit

Kali
m3/jam

m3/ jam
jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA

Jenis Pekerjaan : Mobilisasi/demobilisai


Analisa : Dihitung
Kuantitas Pekerjaan : Ls

Harga
No. Uraian Satuan Kuantitas Satuan
Rp.
1 2 3 4 5

I. MOBILISASI
1 Excavator Unit 2 3,000,000.00
2 Bulldozer Unit
3 Vibrator Roller Unit
4 Dump Truck Unit
5 Concrete Mixer/Molen Beton Unit
6 Genset Unit
7 Pompa Air Unit
8 Chain Saw Unit
9 Stamper Unit
10 Alat Ukur Unit

JUMLAH I

II. DEMOBILISASI
1 Excavator Unit 2 3,000,000.00
2 Bulldozer Unit
3 Vibrator Roller Unit
4 Dump Truck Unit
5 Concrete Mixer/Molen Beton Unit
6 Genset Unit
7 Pompa Air Unit
8 Chain Saw Unit
9 Stamper Unit
10 Alat Ukur Unit

JUMLAH II

TOTAL (I + II)
HARGA SATUAN PEKERJAA

Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/
berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan peker
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operato
- Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak
yang dibayar dari kontrak) dan biaya-biaya lainnya.
- Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja,
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spes
A SATUAN MATA PEMBAYARAN UTAMA

Jumlah
Harga
Rp.
6

6,000,000.00
-
-
-
-
-
-
-
-

###

6,000,000.00
-
-
-
-
-
-
-
-

###

###
###

s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukura

tas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari


udah termasuk bahan bakar, bahan habis dipakai dan operator.
pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

serta lelang harus mencakup seluruh tambahan tenagakerja, bahan, peralatan,


perlukan untuk menyelesaikan pekerjaan sesuai dengan spesifikasi dan gambar
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA

Jenis Pekerjaan : Galian Tanah Pondasi


Analisa : AB
Kuantitas Peke : 319.90 M3

Harga Jumlah
No. Uraian Satuan Kuantitas Satuan Harga
Rp. Rp.
1 2 3 4 5 6

I. TENAGA KERJA
1 Pekerja Org/hr 0.0800 ### 5,998.07
2 Mandor Org/hr 0.0400 ### 3,598.84

Jumlah Harga Tenaga 9,596.91

II. BAHAN

Jumlah Harga Bahan -

III. PERALATAN
1 Excavator Jam 0.0400 ### 12,895.85
Alat bantu Ls 1.0000 150.00 150.00

Jumlah Harga Peralatan 13,045.85


Total (I+II+III) 22,642.76
Jumlah Harga Satuan ###

Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan
berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan peke
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operat
volume dan/atau ukura - Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak
yang dibayar dari kontrak) dan biaya-biaya lainnya.
satuan pekerjaan dari - Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spe

(tetapi tidak termasuk PPN

tenagakerja, bahan, peralatan,


dengan spesifikasi dan gambar
rkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/ata

h kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan da

alatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
masuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te

ukan peserta lelang harus mencakup seluruh tambahan tenagakerja, bahan, p


ngkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spesifik
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA

Jenis Pekerja : Meratakan/urug kembali hasil galian


Analisa : A. 16 A.16
Kuantitas Pe : - 39.9100

No. Uraian Harga Jumlah


Satuan Kuantitas Satuan Harga
Rp. Rp.
1 2 3 4 5 6

I. TENAGA KERJA
1 Pekerja Org/hr 0.0000 - -
2 Mandor Org/hr 0.0000 - -

Jumlah Harga Tenaga -

II. BAHAN

Jumlah Harga Bahan -

III. PERALATAN
1 Excavator Jam 0.0394 ### 12,711.14
2 Ls 1.0000 150.00 150.00

Jumlah Harga Peralatan 12,861.14


Total (I+II+III) 12,861.14
Jumlah Harga Satuan ###

Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
u satuan pekerjaan da berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
- Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak term
an tenagakerja, bahan, yang
p dibayar dari kontrak) dan biaya-biaya lainnya.
- Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja, bah
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spesifika
atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

antitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor

an sudah termasuk bahan bakar, bahan habis dipakai dan operator.


uk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
n peserta lelang harus mencakup seluruh tambahan tenagakerja, bahan, peralatan,
n diperlukan untuk menyelesaikan pekerjaan sesuai dengan spesifikasi dan gambar
M PEKERJAAN PANEL
SK SN-S 06-1989-F
1 Memasang 1 LAMPU TL 2x36 RECESSED MOUNTED C/W ALUMINIUM, LOUVER

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TL 2x36 bh 1.1000 338,000
Perlengkapan (10% harga barang) bh 1.1000 33,800
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

2 LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang.


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Lampu TL 1 x 36 w Recessed Mounted c/w
bh 1.1000 292,000
Bahan Alumunium Louver
Perlengkapan (10% harga barang) bh 1.1000 29,200
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

3 Memasang LAMPU Sorot LED 100 Watt


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan LAMPU Sorot LED 100 Watt bh 1.1000 295,000
Perlengkapan (10% harga barang) bh 1.1000 29,500
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

4 Memasang 1bh LAMPU Downlight LED 16 WATT


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Downlight LED 18 WATT bh 1.1000 128,000
Perlengkapan (10% harga barang) bh 1.1000 12,800
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

5 Memasang 1bh LAMPU Downlight LED 13 WATT


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Downlight LED 13 WATT bh 1.1000 119,000
Perlengkapan (10% harga barang) bh 1.1000 11,900
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
5 Memasang 1bh Lampu Gantung LED Industri 50 Watt
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Lampu Gantung LED Industri 50 Watt bh 1.1000 896,000
Perlengkapan (10% harga barang) bh 1.1000 89,600
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

6 Memasang 1bh saklar 1gang


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Saklar 1 gang bh 1.1000 16,900
Inbow doos bh 1.1000 4,100
Perlengkapan (10% harga barang) bh 1.1000 1,690
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

7 Memasang 1bh saklar 2gang


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Saklar 2 gang bh 1.1000 20,100
Inbow doos bh 1.1000 4,100
Perlengkapan (10% harga barang) bh 1.1000 2,010
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

8 Memasang 1bh saklar 3gang


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Saklar 3 gang bh 1.1000 25,600
Inbow doos bh 1.1000 4,100
Perlengkapan (10% harga barang) bh 1.1000 2,560
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

9 Memasang 1ttk instalasi Penerangan


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan 1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 9 meter m 1.1000 10,900
- Conduit dia.20 @ 9 meter m 1.1000 40,500
Perlengkapan (10% harga barang) bh 1.1000 5,140
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

10 Memasang 1bh Stop Kontak,1 3 A


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Stop Kontak 13A bh 1.1000 13,900
Inbow doos bh 1.1000 4,100
Perlengkapan (10% harga barang) bh 1.0000 1,390
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
11 Memasang 1bh Stop Kontak,25A
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Stop Kontak 25A, bh 1.1000 17,300
Inbow doos bh 1.1000 4,100
Perlengkapan (10% harga barang) bh 1.0000 1,730
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

12 Memasang 1ttk instalasi Stop kontak


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan 1 Titik Instalasi terdiri dari :
- Nym 3x2,5 mm @ 13 meter m 1.1000 10,900
- Conduit dia.20 @ 13 meter m 1.1000 58,500
Perlengkapan (10% harga barang) bh 1.0000 6,940
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

13 Memasang 1bh Penangkal Petir


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Penangkal Petir bh 1.1000 4,280,000
Perlengkapan (10% harga barang) bh 1.0000 428,000
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

16 Memasang 1m GIP-2,5
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Gip 2,5 bh 1.1000 84,356
Perlengkapan (10% harga barang) bh 1.0000 8,436
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

17 Memasang 1m NYY 1x70 mm2


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan nyy 70 mm2 bh 1.1000 62,700
PVC-2 inchi bh 1.1000 71,850
Perlengkapan (10% harga barang) bh 1.0000 6,270
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

18 Memasang 1bh Grounding Box


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Bak Kontrol 400x400x400 1 1.1000 350,000
Perlengkapan (10% harga barang) bh 1.0000 35,000
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
19 Memasang 1bh Grounding rod
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Grounding rod pipa Gip-1" 12 m 1 1.1000 82,594
Galian 12 meter 1 1.1000 600,000
Perlengkapan (10% harga barang) bh 1.0000 8,259
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan

20 Memasang 1bh Terminal Grounding


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Terminal grounding 1 1.2000 250,000
Perlengkapan (10% harga barang) bh 1.0000 25,000
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
Jumlah
(Rp.)

371,800
37,180
13,500
9,180
1,800
486
433,946

Jumlah
(Rp.)

321,200
32,120
13,500
9,180
1,800
486
378,286

Jumlah
(Rp.)

324,500
32,450
13,500
9,180
1,800
486
381,916

Jumlah
(Rp.)

140,800
14,080
13,500
9,180
1,800
486
179,846

Jumlah
(Rp.)
Jumlah
(Rp.)
130,900
13,090
13,500
9,180
1,800
486
168,956
Jumlah
(Rp.)
985,600
98,560
13,500
9,180
1,800
486
1,109,126

Jumlah
(Rp.)
18,590
4,510
1,859
13,500
9,180
1,800
486
49,925

Jumlah
(Rp.)
22,110
4,510
2,211
13,500
9,180
1,800
486
53,797

Jumlah
(Rp.)

28,160
4,510
2,816
13,500
9,180
1,800
486
60,452

Jumlah
(Rp.)

11,990
44,550
5,654
13,500
9,180
1,800
486
87,160

Jumlah
(Rp.)
15,290
4,510
1,390
13,500
9,180
1,800
486
46,156
Jumlah
(Rp.)

19,030
4,510
1,730
13,500
9,180
1,800
486
50,236

Jumlah
(Rp.)

11,990
64,350
6,940
13,500
9,180
1,800
486
108,246

Jumlah
(Rp.)
4,708,000
428,000
13,500
9,180
1,800
486
5,160,966

Jumlah
(Rp.)
92,792
8,436
13,500
9,180
1,800
486
126,193

Jumlah
(Rp.)
68,970
79,035
6,270
13,500
9,180
1,800
486
179,241

Jumlah
(Rp.)
385,000
35,000
13,500
9,180
1,800
486
444,966
Jumlah
(Rp.)
90,853
660,000
8,259
13,500
9,180
1,800
486
784,079

Jumlah
(Rp.)
300,000
25,000
13,500
9,180
1,800
486
349,966
NO. DOKUMEN KET.

1 SURAT PENAWARAN
2 DAFTAR KUANTITAS HARGA
3 AHSP
4 UPAH DAN BAHAN
5 ANTEK
6 METODE PELAKSANAAN
7 TIME SCEDUL
8 DAFTAR PERALATAN UTAMA
9 DAFTAR PERSONIL
10 STRUKTUR ORGANISASI
11 SPESIFIKASI TEKNIS
12 RK3K
13 SUB KON
14 JADWAL ALAT
15 JADWAL BAHAN
16 JADWAL PERSONIL
17 IJAZAH PERSONIL
18 TKDN