A. TIMBUNAN/GALIAN
1 Air Liter 45.00
2 Kerikil Beton Uk. ≥ 4 cm M3 112,500.00
3 Kerikil Beton Uk. 3 cm s/d 4 cm M3 112,500.00
4 Pasir Pasang M3 120,000.00
5 Pasir Beton M3 110,000.00
6 Pasir Urug/Timbun Pilihan M3 67,500.00
7 Sirtu M3 108,000.00
8 Tanah Urug/Timbun Pilihan M3 67,500.00
9 Tanah Urug/Timbun Biasa M3 49,500.00
B. BAHAN PEREKAT
1 Lem Kayu Kg 19,485.00
2 Lem Vinyl/Karet Kg 28,485.00
3 Semen Portland @40 kg Kg 1,350.00
4 Semen Warna @50 kg Kg 2,520.00
5 Sealant Silicon M' 11,250.00
6 Waterproof Kg 27,000.00
C BATU/BATU CETAKAN
1 Batu Pecah 1-2 cm M3 225,000.00
2 Batu Pecah 2-3 cm M3 225,000.00
3 Batu Kali/Sungai 5 - 20 cm M3 112,500.00
4 Batu Bata Mesin 5x10x20 cm Buah 750.00
5 Batu Bata Merah 5 x 11 x 22 cm Buah 750.00
6 Batu Paras M2 130,500.00
7 Batu tempel hitam M2 126,000.00
8 Conblock/HB 20 M2 193,500.00
9 Kolom Beton Pra Cetak Batang 6,750,000.00
10 Kapur Padam M3 148,500.00
11 Panel Beton Pra Cetak Lembar 7,425,000.00
12 Batu Rooster Buah 8,100.00
D KAYU/LANGIT-LANGIT
1 Balok Kayu setara Kuat kayu kelas I M3 4,950,000.00
2 Balok Kayu Kelas II M3 4,050,000.00
3 Balok Kayu 5/7 Kelas IV M3 2,700,000.00
4 Bambu Ø 6-8/600 cm Batang 36,000.00
5 Asbes semen 1 M x 1 M M2 22,500.00
6 Gypsum 120x240 cm tebal 9 mm Lembar 72,000.00
7 Gypsum 120x240 cm tebal 12 mm Lembar 81,900.00
8 Calsyboard 120x240 cm tebal 6 mm Lembar 85,500.00
9 List Profil Gypsum/List Profil Kayu M' 25,650.00
10 Insulasi/Glasswool M2 31,500.00
11 Kayu Dolken/Kayu laut Ø 7,5-10/400 cm Btg 18,000.00
12 Papan Kayu Sembarang M3 3,600,000.00
13 Papan Kayu setara Kuat kayu kelas I M3 4,950,000.00
14 Papan Kayu setara Kuat kayu kelas II M3 4,050,000.00
15 Papan Kayu setara Kuat kayu kelas IV M3 2,700,000.00
16 Plywood 120x240 cm tebal 6 mm Lembar 103,500.00
17 Plywood 120x240 cm tebal 9 mm Lembar 162,000.00
18 Garuda Form 12 mm Lembar 211,500.00
19 Tali Ijuk M3 31,500.00
E. BESI/ALUMINIUM
1 Atap Type Metal Sheet 0,35 M2 65,250.00
2 Alumunium Foil M2 36,000.00
3 Rabung Type Metal Sheet 0,35 M' 24,750.00
4 Baut SDS 12 x 50 mm Buah 990.00
5 Baut Trust ukuran 12 (14 x 20 mm) Buah 315.00
6 Baut Reng ukuran 10 (16 x 16 mm) Buah 360.00
7 Besi Beton Polos Kg 10,400.00
8 Besi beton Ulir Kg 12,750.00
9 Besi Strip Kg 10,800.00
10 Besi Profil Kg 10,800.00
11 Besi Hollow Btg 126,000.00
12 Besi Siku 40.40.4 Kg 21,600.00
13 Besi Square Tube M 21,000.00
14 Besi List Kaca (1 x 1) cm M 9,000.00
15 Pengelasan Cm 6,750.00
16 Furing Channel btg 5,400.00
17 Frame Alumunium Kwalitas Menengah M1 31,500.00
18 Glass Block M2 427,500.00
19 Jendela Naco Buah 202,500.00
20 Main Truss C75 x 0,75 mm Galvalum Panjang 6 M' M1 9,900.00
21 Reng 121 Galvalum Panjang 6 M' M1 9,000.00
22 Kawat Beton Kg 16,200.00
23 Kawat Duri Kg 12,690.00
24 Kawat Jaring Kg 133,200.00
25 Kawat Las Kg 9,000.00
26 Kawat Las Listrik Kg 8,100.00
27 Kalsiplank Lbr 49,500.00
28 Paku Beton 2" - 5" Kg 28,800.00
29 Paku Biasa 0,5" - 2" Kg 14,400.00
30 Paku Biasa 2" - 5" Kg 14,400.00
31 Sekrup 0,5" - 2" Kg 19,800.00
32 Paku Triplek Kg 14,400.00
33 Paku Ulir Kg 25,200.00
34 Penjaga Jarak Bekisting Buah 12,600.00
35 Plat Baja Kg 12,600.00
36 Kusen Alumunium Kwalitas Menengah M' 45,000.00
37 Profil Kaca M' 23,400.00
38 Alluminium Strip Kwalitas Menengah M' 31,500.00
39 Railing tangga (stainless Steel) M2 198,000.00
40 Ramset Buah 2,565.00
41 Roof Light 90 x 180 Lembar 315,000.00
42 Skrup Fixer Buah 270.00
43 Seng Gelombang Lembar 58,500.00
44 Seng Plat Lembar 67,500.00
45 Venetion Blinds dan Vertical Blinds (Tirai) M2 1,350,000.00
H. CAT/MINYAK
1 Amplas/Kertas Pasir Lembar 2,700.00
2 Cat Dasar Kg 50,400.00
3 Cat Tembok Emultion Paint (Dalam) Kg 59,400.00
4 Cat Tembok Wethershield (Luar) Kg 75,600.00
5 Cat Minyak Kayu Kg 13,500.00
6 Cat Menie Kayu/Besi Kg 13,500.00
7 Dempul Gypsum Kg 13,500.00
8 Dempul Cat Kg 22,500.00
9 Kalkarium Kg 13,500.00
10 Kain Kasa M' 90.00
11 Minyak Cat Liter 18,000.00
12 Minyak Bekisting Liter 18,000.00
13 Plamur Kg 19,800.00
14 Residu Liter 10,800.00
15 Sabun Buah 3,600.00
16 Soda Api Kg 10,800.00
17 Solar Industri Liter 8,280.00
18 Minyak Pelumas Liter 40,500.00
19 Kuas Buah 13,500.00
20 Teak Oil Liter 10,800.00
21 Vernis Liter 45,000.00
I. SANITASI/PIPA
1 Bak Fibreglass 1 m³ Buah 292,500.00
2 Bathcup Buah 2,565,000.00
3 Bak Cuci Piring Stainless Steel Buah 382,500.00
4 Closet duduk Buah 2,925,000.00
5 Closet Jongkok Porselen Buah 292,500.00
6 Floor Drain Stainless Steel Buah 135,000.00
7 Instalasi Air Bersih ttk 135,000.00
8 Instalasi Air Kotor/Limbah ttk 135,000.00
9 Kran Air Diameter ½" - ¾" Buah 112,500.00
10 Kran Leher Angsa Buah 202,500.00
11 Jet Washer Buah 261,000.00
12 Pipa PVC tipe AW Ø ½" M' 3,600.00
13 Pipa PVC tipe AW Ø 3/4" M' 5,400.00
14 Pipa PVC tipe AW Ø 1" M' 6,750.00
15 Pipa PVC tipe AW Ø 1½" M' 7,200.00
16 Pipa PVC tipe AW Ø 2" M' 7,875.00
17 Pipa PVC tipe AW Ø 2 ½" M' 9,000.00
18 Pipa PVC tipe AW Ø 3" M' 9,900.00
19 Pipa PVC tipe AW Ø 4" M' 15,300.00
20 Pipa Galvanis diameter ½" M' 21,600.00
21 Pipa Galvanis diameter ¾" M' 28,800.00
22 Pipa Galvanis diameter 1" M' 39,600.00
23 Pipa Galvanis diameter 1 ½" M' 52,200.00
24 Pipa Galvanis diameter 3" M' 104,400.00
25 Pipa Galvanis diameter 4" M' 122,400.00
26 Pipa Beton diameter 15 - 20 cm Buah 270,000.00
27 Pipa Beton diameter 30 - 100 cm Buah 540,000.00
28 Seal tape Buah 6,300.00
29 Septick tank + Resapan Buah 4,500,000.00
30 Soap dispenser bh 31,500.00
31 Tempat Sabun Keramik bh 76,500.00
32 Tempat Tissu bh 103,500.00
33 Water drain Asesories Set 148,500.00
34 Wastafel Buah 585,000.00
35 Urinoir + Sekat Urinoir Buah 1,125,000.00
J. LISTRIK/AKSESORIS
1 Lampu SL 18 Watt + Fitting Set 121,500.00
2 Lampu TL 2 x 40 watt Lengkap kotak Reflektor Set 315,000.00
3 Lampu Downlight 23 watt Lengkap Set 130,500.00
4 Instalasi Listrik Titik Api/Lampu Nyala titik 135,000.00
5 Panel Box Listrik Lengkap set 607,500.00
6 Stop Kontak Tanam bh 40,500.00
7 Saklar Tunggal Buah 22,500.00
8 Saklar Ganda Buah 31,500.00
K. LISTRIK/AKSESORIS
1 Crane Diesel Jam 473,500.00
2 Vibro Hammer Jam 282,000.00
3 Water Jet Pump Jam 215,000.00
Terjemahan kedalam kalimat
erbilang = Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
BASIC => satu dua tiga empat lima enam tujuh delapan s @@@@@
ribu juta milyar triliyun @@@@@
013280730000 @@@@@
@ @@@@@@@@@@@ @@@@@ @@@@@ @@@@@ @@@@@@@@@@@
basic @ 000 1 @@@@@
erhitungan @ 0 @@@@@
angka @ sepuluh @@@@@
@ 0 @@@@@
@ 0 @@@@@
@ @@@@@
@ @@@@@
@ @@@@@
@ @@@@@
@ 730 2 @@@@@
@ 7 tiga puluh @@@@@
@ tujuh ratus sepuluh @@@@@
@ 3 @@@@@
@ 0 tiga puluh @@@@@
@ tiga puluh tiga puluh @@@@@
@ tujuh ratus tiga puluh ribu @@@@@
@ @@@@@
@ @@@@@
@ 280 3 @@@@@
@ 2 delapan puluh @@@@@
@ dua ratus sepuluh @@@@@
@ 8 @@@@@
@ 0 delapan puluh @@@@@
@ delapan puluh delapan puluh @@@@@
@ dua ratus delapan puluh juta @@@@@
@ @@@@@
@ @@@@@
@ 013 4 @@@@@
@ 0 @@@@@
@ tiga belas @@@@@
@ 1 tiga @@@@@
@ 3 tiga @@@@@
@ tiga belas tiga belas @@@@@
@ tiga belas milyar @@@@@
@ @@@@@
@ 000 1 @@@@@
@ 0 @@@@@
@ sepuluh @@@@@
@ 0 @@@@@@@@@@@
@ 0 @@@@@
@ @@@@@
@ @@@@@
@ ***
@
@ 82 00
@ tiga belas milyar dua ratus dtiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
@ tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
@ Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA
SESUDAH KLARIFIKASI NEGOSIASI
NO JENIS PEKERJAAN
1 PEKERJAAN PERSIAPAN
4 PEKERJAAN STRUKTUR
7 PEKERJAAN PLAFOND
9 PEKERJAAN LANTAI
10 PEKERJAAN PENGECATAN
11 PEKERJAAN SANITASI
13 PEKERJAAN LAIN-LAIN
JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN
Terbilang : Tiga belas milyar dua ratus delapan puluh juta tujuh ratus tiga puluh ribu rupiah.
REKAPITULASI
RENCANA ANGGARAN BIAYA
ESUDAH KLARIFIKASI NEGOSIASI
TOTAL HARGA
Rp.
Rp 186,352,024.00
Rp 156,111,441.75
Rp 1,381,606,995.38
Rp 4,796,770,964.98
Rp 654,508,796.72
Rp 1,101,897,756.10
Rp 144,200,700.00
Rp 931,050,220.00
Rp 520,765,953.46
Rp 238,956,980.62
Rp 80,240,592.00
Rp 892,096,105.80
Rp 988,835,800.00
Rp 12,073,394,330.80
Rp 1,207,339,433.08
Rp 13,280,733,763.88
Rp 13,280,730,000.00
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 150.00 M
b. Pemasangan Pagar Pengaman 80.00 m'
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 1.00 Pkt
d. Test Mutu Beton 1.00 Pkt
e. Direksi Keet 24.00 M2
f. Gudang Semen dan Peralatan 24.00 M2
g. Bedeng Pekerja 40.00 M2
h. Sewa Scafolding 1.00 Pkt
i. Perizinan 1.00 Pkt
NO JENIS PEKERJAAN
VOL SAT
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 98.10 M3
- Besi Ulir 12,893.15 Kg
- Besi Polos 4,427.37 Kg
- Bakesting Sloof 817.50 M2
Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3
- Besi Ulir 968.35 Kg
- Besi Polos 377.71 Kg
- Bakesting Sloof 78.09 M2
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3
- Besi Ulir 9,419.52 Kg
- Besi Polos 1,774.93 Kg
- Bakesting Kolom 323.40 M2
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3
- Besi Ulir 10,347.20 Kg
- Besi Polos 1,774.93 Kg
- Bakesting Kolom 323.40 M2
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.44 M3
- Besi Ulir 426.60 Kg
- Besi Polos 142.08 Kg
- Bakesting Kolom 28.80 M2
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.13 M3
- Besi Polos 944.61 Kg
- Bakesting Kolom 65.52 M2
Plat Canopy T = 7 cm
- Mutu Beton K-200 2.65 M3
- Besi Polos 233.10 Kg
- Bakesting Lantai 44.24 M2
b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.86 M3
- Besi Ulir 2,954.27 Kg
- Besi Polos 854.70 Kg
- Bakesting Balok 152.19 M2
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 68.62 M3
- Besi Ulir 10,994.23 Kg
- Besi Polos 3,159.76 Kg
- Bakesting Balok 484.90 M2
Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 15.84 M3
- Besi Ulir 3,038.02 Kg
- Besi Polos 1,058.20 Kg
- Bakesting Balok 211.14 M2
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 33.00 M3
- Besi Ulir 5,298.48 Kg
- Besi Polos 1,448.92 Kg
- Bakesting Kolom 284.20 M2
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 29.00 M3
- Besi Ulir 6,467.00 Kg
- Besi Polos 1,273.29 Kg
- Bakesting Kolom 284.20 M2
Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.48 M3
- Besi Ulir 189.60 Kg
- Besi Polos 47.36 Kg
- Bakesting Kolom 9.60 M2
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.16 M3
- Besi Polos 965.03 Kg
- Bakesting Kolom 66.56 M2
Plat Lantai T = 12 cm
- Mutu Beton K-250 236.14 M3
- Besi Polos 27,047.96 Kg
- Bakesting Lantai 1,967.80 M2
Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3
- Besi Polos 349.65 Kg
- Bakesting Lantai 66.29 M2
NO JENIS PEKERJAAN
VOL SAT
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3
- Besi Ulir 915.77 Kg
- Besi Polos 47.36 Kg
- Bakesting Kolom 9.60 M2
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.50 M3
- Besi Polos 406.54 Kg
- Bakesting Kolom 15.34 M2
NO JENIS PEKERJAAN
VOL SAT
LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 661.03 M2
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 1,322.05 M2
LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 355.32 M2
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 710.64 M2
PENUTUP ATAP
a. Seng Spandek 0.40 mm 1,446.79 M2
b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar 54.00 M2
c. Rabung Seng Spandek 72.24 M'
TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 54.00 Buah
c. Besi Baja UNP 250 x 90 x 9 mm 2,500.92 Kg
d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M'
e. Bordes Baja 51.60 M2
f. Perakitan Baja 2,598.14 Kg
7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2
b. Profil Gipsum Terpasang 385.80 M
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh
g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
3.00 Bh
Terpasang sesuai Gambar (P6)
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.00 Bh
b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.00 Bh
c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka + kaca
+ Aksesoris lengkap Terpasang (J3) 2.00 Bh
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 15.00 Bh
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 119.72 M2
b. Dinding Kaca 5 mm + Rangka Alumunium Putih (sesuai Gambar) 124.99 M2
LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh
b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 4.00 Bh
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 5.00 Bh
e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm 3.00
+ Aksesoris lengkap Terpasang (P4) Bh
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh
Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh
b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh
c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J6) 4.00 Bh
d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J7) 2.00 Bh
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 7.00 Bh
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3
b. Lantai Granit 60 x 60 cm (Unpolishet) 107.03 M2
c. Lantai Granit 30 x 60 cm + Stop Nosing 18.94 M2
d. Dinding Granit 60 x 60 cm (Polishet) 297.95 M2
e. Pekerjaan Floor Hardener + Trowel 1,258.82 M2
f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 152.58 M2
LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2
b. Dinding Granit 60 x 60 cm (Polishet) 13.45 M2
c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 852.11 M2
NO JENIS PEKERJAAN
VOL SAT
Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap 945.64 M2
b.Pengecatan Permurkaan Tangga Baja 112.24 M2
11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah
5 Washtafel Lengkap Setara TOTO 5.00 Buah
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah
8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah
10 Floor Drain Stainless 10.00 Buah
11 Tempat Sabun Dalam Toilet 9.00 Buah
12 Tempat Tissue Stailess 9.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 2.00 Buah
B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah
5 Washtafel Lengkap Setara TOTO 4.00 Buah
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah
8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah
10 Floor Drain Stainless 8.00 Buah
11 Tempat Sabun Dalam Toilet 7.00 Buah
12 Tempat Tissue Stailess 7.00 Buah
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 6.00 Buah
NO JENIS PEKERJAAN
VOL SAT
b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit
Pemasangan Exhaust Fan Dinding Type 1 28.00 unit
Pemasangan Exhaust Fan Dinding Type 2 2.00 unit
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
c LANTAI ATAP
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m
dia. 3/4 Inch ( Pipa Tegak ) 8.00 m
dia. 1/2 Inch 30.00 m
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
1. LANTAI-1
Hydrant Box + selang 2.00 bh
Pipa dia. 3 Inch 50.00 m
b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
J PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m
Alarm Led min-Max 3 gas 1.00 Unit
Cabinet For Area Valve dan Alarm 1.00 Unit
Fitting-Fitting pipa 1.00 Lot
PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan
2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
N PEKERJAAN PENGKABELAN
1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m
B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m
2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 57.00 ttk
1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
( Dipasang Diatap )
- Kabel NYY 70 mm2 25.00 m
- Termination & Supporting Material 1.00 lot
- Grounding Box 1.00 lot
- Grounding Rod ( R < 3 Ohm ) 1.00 lot
13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M'
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M'
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt
h Pemasangan Logo sesuai gambar 1.00 Pkt
KONSTRU
NO JENIS PEKERJAAN
VOL SAT
Ls 22,148,530.25 44,297,060.50
Ls 6,408,520.80 19,225,562.40
Ls 6,305,919.40 18,917,758.20
Ls 3,304,075.50 3,304,075.50
Ls 2,915,000.00 8,745,000.00
Ls 1,551,000.00 13,959,000.00
Ls 3,685,000.00 11,055,000.00
KONSTRUKSI FISIK WORKSHOP
Ls 13,000,000.00 26,000,000.00
Ls 9,700,000.00 77,600,000.00
Ls 20,515,275.00 20,515,275.00
Ls 6,932,970.00 27,731,880.00
Ls 5,457,870.00 32,747,220.00
Ls 5,431,085.00 10,862,170.00
Ls 1,649,489.60 6,597,958.40
Ls 546,114.80 8,191,722.00
Ls 6,408,520.80 25,634,083.20
Ls 6,305,919.40 25,223,677.60
Ls 3,304,075.50 16,520,377.50
Ls 2,915,000.00 8,745,000.00
Ls 1,551,000.00 7,755,000.00
Ls 4,991,738.40 19,966,953.60
Ls 7,107,888.70 92,402,553.10
Ls 2,517,504.00 10,070,016.00
Ls 2,323,282.50 4,646,565.00
Ls 1,649,489.60 6,597,958.40
Ls 546,114.80 3,822,803.60
Ls 410,000.00 106,399,100.00
KONSTRUKSI FISIK WORKSHOP
Ls 745,000.00 131,313,700.00
Jumlah 8 931,050,220.00
54,366.00 10,873,200.00
Sub Jumlah 10,873,200.00
KONSTRUKSI FISIK WORKSHOP
71,406.00 2,142,180.00
Sub Jumlah 2,142,180.00
71,406.00 2,284,992.00
Sub Jumlah 2,284,992.00
683,286.00 8,199,432.00
523,686.00 6,284,232.00
1,694,800.00 16,948,000.00
683,286.00 5,466,288.00
523,686.00 14,663,208.00
1,694,800.00 3,389,600.00
KONSTRUKSI FISIK WORKSHOP
3,925,000.00 43,175,000.00
Sub Jumlah 98,125,760.00
54,366.00 380,562.00
47,886.00 335,202.00
43,926.00 1,317,780.00
54,366.00 434,928.00
47,886.00 383,088.00
43,926.00 1,317,780.00
Sub Jumlah 4,169,340.00
111,846.00 782,922.00
111,846.00 1,118,460.00
111,846.00 1,118,460.00
Sub Jumlah 3,019,842.00
111,846.00 782,922.00
71,406.00 714,060.00
71,406.00 714,060.00
Sub Jumlah 2,211,042.00
KONSTRUKSI FISIK WORKSHOP
71,406.00 9,425,592.00
111,846.00 11,967,522.00
42,000.00 462,000.00
Sub Jumlah 21,855,114.00
4,261,886.00 8,523,772.00
158,686.00 7,934,300.00
736,086.00 2,944,344.00
KONSTRUKSI FISIK WORKSHOP
736,086.00 2,944,344.00
Sub Jumlah 22,346,760.00
392,000.00 7,840,000.00
19,200,000.00 19,200,000.00
3,500,000.00 3,500,000.00
22,500,000.00 22,500,000.00
Sub Jumlah 53,040,000.00
4,224,966.00 8,449,932.00
4,710,000.00 18,840,000.00
Sub Jumlah 27,289,932.00
141,000,000.00 141,000,000.00
13,719,366.00 13,719,366.00
KONSTRUKSI FISIK WORKSHOP
13,719,366.00 13,719,366.00
10,944,966.00 21,889,932.00
8,394,966.00 25,184,898.00
1,088,166.00 163,224,900.00
360,966.00 54,144,900.00
KONSTRUKSI FISIK WORKSHOP
38,046.00 41,546,232.00
38,046.00 37,741,632.00
Sub Jumlah 296,657,664.00
433,946.00 4,773,406.00
378,286.00 17,401,156.00
381,916.00 4,201,076.00
179,846.00 2,517,844.00
168,956.00 2,534,340.00
168,956.00 3,717,032.00
87,160.00 10,372,040.00
433,946.00 23,867,030.00
378,286.00 2,269,716.00
1,109,126.00 5,545,630.00
168,956.00 2,872,252.00
87,160.00 7,234,280.00
46,156.00 1,384,680.00
108,246.00 3,247,380.00
46,156.00 2,630,892.00
108,246.00 6,170,022.00
Sub Jumlah 13,432,974.00
228,966.00 10,303,470.00
228,966.00 10,303,470.00
Sub Jumlah 20,606,940.00
5,160,966.00 5,160,966.00
KONSTRUKSI FISIK WORKSHOP
179,241.00 4,481,025.00
349,966.00 349,966.00
444,966.00 444,966.00
784,078.80 784,078.80
Sub Jumlah 11,221,001.80
Jumlah 12 892,096,105.80
C BATU/BATU CETAKAN
1 Batu Pecah 1-2 cm M3
2 Batu Pecah 2-3 cm M3
3 Batu Kali/Sungai 5 - 20 cm M3
4 Batu Bata Mesin 5x10x20 cm Buah
5 Batu Bata Merah 5 x 11 x 22 cm Buah
D KAYU/LANGIT-LANGIT
1 Balok Kayu setara Kuat kayu kelas I M3
2 Balok Kayu Kelas II M3
3 Balok Kayu 5/7 Kelas IV M3
4 Kayu Dolken/Kayu laut Ø 7,5-10/400 cm Btg
5 Papan Kayu Sembarang M3
6 Kayu setara Kuat kayu kelas I M3
7 Kayu setara Kuat kayu kelas II M3
8 Kayu setara Kuat kayu kelas III M3
9 Kayu setara Kuat kayu kelas IV M3
10 Plywood 120x240 cm tebal 6 mm Lembar
11 Plywood 120x240 cm tebal 9 mm Lembar
12 Kalsiplank M'
E. BESI/ ALUMINIUM
1 Besi Beton Polos Kg
2 Besi beton Ulir Kg
3 Besi Strip Kg
4 Besi Baja Profil/Gording CNP Kg
4 Jendela Naco Buah
5 Kawat Beton Kg
6 Paku Beton 2" - 5" Kg
7 Paku Biasa 0,5" - 2" Kg
8 Paku Biasa 2" - 5" Kg
9 Sekrup 0,5" - 2" Kg
10 Sekrup 0,5" - 2" Bh
10 Paku Triplek Kg
11 Paku Ulir Kg
12 Penjaga Jarak Bekisting Buah
13 Plat Baja Kg
14 Seng Gelombang Lembar
15 Seng Plat Lembar
16 Seng Spndek 0.35 mm M'
17 Seng Plat M'
18 Wiremesh Kg
F. PENUTUP LANTAI DAN DINDING
1 Keramik 30 x 30 cm Anti Slip Buah
2 Keramik Dinding 30 x 60 cm Buah
3 Granit Anti Slip + Stop Nosing 30 x 60 cm Buah
4 Granit 60 x 60 cm Buah
NO. URAIAN UPAH DAN BAHAN KODE SATUAN
H. CAT/MINYAK
1 Amplas/Kertas Pasir Lembar
2 Cat Dasar Kg
3 Cat Tembok Emultion Paint Setara Jotun Kg
4 Cat Minyak Kayu Kg
5 Cat Menie Kayu/Besi Kg
6 Dempul Gypsum Kg
7 Dempul Cat Kg
8 Kalkarium Kg
9 Kain Kasa M'
10 Minyak Cat Liter
11 Minyak Bekisting Liter
12 Plamur Kg
13 Residu Liter
14 Soda Api Kg
15 Solar Industri Liter
16 Minyak Pelumas Liter
17 Kuas Buah
18 Teak Oil Liter
19 Vernis Liter
I. SANITASI
1 Closet duduk setara TOTO Buah
2 Closet Jongkok setara TOTO Buah
3 Floor Drain Stainless Steel setara TOTO Buah
4 Kran Air Diameter ½" - ¾" setara TOTO Buah
5 Jet Washer setara TOTO Buah
6 Seal tape Buah
7 Wastafel setara TOTO Buah
8 Urinoir setara TOTO Buah
9 Penyekat Urinoir Porselein Setara TOTO Buah
10 Cermin Pada Washtafel Ukuran Besar Buah
11 Cermin Pada Washtafel Ukuran Kecil Buah
12 Tempat Sabun Dalam Toilet Buah
13 Tempat Tissue Stailess Buah
14 Gantungan Pakaian Stailess Belakang Pintu Toilet Buah
J. LISTRIK/AKSESORIS
1 Crane Diesel Jam
2 Vibro Hammer Jam
3 Water Jet Pump Jam
K TATA UDARA
1 Fan Wall Mounted Exhaust Type 1 / Unit
2 Fan Wall Mounted Exhaust Type 2 / Unit
3 Fan Ceilling Mounted Exhaust / Unit
4 Pipa Liquid 6,4 mm /m
5 Isolasi Liquid 6,4 mm /m
NO. URAIAN UPAH DAN BAHAN KODE SATUAN
12 Pipa Drain 20 mm /m
13 Isolasi Liquid 20 mm /m
14 Louver Grille 150X150 / bh
L PLAMBING
1 pipa GIP dia. 3 Inch /m
2 pipa dia. 1/2 Inch PVC AW /m
3 pipa dia. 3/4 Inch PVC AW /m
4 pipa dia. 1 Inch PVC AW /m
5 pipa dia. 4 Inch PVC AW /m
6 pipa dia. 3 Inch PVC AW /m
7 pipa dia. 2 Inch PVC AW /m
8 Clean Out-100 TOTO TX 1 AN / Unit
9 Roof Drain dia.100 / Unit
10 Tangki air fiber kap. 1000 liter / Unit
11 Tangki air fiber panel kap. 2000 liter / Unit
M PEMADAM KEBAKARAN
1 DCP-3 kg / Unit
2 Indoor Hydrant Box c/w Accessories / set
3 JET NOZZLE Ukuran 1.5" / set
4 Selang Hydrant KANVAS 1,5 x 20 m setara ROYAL / set
N LAMPU
1 Lampu TL 2 x 36 w Recessed Mounted c/w Alumunium Louver / Unit
2 LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. / Unit
3 LAMPU Sorot LED 100 Watt / Unit
4 Lampu downlight LED -16 W / Unit
5 Lampu downlight LED -13 W / Unit
6 Lampu Gantung LED Industri 50 Watt / Unit
O PANEL
1 P-MDB / Unit
2 DB-LT/1 / Unit
3 DB-LT Mesin / Bh
P KABEL
1 NYY 240 mm2 / meter
2 NYY 4x50 mm2 / meter
3 NYY 3x2,5 mm2 / meter
4 NYM 3x2,5 mm2 / meter
Q STOP KONTAK DAN SAKLAR
1 SAKLAR 1 GANG / Unit
2 SAKLAR 2 GANG / Unit
3 SAKLAR 3 GANG / Unit
4 STOP KONTAK 13 A / Unit
5 STOP KONTAK 25 A / Unit
6 INBOW DOS / Unit
R PENANGKAL PETIR
1 PENANGKAL PETIR RADIUS 97 METER / Unit
NO. URAIAN UPAH DAN BAHAN KODE SATUAN
HARGA SATUAN
Rp 75,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 100,000.00
Rp 90,000.00
Rp 90,000.00
Rp 75,000.00
Rp 125,000.00
Rp 120,000.00
Rp 75,000.00
Rp 100,000.00
Rp 70,000.00
Rp 60,000.00
Rp 18,000.00
Rp 15,000.00
Rp 10,000.00
Rp 125,000.00
Rp 75,000.00
Rp 90,000.00
Rp 25.00
Rp 143,000.00
Rp 143,000.00
Rp 132,000.00
Rp 143,000.00
Rp 85,000.00
Rp 204,000.00
Rp 65,000.00
Rp 16,000.00
Rp 26,500.00
Rp 1,121,000.00
HARGA SATUAN
Rp 1,023,000.00
Rp 1,350.00
Rp 2,600.00
Rp 8,500.00
HARGA SATUAN
Rp 285,000.00
Rp 345,000.00
Rp 179,000.00
Rp 750.00
Rp 780.00
Rp 3,850,000.00
Rp 3,400,000.00
Rp 2,400,000.00
Rp 18,500.00
Rp 2,350,000.00
Rp 3,750,000.00
Rp 3,300,000.00
Rp 3,050,000.00
Rp 2,350,000.00
Rp 98,000.00
Rp 148,000.00
Rp 51,500.00
Rp 10,400.00
Rp 13,100.00
Rp 8,500.00
Rp 15,200.00
Rp 146,000.00
Rp 15,000.00
Rp 17,000.00
Rp 17,000.00
Rp 17,000.00
Rp 18,500.00
Rp 250.00
Rp 17,000.00
Rp 22,500.00
Rp 8,000.00
Rp 11,300.00
Rp 47,000.00
Rp 26,500.00
Rp 58,500.00
Rp 39,000.00
Rp 15,800.00
NG
Rp 11,500.00
Rp 23,400.00
Rp 61,300.00
Rp 67,900.00
HARGA SATUAN
Rp 72,500.00
Rp 72,000.00
Rp 225,000.00
HARGA SATUAN
Rp 5,000.00
Rp 25,500.00
Rp 51,600.00
Rp 38,000.00
Rp 38,000.00
Rp 5,500.00
Rp 18,000.00
Rp 11,800.00
Rp 180.00
Rp 14,000.00
Rp 8,000.00
Rp 13,750.00
Rp 8,000.00
Rp 6,000.00
Rp 12,000.00
Rp 32,000.00
Rp 18,000.00
Rp 9,000.00
Rp 38,000.00
Rp 2,850,000.00
Rp 325,000.00
Rp 98,000.00
Rp 85,000.00
Rp 230,000.00
Rp 4,000.00
Rp 955,000.00
Rp 1,880,000.00
Rp 1,650,000.00
Rp 428,000.00
Rp 295,000.00
Rp 85,000.00
Rp 65,000.00
Rp 62,000.00
Rp 295,000.00
Rp 210,000.00
Rp 135,000.00
Rp 415,000.00
Rp 1,180,000.00
Rp 548,000.00
Rp 33,400.00
Rp 9,700.00
HARGA SATUAN
Rp 88,000.00
Rp 26,900.00
Rp 76,500.00
Rp 32,500.00
Rp 17,600.00
Rp 29,700.00
HARGA SATUAN
Rp 23,400.00
Rp 48,000.00
Rp 105,500.00
Rp 665,000.00
Rp 15,200.00
Rp 18,500.00
Rp 23,900.00
Rp 71,800.00
Rp 38,100.00
Rp 34,600.00
Rp 389,000.00
Rp 205,500.00
Rp 1,925,000.00
Rp 4,710,000.00
Rp 592,000.00
Rp 1,486,000.00
Rp 530,000.00
Rp 1,700,000.00
Rp 338,000.00
Rp 292,000.00
Rp 295,000.00
Rp 128,000.00
Rp 119,000.00
Rp 896,000.00
Rp 11,412,000.00
Rp 9,100,000.00
Rp 6,975,000.00
Rp 886,000.00
Rp 280,000.00
Rp 10,900.00
Rp 8,200.00
Rp 16,900.00
Rp 20,100.00
Rp 25,600.00
Rp 13,900.00
Rp 17,300.00
Rp 4,100.00
Rp 4,280,000.00
HARGA SATUAN
Rp 62,700.00
Rp 200,000.00
Rp 170,000.00
Rp 176,000.00
HARGA SATUAN
Rp 182,000.00
Rp 169,000.00
Rp 159,000.00
Rp 172,000.00
Rp 9,800.00
Rp 58,000.00
Rp 58,000.00
Rp 58,000.00
Rp 53,000.00
Rp 322,500.00
Rp 95,500.00
Rp 17,500.00
Rp 150.00
1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank
1 Volume Pekerjaan = 150.00 M
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.100 Oh
Tukang = 0.100 Oh
Kepala Tukang = 0.010 Oh
Mandor = 0.005 Oh
0.215 Oh
Page 69 of 682
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.000 Minggu
Dibulatkan = 1.00 Minggu
e. Direksi Keet
1 Volume Pekerjaan = 24.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 2.000 Oh
Tukang = 2.000 Oh
Kepala Tukang = 1.000 Oh
Mandor = 0.300 Oh
5.300 Oh
Page 70 of 682
Besi Strip = 1.1 Kg x 24.00 M2 = 26.40 Kg
Semen Portland = 35 Kg x 24.00 M2 = 840.00 Kg
Pasing Pasang = 0.15 M3 x 24.00 M2 = 3.60 M3
Pasir Beton = 0.1 M3 x 24.00 M2 = 2.40 M3
Kerikil Beton Uk. 3 cm s/d 4 cm = 0.15 M3 x 24.00 M2 = 3.60 M3
Bata Merah = 30 Bh x 24.00 M2 = 720.00 Bh
Seng Plat = 0.25 Lbr x 24.00 M2 = 6.00 Lbr
Jendela Naco = 0.2 Bh x 24.00 M2 = 4.80 Bh
Kaca Polos tebal 3 mm ( Asahimas ) = 0.08 M2 x 24.00 M2 = 1.92 M2
Kunci Tanam = 0.15 Bh x 24.00 M2 = 3.60 Bh
Plywood 4 mm = 0.06 Lbr x 24.00 M2 = 1.44 Lbr
Page 71 of 682
3 Faktor Tenaga Kerja = Pekerja = 1.000 Oh
Tukang = 2.000 Oh
Kepala Tukang = 0.200 Oh
Mandor = 0.050 Oh
3.250 Oh
Page 72 of 682
h. Sewa Scafolding
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari (Mobilisasi)
= 0.143 Minggu
Dibulatkan = 1.00 Minggu
Digunakan selama 189 hari kerja
i. Perizinan
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.143 Minggu
Dibulatkan = 1.00 Minggu
2. PEK. GALIAN TANAH PONDASI
a. Galian Tanah Pondasi
1 Volume Pekerjaan = 319.90 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.750 Oh
Tukang = 0.025 Oh
0.775 Oh
0.550 Oh
Page 73 of 682
4 Jumlah Tenaga Kerja = 18.00 Org =
0.310 Oh
Page 74 of 682
6 Produktivitas Kerja Perhari = 6.00 = 19.355 M3
0.310
0.310 Oh
Page 75 of 682
5 Jumlah Bahan Yang Digunakan
Beton Ready Mix K-250 = 1.000 M3 x 212.89 M3 = 212.89 M3
Pompa = 1.000 M3 x 212.89 M3 = 212.89 M3
- Besi Ulir
1 Volume Pekerjaan = 26,513.19 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 76 of 682
5 Jumlah Bahan Yang Digunakan
Besi Beton Ulir = 1.050 Kg x 26,513.19 Kg = 27,838.85 Kg
Kawat Beton = 0.015 Kg x 26,513.19 Kg = 397.70 Kg
- Besi Polos
1 Volume Pekerjaan = 4,210.38 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0250 Oh
Tukang = 0.0250 Oh
Kepala Tukang = 0.0250 Oh
Mandor = 0.0010 Oh
0.076 Oh
Page 77 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.413 Oh
Tukang = 0.069 Oh
Kepala Tukang = 0.007 Oh
Mandor = 0.021 Oh
0.509 Oh
Page 78 of 682
- Besi Ulir
1 Volume Pekerjaan = 6,247.46 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 79 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.413 Oh
Tukang = 0.069 Oh
Kepala Tukang = 0.007 Oh
Mandor = 0.021 Oh
0.509 Oh
Page 80 of 682
- Besi Ulir
1 Volume Pekerjaan = 1,996.49 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 81 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.5000 Oh
Tukang = 0.7500 Oh
Kepala Tukang = 0.0750 Oh
Mandor = 0.0750 Oh
2.400 Oh
Page 82 of 682
Pas. Batu Kosong (Aanstamping)
1 Volume Pekerjaan = 2.02 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.7800 Oh
Tukang = 0.3900 Oh
Kepala Tukang = 0.0390 Oh
Mandor = 0.0390 Oh
1.248 Oh
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250
1 Volume Pekerjaan = 98.10 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh
- Besi Ulir
Page 83 of 682
1 Volume Pekerjaan = 12,893.15 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 84 of 682
- Besi Polos
1 Volume Pekerjaan = 4,427.37 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Sloof
1 Volume Pekerjaan = 817.50 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh
Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250
1 Volume Pekerjaan = 6.25 M3
Page 85 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh
Page 86 of 682
- Besi Ulir
1 Volume Pekerjaan = 968.35 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Besi Polos
1 Volume Pekerjaan = 377.71 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Sloof
1 Volume Pekerjaan = 78.09 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.5200 Oh
Page 87 of 682
Tukang = 0.2600 Oh
Kepala Tukang = 0.0260 Oh
Mandor = 0.0260 Oh
0.832 Oh
Page 88 of 682
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250
1 Volume Pekerjaan = 40.43 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh
- Besi Ulir
1 Volume Pekerjaan = 9,419.52 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Besi Polos
1 Volume Pekerjaan = 1,774.93 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
Page 89 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 90 of 682
- Bakesting Kolom
1 Volume Pekerjaan = 323.40 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Besi Ulir
Page 91 of 682
1 Volume Pekerjaan = 10,347.20 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
Page 92 of 682
- Besi Polos
1 Volume Pekerjaan = 1,774.93 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 323.40 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
Page 93 of 682
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250
1 Volume Pekerjaan = 1.44 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh
Page 94 of 682
- Besi Ulir
1 Volume Pekerjaan = 426.60 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 28.80 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Page 95 of 682
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
Page 96 of 682
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200
1 Volume Pekerjaan = 2.13 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 65.52 M2
Page 97 of 682
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
Page 98 of 682
Balok Latai 13 x 20 cm (BLL)
- Mutu Beton K-200
1 Volume Pekerjaan = 6.12 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 1.6500 Oh
Tukang = 0.2750 Oh
Kepala Tukang = 0.0280 Oh
Mandor = 0.0830 Oh
2.036 Oh
- Bakesting Balok
1 Volume Pekerjaan = 124.84 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
Page 99 of 682
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Bakesting Lantai
1 Volume Pekerjaan = 248.89 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
- Besi Polos
1 Volume Pekerjaan = 233.10 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Lantai
1 Volume Pekerjaan = 44.24 M2
- Besi Polos
1 Volume Pekerjaan = 854.7 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
Balok 30 x 50 cm (BL2)
- Mutu Beton K-250
1 Volume Pekerjaan = 68.62 M3
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.4125 Oh
Tukang = 0.0688 Oh
Kepala Tukang = 0.0070 Oh
Mandor = 0.0208 Oh
0.509 Oh
- Bakesting Balok
1 Volume Pekerjaan = 484.90 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Besi Polos
1 Volume Pekerjaan = 1,058.20 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Balok
1 Volume Pekerjaan = 211.14 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
- Bakesting Balok
1 Volume Pekerjaan = 115.31 M2
- Besi Polos
1 Volume Pekerjaan = 1,448.92 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 284.20 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Besi Polos
1 Volume Pekerjaan = 47.36 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 9.60 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 66.56 M2
- Besi Polos
1 Volume Pekerjaan = 27,047.96 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Lantai
1 Volume Pekerjaan = 1,967.80 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
- Besi Polos
1 Volume Pekerjaan = 349.65 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Lantai
1 Volume Pekerjaan = 66.29 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
- Besi Ulir
1 Volume Pekerjaan = 1,245.80 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Besi Polos
1 Volume Pekerjaan = 278.02 Kg
- Bakesting Balok
1 Volume Pekerjaan = 361.86 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Bakesting Balok
1 Volume Pekerjaan = 61.33 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
Tukang = 0.3300 Oh
Kepala Tukang = 0.0330 Oh
Mandor = 0.0330 Oh
1.056 Oh
- Besi Polos
1 Volume Pekerjaan = 47.36 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 9.60 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6600 Oh
- Bakesting Kolom
1 Volume Pekerjaan = 15.34 M2
- Besi Polos
1 Volume Pekerjaan = 1,957.12 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0070 Oh
Tukang = 0.0070 Oh
Kepala Tukang = 0.0007 Oh
Mandor = 0.0004 Oh
0.015 Oh
- Bakesting Lantai
1 Volume Pekerjaan = 49.17 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
- Bakesting Lantai
1 Volume Pekerjaan = 56.49 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding)
1 Volume Pekerjaan = 661.03 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.6000 Oh
Tukang = 0.2000 Oh
Kepala Tukang = 0.0200 Oh
Mandor = 0.0300 Oh
0.850 Oh
g. Trestang 14 mm Terpasang
1 Volume Pekerjaan = 76.00 Psng
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 5.00 Hari
= 0.71 Minggu
Dibulatkan = 1.00 Minggu
h. Plat Buhul T = 10 MM
1 Volume Pekerjaan = 278.51 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh
i. Perakitan Baja
1 Volume Pekerjaan = 15,877.12 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.1000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0010 Oh
TANGGA BAJA
a. Plat Tumpu T = 12 MM
1 Volume Pekerjaan = 97.22 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.0300 Oh
Tukang = 0.0100 Oh
Kepala Tukang = 0.0060 Oh
Mandor = 0.0040 Oh
0.050 Oh
f. Perakitan Baja
1 Volume Pekerjaan = 2,598.14 Kg
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.1000 Oh
Tukang = 0.1000 Oh
Kepala Tukang = 0.0010 Oh
Mandor = 0.0050 Oh
0.206 Oh
7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang
1 Volume Pekerjaan = 200.20 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu
b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1)
1 Volume Pekerjaan = 3.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm +
Aksesoris lengkap Terpasang (J1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar)
1 Volume Pekerjaan = 119.72 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu
Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris
lengkap (J4)
1 Volume Pekerjaan = 4.00 Bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar)
1 Volume Pekerjaan = 259.51 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 2.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 14.00 Hari
= 2.00 Minggu
Dibulatkan = 2.00 Minggu
9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja
1 Volume Pekerjaan = 4.28 M3
Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap
1 Volume Pekerjaan = 945.64 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 0.2500 Oh
Tukang = 0.2250 Oh
Kepala Tukang = 0.0225 Oh
Mandor = 0.0075 Oh
0.505 Oh
11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap
1 Volume Pekerjaan = 2.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 3.3000 Oh
Tukang = 1.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.1600 Oh
4.570 Oh
B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap
1 Volume Pekerjaan = 5.00 Buah
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = Pekerja = 3.3000 Oh
Tukang = 1.1000 Oh
Kepala Tukang = 0.0100 Oh
Mandor = 0.1600 Oh
4.570 Oh
b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP)
1 Volume Pekerjaan = 8.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu
c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar
1 Volume Pekerjaan = 11.00 unit
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak )
1 Volume Pekerjaan = 8.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
dia. 4 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
dia. 3 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch
1 Volume Pekerjaan = 10.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
dia. 4 Inch
1 Volume Pekerjaan = 107.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless
1 Volume Pekerjaan = 4.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan
1 Volume Pekerjaan = 20.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
Fitting-Fitting pipa
1 Volume Pekerjaan = 1.00 Lot
PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan
1 Volume Pekerjaan = 1.00 Pkt
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
N PEKERJAAN PENGKABELAN
1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm
1 Volume Pekerjaan = 150.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2
1 Volume Pekerjaan = 150.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2
1 Volume Pekerjaan = 992.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 7.00 Hari
= 1.00 Minggu
Dibulatkan = 1.00 Minggu
2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
-
c/w Alumunium Louver
1 Volume Pekerjaan = 55.00 bh
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 2.00 Hari
= 0.29 Minggu
Dibulatkan = 1.00 Minggu
Lantai -2
Pekerjaan Gantungan Listrik (Sesuai Gambar)
1 Volume Pekerjaan = 45.00 m
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 3.00 Hari
= 0.43 Minggu
Dibulatkan = 1.00 Minggu
- Grounding Box
1 Volume Pekerjaan = 1.00 lot
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
- Grounding Rod ( R < 3 Ohm )
1 Volume Pekerjaan = 1.00 lot
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 1.00 Hari
= 0.14 Minggu
Dibulatkan = 1.00 Minggu
13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris
Lengkap Terpasang
1 Volume Pekerjaan = 1,038.00 M2
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar.
1 Volume Pekerjaan = 169.48 M'
2 Tenaga yang digunakan = Tenaga manual dengan alat bantu
3 Faktor Tenaga Kerja = = 1.00 Group
4 Jumlah Tenaga Kerja =
5 Produktivitas Kerja Perhari =
6 Waktu yang dibutuhkan = = 4.00 Hari
= 0.57 Minggu
Dibulatkan = 1.00 Minggu
Jakarta,11
PT. MIRTADA
John Kirain
Direktur
5.83 Group
= 1.00 Hari
3.00 Group
= 5.00 Hari
= 7.00 Hari
= 14.00 Hari
= 2.00 Hari
1.00 Group
5.00 Group
= 13.00 Hari
4.00 Group
5.00 Group
5.00 Group
= 11.00 Hari
= 4.00 Hari
= 4.00 Hari
5.00 Group
Liter
= 8.00 Hari
= 3.00 Hari
= 3.00 Hari
3.00 Group
Liter
= 4.00 Hari
= 1.00 Hari
= 1.00 Hari
3.00 Group
= 3.00 Hari
= 9.00 Hari
= 4.00 Hari
6.00 Group
Liter
= 19.00 Hari
= 1.00 Hari
= 2.00 Hari
1.00 Group
= 1.00 Hari
Liter
= 4.00 Hari
= 2.00 Hari
4.00 Group
= 6.00 Hari
= 3.00 Hari
Liter
Lembar
Batang
= 12.00 Hari
2.00 Group
= 2.00 Hari
= 6.00 Hari
= 3.00 Hari
5.00 Group
Liter
Lembar
Batang
= 12.00 Hari
= 1.00 Hari
= 2.00 Hari
1.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 3.00 Hari
Liter
= 1.00 Hari
1.00 Group
= 3.00 Hari
Liter
Lembar
Batang
= 3.00 Hari
Liter
= 3.00 Hari
1.00 Group
= 2.00 Hari
Liter
Lembar
Batang
= 5.00 Hari
= 4.00 Hari
1.00 Group
= 26.00 Hari
Liter
Lembar
Batang
= 9.00 Hari
Liter
= 1.00 Hari
1.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 2.00 Hari
= 1.00 Hari
4.00 Group
= 2.00 Hari
= 1.00 Hari
Liter
Lembar
Batang
= 6.00 Hari
5.00 Group
= 2.00 Hari
= 6.00 Hari
= 4.00 Hari
5.00 Group
Liter
Lembar
Batang
= 18.00 Hari
= 1.00 Hari
= 2.00 Hari
3.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 8.00 Hari
Liter
= 1.00 Hari
1.00 Group
= 2.00 Hari
Liter
Lembar
Batang
= 3.00 Hari
= 2.00 Hari
2.00 Group
= 7.00 Hari
= 4.00 Hari
Liter
Lembar
Batang
= 13.00 Hari
2.00 Group
= 2.00 Hari
= 17.00 Hari
= 4.00 Hari
5.00 Group
Liter
Lembar
Batang
= 11.00 Hari
= 1.00 Hari
= 1.00 Hari
1.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 2.00 Hari
Liter
= 1.00 Hari
1.00 Group
= 3.00 Hari
Liter
Lembar
Batang
= 6.00 Hari
= 6.00 Hari
5.00 Group
= 14.00 Hari
Liter
Lembar
Batang
= 21.00 Hari
= 1.00 Hari
1.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 3.00 Hari
= 1.00 Hari
2.00 Group
= 2.00 Hari
= 1.00 Hari
Liter
Lembar
Batang
= 4.00 Hari
1.00 Group
= 5.00 Hari
= 4.00 Hari
= 7.00 Hari
3.00 Group
Liter
Lembar
Batang
= 22.00 Hari
= 1.00 Hari
= 3.00 Hari
3.00 Group
Liter
Lembar
Batang
= 4.00 Hari
= 1.00 Hari
= 2.00 Hari
1.00 Group
= 1.00 Hari
Liter
Lembar
Batang
= 2.00 Hari
Liter
= 1.00 Hari
1.00 Group
= 2.00 Hari
Liter
Lembar
Batang
= 2.00 Hari
= 1.00 Hari
2.00 Group
= 3.00 Hari
Liter
Lembar
Batang
= 3.00 Hari
= 1.00 Hari
2.00 Group
= 2.00 Hari
Liter
Lembar
Batang
= 4.00 Hari
Buah
= 20.00 Hari
8.00 Group
= 23.00 Hari
Buah
= 4.00 Hari
= 5.00 Hari
8.00 Group
Buah
= 12.00 Hari
= 14.00 Hari
Buah
= 11.00 Hari
8.00 Group
= 8.00 Hari
= 5.00 Hari
= 13.00 Hari
= 8.00 Hari
1.00 Group
1.00 Group
= 3.00 Hari
Liter
Liter
= 47.00 Hari
= 24.00 Hari
2.00 Group
Buah
1.00 Group
3.00 Group
= 7.00 Hari
Liter
Liter
Liter
= 2.00 Hari
Buah
= 7.00 Hari
2.00 Group
Buah
= 2.00 Hari
Buah
= 14.00 Hari
Buah
= 1.00 Hari
Buah
= 3.00 Hari
= 14.00 Hari
8.00 Group
5.00 Group
5.00 Group
Liter
= 16.00 Hari
2.00 Group
= 3.00 Hari
Buah
= 1.00 Hari
1.33 Group
Unit
= 1.00 Hari
= 1.00 Hari
1.00 Group
Buah
Buah
1.00 Group
Buah
Buah
1.00 Group
Buah
= 1.00 Hari
Buah
= 2.00 Hari
Unit
= 1.00 Hari
Unit
= 1.00 Hari
Buah
Buah
1.00 Group
Buah
Buah
= 1.00 Hari
1.00 Group
Buah
= 1.00 Hari
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 192.00 M 0.1133 0.113
b. Pemasangan Pagar Pengaman 25.00 m' 0.0202 0.020
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 1.00 Pkt 0.0170 0.017
d. Test Mutu Beton 1.00 Pkt 0.1362
e. Direksi Keet 24.00 M2 0.2504 0.250
f. Gudang Semen dan Peralatan 24.00 M2 0.2145 0.214
g. Bedeng Pekerja 40.00 M2 0.3681 0.368
h. Sewa Scafolding 1.00 Pkt 0.3618 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
i. Perizinan 1.00 Pkt 0.0851 0.085
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 100.37 M3 1.0882 0.544 0.544
- Besi Ulir 12,627.02 Kg 1.7980 0.899 0.899
- Besi Polos 5,432.88 Kg 0.6294 0.315 0.315
- Bakesting Sloof 669.12 M2 0.8807 0.440 0.440
Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3 0.0678 0.034 0.034
- Besi Ulir 969.09 Kg 0.1380 0.069 0.069
- Besi Polos 472.29 Kg 0.0547 0.027 0.027
- Bakesting Sloof 78.15 M2 0.1029 0.051 0.051
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3 0.4383 0.219 0.219
- Besi Ulir 9,419.52 Kg 1.3412 0.671 0.671
- Besi Polos 1,774.93 Kg 0.2056 0.103 0.103
- Bakesting Kolom 323.40 M2 0.6757 0.338 0.338
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3 0.3852 0.193 0.193
- Besi Ulir 10,347.20 Kg 1.4733 0.737 0.737
- Besi Polos 1,781.54 Kg 0.2064 0.103 0.103
- Bakesting Kolom 284.20 M2 0.5938 0.297 0.297
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.28 M3 0.0139 0.008 0.006
- Besi Ulir 362.61 Kg 0.0516 0.026 0.026
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 3.40 M3 0.0296 0.018 0.012
- Besi Polos 1,148.46 Kg 0.1330 0.067 0.067
- Bakesting Kolom 104.47 M2 0.2183 0.131 0.087
Plat Canopy T = 7 cm
- Mutu Beton K-200 2.76 M3 0.0240
- Besi Polos 324.12 Kg 0.0375
- Bakesting Lantai 46.13 M2 0.1124
b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.03 M3 0.1954
- Besi Ulir 2,645.67 Kg 0.3767 0.188
- Besi Polos 778.58 Kg 0.0902 0.045
- Bakesting Balok 147.69 M2 0.3156 0.158 0.158
Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 48.97 M3 0.5309
- Besi Ulir 10,981.64 Kg 1.5637 0.782
- Besi Polos 2,850.51 Kg 0.3302 0.165
- Bakesting Balok 553.02 M2 1.1818 0.591 0.591
Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 9.58 M3 0.1039
- Besi Ulir 3,003.52 Kg 0.4277 0.214
- Besi Polos 1,024.53 Kg 0.1187 0.059
- Bakesting Balok 212.86 M2 0.4549 0.227 0.227
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 31.00 M3 0.3361
- Besi Ulir 4,977.36 Kg 0.7087
- Besi Polos 1,361.11 Kg 0.1577
- Bakesting Kolom 223.20 M2 0.4663
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 28.00 M3 0.3036
- Besi Ulir 5,619.60 Kg 0.8002
- Besi Polos 1,400.67 Kg 0.1623
- Bakesting Kolom 224.00 M2 0.4680
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 0.14 M3 0.0016
- Besi Ulir 43.61 Kg 0.0062
- Besi Polos 12.88 Kg 0.0015
- Bakesting Kolom 2.88 M2 0.0060
Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.97 M3 0.0105
- Besi Ulir 174.43 Kg 0.0248
- Besi Polos 65.27 Kg 0.0076
- Bakesting Kolom 8.64 M2 0.0181
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 1.45 M3 0.0127
- Besi Polos 539.59 Kg 0.0625
- Bakesting Kolom 28.08 M2 0.0587
Plat Lantai T = 12 cm
- Mutu Beton K-250 112.75 M3 1.2225
- Besi Polos 22,650.17 Kg 2.6239 0.918
- Bakesting Lantai 749.32 M2 1.8252 0.821 0.548
Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3 0.0346
- Besi Polos 349.84 Kg 0.0405
- Bakesting Lantai 66.29 M2 0.1615
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3 0.0328
- Besi Ulir 915.77 Kg 0.1304
- Besi Polos 270.40 Kg 0.0313
- Bakesting Kolom 60.48 M2 0.1264
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.45 M3 0.0039
- Besi Polos 269.23 Kg 0.0312
- Bakesting Kolom 13.81 M2 0.0288
LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 607.53 M2 0.9638
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 1,215.06 M2 0.5654
LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 399.76 M2 0.6342
b. Plesteran 1 Pc : 4 Ps, Tebal 15 mm (Dinding) 799.52 M2 0.3720
PENUTUP ATAP
a. Seng Spandek 0.40 mm 1,446.79 M2 1.5521
b. Acrylic 8 mm Warna Clear terpasang sesuai Gambar 54.00 M2 0.3347
c. Rabung Seng Spandek 72.24 M' 0.0528
TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg 0.0313
b. Baut Angkur Plat Tumpu 1 Inci P = 50 Cm (Pabrikasi) 54.00 Buah 0.0317
c. Besi Baja UNP 250 x 90 x 9 mm 4,516.67 Kg 1.4522
d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M' 0.3524
e. Bordes Baja 51.60 M2 0.1208
f. Perakitan Baja 4,613.89 Kg 0.1372
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2 0.2982
b. Profil Gipsum Terpasang 187.60 M 0.0168
LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2 0.8780
b. Profil Gipsum Terpasang 385.80 M 0.0345
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh 0.1188
g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
Terpasang sesuai Gambar (P6) 3.00 Bh 0.0941
h. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL1) 2.00 Bh 0.2213
i. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL2) 8.00 Bh 0.6606
j. Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) 1.00 Bh 0.1746
Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.000 Bh 0.2361
b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.000 Bh 0.2788
c. Kusen Aluminium putih + Kaca warna biru 5 mm + jendela buka + kaca
+ Aksesoris lengkap Terpasang (J3) 2.000 Bh 0.0925
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh 0.0562
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 15.00 Bh 0.0697
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 128.79 M2 0.4495
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh 0.2182
b. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P2) 4.00 Bh 0.2147
c. Kusen Aluminium putih + Ventilasi Kaca 5 mm + Pintu Kaca warna biru 5 mm
+ Aksesoris lengkap Terpasang (P3) 5.00 Bh 0.1406
e. Kusen Aluminium putih + Pintu Ambang Alumunium Kaca Buram 5 mm
3.00 Bh 0.0744
+ Aksesoris lengkap Terpasang (P4)
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh 0.0660
Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh 0.1700
b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh 0.7866
c. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J6) 4.00 Bh 0.0857
d. Kusen Aluminium putih + Jendela Kaca 5 mm + Aksesoris lengkap (J7) 2.00 Bh 0.0396
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh 0.0562
b. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V2) 7.00 Bh 0.0325
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2 0.9058
b. Dinding Kaca 5 mm Rangka Alumunium Putih (sesuai Gambar) 176.26 M2 1.1178
9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3 0.0303
b. Lantai Granit 60 x 60 cm (Unpolishet) 107.03 M2 0.3307
c. Lantai Granit 30 x 60 cm + Stop Nosing 18.94 M2 0.0845
d. Dinding Granit 60 x 60 cm (Polishet) 297.95 M2 0.4986
e. Pekerjaan Floor Hardener + Trowel 1,258.82 M2 1.8324
f. Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 152.58 M2 0.2403
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2 0.0519
b. Dinding Granit 60 x 60 cm (Polishet) 13.45 M2 0.0225
c Pekerjaan Elevasi Lantai + Fin. Flooring Lantai 852.11 M2 1.3420
11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah 0.0633
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah 0.0111
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah 0.0738
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah 0.0421
5 Washtafel Lengkap Setara TOTO 5.00 Buah 0.0615
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah 0.0036
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah 0.0050
8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah 0.0113
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah 0.0046
10 Floor Drain Stainless 10.00 Buah 0.0102
11 Tempat Sabun Dalam Toilet 9.00 Buah 0.0065
12 Tempat Tissue Stailess 9.00 Buah 0.0050
13 Gantungan Pakaian Stailess Belakang Pintu Toilet 2.00 Buah 0.0011
B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah 0.1581
2 Closet Jongkok Setara TOTO Lengkap 4.00 Buah 0.0111
3 Urinoir Setara TOTO Type Muslim Lengkap 3.00 Buah 0.0738
4 Penyekat Urinoir Porselein Setara TOTO 3.00 Buah 0.0421
5 Washtafel Lengkap Setara TOTO 4.00 Buah 0.0492
6 Cermin Pada Washtafel Ukuran Besar 1.00 Buah 0.0036
7 Cermin Pada Washtafel Ukuran Kecil 2.00 Buah 0.0050
8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah 0.0094
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah 0.0115
10 Floor Drain Stainless 8.00 Buah 0.0081
11 Tempat Sabun Dalam Toilet 7.00 Buah 0.0051
12 Tempat Tissue Stailess 7.00 Buah 0.0039
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit 0.0465
Pemasangan Exhaust Fan Dinding Type 1 28.00 unit 0.1248
Pemasangan Exhaust Fan Dinding Type 2 2.00 unit 0.0289
c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit 0.3675
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m 0.0037
dia. 3/4 Inch ( Pipa Tegak ) 8.00 m 0.0033
dia. 1/2 Inch 30.00 m 0.0112
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m 0.0095
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m 0.0061
1. LANTAI-1
Hydrant Box + selang 2.00 bh 0.0726
Pipa dia. 3 Inch 50.00 m 0.0675
b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh 0.0251
2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh 0.0251
K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m 0.0667 0.067
Alarm Led min-Max 3 gas 1.00 Unit 0.1634 0.163
Cabinet For Area Valve dan Alarm 1.00 Unit 0.0298 0.030
Fitting-Fitting pipa 1.00 Lot 0.1915 0.192
Spesifikasi :
1. Jenis Pompa : Jetpump
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
4. Daya Dorong : 30 Meter
5. Daya Listrik P1 : 850 Watt
7. Pipa Outlet/Inket : 1/1 inch
8. Suhu Cairan : 0 – 35 C
PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt 1.2003
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan
2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt 0.1168
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
N PEKERJAAN PENGKABELAN
1 Lantai-1
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m 1.3895
B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m 0.4609
2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m 0.3213
2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
- 55.00 bh 0.2032
c/w Alumunium Louver
- LAMPU TL 2 x 36 Watt + Gantungan Besi Lengkap Terpasang. 6.00 bh 0.0193
- Lampu Gantung LED Industri 50 Watt 5.00 bh 0.0472
- Lampu Down Light LED 13 Watt 17.00 bh 0.0245
- Sakral + Instalasi penerangan NYM 3 x 2,5 m2 83.00 ttk 0.0616
in konduit HI dia 20 m2
2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh 0.0224
- Instalasi Stop Kontak, NYM 3 x 2,5 mm2
in conduit HI dia 20 mm2 57.00 ttk 0.0525
1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m 0.0877
2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m 0.0877
- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit 0.0439
( Dipasang Diatap )
- Kabel NYY 70 mm2 25.00 m 0.0381
- Termination & Supporting Material 1.00 lot 0.0030
- Grounding Box 1.00 lot 0.0038
- Grounding Rod ( R < 3 Ohm ) 1.00 lot 0.0067
13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2 5.4343
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M' 0.6997
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt 0.9194
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt 0.3533
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2 0.1549
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M' 0.1112
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt 0.3958
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt 0.0532
h Pemasangan Logo sesuai gambar 1.00 Pkt 0.0319
i Tangga Inspeksi 2.00 Unit 0.0553
j Septictank + Resapan + Box Kontrol 2.00 Pkt 0.1703
k Pembersihan Akhir (Finishing) 1.00 Pkt 0.0383
PROGRES RENCANAN KOMULATIF MINGGUAN (%) 0.337 0.955 1.806 4.172 7.360 10.885 13.200 15.563 19.119 22.362 25.134 28.280 32.710
JADWAL P
BOBOT
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III B
100%
1 2 3 4 5 6 7 8 9 10 11 12 13
DULE
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.136
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.033 0.033
0.055
0.166 0.166
2.099
0.294 0.294 0.294
0.024
0.038
0.112
0.195
0.188
0.045
0.531
0.782
0.165
0.104
0.214
0.059
0.051
0.085
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.257
0.336
0.496 0.213
0.110 0.047
0.210 0.256
0.304
0.240 0.560
0.049 0.114
0.281 0.187
0.011
0.017 0.007
0.005 0.002
0.009 0.009
0.006 0.006
0.031 0.031
0.029 0.029
1.222
1.706
0.456
0.035
0.041
0.161
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.033
0.177
0.038
0.146
0.506
0.876
0.262
0.305 0.305 0.305
0.068
0.138
0.274
0.033
0.130
0.031
0.126
0.004
0.031
0.029
0.064
0.227
0.120
0.073
0.119
0.138
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.056
0.482 0.482
0.283 0.283
0.317 0.317
0.186 0.186
0.445
0.268
1.498 1.498
0.022
0.929 0.929
0.053
0.215
0.090
0.101 0.101 0.101 0.101 0.101
0.031
0.032
1.452
0.352
0.121
0.069 0.069
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.149 0.149
0.008 0.008
0.439 0.439
0.017 0.017
0.377
0.164
0.161
0.028
0.074
0.119
0.094
0.221
0.661
0.175
0.236
0.279
0.092
0.056
0.070
0.450
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.740
0.218
0.215
0.141
0.074
0.066
0.170
0.787
0.086
0.040
0.056
0.033
0.589 0.317
0.727 0.391
0.030
0.331
0.084
0.174 0.324
0.641 1.191
0.084 0.156
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.052
0.023
0.470 0.872
0.427 0.427
0.478
0.257
0.398
0.047
0.063
0.011
0.074
0.042
0.061
0.004
0.005
0.011
0.005
0.010
0.007
0.005
0.001
0.158
0.011
0.074
0.042
0.049
0.004
0.005
0.009
0.011
0.008
0.005
0.004
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.003
0.093
0.018
0.019
0.070
0.053
0.144
0.047
0.125
0.029
0.368
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.004
0.003
0.011
0.010
0.006
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.080
0.102
0.004
0.073
0.068
0.025
0.025
0.072
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.160
1.200
0.117
0.117
0.186
0.214
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1.389
0.461
0.354
0.321
0.041
0.148
0.036
0.021
0.022
0.032
0.088
0.203
0.019
0.047
0.024
0.062
0.012
0.028
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.022
0.053
0.088
0.088
0.044
0.038
0.003
0.004
0.007
0.919
0.353
0.155
0.111
0.396
0.053
0.032
0.055
0.170
0.038
4.210 3.454 2.435 3.765 2.853 3.131 2.969 4.210 3.476 4.097 5.436 5.438 5.282 5.232 5.267 4.620 1.400
36.920 40.373 42.809 46.573 49.427 52.558 55.527 59.737 63.213 67.310 72.746 78.184 83.465 88.697 93.964 98.584 99.985
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 150.00 M
Kayu 5/7 Kelas IV
Paku 2" - 3"
Kayu Papan 3/20 Kelas IV
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1)
- Mutu Beton K-250 98.10 M3
Beton Ready Mix K-250
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Sloof 20 x 40 cm (SL2)
- Mutu Beton K-250 6.25 M3
Beton Ready Mix K-250
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 40.43 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 35.53 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 1.44 M3
Beton Ready Mix K-250
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.13 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plat Canopy T = 7 cm
- Mutu Beton K-200 2.65 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air
b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1)
- Mutu Beton K-250 18.86 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Balok 30 x 50 cm (BL2)
- Mutu Beton K-250 68.62 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Balok 20 x 30 cm (BL3)
- Mutu Beton K-250 15.84 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
Kolom 50 x 50 cm (K1)
- Mutu Beton K-250 33.00 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Kolom 50 x 50 cm (K2)
- Mutu Beton K-250 29.00 M3
Beton Ready Mix K-250
Kolom 30 x 30 cm (K4)
- Mutu Beton K-250 0.48 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 2.16 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plat Lantai T = 12 cm
- Mutu Beton K-250 236.14 M3
Beton Ready Mix K-250
Plat Canopy T = 7 cm
- Mutu Beton K-250 3.97 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Kolom 20 x 20 cm (K3)
- Mutu Beton K-250 3.02 M3
Beton Ready Mix K-250
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
Kolom 13 x 13 cm (KP)
- Mutu Beton K-200 0.50 M3
Semen Portland
Pasir Beton
Batu Pecah 1-2 cm
Air
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Plywood Tebal 9 mm
Dolken Kayu Ø 8 - 10 cm - 4 m
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
LANTAI . 2
a. Pas Bata 1 Pc : 4 Ps (Dinding) 661.03 M2
Bata Merah
Semen Portland
Pasir Pasang
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
LANTAI ATAP
a. Pas Bata 1 Pc : 4 Ps (Dinding) 355.32 M2
Bata Merah
Semen Portland
Pasir Pasang
PENUTUP ATAP
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
TANGGA BAJA
a. Plat Tumpu T = 12 MM 97.22 Kg
Besi Baja Profil
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
d. Injakan Tangga Hollow 50 x 50 x 3,2 mm + Plat Bunga sesuai Gambar 120.00 M'
7. PEKERJAAN PLAFOND
LANTAI. 1
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 200.20 M2
b. Profil Gipsum Terpasang 187.60 M
LANTAI. 2
a. Plafond Gipsum t=9 mm + Rangka furing Fin. Cat Terpasang 589.40 M2
b. Profil Gipsum Terpasang 385.80 M
b. Kusen Aluminium warna putih +Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 3.00 Bh
Daun Ambang aluminium + Kaca 5 mm
Ventlasi Kusen aluminium + Kaca Mati
Aksesories (10% dari bahan)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 9.00 Bh
Daun Pintu aluminium km/wc
Aksesories (10% dari bahan)
g. Kusen dan Rangka Besi Hollow 40 x 40 mm + besi dia 3/4 Inchi + Aksesoris lengkap
Terpasang sesuai Gambar (P6) 3.00 Bh
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
h. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL1) 2.00 Bh
i. Pintu Folding Gate + Aksesoris lengkap Terpasang sesuai Gambar (PL2) 8.00 Bh
j. Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS) 1.00 Bh
Kusen UPVC + Pintu Ambang UPVC + Kaca warna biru 5 mm (PS)
Aksesories (10% dari bahan)
Jendela
a. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J1) 4.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)
b. Kusen Aluminium putih + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang (J2) 6.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
kosen + Kaca warna hijau Tebal 5 mm
Aksesories (10% dari bahan)
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 119.72 M2
LANTAI. 2
Pintu
a. Kusen Aluminium warna putih+Ventilasi Kaca 5 mm + Pintu kaca warna biru
+ Aksesoris lengkap Terpasang (P1) 4.00 Bh
Daun Ambang aluminium + Kaca 5 mm
Ventlasi Kusen aluminium + Kaca Mati
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
f. Kusen Aluminium putih + Pintu aluminium KM/WC + Aksesoris lengkap Terpasang (P5) 5.00 Bh
Daun Pintu aluminium km/wc
Aksesories (10% dari bahan)
Jendela
a. Kusen Aluminium putih + Kaca 5 mm warna biru + Aksesoris lengkap (J4) 4.00 Bh
Daun Jendela + kaca warna hijau
Aksesories (10% dari bahan)
b. Kusen Aluminium putih + Jendela Kaca 5 mm warna biru + Aksesoris lengkap (J5) 13.00 Bh
Daun Jendela
Kosen aluminium + Kaca
Aksesories (10% dari bahan)
Ventilasi
a. Kusen Aluminium + Ambang Kaca 5 mm + Aksesoris lengkap Terpasang (V1) 4.00 Bh
kosen + Kaca warna hijau Tebal 5 mm
Aksesories (10% dari bahan)
Dinding
a. Dinding GRC t= 6 mm Timbal Balik + Rangka Canal C 100 + Fin. Cat (sesuai Gambar) 259.51 M2
9. PEKERJAAN LANTAI
LANTAI. 1
a. Beton Cor Lantai Kerja 4.28 M3
Semen Portland
Pasir Beton
Kerikil Beton Uk. ≥ 4 cm
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Air
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
LANTAI. 2
a. Lantai Granit 60 x 60 cm (Unpolishet) 16.80 M2
Granit Anti Slip 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
Pengecatan Baja
a.Pengecatan Permurkaan Rangka Baja Atap 945.64 M2
Menie Besi
Pengencer
Kuas
Perancah Kayu
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
11 PEKERJAAN SANITASI
A Lantai I
1 Closet Duduk Setara TOTO Lengkap 2.00 Buah
Closet Duduk
Perlengkapan
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
8 Kran tembok Stainless Setara TOTO dia 1/2 " 12.00 Buah
Kran air
Sealtape
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 2.00 Buah
Jet Washer
Sealtape
B Lantai II (dua)
1 Closet Duduk Setara TOTO Lengkap 5.00 Buah
Closet Duduk
Perlengkapan
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan
8 Kran tembok Stainless Setara TOTO dia 1/2 " 10.00 Buah
Kran air
Sealtape
9 Jet Washer Pada Closet Duduk Setara TOTO Lengkap 5.00 Buah
Jet Washer
Sealtape
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
b LANTAI 2
Pemasangan Exhaust Fan Plafond (EFP) 8.00 unit
Memasang Fan Ceilling Mounted Exhaust
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
c LANTAI Atap
Cyclone Turbine Ventilator L-75 Terpasang Sesuai Gambar 11.00 unit
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
(Incl.Fitting & All Accessories)
dia. 1 Inch ( Pipa Tegak ) 8.00 m
PVC AW dia.1 Inch
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 4 Inch 10.00 m
PVC AW 4 Inch
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2. LANTAI-2
a. Pemipaan PVC class AW Wavin
dia. 3 Inch 10.00 m
PVC AW 3 Inch
Perlengkapan (10% harga barang)
1. LANTAI-1
Hydrant Box + selang 2.00 bh
Indoor Hydrant Box 1000x800x180mm
Selang Hydrant KANVAS setara ROYAL
JET NOZZLE Ukuran 1.5"
Perlengkapan (10% harga barang)
b. FIRE EXTINGUISHER
1. LANTAI-1
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
DCP 3 kg
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2. LANTAI-2
Fire Extinguisher Tabung Cat Oven sesuai
SPEK & Skedul :
Type DCP 3 kg Seamless 4.00 bh
DCP 3 kg
Perlengkapan (10% harga barang)
K PEKERJAAN GAS
a. INSTALASI PEMIPAAN
1. LANTAI-1
Diameter.3/4'' + Pengecatan 20.00 m
Alarm Led min-Max 3 gas 1.00 Unit
Cabinet For Area Valve dan Alarm 1.00 Unit
Fitting-Fitting pipa 1.00 Lot
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
PEKERJAAN ELEKTRIKAL
L SITE PLAN
1 PEKERJAAN PANEL TEGANGAN RENDAH ( TR )
PENYAMBUNGAN DAYA
termasuk perijinan
- BP (Biaya penyambungan )131 KVA
- UJL ( Uang jaminan langganan) 131 KVA 1.00 Pkt
- JI ( jaminan instalasi) 131 KVA
- Jasa pengurusan
2 PEKERJAAN PENGKABELAN
Lantai 1
Dari PUTR ke :
- P-MDB 1.00 Pkt
- MCCB 3 Phase 400A EZC400N3400N
- Kabel 1 x 240 single
- Box Panel ukuran 60 cm x 80 cm + Assesoris lengkap
P-MDB
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
N PEKERJAAN PENGKABELAN
1 Lantai-1
A Dari PUTR ke :
- P-MDB
NYFGBY 4 x 240 mm 150.00 m
NYY 240 mm2
Perlengkapan (10% harga barang)
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B Dari P-MDB ke :
- DB-LT.1
NYY 4 x 50 mm2 150.00 m
NYY 4x50 mm2
Perlengkapan (10% harga barang)
2 Lantai-2
Dari DB-LT.2 ke Stop Kontak dan Saklar Penerangan
NYY 3 x 2,5 mm2 992.00 m
NYY 3x2,5 mm2
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2 Lantai-2
LAMPU TL 2 x 36 Watt Recessed Mounted
- 55.00 bh
c/w Alumunium Louver
TL 2x36
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
2 Lantai-2
- Stop Kontak, 1Ø , 13 A, 220 v ,Wall type 57.00 bh
Stop Kontak 13A
Inbow doos
Perlengkapan (10% harga barang)
1 Lantai -1
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
TRAY W=300
Perlengkapan (10% harga barang)
2 Lantai -2
- Pekerjaan Gantungan Listrik (Sesuai Gambar) 45.00 m
TRAY W=300
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
- Electrostatic H=6 M, Radius +/- 97 Meter (Lihat Gambar Perencanaan) 1.00 unit
( Dipasang Diatap )
Penangkal Petir
Perlengkapan (10% harga barang)
NO JENIS PEKERJAAN VOL SAT BULAN I BULAN II BULAN III BULAN IV BULAN V
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
13 PEKERJAAN LAIN-LAIN
a Pemasangan ACP + Rangka Siku 40 x 40 x 4 mm Aksesoris Lengkap Terpasang 1,038.00 M2
b Pemasangan Relling Tangga & Balkon Fin. Cat Terpasang sesuai Gambar. 169.48 M'
c Pemasangan Canopy Teras Baja IWF + Kaca Tempered + ACP + Hollow Hitam
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang
- Kanopi Type 1 Sesuai Gambar 1.00 Pkt
- Kanopi Type 2 Sesuai Gambar 1.00 Pkt
d Pemasangan Canopy Teras Besi Hollow + Atap Spandek 0.35 mm
+ Besi Hanger + Fin. Cat + Aksesoris Terpasang 56.00 M2
e Pemasangan Frame Fasade Besi Hollow Stainless Steel terpasang sesuai gambar 79.20 M'
f Pemasangan Huruf acrylik + lampu Terpasang + Terpasang 1.00 Pkt
g Pemasangan Huruf Stainless Steel Terpasang Sisi Depan Terpasang 1.00 Pkt
h Pemasangan Logo sesuai gambar 1.00 Pkt
i Tangga Inspeksi 2.00 Unit
j Septictank + Resapan + Box Kontrol 2.00 Pkt
k Pembersihan Akhir (Finishing) 1.00 Pkt
HAN MATERIAL LAPANGAN
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
21 22 23 24 25 26 27 28 29 30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2. Molen 2 Unit
3. Crane 1 Unit
6. Theodolit 1 Unit
9. Waterpass 1 Unit
JADWAL PELAKSANAAN PEKERJAA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
JADWAL PELAKSANAAN PEKERJAAN 210 HARI
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112
1. PEKERJAAN PERSIAPAN
a. Pengukuran Dan pemasangan Bowplank 0.0860 1.00 35
b. Pemasangan Pagar Pengaman 0.0629 1.00 6
c. Pintu Masuk Proyek 2.5 m x 4 m Rangka Hollow + Seng Plat + Lengkap Rel. 0.0165 1.00 6
d. Test Mutu Beton 0.1654
e. Direksi Keet 0.2434 1.00 6
f. Gudang Semen dan Peralatan 0.2084 1.00 6
g. Bedeng Pekerja 0.3577 1.00 20
h. Sewa Scafolding 0.3516
i. Perizinan 0.0827
2. PEK. GALIAN TANAH PONDASI
a. Galian Tanah Pondasi 0.1699 2.00 18 18
b. Urugan Kembali Bekas Galian Tanah 0.0152 1.00 18
c. Urugan Pasir Alas Dipadatkan 0.0306 1.00 6
d. Timbunan Tanah Bawah Lantai 1.0758 2.00
3. PEKERJAAN PONDASI/STRUKTUR BAWAH
a. Pekerjaan Pondasi Bore Pile Diameter 40 cm Panjang = 530 cm 8.1150 3.00 42 42 28
b. Pondasi Pile Cape
Pondasi Pile Cape (PC 1) 2.5343 2.00 39 39
Pondasi Pile Cape (PC 2) 0.7432 1.00 18
c. Pasangan Pondasi batu Gunung 0.0461 1.00 24
4. PEKERJAAN STRUKTUR
a. STRUKTUR LT.1
Sloof 30 x 60 cm (SL1) 4.3683 2.00 48 32
Sloof 20 x 40 cm (SL2) 0.3428 1.00 12
Kolom 50 x 50 cm (K1) 2.5890 2.00 39 26
Kolom 50 x 50 cm (K2) 2.6658 2.00 42 28
Kolom 20 x 20 cm (K3) 0.1489 1.00 15
Kolom 13 x 13 cm (KP) 0.2584 1.00 9
Balok Latai 13 x 20 cm (BLL) 0.3871 1.00 14
Plat Lantai Dasar T = 12 cm 3.7990 5.00 17 17 33 22
Plat Canopy T = 7 cm 0.1536 1.00
b. STRUKTUR LT.2
Balok 35 x 80 cm (BL1) 1.0211 2.00 32 0 0
Balok 30 x 50 cm (BL2) 3.6119 3.00 34 34 0
Balok 20 x 30 cm (BL3) 1.1464 3.00 36 36 0
PERIODE MINGGU KE :
BOBOT
NO JENIS PEKERJAAN MINGGU 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
100%
HARI KE : 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
33
12
32
34
36
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
33
15 10
27 18
8
16
103 103 103 39
18
21 0 0 11
30 30 30 15
18 18
10
8
18
12
40 40 24 24
48 48
39 39
70 36 6 45 40 70
30 30 27
36 39
12 12
12 12
6
6
6
6
6
6
6
12 12
28 24
19 19
48 63
28
10
10
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
6
6
6
6
6
6
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
6
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
6
6
6
6
6
6 0 0 0 6
6 0 0 0 6
6
6
6
6
6
12 12
148 42 52 154 133 191 210 141 69 350 178 333 182 24
MINGGU KE :
17 18 19 20 21 22 23 24 25 26 27 28 29 30
113-119 120-126 127-133 134-140 141-147 148-155 155-162 163-169 170-176 177-180 181-188 189-196 197-203 204-210
21 6 7 22 19 27 30 20 10 50 25 48 26 3
Jabatan Dalam
No. Nama Personil Tgl/Bln/thn lahir
Pekerjaan
1 2 3 4
Pengalaman
Pendidikan
Kerja Ijazah SKA/SKTK
Terakhir
(Tahun)
5 6 7 8
1 2 3 4 5 6
7. Pompa Air 2 2.6 kW (3.5 HP) 360 min - 1 rpm Honda 2009
Status
Kondisi Lokasi
Kepemilikan/
Sekarang
Dukungan Sewa
7 8 9
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Muhammad Yusuf, ST
General Superintendent
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Achyarullah, ST
Tanggal Lahir : Sibreh/ 25 Desember 1972
Alamat : Jl. Tgk. Chik Di Pineung Kp. Pineung
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Bangunan Gedung Muda
Ahli Geoteknik Muda
Ahli Sistem Manajemen Mutu Muda
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Achyarullah, ST
Site Manager
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Fakhruddin, ST
Tanggal Lahir : Seumeureung/ 5 Mei 1981
Alamat : Desa Blang Preh Kec. Simpang Tiga
Kab. Aceh Besar
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Bangunan Gedung Muda
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 8 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Fakhruddin, ST
Enggineer Struktur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Setiyo Pambudi, ST
Enggineer Arsitektur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Mustafa Ismail, ST
Tenaga Ahli Manajemen Konstruksi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Rizka, ST
Tanggal Lahir : Biak/ 6 Mei 1980
Alamat : Jl. T. Chik Di Pineung VI Kec. Syiah Kuala
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Elektro
Sertifikat Keahlian/ Keterampilan : Ahli Teknik Tenaga Listrik Madya
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 10 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Rizka, ST
Engginer Elektrikal
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Cahaya Danurwendi, ST
Ahli Geodesi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Endang Syamsudin, ST
Ahli Mekanikal
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
November 2010 Desember 2010 Pekerjaan Pembangunan Lanjutan Rehabilitasi Gedung Rektorat Tahap II
Universitas Syiah Kuala Drussalam - Banda Aceh
PT. MIRTADA SEJAHTERA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
April 2017 November 2017 Pembangunan Gedng Laboratotium Multiguna Tahap I Poltekkes Kemenkes
Aceh Tahun 2017
PT. MIRTADA SEJAHTERA
Agustus 2015 Desember 2015 Renovasi Gedung Tgk Chik Di Tiro Kota Banda Aceh
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Sanneti Hevianis, ST
Pelaksana Bangunan Gedung
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Rizki Maulana
Tukang Pekerjaan Pondasi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Padly
Tanggal Lahir : Aceh Timur/ 5 Juli 1961
Alamat : Dusun VI Kompl. Abdul Hamid NST
Deli Serdang - Sumut
Pendidikan/ Lembaga Pendidikan : SMK / STM
Sertifikat Keahlian/ Keterampilan : Mandor Pemasangan Rangka Atap Baja Ringan
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Padly
Mandor Pemasangan Rangka Atap
Baja Ringan
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Liana Rahmah, ST
Tenaga Juru Gambar
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Balya, ST
Tanggal Lahir : Bireuen/ 23 Februari 1982
Alamat : Dusun Tgk. Di Cot Kel. Cot Keutapang
Kab. Bireuen
Pendidikan/ Lembaga Pendidikan : S - I Teknik Sipil
Sertifikat Keahlian/ Keterampilan : Juru Ukur Kuantitas Bangunan Gedung
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 6 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Balya, ST
Tenaga Juru Ukur
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
Nama : Yusrizal, SE
Tanggal Lahir : Teureubue/ 7 September 1981
Alamat : Jl. Sentosa No. 38 C Kp. Laksana
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Ekonomi Akuntansi
Sertifikat Keahlian/ Keterampilan : -
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 8 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Yusrizal, SE
Tenaga Adminstrasi
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Muhammad Alfairusy
Tenaga Logistik
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Nama : Asrusman
Tanggal Lahir : Samadua/ 11 Agustus 1976
Alamat : Desa Ujung Kampung Kec. Sama Dua
Aceh Selatan
Pendidikan/ Lembaga Pendidikan : SMK / STM
Tukang Pasang Bata/ Dinding / Bricklayer /Bricklaying
Sertifikat Keahlian/ Keterampilan : (Tukang Bata)
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Asrusman
Tukang Pasang Bata
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Tri Wahono
Teknisi Listrik Industri
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Erwin Juanda
Tukang Rangka Aluminium
DAFTAR RIWAYAT HIDUP
PT. MIRTADA SEJAHTERA
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Nama : Satria, ST
Tanggal Lahir : Jakarta/ 24 Maret 1976
Alamat : Jl. T. Chik Dipineung VI Kp. Pineung
Kota Banda Aceh
Pendidikan/ Lembaga Pendidikan : S - I Teknik Mesin
Sertifikat Keahlian/ Keterampilan : Tukang Pekerja Baja
Status di Perusahaan : Tenaga Ahli Kontrak
Pengalaman Perusahaan : 12 Tahun
TAHUN
RINGKASAN PEKERJAAN
DARI SAMPAI
Juni 2014 November 2014 Pembangunan Garasi Workshop Gudang Logistik Kebencanaan
Provinsi Aceh
CV. NASYIRA
Mei 2016 November 2016 Lanjutan Rehabilitasi dan Pengembangan UPTD Puskesmas Lampulo Tahap
II
CV. TITI AMAE
Juni 2017 Oktober 2017 Pembangunan Ruang Guru SD Negeri 1 Pagar Air
Kec. Ingin Jaya (Otsus)
CV. IKHLAS MULIA
Daftar riwayat hidup ini saya buat dengan sebenar-benarnya dan penuh rasa tanggung jawab .
Satria, ST
Tukang Pekerjaan Baja
RENCANA ORGANISASI P
PT. MIRTADA
Liana Rahmah, ST
Tenaga Juru Gambar
Yusrizal, SE
Tenaga Adminstrasi
Muhammad Yusuf, ST
General Superintendent
Achyarullah, ST
Site Manager
Muhammad Alfairusy
Tenaga Logistik
Rizki Maulana Tri Wahono Erwin Juanda Abdul Hadi Abdul Hanan, ST Satria, ST
Tukang Pekerjaan Pondasi Teknisi Listrik Industri Tukang Rangka Aluminium Tukang Pipa Gas Tukang Pekerjaan Baja
Formulasi Perhitungan
7,485,504,485 Jakarta,11 Mei 2018
62%
12,073,394,331 PT. MIRTADA SEJAHTERA
4,587,889,846
38%
38%
12,073,394,331
John Kiraini, SE. Ak
100% Direktur Utama
IR REKAPITULASI PERHITUNGAN
KOMPONEN DALAM NEGERI (TKDN)
TKDN
Gabungan
62%
38%
100%
Persentase Persentase
No. Mata Dari Harga Dari Harga
Pembayaran Jenis Pekerjaan Total Item Mata Total Item Mata
Pekerjaan Penawaran
(%) (%)
"N I H I L"
T o t a l (%) 0.00 %
Nama
SubKontraktor
(Jika diperlukan)
N I H I L"
B BAHAN
Kayu 5/7 Kelas IV M3 0.012 2,400,000.00
Paku 2" - 3" Kg 0.020 17,000.00
Kayu Papan 3/20 Kelas IV M3
0.007 2,350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.250 18,500.00
Kayu 5/7 Kelas IV M3 0.180 2,400,000.00
Paku Biasa Kg 0.080 17,000.00
Besi Strip Kg 1.100 8,500.00
Semen Portland Kg 35.000 1,350.00
Pasing Pasang M 3
0.150 143,000.00
Pasir Beton M3 0.100 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M 3
0.150 143,000.00
Bata Merah Bh 30.000 780.00
Seng Plat Lbr 0.250 26,500.00
Jendela Naco Bh 0.200 146,000.00
Kaca Polos tebal 3 mm ( Asahimas ) M2 0.080 72,000.00
Kunci Tanam Bh 0.150 225,000.00
Plywood 4 mm Lbr 0.060 98,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.2.1.7. Pembuatan 1 M2 Gudang Semen dan Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 1.000 75,000.00
Tukang Kayu L.02 OH 2.000 85,000.00
Kepala Tukang L.03 OH 0.200 100,000.00
Mandor L.04 OH 0.050 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.700 18,500.00
Kayu 5/7 Kelas IV M 3
0.210 2,400,000.00
Paku Biasa Kg 0.300 17,000.00
Semen Portland Kg 10.500 1,350.00
Pasir Beton M 3
0.030 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M 3
0.050 143,000.00
Seng Gelombang Lbr 1.500 47,000.00
Seng Plat Lbr 0.250 26,500.00
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Dolken Kayu Ø 8-10/400 cm Btg 1.250 18,500.00
Kayu 5/7 Kelas IV M3 0.186 2,400,000.00
Paku Biasa Kg 0.300 17,000.00
Semen Portland Kg 18.000 1,350.00
Pasir Beton M3 0.030 143,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M3 0.050 143,000.00
Seng Gelombang Lbr 1.500 47,000.00
Plywood 6 mm Lbr 1.350 98,000.00
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
B BAHAN
B BAHAN
Pasir Urug/Tanah Urug M3 1.200 85,000.00
B BAHAN
Tanah Timbun M3 1.200 65,000.00
Jumlah Harga
(Rp)
7,500.00
8,500.00
1,000.00
450.00
17,450.00
28,800.00
340.00
16,450.00
45,590.00
-
63,040.00
6,304.00
69,344.00
Jumlah Harga
(Rp)
150,000.00
170,000.00
85,000.00
30,000.00
4,500.00
439,500.00
23,125.00
432,000.00
1,360.00
9,350.00
47,250.00
21,450.00
14,300.00
21,450.00
23,400.00
6,625.00
29,200.00
5,760.00
33,750.00
5,880.00
674,900.00
-
1,114,400.00
111,440.00
1,225,840.00
Jumlah Harga
(Rp)
75,000.00
170,000.00
20,000.00
4,500.00
269,500.00
31,450.00
504,000.00
5,100.00
14,175.00
4,290.00
7,150.00
70,500.00
6,625.00
643,290.00
-
912,790.00
136,918.50
1,049,708.50
Jumlah Harga
(Rp)
75,000.00
170,000.00
20,000.00
4,500.00
269,500.00
23,125.00
446,400.00
5,100.00
24,300.00
4,290.00
7,150.00
70,500.00
132,300.00
713,165.00
-
982,665.00
98,266.50
1,080,931.50
Jumlah Harga
(Rp)
56,250.00
2,125.00
58,375.00
-
58,375.00
5,837.50
64,212.50
Jumlah Harga
(Rp)
37,500.00
4,250.00
41,750.00
-
41,750.00
4,175.00
45,925.00
Jumlah Harga
(Rp)
22,500.00
850.00
23,350.00
102,000.00
102,000.00
-
125,350.00
12,535.00
137,885.00
Jumlah Harga
(Rp)
22,500.00
850.00
23,350.00
78,000.00
78,000.00
-
101,350.00
10,135.00
111,485.00
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 M 3 Pondasi Batu Belah Campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 75,000.00
Tukang Kayu L.02 OH 0.750 85,000.00
Kepala Tukang L.03 OH 0.075 100,000.00
Mandor L.04 OH 0.075 90,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Kali/Sungai 5 - 20 cm M3 1.200 179,000.00
Semen Portland Kg 202.000 1,350.00
Pasir Pasang M3 0.485 132,000.00
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kerikil Beton Uk. ≥ 4 cm M3 1.200 143,000.00
Pasir Pasang M3
0.432 132,000.00
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Batu Kali/Sungai 5 - 20 cm M3 0.450 170,000.00
Semen Portlan Kg 194.000 1,325.00
Pasir Beton M3 0.312 150,000.00
Kerikil Beton Uk. 3 cm s/d 4 cm M3
0.468 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
112,500.00
63,750.00
7,500.00
6,750.00
190,500.00
214,800.00
272,700.00
64,020.00
551,520.00
-
742,020.00
74,202.00
816,222.00
Jumlah Harga
(Rp)
58,500.00
33,150.00
3,900.00
3,510.00
99,060.00
171,600.00
57,024.00
228,624.00
-
327,684.00
32,768.40
360,452.40
Jumlah Harga
(Rp)
180,000.00
68,000.00
8,000.00
10,710.00
266,710.00
76,500.00
257,050.00
46,800.00
70,200.00
450,550.00
-
717,260.00
71,726.00
788,986.00
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4. Membuat 1 M 3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 125), slump (3 - 6) cm, w/c = 0,87
B BAHAN
Semen Portland Kg 230.000
Pasir Beton Kg 893.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,027.000
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.5. Membuat 1 M 3 Beton Mutu f'c = 12,2 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
B BAHAN
Semen Portland Kg 326.000
Pasir Beton Kg 760.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,029.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.6. Membuat 1 M 3 Beton Mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61
B BAHAN
Semen Portland Kg 352.000
Pasir Beton Kg 731.000
Batu Pecah 1-2 cm Kg 1,031.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Semen Portland Kg 371.000
Pasir Beton Kg 698.000
Batu Pecah 1-2 cm Kg 1,047.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.3. Membuat 1 M 3 Beton Mutu f'c = 12,2 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,72
A TENAGA
Pekerja L.01 OH 1.650
Tukang Batu L.02 OH 0.275
Kepala Tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000
Pasir Beton Kg 799.000
Kerikil Beton Uk. ≥ 4 cm Kg 1,017.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Beton Ready Mix K-250 M3 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Pompa M3 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Beton Ready Mix K-300 M3 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Pompa M3 1.000
JUMLAH HARGA ALAT
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.17. Pembesian 1 Kg dengan Besi Polos
No Uraian Kode Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.007
Tukang Batu L.02 OH 0.007
Kepala Tukang L.03 OH 0.0007
Mandor L.04 OH 0.0004
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton Polos Kg 1.050
Kawat Beton Kg 0.015
B BAHAN
Besi Beton Ulir Kg 1.050
Kawat Beton Kg 0.015
B BAHAN
Jaring kawat baja dilas Kg 10.200
Kawat Beton Kg 0.005
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kayu Kelas III M3 0.040
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kayu Kelas III 2x Pakai M3 0.045
Paku 5 - 10 cm Kg 0.300
Minyak Bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kayu Kelas III 2x Pakai M3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.200
Balok Kayu Kelas II 2x Pakai M3 0.015
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kayu Kelas III 2x Pakai M3 0.030
Paku 5 - 12 cm Kg 0.400
Minyak Bekisting Liter 0.150
Balok Kayu Kelas II 2x Pakai M3 0.015
Plywood Tebal 9 mm 2x Pakai Lembar 0.350
Dolken Kayu Ø 8 - 10 cm - 4 m 2x Pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
75,000.00 90,000.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 5,400.00
JUMLAH TENAGA KERJA 114,400.00
1,350.00 310,500.00
102.14 91,213.57
105.93 108,785.93
25.00 5,000.00
JUMLAH HARGA BAHAN 515,499.50
75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00
1,350.00 440,100.00
102.14 77,628.57
105.93 108,997.78
25.00 5,375.00
JUMLAH HARGA BAHAN 632,101.35
75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00
1,350.00 475,200.00
102.14 74,666.43
211.11 217,655.56
25.00 5,375.00
JUMLAH HARGA BAHAN 772,896.98
75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00
1,350.00 500,850.00
102.14 71,295.71
211.11 221,033.33
25.00 5,375.00
JUMLAH HARGA BAHAN 798,554.05
75,000.00 123,750.00
85,000.00 23,375.00
100,000.00 2,800.00
90,000.00 7,470.00
JUMLAH TENAGA KERJA 157,395.00
1,350.00 403,650.00
102.14 81,612.14
105.93 107,726.67
25.00 5,375.00
JUMLAH HARGA BAHAN 598,363.81
75,000.00 30,937.50
85,000.00 5,843.75
100,000.00 700.00
90,000.00 1,867.50
JUMLAH TENAGA KERJA 39,348.75
1,023,000.00 1,023,000.00
JUMLAH HARGA BAHAN 1,023,000.00
95,500.00 95,500.00
JUMLAH HARGA ALAT 95,500.00
1,157,848.75
10% x D 115,784.88
1,273,633.63
75,000.00 30,937.50
85,000.00 5,843.75
100,000.00 700.00
90,000.00 1,867.50
JUMLAH TENAGA KERJA 39,348.75
1,121,000.00 1,121,000.00
JUMLAH HARGA BAHAN 1,121,000.00
95,500.00 95,500.00
JUMLAH HARGA ALAT 95,500.00
1,255,848.75
10% x D 125,584.88
1,381,433.63
Harga Satuan Jumlah Harga
(Rp) (Rp)
75,000.00 525.00
85,000.00 595.00
100,000.00 70.00
90,000.00 36.00
JUMLAH TENAGA KERJA 1,226.00
10,400.00 10,920.00
15,000.00 225.00
75,000.00 525.00
85,000.00 595.00
100,000.00 70.00
90,000.00 36.00
JUMLAH TENAGA KERJA 1,226.00
13,100.00 13,755.00
15,000.00 225.00
75,000.00 1,875.00
85,000.00 2,125.00
100,000.00 2,500.00
90,000.00 90.00
JUMLAH TENAGA KERJA 6,590.00
15,800.00 161,160.00
15,000.00 75.00
JUMLAH HARGA BAHAN 161,235.00
75,000.00 39,000.00
85,000.00 22,100.00
100,000.00 2,600.00
90,000.00 2,340.00
JUMLAH TENAGA KERJA 66,040.00
3,050,000.00 122,000.00
17,000.00 5,100.00
8,000.00 800.00
JUMLAH HARGA BAHAN 127,900.00
75,000.00 39,000.00
85,000.00 22,100.00
100,000.00 2,600.00
90,000.00 2,340.00
JUMLAH TENAGA KERJA 66,040.00
3,050,000.00 68,625.00
17,000.00 5,100.00
8,000.00 800.00
JUMLAH HARGA BAHAN 74,525.00
75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00
3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 139,300.00
75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00
3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 30,600.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 144,400.00
75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00
3,050,000.00 61,000.00
17,000.00 6,800.00
8,000.00 1,600.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 55,500.00
JUMLAH HARGA BAHAN 176,300.00
75,000.00 49,500.00
85,000.00 28,050.00
100,000.00 3,300.00
90,000.00 2,970.00
JUMLAH TENAGA KERJA 83,820.00
3,050,000.00 45,750.00
17,000.00 6,800.00
8,000.00 1,200.00
3,400,000.00 25,500.00
148,000.00 25,900.00
18,500.00 18,500.00
JUMLAH HARGA BAHAN 123,650.00
B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 26.550
Pasir Pasang Kg 130.200
JUMLAH HARGA BAHAN
C PERALATAN
A.4.4.1.7. Pemasangan 1 M 2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu Campuran 1 SP:2PP
B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 18.950
Pasir Pasang Kg 53.200
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Semen Portland Kg 10.224
Pasir Pasang Kg 28.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Semen Portland Kg 6.240
Pasir Pasang Kg 33.600
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Keramik 30 x 30 cm Anti Slip Buah 6.250
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.500
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Keramik Dinding 30 x 60 cm Buah 3.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Granit Anti Slip 30 x 60 cm Buah 6.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Granit 60 x 60 cm Buah 3.000
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Granit Anti Slip 60 x 60 cm Buah 3.055
Semen Portland Kg 8.190
Pasir Pasang Kg 63.000
Semen Warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kalsiplank M' 1.1000
Skrup Fixer Buah 10.000
JUMLAH HARGA BAHAN
C PERALATAN
75,000.00 45,000.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 2,700.00
JUMLAH TENAGA KERJA 66,700.00
780.00 54,600.00
1,350.00 35,842.50
94.29 12,276.00
JUMLAH HARGA BAHAN 102,718.50
75,000.00 22,500.00
85,000.00 8,500.00
100,000.00 1,000.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 33,350.00
780.00 54,600.00
1,350.00 25,582.50
94.29 5,016.00
JUMLAH HARGA BAHAN 85,198.50
75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 38,100.00
1,350.00 13,802.40
94.29 2,640.00
JUMLAH HARGA BAHAN 16,442.40
75,000.00 22,500.00
85,000.00 12,750.00
100,000.00 1,500.00
90,000.00 1,350.00
JUMLAH TENAGA KERJA 38,100.00
1,350.00 8,424.00
94.29 3,168.00
JUMLAH HARGA BAHAN 11,592.00
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
11,500.00 71,875.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 3,900.00
JUMLAH HARGA BAHAN 92,771.50
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
23,400.00 70,200.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 89,796.50
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
61,300.00 367,800.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 387,396.50
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
67,900.00 203,700.00
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 223,296.50
75,000.00 52,500.00
85,000.00 29,750.00
100,000.00 3,500.00
90,000.00 3,150.00
JUMLAH TENAGA KERJA 88,900.00
72,500.00 221,487.50
1,350.00 11,056.50
94.29 5,940.00
2,600.00 2,600.00
JUMLAH HARGA BAHAN 241,084.00
75,000.00 7,500.00
85,000.00 17,000.00
100,000.00 2,000.00
90,000.00 450.00
JUMLAH TENAGA KERJA 26,950.00
51,500.00 56,650.00
250.00 2,500.00
JUMLAH HARGA BAHAN 59,150.00
B BAHAN
Besi Baja Profil Kg
C PERALATAN
Sewa Alat Jam
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Solar Liter
Minyak Pelumas Liter
C PERALATAN
Sewa Alat Jam
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E)/Kg
B BAHAN
Jendela Naco (Rangka + Kaca 5 mm) M2
Paku Skrup 1 cm - 2,5 cm Buah
Baja Strip M
C PERALATAN
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Seng Plat M
Paku Skrup 1 cm - 2,5 cm Kg
Papan Kayu Kelas IV M3
C PERALATAN
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19. Pemasangan 1 M ' Talang ½ Lingkaran D-15 cm, Seng Plat Bjls 30 Lebar 45 cm
No Uraian Kode Satuan
A TENAGA
Pekerja L.01 OH
Tukang L.02 OH
Kepala Tukang L.03 OH
Mandor L.04 OH
B BAHAN
Seng Plat M
Paku Skrup 1 cm - 2,5 cm Kg
Papan Kayu Kelas IV M3
C PERALATAN
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Seng Spandek 0,40 mm M'
Paku Sekrup Buah
C PERALATAN
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
B BAHAN
Seng Spandek 0,35 mm M'
Paku Sekrup Buah
C PERALATAN
D Jumlah (A + B + C )
E Overhead & Profit (10%)
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
Koefisien
(Rp) (Rp)
0.800
JUMLAH HARGA ALAT -
31,750.00
10% x D 3,175.00
34,925.00
3,492.50
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
CABLE TRAY
8 Memasang 1M TRAY W=600
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TRAY W=600 bh 1.1000 200,000
Perlengkapan (10% harga barang) bh 1.0000 20,000
Pekerja OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
12,553,200
1,141,200
13,500
9,180
1,800
486
13,719,366
Jumlah
(Rp.)
10,010,000
910,000
13,500
9,180
1,800
486
10,944,966
Jumlah
(Rp.)
7,672,500
697,500
13,500
9,180
1,800
486
8,394,966
Jumlah
(Rp.)
3,850,000
350,000
13,500
9,180
1,800
486
4,224,966
Jumlah
(Rp.)
Jumlah
(Rp.)
974,600
88,600
13,500
9,180
1,800
486
1,088,166
Jumlah
(Rp.)
308,000
28,000
13,500
9,180
1,800
486
360,966
Jumlah
(Rp.)
11,990
1,090
13,500
9,180
1,800
486
38,046
Jumlah
(Rp.)
220,000
20,000
13,500
9,180
1,800
486
264,966
Jumlah
(Rp.)
187,000
17,000
13,500
9,180
1,800
486
228,966
Jumlah
(Rp.)
200,200
18,200
13,500
9,180
1,800
486
243,366
Jumlah
(Rp.)
174,900
15,900
13,500
9,180
1,800
486
215,766
Jumlah
(Rp.)
185,900
16,900
13,500
9,180
1,800
486
227,766
Jumlah
(Rp.)
189,200
17,200
13,500
9,180
1,800
486
231,366
Jumlah
(Rp.)
174,900
15,900
13,500
9,180
1,800
486
215,766
M PEKERJAAN SANITASI
SK SN-S 06-1989-F
- Memasang 1 m1 GIP dia.3 Inch
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan GIP dia.3 Inch m1 1.1000 110,833
Perlengkapan (10% harga barang) set 1.0000 11,083
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
- Memasang 1 m dia. 20
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Pipa dia. 20 m 1.1000 23,400
Isolasi aeroflex m 1.0000 48,000
Perlengkapan (10% harga barang) set 1.0000 7,140
Tukang OH 0.1800 85,000
Tenaga Kerja Pekerja OH 0.1080 75,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
121,917
11,083
15,300
8,100
1,800
486
158,686
Jumlah
(Rp.)
38,060
3,460
15,300
8,100
1,800
486
67,206
Jumlah
(Rp.)
16,720
1,520
15,300
8,100
1,800
486
43,926
Jumlah
(Rp.)
26,290
2,390
15,300
8,100
1,800
486
54,366
Jumlah
(Rp.)
20,350
1,850
15,300
8,100
1,800
486
47,886
Jumlah
(Rp.)
16,720
1,520
15,300
8,100
1,800
486
43,926
Jumlah
(Rp.)
427,900
38,900
15,300
8,100
1,800
486
492,486
Jumlah
(Rp.)
78,980
7,180
15,300
8,100
1,800
486
111,846
Jumlah
(Rp.)
41,910
3,810
15,300
8,100
1,800
486
71,406
Jumlah
(Rp.)
651,200
59,200
15,300
8,100
1,800
486
736,086
Jumlah
(Rp.)
226,050
20,550
15,300
8,100
1,800
486
272,286
Jumlah
(Rp.)
1,925,000
192,500
15,300
8,100
1,800
486
2,143,186
Jumlah
(Rp.)
4,710,000
471,000
15,300
8,100
1,800
486
5,206,686
Jumlah
(Rp.)
116,050
10,550
15,300
8,100
1,800
486
152,286
Jumlah
(Rp.)
36,740
9,700
4,310
15,300
8,100
1,800
486
76,436
Jumlah
(Rp.)
96,800
26,900
11,490
15,300
8,100
1,800
486
160,876
Jumlah
(Rp.)
84,150
32,500
10,900
15,300
8,100
1,800
486
153,236
Jumlah
(Rp.)
25,740
48,000
7,140
15,300
8,100
1,800
486
106,566
Jumlah
(Rp.)
602,800
54,800
15,300
8,100
1,800
486
683,286
Jumlah
(Rp.)
Jumlah
(Rp.)
456,500
41,500
15,300
8,100
1,800
486
523,686
Jumlah
(Rp.)
1,634,600
1,700,000
530,000
371,600
15,300
8,100
1,800
486
4,261,886
Jumlah
(Rp.)
1,180,000
118,000
371,600
15,300
8,100
1,800
1,694,800
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 Buah Closet duduk/Monoblock
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.300
Tukang Batu L.02 OH 1.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet Duduk Buah 1.000
Perlengkapan % 6.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir Pasang Kg 14.000
Perlengkapan % 30.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Floor Drain Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Kran air Buah 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Jet Washer Buah 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN
75,000.00 247,500.00
85,000.00 93,500.00
100,000.00 1,000.00
90,000.00 14,400.00
JUMLAH TENAGA KERJA 356,400.00
2,850,000.00 2,850,000.00
2,850,000.00 171,000.00
JUMLAH HARGA BAHAN 3,021,000.00
75,000.00 75,000.00
85,000.00 85,000.00
100,000.00 10,000.00
90,000.00 4,500.00
JUMLAH TENAGA KERJA 174,500.00
1,880,000.00 1,880,000.00
1,350.00 8,100.00
94.29 1,320.00
1,880,000.00 564,000.00
JUMLAH HARGA BAHAN 2,453,420.00
75,000.00 90,000.00
85,000.00 123,250.00
100,000.00 15,000.00
90,000.00 5,400.00
JUMLAH TENAGA KERJA 233,650.00
955,000.00 955,000.00
1,350.00 8,100.00
94.29 1,320.00
955,000.00 114,600.00
JUMLAH HARGA BAHAN 1,079,020.00
75,000.00 750.00
85,000.00 8,500.00
100,000.00 1,000.00
90,000.00 450.00
JUMLAH TENAGA KERJA 10,700.00
98,000.00 98,000.00
JUMLAH HARGA BAHAN 98,000.00
75,000.00 4,050.00
85,000.00 7,650.00
100,000.00 900.00
90,000.00 2,430.00
JUMLAH TENAGA KERJA 15,030.00
85,000.00 85,000.00
4,000.00 100.00
JUMLAH HARGA BAHAN 85,100.00
75,000.00 4,050.00
85,000.00 7,650.00
100,000.00 900.00
90,000.00 2,430.00
JUMLAH TENAGA KERJA 15,030.00
230,000.00 230,000.00
4,000.00 100.00
JUMLAH HARGA BAHAN 230,100.00
JUMLAH HARGA ALAT -
245,130.00
10% x D 24,513.00
269,643.00
PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI DAN DINDING PARTISI
PINTU
1 Unit Pintu, Type Pj1
2.000 Unit Daun Pintu Kaca Tempered 12 mm Lengkap @Rp
12.480 Ls Granit + Beton @Rp
6.120 M2 Kusen aluminium + Kaca Mati @Rp
0.100 Aksesories (10% dari bahan) @Rp
JENDELA
1 Unit Jendela, Type J1
8.460 M2 Daun Jendela + kaca warna hijau @Rp
0.100 Aksesories (10% dari bahan) @Rp
VENTILASI
1 Unit Ventilasi, Type V1
2.013 M2 kosen + Kaca warna hijau Tebal 5 mm @Rp
0.100 Aksesories (10% dari bahan) @Rp
B BAHAN
Plamuur Kg 0.100
Cat Dasar Kg 0.100
Cat Tembok Emultion Paint Setara Jotun Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
B BAHAN
Menie Besi Kg 0.100
Pengencer Liter 0.010
Kuas Bh 0.010
Perancah Kayu M3 0.002
JUMLAH HARGA BAHAN
C PERALATAN
75,000.00 15,000.00
85,000.00 5,358.15
100,000.00 630.00
90,000.00 270.00
JUMLAH TENAGA KERJA 21,258.15
13,750.00 1,375.00
25,500.00 2,550.00
51,600.00 13,416.00
JUMLAH HARGA BAHAN 17,341.00
75,000.00 18,750.00
85,000.00 19,125.00
100,000.00 2,250.00
90,000.00 675.00
JUMLAH TENAGA KERJA 40,800.00
38,000.00 3,800.00
14,000.00 140.00
18,000.00 180.00
18,500.00 37.00
JUMLAH HARGA BAHAN 4,157.00
I DATA PERALATAN
1. Jenis Peralatan = Eksavator
2. Tenaga =
3. Harga = Rp
4. Umur Kerja =
5. 1 tahun =
6. 1 hari kerja =
7. Umur Ekonomis (TahunUE =
8. Jam kerja per tahun (T h =
9. Harga Pokok HP =
10. Harga Bahan Pokok/ THbp =
11. Harga Sisa (HS) = 10% (HP Hbp)=
12. Harga Penyusutan (HP - Hbp - HS) =
b. Transmisi
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.22
T = (Jam) = 250.00
S = = 0.00
E = = 0.66
N = = 80.00
Hbop = (Harga bahan oli = -
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = 2.88
T = 2,400.00
S = 0.00
E = 0.66
N = 80.00
Hbbh = (Harga bahan hydraulik) -
0.80 M3
80.00 HP
###
6.00 Tahun
100.00 Hari
7.00 Jam
6.00 Thn 14,400.00 Jam
2,400.00
### ###
20,000,000.00
118,000,000.00
###
###
Rp/ jam 73,750.00
Rp/ jam 43,750.00
Rp/ jam 5,833.33
###
14.55 /jam -
0.10 /jam -
0.11 /jam -
0.17 /jam -
0.01 /jam -
0.00 /jam -
8,333.33
120,000.00
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sepanjang Muara
3 Kondisi jalan : sedang baik
4 Jam kerja efektif per - hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
2 ALAT
2.a EXCAVATOR 120 HP (E11)
- Kapasitas Bucket V 0.80 M3
- Faktor Bucket Fb 0.85
- Faktor Efesiensi Alat Fa 0.80
- Swell Sw 70.00 %
- Kapasitas Nyata 1/(1 + Sw) x V Kn 0.74 M3
0.0400 M3/jam
3 TENAGA
Produksi menentukan : EXCAVATOR Q1 25.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 175.06 M3
Kebutuhan tenaga : 7.00
Pekerja P 2.00 orang
Mandor M 1.00 orang
Koefisien tenaga / M3
Pekerja = (Tk x P) : Qt (Lo1) 0.0800 Jam
Mandor = (Tk x M) : Qt (Lo3) 0.0400 Jam
NALISA PRODUKTIVITAS ALAT
KET.
ANALISA PRODUKTIVITAS ALAT
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : Sepanjang Muara
3 Kondisi jalan : sedang baik
4 Jam kerja efektif per - hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
2 ALAT
2.a EXCAVATOR 120 HP (E11)
- Kapasitas Bucket V 0.80 M3
- Faktor Bucket Fb 0.85
- Faktor Efesiensi Alat Fa 0.80
- Swell Sw 70.00 %
- Kapasitas Nyata 1/(1 + Sw) x V Kn 0.74 M3
0.0394 M3/jam
3 TENAGA
Produksi menentukan : EXCAVATOR Q1 25.37 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 177.60 M3
Kebutuhan tenaga : 7.00
Pekerja P 2.00 orang
Mandor M 1.00 orang
Koefisien tenaga / M3
Pekerja = (Tk x P) : Qt (Lo1) 0.0788 Jam
Mandor = (Tk x M) : Qt (Lo3) 0.0394 Jam
ANALISA TAKSIRAN PRODUKSI ALAT BERAT
I Asumsi
1 Menggunakan Alat Berat
2 Lokasi Pekerjaan : Sepanjang pekerjaan
3 Jam kerja efektif per hari lk 7.00
II Metode Pelaksanaan
1 Menggali dan meratakan hasil galian
2 Alat
2.1 Excavator (HER) 120 HP
- Kapasitas Bucket V 0.80
- Faktor Bucket Fb 0.85
- Faktor efisiensi Alat Fa 0.85
- Swell Sw 85.00
- Kapasitas nyata 1/ (1 + sw) x V Kn 0.68
Sat Ket
jam
m3
m3
m3
%
m3
Menit
Menit
Menit
Menit
Menit
Kali
m3/jam
m3/ jam
jam
ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
Harga
No. Uraian Satuan Kuantitas Satuan
Rp.
1 2 3 4 5
I. MOBILISASI
1 Excavator Unit 2 3,000,000.00
2 Bulldozer Unit
3 Vibrator Roller Unit
4 Dump Truck Unit
5 Concrete Mixer/Molen Beton Unit
6 Genset Unit
7 Pompa Air Unit
8 Chain Saw Unit
9 Stamper Unit
10 Alat Ukur Unit
JUMLAH I
II. DEMOBILISASI
1 Excavator Unit 2 3,000,000.00
2 Bulldozer Unit
3 Vibrator Roller Unit
4 Dump Truck Unit
5 Concrete Mixer/Molen Beton Unit
6 Genset Unit
7 Pompa Air Unit
8 Chain Saw Unit
9 Stamper Unit
10 Alat Ukur Unit
JUMLAH II
TOTAL (I + II)
HARGA SATUAN PEKERJAA
Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/
berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan peker
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operato
- Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak
yang dibayar dari kontrak) dan biaya-biaya lainnya.
- Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja,
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spes
A SATUAN MATA PEMBAYARAN UTAMA
Jumlah
Harga
Rp.
6
6,000,000.00
-
-
-
-
-
-
-
-
###
6,000,000.00
-
-
-
-
-
-
-
-
###
###
###
s jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukura
Harga Jumlah
No. Uraian Satuan Kuantitas Satuan Harga
Rp. Rp.
1 2 3 4 5 6
I. TENAGA KERJA
1 Pekerja Org/hr 0.0800 ### 5,998.07
2 Mandor Org/hr 0.0400 ### 3,598.84
II. BAHAN
III. PERALATAN
1 Excavator Jam 0.0400 ### 12,895.85
Alat bantu Ls 1.0000 150.00 150.00
Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan
berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan peke
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operat
volume dan/atau ukura - Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak
yang dibayar dari kontrak) dan biaya-biaya lainnya.
satuan pekerjaan dari - Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spe
alatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
masuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak te
I. TENAGA KERJA
1 Pekerja Org/hr 0.0000 - -
2 Mandor Org/hr 0.0000 - -
II. BAHAN
III. PERALATAN
1 Excavator Jam 0.0394 ### 12,711.14
2 Ls 1.0000 150.00 150.00
Catatan ;
- SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau
u satuan pekerjaan da berat untuk bahan-bahan.
- Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan
mata pembayaran.
- Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
- Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak term
an tenagakerja, bahan, yang
p dibayar dari kontrak) dan biaya-biaya lainnya.
- Harga satuan yang diajukan peserta lelang harus mencakup seluruh tambahan tenagakerja, bah
atau kerugian yang mungkin diperlukan untuk menyelesaikan pekerjaan sesuai dengan spesifika
atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
antitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan TL 2x36 bh 1.1000 338,000
Perlengkapan (10% harga barang) bh 1.1000 33,800
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang OH 0.1080 85,000
Kepala Tukang OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
16 Memasang 1m GIP-2,5
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp.)
Bahan Gip 2,5 bh 1.1000 84,356
Perlengkapan (10% harga barang) bh 1.0000 8,436
Pembantu tukang OH 0.1800 75,000
Tenaga Kerja Tukang Listrik OH 0.1080 85,000
Kepala Tukang Listrik OH 0.0180 100,000
Mandor OH 0.0054 90,000
Jumlah harga per satuan pekerjaan
371,800
37,180
13,500
9,180
1,800
486
433,946
Jumlah
(Rp.)
321,200
32,120
13,500
9,180
1,800
486
378,286
Jumlah
(Rp.)
324,500
32,450
13,500
9,180
1,800
486
381,916
Jumlah
(Rp.)
140,800
14,080
13,500
9,180
1,800
486
179,846
Jumlah
(Rp.)
Jumlah
(Rp.)
130,900
13,090
13,500
9,180
1,800
486
168,956
Jumlah
(Rp.)
985,600
98,560
13,500
9,180
1,800
486
1,109,126
Jumlah
(Rp.)
18,590
4,510
1,859
13,500
9,180
1,800
486
49,925
Jumlah
(Rp.)
22,110
4,510
2,211
13,500
9,180
1,800
486
53,797
Jumlah
(Rp.)
28,160
4,510
2,816
13,500
9,180
1,800
486
60,452
Jumlah
(Rp.)
11,990
44,550
5,654
13,500
9,180
1,800
486
87,160
Jumlah
(Rp.)
15,290
4,510
1,390
13,500
9,180
1,800
486
46,156
Jumlah
(Rp.)
19,030
4,510
1,730
13,500
9,180
1,800
486
50,236
Jumlah
(Rp.)
11,990
64,350
6,940
13,500
9,180
1,800
486
108,246
Jumlah
(Rp.)
4,708,000
428,000
13,500
9,180
1,800
486
5,160,966
Jumlah
(Rp.)
92,792
8,436
13,500
9,180
1,800
486
126,193
Jumlah
(Rp.)
68,970
79,035
6,270
13,500
9,180
1,800
486
179,241
Jumlah
(Rp.)
385,000
35,000
13,500
9,180
1,800
486
444,966
Jumlah
(Rp.)
90,853
660,000
8,259
13,500
9,180
1,800
486
784,079
Jumlah
(Rp.)
300,000
25,000
13,500
9,180
1,800
486
349,966
NO. DOKUMEN KET.
1 SURAT PENAWARAN
2 DAFTAR KUANTITAS HARGA
3 AHSP
4 UPAH DAN BAHAN
5 ANTEK
6 METODE PELAKSANAAN
7 TIME SCEDUL
8 DAFTAR PERALATAN UTAMA
9 DAFTAR PERSONIL
10 STRUKTUR ORGANISASI
11 SPESIFIKASI TEKNIS
12 RK3K
13 SUB KON
14 JADWAL ALAT
15 JADWAL BAHAN
16 JADWAL PERSONIL
17 IJAZAH PERSONIL
18 TKDN