Академический Документы
Профессиональный Документы
Культура Документы
Street ###
x ###
x 18.00 x 14.00 x 0.42 = 105.84
Street ###
x ###
x 5.00 x 9.50 x 0.42 = 19.95
Street ###
x ###
x 81.50 x 12.88 x 0.50 = 524.86
Street ###
x ###
x 35.25 x 10.83 x 0.42 = 160.34
Street ###
x ###
x 52.00 x 4.75 x 0.42 = 103.74
Street ###
x ###
x 44.00 x 14.50 x 0.42 = 267.96
Street ###
x ###
x 27.00 x 9.83 x 0.42 = 111.47
Street ###
x ###
x 100.00 x 10.00 x 0.42 = 420.00
Street ###
x ###
x 49.00 x 12.00 x 0.42 = 246.96
1961.12 Cft 9416.28 % Cft Rs. 184664.58
Street ###
x ###
x 18.00 x 14.00 x 0.375 = 94.50
Street ###
x ###
x 5.00 x 9.50 x 0.33 = 15.68
Street ###
x ###
x 81.50 x 12.88 x 0.38 = 393.65
Street ###
x ###
x 35.25 x 10.83 x 0.33 = 125.98
Street ###
x ###
x 52.00 x 4.75 x 0.33 = 81.51
Street ###
x ###
x 44.00 x 14.50 x 0.33 = 210.54
Street ###
x ###
x 27.00 x 9.83 x 0.33 = 87.59
Street ###
x ###
x 100.00 x 10.00 x 0.375 = 375.00
Street ###
x ###
x 49.00 x 12.00 x 0.33 = 194.04
1578.48 Cft 14429.25 % Cft Rs. 227762.14
PACCA 19 11 20 21 17 6
LEAD IN MILES
KATCHA 0 0 0 0 0 0
PACCA
Rs. 0 X 0.60 X 1.25 0 X 32.56 X 1.25 0 X 32.56 X 1.25 0 X 32.56 X 1.25 0 X 32.56 X 1.25 0 X 32.56 X 1.25
Rs. #REF!
SUB - ENGINEER
BUILDINGS ASSISTANT ENGINEER
KOTRI BUILDINGS
KOTRI
Summary of Cost
NAME OF WORK : - CONSTRUCTION OF CC BLOCK & DRAIN @ VARIOUS STREETS OF
UNION COUNCIL BOLHARI, TALUKA KOTRI DISTRICT JAMSHORO.
( i ) STREET GHULAM NABI QURESHI BHATTI COLONY.
SUB - ENGINEER
BUILDINGS ASSISTANT ENGINEER
KOTRI BUILDINGS
KOTRI
EXTRA ITEM STATEMENT.
Name Of Work: Construction Of One Class Room at Government Boys Primary School Nawab Khan
Palari Taluka Thana Bula Khan District Jamshoro.(Civil Work).
Name Of Agency. M/s Khair Gul and Co,
Authiority N0. XEN (Building)/TC/G-55 / 426 /Date. 10 / 05 /2015.
As Per Technical Sanctio. As Per Work done /to be done.
S.N0 Discription Excess Saving Remarks
Qty. Rate. Unit. Amount Qty Rate. Unit Amoun.
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Errection & removal of centerint ………… ………… ………… …………. 232 1405/75 %Sf 3261/84 3261/84 ………..
for renforced or plain cement
concrete works of partial wood
2nd class)(B) Vertical.
Total. 3261/84 3261/84
curing Strengt
Sampl sample sample Strengt curiung Testing
specimen Type time average h in results
e1 2 3 h in psi date Date
(Days) N/mm2
cube SCC 3 Days 277020 351880 292220 307040 4495 31 8/10/2018 8/30/2018
cube SCC 7 Days 345380 353570 340460 346470 5075 35 8/10/2018 8/17/2018
Cube SCC 14 Days 421280 372120 407380 400260 5800 40 8/9/2018 8/28/2018
cube SCC 21 Days 403350 400620 320510 374826.7 5365 37 8/9/2018 8/30/2018
Cube SCC 28 Days 267680 430800 402500 366993.3 5365 37 8/9/2018 6-Sep-18
cube SCC 56 Days 515900 445080 535860 498946.7 7250 50 8/9/2018 10/3/2018
cube SCC 70 Days 522480 477890 526360 508910 7395 51 8/9/2018 10/17/2018
Cube SCC 90 Days 515440 547280 547080 536600 7830 54 8/9/2018 11/8/2018
cube NC 3 Days 249780 263150 251790 254906.7 3625 25 9/25/2018 9/28/2018
Cube NC 7 Days 258900 242590 200830 234106.7 3335 23 8/30/2018 9/5/2018
cube NC 14 Days 321920 324180 332790 326296.7 4785 33 8/30/2018 9/12/2018
cube NC 21 Days 338580 312450 335920 328983.3 4785 33 8/30/2018 9/19/2018
Cube NC 28 Days 366280 382050 292550 346960 5075 35 8/30/2018 9/26/2018
cube NC 56 Days 437800 404610 390640 411016.7 5945 41 8/30/2018 10/24/2018
Cube NC 70 Days 344990 432510 441090 406196.7 5945 41 8/30/2018 11/7/2018
Cube NC 90 Days 499180 422790 446700 456223.3 6670 46 8/30/2018 11/27/2018
Sample Area 16 in2
10000 mm2
curing Strengt
Sampl sample sample Strengt curiung Testing
specimen Type time average h in results
e1 2 3 h in psi date Date
(Days) N/mm2
cube SCC 3 Days 285520 295310 292220 291016.7 4205 29 8/10/2018 8/30/2018
cube SCC 7 Days 345380 353570 340460 346470 5075 35 8/10/2018 8/17/2018
Cube SCC 14 Days 385160 372120 377670 378316.7 5510 38 8/9/2018 8/28/2018
cube SCC 21 Days 403350 400620 408850 404273.3 5800 40 8/9/2018 8/30/2018
Cube SCC 28 Days 437800 430800 429800 432800 6235 43 8/9/2018 6-Sep-18
cube SCC 56 Days 457780 445080 467890 456916.7 6670 46 8/9/2018 10/3/2018
cube SCC 70 Days 522480 519960 526360 522933.3 7540 52 8/9/2018 10/17/2018
Cube SCC 90 Days 548780 547280 547080 547713.3 7975 55 8/9/2018 11/8/2018
cube NC 3 Days 249780 252890 251790 251486.7 3625 25 9/25/2018 9/28/2018
Cube NC 7 Days 258900 263150 265670 262573.3 3770 26 8/30/2018 9/5/2018
cube NC 14 Days 321920 324180 332790 326296.7 4785 33 8/30/2018 9/12/2018
cube NC 21 Days 338580 340080 335920 338193.3 4930 34 8/30/2018 9/19/2018
Cube NC 28 Days 366280 382050 379570 375966.7 5510 38 8/30/2018 9/26/2018
cube NC 56 Days 407890 404610 390640 401046.7 5800 40 8/30/2018 10/24/2018
Cube NC 70 Days 437800 432510 441090 437133.3 6380 44 8/30/2018 11/7/2018
Cube NC 90 Days 460090 458970 446700 455253.3 6670 46 8/30/2018 11/27/2018
Comparison of Compressive Strength Of SCC and NCC
3 Days 7 Days 14 Days 21 Days 28 Days 56 Days 70 Days 90 Days
Compressive Strength (PSI)
8000
7000
6000
5000
4000
3000
2000
1000
0
3.1415927
L 200 mm Sample
8 in
curing
Sample sample sample
specimen Type time average
1 2 3
(Days)
Cylinder SCC 3 Days 68390 68560 67390 68113.33
Cylinder SCC 7 Days 94150 94650 93850 94216.67
Cylinder SCC 14 Days 95270 96760 95990 96006.67
Cylinder SCC 21 Days 96380 97850 98150 97460
Cylinder SCC 28 Days 107890 110380 109900 109390
Cylinder SCC 56 Days 111580 111860 113490 112310
Cylinder SCC 70 Days 114560 115820 113600 114660
Cylinder SCC 90 Days 116780 117650 118580 117670
Cylinder NC 3 Days 64390 62460 63460 63436.67
Cylinder NC 7 Days 72980 75340 77540 75286.67
Cylinder NC 14 Days 79870 80670 81480 80673.33
Cylinder NC 21 Days 81780 84910 83560 83416.67
Cylinder NC 28 Days 95840 97890 99850 97860
Cylinder NC 56 Days 99400 100080 108200 102560
Cylinder NC 70 Days 101680 107290 108040 105670
Cylinder NC 90 Days 109980 107810 110850 109546.7
DIA 4 in
100 mm
Strength
Strength curiung Testing
in results
in psi date Date
N/mm2
315 2.17 8/10/2018 8/30/2018
435 3 8/10/2018 8/17/2018
444 3.06 8/9/2018 8/28/2018
450 3.1 8/9/2018 8/30/2018
505 3.48 8/9/2018 6-Sep-18
518 3.57 8/9/2018 10/3/2018
529 3.65 8/9/2018 10/17/2018
544 3.75 8/9/2018 11/8/2018
293 2.02 9/25/2018 9/28/2018
348 2.4 8/30/2018 9/5/2018
373 2.57 8/30/2018 9/12/2018
386 2.66 8/30/2018 9/19/2018
451 3.11 8/30/2018 9/26/2018
473 3.26 8/30/2018 10/24/2018
487 3.36 8/30/2018 11/7/2018
506 3.49 8/30/2018 11/27/2018
Splitting Tensile Strength (PSI) Comparison of Splitting Tensile Strength Of SCC and NCC
600
550
500
450
400
350
300
250
200
150
100
50
0
3 Days 7 Days 14 Days 21 Days 28 Days 56 Days 70 Days 90 Days
3.1415927
L 200 mm Sample
8 in
curing
Sample sample sample
specimen Type time average
1 2 3
(Days)
Strength
Strength curiung Testing
in results
in psi date Date
N/mm2