Вы находитесь на странице: 1из 1

AOG CHECKLIST

A/C REGISTRY: STATION: DATE:


SYSTEM/POWERPLANT STRUCTURES
RETRIEVED DATA: RETRIEVED DATA:
_____COPY OF ATL REMARKS _____DAMAGE DIMENSION
_____PFR _____DAMAGE MAPPING
_____BITE RESULT

_____TSD

_____SMR

_____FILLED OUT REFORT FORM


(VIBRATION, PDA AND COS REPORTING SHEET)

_____DFDR DATA DOWNLOADING

_____OTHERS (MCDU GENERATED REPORT)


REFERENCES: (INDICATE REFERENCE REFERENCES: (INDICATE REFERENCE
NUMBER) NUMBER)
_____AMM - ________________________ _____SRM - ________________________

_____IPC - _________________________ _____CMM - ________________________

_____CMM - ________________________ _____OTHERS - _____________________

_____TSM - ________________________

_____AWM - ________________________

_____ESPM - _______________________
CONFIRM ALLOWABLE DAMAGE
PERFORM TROUBLESHOOTING AS PER LIMITATION AND APPLICABLE REPAIR
APPLICABLE TSM PROCEDURE
NOTE: FOLLOW TSM STEP-BY-STEP PROCEDURE NOTE: ENSURE CORRECT WV AND A/C CONFIGURATION
(MOD)

RFTS RAISED: ____YES ____NO


DATE/TIME:__________/__________
REASON FOR RAISING RFTS:___________________________________________________
_____________________________________________________________________________
IDENTIFY SPARE & TOOL IDENTIFY MATERIAL AND TOOL
REQUIREMENT: REQUIREMENT:
(UTILIZE A/C DISCREPANCY RECTIFICATION (UTILIZE A/C DISCREPANCY RECTIFICATION
SPARE REQUIREMENT FORM) SPARE REQUIREMENT FORM)

REPLACE DEFECTIVE PART REPAIR DAMAGE


A/C DOCUMENTATION

_________________________________ ______________________________
PCC/OIC Signature over Printed Name Ops Manager Signature over Printed Name

Вам также может понравиться