Schedule Kedatangan (per minggu)

Uraian Pekerjaan 13/05/19 20/05/19 27/05/19 03/06/19 10/06/19 17/06/19 Contoh Material
19/05/19 26/05/19 02/06/19 09/06/19 16/06/19 23/06/19
PRELIMINARIES
Pagar proyek seng, hollow
Direksi kit CNP 150, partisi, pas. Bata, kusen, sanitary
Bedeng pekerja seng, balok kayu, triplek, km pekerja
Listrik dan air kerja trafo listrik, pasang pdam dan bor sumur
Perlengkapan dan peralatan kerja ekscavator, tc, material scafolding, panel coloum, dll

Schedule Kedatangan (per 2 minggu)


Uraian Pekerjaan 17/06/19 30/06/19 13/07/19 26/07/19 08/08/19 21/08/19 03/09/19 16/09/19 29/09/19 12/10/19 25/10/19 07/11/19 20/11/19 Contoh Material
29/06/19 12/07/19 25/07/19 07/08/19 20/08/19 02/09/19 15/09/19 28/09/19 11/10/19 24/10/19 06/11/19 19/11/19 02/12/19
STRUCTURE
Sub Structure batako, besi, beton, anti rayap
Coloum triplek corimplek 18mm, besi, beton
Upper Structure material scafolding, triplek melamin 12mm, besi, beton
Structure Staircase material scafolding, triplek melamin 12mm, besi, beton
Structure Roof material scafolding, triplek melamin 12mm, besi, beton, baja
Str Bangunan Penunjang batako, besi, beton, anti rayap, scafolding, triplek, besi, beton
Str Bangunan Parkir batako, besi, beton, anti rayap, scafolding, triplek, besi, beton, baja

Schedule Kedatangan (per 2 minggu)


Uraian Pekerjaan 09/09/19 22/09/19 05/10/19 18/10/19 31/10/19 13/11/19 26/11/19 09/12/19 22/12/19 04/01/20 17/01/20 30/01/20 12/02/20 25/02/20 09/03/20 22/03/20 Contoh Material
21/09/19 04/10/19 17/10/19 30/10/19 12/11/19 25/11/19 08/12/19 21/12/19 03/01/20 16/01/20 29/01/20 11/02/20 24/02/20 08/03/20 21/03/20 03/04/20
ARCHITECTURE
Ars Staircase Hollo,Cat,Hand Raling Kayu Nato, Step Nosing ,Floor Hadener
Ars Roof Metall zincalum Type Kliklock 0.6 mm,Isulasi Atap Tipe ZT-01BFV
Eksternal Walls Bata Ringan Tebal 10cm, ACP,Angkur Joint
Internal Wall Bata Ringan tebal 10 Cm, Angkur Joint
Internal Screen & Borrowed Light Phenolic Board 12mm
Windows Kusen Aluminum, Kaca Clear+ Aksesoris Jendela
External Dors Kusen Aluminium, Kusen Besi ,Daun Pintu plat besi, Daun Pintu Aluminium
Internal Dors Kusen Aluminum, Daun pintu engginerdor.
Finishes Plaster acian,Keramik Dinding,Cat,Keramik Lantai,Plafon Gypsum
Pek Landscape RCP, U-Ditch,Pipa 6"
Pek Waterprofing Sika Top 107 , Sika Deck Seal Sikalastic-590
Pek Roads,Footphats,& Paved area Sirtu,Paving Block, Kanstien , Car Stopper,Cat
Pek Sanitair Wastafel,Kran,Closed,Avour,Urinoir,Jet Spray
Pek Arsitektur Penunjang Bata Ringan , Acian, Cat ,FloorHaidner, Plafond
Pek Aritektur Bangunan Parkir Atap Zincalum type kliplock 0.6mm , Raalling , Florhaidner

Schedule Kedatangan (per 2 minggu)


Uraian Pekerjaan 02/09/19 15/09/19 28/09/19 11/10/19 24/10/19 06/11/19 19/11/19 02/12/19 15/12/19 28/12/19 10/01/20 23/01/20 05/02/20 18/02/20 Contoh Material
14/09/19 27/09/19 10/10/19 23/10/19 05/11/19 18/11/19 01/12/19 14/12/19 27/12/19 09/01/20 22/01/20 04/02/20 17/02/20 01/03/20
MEP
Electrical Kabel ,Panel ,Travo,Kabel Feeder,Mcb,Lampu Indikator,Stop kontak
AC Kabel Power, Ac Split , Ac Outdor , Stop Kontak,Exhouse Fan
Fire Alarm Indicator Detector, Kabel,Pipa conduit, Smoke Detector, Alarm Bel
Telepon Kebel feeder , Telepon Box, Outlet telepon,Telephone
Sound System Kabel NYM ,Amplifier ,Terminal Box Sound Sytem , Speaker 6w
CCTV Digital Video Recording , UPS, LED TV , Cabinet Rack , Camera Dome
Plumbing Pipa ppr , pipa Pvc Aw , Clean Out , Floor Drain , Pompa Tranfer
Hydrant & Sprinkler Box Hydrant ,Electrik Main Pump ,Disen pump,ockey Pump,Pipa Bsp