** ON A/C ALL
TASK 12-14-29-614-001-A
Fill the Hydraulic Power Accumulators with Nitrogen
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
GEAR.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING: MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OP-
ERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF
HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL
MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
B. Consumable Materials
REFERENCE DESIGNATION
(Material No. 14-VGC1) Individual Compound-- Nitrogen Gaseous
D. Referenced Information
REFERENCE DESIGNATION
(Ref. 29-10-00-200-008-A). Check Nitrogen Charge Pressure on Hydraulic Power Accumulators
Hydraulic Power Accumulators - Location
Hydraulic Power Accumulator - Pressure Graph SHEET 1
FOR 1070GM (HYD ACCU GREEN)
(Ref. 29-10-00-864-001-A). Depressurize the Green Hydraulic System
(Ref. 32-12-00-010-001-A). Open the Main Gear Doors for Access
(Ref. 32-12-00-410-001-A). Close the Main Gear Doors after Access
FOR 2070GM (HYD ACCU BLUE)
(Ref. 29-10-00-864-003-A). Depressurize the Blue Hydraulic System
FOR 3070GM (HYD ACCU YELLOW)
(Ref. 29-10-00-864-002-A). Depressurize the Yellow Hydraulic System
Z195
GREEN SYSTEM
A
C
A
B
D
FR44
Z196 Z147
FR43
FR42
D
2
1
HYDRAULIC
POWER
ACCUMULATOR
1070GM
N_MM_121429_3_AAPA_01_00
FR41
BLUE SYSTEM
C
FR41 FR42
E
E
HYDRAULIC POWER
ACCUMULATOR
2070GM
(3070GM)
3
2
1
N_MM_121429_3_AAPA_02_00
PRESSURE
BARS PSI
MAX VALUE
160 2320 NOMINAL
PRESSURE
150 2175
MIN VALUE
140 2030
130 1885
120 1740
110 1595
100 1450
20 10 0 10 20 30 40 50 60 C TEMPERATURE
N_MM_121429_3_AEM0_01_00
3. Job Set-up
Subtask 12-14-29-010-052-A
A. Get Access
(1) Open the applicable access door/panel:
(a) FOR 1070GM (HYD ACCU GREEN)
Open the left main-landing-gear (MLG) door (Ref. AMM TASK 32-12-00-010-001) .
(b) FOR 3070GM (HYD ACCU YELLOW)
Open access panel 196BB.
(c) FOR 2070GM (HYD ACCU BLUE)
Open access panel 195BB.
Subtask 12-14-29-860-050-A
B. Aircraft Maintenance Configuration
(1) Depressurize the applicable hydraulic system:
(a) FOR 1070GM (HYD ACCU GREEN)
Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) .
(b) FOR 3070GM (HYD ACCU YELLOW)
Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002) .
(c) FOR 2070GM (HYD ACCU BLUE)
Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003) .
(2) Put WARNING NOTICE(S) in position to tell persons not to pressurize the applicable hydraulic
system:
· On the applicable ground service panel
· On panel 40VU in the cockpit.
(3) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the MLG bay.
4. Procedure
(Ref. Fig. Hydraulic Power Accumulators - Location) (Ref. Fig. Hydraulic Power Accumulator - Pressure
Graph SHEET 1)
Subtask 12-14-29-614-052-A
A. Fill the Applicable Accumulator with Nitrogen
(1) Do a check of the nitrogen pressure gage, before you fill the applicable accumulator:
(a) If the decrease in nitrogen pressure is more than 15 bar (217.56 psi) (refer to the
subsequent nitrogen pressure table), do a leak check of the applicable accumulator
(Ref. AMM TASK 29-10-00-200-008) .
(b) If the decrease in nitrogen pressure is less than 15 bar (217.56 psi), continue as follows:
(2) Remove the blanking cap (1) from the charging valve (2).
(3) Connect the FILL UNIT-NITROGEN (98F29103500000) or a nitrogen bench capable of maximum
pressure 155 bar (2248.08 psi) to the charging valve (2).
(4) Loosen the charging valve nut (2).
(5) Open the control valve slowly and fill the hydraulic power accumulator with the nitrogen Individual
Compound-- Nitrogen Gaseous (Material No. 14-VGC1) to the correct pressure for the ambient
temperature.
Table I
(6) When the pressure is stable and correct, tighten the charging valve nut (2).
(7) TORQUE the charging valve nut (2) to between 50 and 60 lbf.in (0.57 and 0.68 m.daN).
(8) Make sure that the pressure shown on the pressure gage (3) is correct.
(9) Stop the supply and remove the nitrogen filling system from the charging valve (2).
(10) Loosely install the blanking cap (1) on the charging valve (2).
(11) TORQUE the blanking cap (1) to between 5.0 and 10.0 lbf.in (0.06 and 0.11 m.daN).
5. Close-up
Subtask 12-14-29-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access door/panel:
(a) FOR 1070GM (HYD ACCU GREEN)
Close the left MLG door (Ref. AMM TASK 32-12-00-410-001) .
(b) FOR 3070GM (HYD ACCU YELLOW)
Close access panel 196BB.
(c) FOR 2070GM (HYD ACCU BLUE)
End of document