Service Connection Charges for effecting LT Single phase Service Connection
I

Service Connection charges for effecting LT single phase SCs.


Quantity Description Rate in Per Amount in Rs.
Rs.

1 Single phase AC High Precision meter 5-20A 821 E 821

1 SPIC Cutout 32 Amps 41 E 41


Cost of materials 862
Contingencies 5% 43
Total cost of materials 905
Storage 3% 27
Labour and Transport 30% 280
Sub-total 1212

Estt. & Supervision charges 509

Gross Total 1721


Less : cost of meter 821
Net Total 900
Proposed service connection charges 900
Note: All the other Service connection materials are to be provided by the applicants.
II Service Connection charges for effecting LT Three phase Service Connection with
CL less than 18.6 KW
Quantity Description Rate in Per Amount in Rs.
Rs.

1 Three phase static meter 10-60A 3450 E 3450


3 SPIC Cutout 32 Amps 41 E 123
Cost of materials 3573
Contingencies 1% 36
Total cost of materials 3609
Labour 10% 361
Transport 3 % 119
Sub-total 4089
Estt. & Supervision charges 1019
Gross Total 5107
Less : cost of meter 3450
Net Total 1657
Proposed service connection charges 1600
Note: All the other Service connection materials are to be provided by the applicants.
ANNEXURE -I
ESTIMATE FOR SERVICE CONNECTION CHARGES
II
Service Connection charges for effecting LT Three phase Service Connection with
CL between 18.6 KW and 60 KW
Quantity Description Rate in Per Amount in Rs.
Rs.
1 Three phase static meter 50-100A 3800 E 3800
3 SPIC Cutout 63 Amps 74 E 222
Cost of materials 4022
Contingencies 1% 40
Total cost of materials 4062
Labour 10 % 406
Transport 3 % 134
Sub-total 4602
Estt. & Supervision charges 2188
Gross Total 6790
Less : cost of meter 3800
Net Total 2990
Proposed service connection charges 3000
Note: All the other Service connection materials are to be provided by the applicants.

Service Connection charges for effecting LT Three phase Service Connction With
CT meter
Quantity Description Rate in Per Amount
Rs.
3 SPIC Cutout with fuse unit 100 Amps 354 E 1062
1 3 phase LTCT Meter 3803 E 3803
3 LTCT 264 E 792
1 Triple compartment box 1759 E 1759
1.5 GI wire 7/20 SWG 68.64 KG 103
5 GI Pipe 278 m 1390
Cost of materials 8909
Contingencies 1% 89
Total cost of materials 8998
Labour 10% 900
Transport 3% 297

Sub-total 10195
Estt. & Supervision charges 3647
Gross Total 13842
Less : cost of meter 3803
Net Total 10039
Proposed service connection charges 10000
Note: All the other Service connection materials are to be provided by the applicants.
ANNEXURE-II
DETAILS FOR METER RENT (HT SERVICES )
Sl.No. Type of Service Cost of Cost of Monthly interest for Meter Rent
Meter in Rs. Metering metering proposed by
Set/CT-PT in arrangements @ TNEB in Rs. Per
Rs. 12.5% p.a. in Rs. service per
month.
Electronics Trivector Meter

1 For 11 KV 44442 501


3665
2 For 22 KV 65941 725 Rs.700/-
3 For 33 KV 75355 823 /Service/Month
4 For EHT Services
110 KV CTS &
a. PTs 181825 1932
3665
230 KV CTS & Rs.2500/-
b. PTs 280185 2957 /Service/Month

DETAILS FOR METER RENT (LT SERVICES )


Sl.No. Type of Service Cost of Monthly Meter Rent
Meter in interest for proposed by TNEB in
Rs. metering Rs. Per service per
arrangeme month.
nts @
12.5% p.a.
in Rs.
Mechanical /
821 9 10
1 Electronic Meter
Average of two
Mechanical / Multi
3625 38 40 meter
function Meter
2
Multi function
Meter for LTCT 3803 40 45
3 SCs
ANNEXURE - III

DETAILS OF EXPENDITURE FOR CHANGING OF METER BOARD/ LTCT Box/HT Box


Single phase
Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Foreman 38425 1281 160 2 320
2 Wireman 21750 725 91 2 181
Total 501
The changing meter board fee now proposed is Rs. 500/-.

Three phase upto 18.6kw


Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Foreman 38425 1281 160 3 480
2 Wireman 21750 725 91 3 272
Total 752
The changing meter Board fee now proposed is Rs 750/-.

Three phase 18.6kw to 60 KW


Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Engineer/MRT,
O&M 39223 1307 163 6 981
2 Technical Assistant 22475 749 94 3 281
3 Foreman 38425 1281 160 3 480
4 Wireman 21750 725 91 3 272
Total 121873 2014
The changing meter Box fee now proposed is Rs 2000/-.

LTCT Services
Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer 48575 1619 202 3 607
2 Asst.Engineer/MRT, O& 39223 1307 163 6 981
3 Technical Assistant 22475 749 94 3 281
4 Foreman 38425 1281 160 3 480
5 Wireman 21750 725 91 3 272
Total 2621
The changing meter Box fee now proposed is Rs 2600/-.
HT Services
Sl. No. Man power required Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer/O&M 48575 1619 202 3 607
2 Asst.Exe.Engineer /MRT 48575 1619 202 3 607
3 Asst.Engineer 39223 1307 163 3 490
4 Technical Assistant 22475 749 94 3 281
5 Foreman 39223 1307 163 3 490
6 Wireman 38425 1281 160 3 480
Total 2956
The changing meter Box fee now proposed is Rs 3000/-.
ANNEXURE - IV
DETAILS OF EXPENDITURE FOR CHANGING OF METER
Single phase
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.
1 Foreman 38425 1281 160 1 160
2 Wireman 21750 725 91 1 91
Total 251
The changing of meter fee now proposed is only Rs 250/-.

Three phase up to 18.6 KW


Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
1 Foreman R 38425 R 1281 R 160 2 320
2 Wireman 21750 725 91 2 181
Total 501
The changing of meter fee now proposed is only Rs 500/-.

Three phase 18.6 KW to 60 KW


Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
1 Asst.Engineer 39222.5 1307 163 2.5 409
2 Technical Assistant 22475 749 94 2.5 234
3 Helper 21315 711 89 2.5 222
Transport LS 750
Total 1615
The changing of meter fee now proposed is only Rs 1600/-.
LTCT Services
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
1 Asst.Exe.Engineer 48575 1619 202 2.5 506
2 Asst.Engineer 39223 1307 163 2.5 409
3 Technical Assistant 22475 749 94 2.5 234
5 Helper 21315 711 89 2.5 222
Transport LS 750
Total 2121
The changing of meter fee now proposed is only Rs 2100/-.
H.T.Services
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
1 Asst.Exe.Engineer R 48575 R 1619 R 202 3 607
2 Asst.Engineer 39222.5 1307 163 3 490
3 Technical Assistant 22475 749 94 3 281
4 Hepler 21315 711 89 3 266
5 Transport LS 750
Total 2395
The changing of meter fee now proposed is only Rs 2400/-.
ANNEXURE - V
DETAILS OF EXPENDITURE FOR INSTALLATION TESTING
Single phase service
Sl. No. Man power required Wages Wages Wages per Man hour Total amount
per month per day hour Rs. required required Rs.
1 Foreman 38425 1281 160 1 160
2 Wireman 21750 725 91 1 91
Total 251
The Installation Testing fee now proposed is only RS 250/-.
Three Phase Service upto 18.6 KW
Sl. No. Man power required Wages Wages Wages per Man hour Total amount
per month per day hour Rs. required required Rs.
1 Foreman 38425 1281 160 1.5 240
2 Wireman 21750 725 91 1.5 136
Total 376
The Installation Testing fee now proposed is only RS 350/-.
Three Phase Service 18.6 KW to 60 KW
Sl. No. Man power required Wages Wages Wages per Man hour Total amount
per month per day hour Rs. required required Rs.
1 Asst.Engineer 39223 1307 163 3 490
2 Technical Assistant 22475 749 94 3 281
3 Hepler 21315 711 89 3 266
4 Transport LS 750 750
Total 1788
The proposed charges is Rs 1800/-.
LTCT Services
Sl. No. Man power required Wages Wages Wages per Man hour Total amount
per month per day hour Rs. required required Rs.
1 Asst.Exe.Engineer 48575 1619 202 1 202
2 Asst.Engineer 39223 1307 163 3 490
3 Technical Assistant 22475 749 94 3 281
4 Hepler 21315 711 89 3 266
5 Transport LS 750 750
Total 1990
The proposed charges is Rs 2000/-.
H.T.Services
Sl. No. Man power required Wages Wages Wages per Man hour Total amount
per month per day hour Rs. required required Rs.
1 Asst.Exe.Engineer 48575 1619 202 3 607
2 Asst.Engineer 39223 1307 163 6 981
3 Technical Assistant 22475 749 94 6 562
4 Hepler 21315 711 89 6 533
5 Transport LS 500
Total 3183
The proposed fee is only RS 3000/-
Considered that meter reading is being
Charges for taking meter reading in Wind Farm taken in 20 service per day,
Sl. No. Man power required Wages Wages Wages per
per month per day Service Rs.
1 Asst.Exe.Engineer 48575 1619 81
2 Asst.Engineer 39223 1307 65
3 Foreman 38425 1281 64
4 Transport LS 3000 150
Total 360
The proposed fee is only RS 350/-
ANNEXURE - VI
DETAILS OF EXPENDITURE FOR DOWNLOADING OF METER READING
USING CMRI
Single and Three phase Nonstatic meters
Sl. No. Man power require Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Foreman 38425 1281 160 0.5 80

Total 80
The proposed charges is Rs 80/-.

LT Static meters
Sl. No. Man power require Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Engineer 39223 1307 163 0.5 82
2 Transport 750 150
Total 232
The proposed charges is Rs 230/-.

H.T.Services
Sl. No. Man power require Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required
Rs.
1 Asst.Exe.Engineer
48575 1619 202 0.75 152
2 Hepler 21315 711 89 0.75 67
3 Transport 750 250
Total 468
The proposed charges is Rs 460/-.
ANNEXURE-VII
Meter Caution Deposit
Cost of the meter Existing proposed
in Rs. in Rs. in Rs.
LT Services
Single phase Meter 821 700/Meter 825/Meter

Three Phase Meter

Electronic Static meter

10-60 A 3450
2500/Meter 3650/Meter
50-100 A 3800

Electronic Static Type LT 3803 (Meter) + 792


2500/Meter 4600/Meter
CT operated (LTCTs) = 7025

HT Services
11 KV Meter plus metering
set 48107
22 KV Meter plus metering Rs.40,000 per Rs.65000 per
set 69606 service service
33 KV Meter plus metering
set 79020

EHT Services

110 KV

Meter 3665
Rs.1,00,000
CTs and PTs 181825 per service
Rs.2,35,000 per
230 KV service
Meter 3665
Rs.1,00,000
CTs and PTs 280185 per service
ANNEXURE - VIII
DETAILS OF EXPENDITURE FOR RECONNECTION
Cut out (Single phase)
Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.
1 Wireman 21750 725 91 1.5 136

2 Helper 21315 711 89 1.5 133

Total 269
The proposed charges is Rs 270/-.

Cut out (Three phase)


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Wireman 21750 725 91 2 181

2 Helper 21315 711 89 2 178

Total 359
The proposed charges is Rs 360/-.

Overhead Line (Single phas


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Wireman 21750 725 91 3 272

2 Helper 21315 711 89 3 266

Total 538
The proposed charges is Rs 540/-.

Overhead Line (Three phase


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.
1 Foreman 38425 1281 160 3 480

2 Wireman 21750 725 91 3 272

Total 752
The proposed charges is Rs 750/-.

Under Ground Cable (Single phase)


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Wireman 21750 725 91 4 363

2 Helper 21315 711 89 4 355

Total 718
The proposed charges is Rs 700/-.

Under Ground Cable (Three phase)


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Wireman 21750 725 91 5.5 498

2 Helper 21315 711 89 5.5 488

Total 987
The reconnection fee now proposed is only RS 1000/-.
ANNEXURE-IX
Reconnection of LT CT.Services within Six months after the date of DC
Wages per Wages per Wages per man hour
Sl.No. Man Power required month day hour required Amount required
1 AEE/Dist 48575 1619 202 2 405
2 AE/Dist 39223 1307 163 4 654
3 Foreman 38425 1281 160 4 640
4 Area WM 21750 725 91 4 363
5 Helper 21315 711 89 4 355
Total 169288 2417
The Reconnection now proposed Rs 2500

Reconnection of HT .Services within six months after the date of DC


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Asst.Exe.Engineer
48575 1619 202 5 1012
2 FM
38425 1281 160 5 801
3 Wireman 21750 725 91 5 453
4 Hepler 21315 711 89 5 444
5 Clerical Work LS 500
6 Transport charges LS 1000
Total 4210
The reconnection fee now proposed only RS 4000/-.

Reconnection of LT CT.Services beyond six months after the date of DC


Wages per Wages per Wages per man hour
Sl.No. Man Power required month day hour required Amount required
1 AEE/Dist 48575 1619 202 2 405
2 AE/Dist 39223 1307 163 4 654
3 AE/MRT 39223 1307 163 4 654
4 Foreman 38425 1281 160 4 640
5 TA Grade -I 22475 749 94 4 375
6 Area WM 21750 725 91 4 363
7 Helper 21315 711 89 4 355
Total 230985 3445
The Reconnection now proposed Rs 3500

Reconnection of H.T.Services Beyond Six months from the date of disconnection


Sl. No. Man power required Wages per Wages per Wages per Man hour Total amount
month Rs. day Rs. hour Rs. required required Rs.

1 Asst.Exe.Engineer
48575 1619 202 6 1214
MRT
2 Asst.Exe.Engineer 48575 1619 202 6 1214
3 Technical Assistant 22475 749 94 6 562
3 FM 38425 1281 160 6 961
3 Wireman 21750 725 91 6 544
4 Hepler 21315 711 89 6 533
5 Clerical Work LS 500
6 Transport charges LS 1000
Total 6528
The reconnection fee now proposed only RS 6500/-.
ANNEXURE - X
DETAILS OF EXPENDITURE FOR NAME TRANSFER OF SERVICES

LT Category
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.

1 IA 22475 749 94 2 187

2 RS 38425 1281 160 2 320

3 AE 39223 1307 163 1 163

Taking RTR after inspection


4 by FM 38425 1281 160 1 160

5 Postal & Stationary LS 75


Total 906
Name transfer fee proposed is only Rs.900/-

For HT Service
Sl. No. Man power required Wages Wages Wages Man hour Total amount
per month per day per hour required required Rs.
Rs. Rs. Rs.

1 Superintending Engineer 88885 2963 370 0.5 185

2 Deputy Financial Controller 49880 1663 208 2 416

3 Accounts Officer 48720 1624 203 2 406

4 Asst.Accounts officer 47560 1585 198 3 595

5 Accounts supervisor 38425 1281 160 4 640

Taking RTR after inspection


6 by AEE including transport 2000

7 Postal,stationery etc LS 150

Total 4392
Name transfer fee proposed is only Rs.4500/-
ANNEXURE-XI
Development Charges
Cost of Length
Establishment of Length of Cost of Cost of
substation/ of Out Cost of Total
substations/ incoming incoming Out going Total Cost per
Sl NO Distribution going land in Cost in
Distribution line in line in line line in KVA KVA
Transformers line in Rs lakhs Rs lakhs
Transformers in Rs lakhs
KM Rs lakhs KM Rs lakhs

9
1 2 3 4 5 6 7 8 =3+5+7 10 11
+8

Erection of 230 KV
substation with 100
a MVA Power 2590 1 37.3 1 22 24 2673 100000 2673
Transformers and 6
Nos 110 KV feeders

Erection of 110/11
KV substation with
b 2*10 MVA Power 527 1 22 1 3.87 10 563 20000 2814
Transformers and 4
Nos 11 KV feeders

Erection of 33 KV
substation with 2*8
c MVA Power 371 1 3.83 1 3.87 4 383 16000 2392
Transformers and 3
Nos 11 KV feeders

Erection of
11 KV/100 KVA
d 1.61 1 3.0 1 2.1 0 7 100 6636
Distribution
Transformers

Erection of
11 KV/250 KVA
e 2.89 1 3.0 1 2.1 0 8 250 3167
Distribution
Transformers
Erection of
11 KV/500 KVA
f 4.30 1 3.0 1 2.1 0 9 500 1867
Distribution
Transformers
Erection of
22 KV/100 KVA
g 2.02 1 3.23 1 2.1 0 7 100 7328
Distribution
Transformers
Erection of
22 KV/250 KVA
h 3.60 1 3.23 1 2.1 0 9 250 3562
Distribution
Transformers
Erection of
22 KV/500 KVA
i 6.54 1 3.23 1 2.1 0 12 500 2369
Distribution
Transformers
Average cost per KVA 3645
Average cost per KVA with diversity factor of 1.5 2430
Development charges now proposed for HT services 2500
Average cost per KVA for LT services @ diversity factor of 1.5 and power factor of 0.9 1852
Development charges now proposed for LT services 1800
ANNEXURE - XII
DETAILS OF EXPENDITURE FOR REGISTRATION AND
PROCESSING OF APPLICATION
LT Category involving Minor extension (LT services)
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AE 39223 1307 163 0.5 82

2 CI / CA 21750 725 91 4 363


Total 444
Proposed charge is Rs.500

LT Category involving major extension/improvements (LT CT services)


Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AE
49880 1663 208 5 1039

2 CI / CA 21750 725 91 5 453


Total 1492
Proposed charge is Rs.1500

For HT Service
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 SE 88885 2963 370 1 370

2 AEE/Gl. 48575 1619 202 3 607

3 EE/Dist. &
49880 1663 208 6 1247
EE/GL

4 AEE/Dist. 48575 1619 202 4 810

Total 3034
Proposed charge is Rs.3000
ANNEXURE - XIII
DETAILS OF EXPENDITURE FOR CHANGE OF TARIFF
LT Category lower to higher tariff
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AE 39223 1307 163 1 163

2 FORMAN 38425 1281 160 1 160

3 CI / CA 21750 725 91 1 91
Total 254

LT Category lower to higher tariff


Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 AEE 48575 1619 202 1 202

2 AE 39223 1307 163 1 163

3 FORMAN 38425 1281 160 1 160

4 CI / CA 21750 725 91 2 181


Total 526

For HT Service
Sl. No. Man power Wages Wages Wages Man hour Total
per month per day per hour required amount
Rs. Rs. Rs. required Rs.
1 SE 88885 2963 370 0.5 185

2 AEE/Gl. 48575 1619 202 3 607

3 EE/Dist. &
49880 1663 208 3 624
EE/GL

4 AEE/Dist. 48575 1619 202 3 607

Total 2023
ANNEXURE - XIV
SECURITY DEPOSITS
LT services
Energy Electricity
Rate of
Consumption Charges CCD
Sl. realisation Connected No of No of No of
Tariff for for 3 proposed by
No. in Rs/ load in Kw Hours days Months
3 months/ months TANGEDCO
KWH.
KW in Rs.
1 2 3 4 5 6 7 8=4*5*6*7 9=8*3 10
LT tariff
a IA
Single Rs.900/-per
I 2.42 1 4 30 3 360 871
Phase service
Three Rs.650/-per
II 2.42 1 6 30 3 540 1307
Phase Kw
LT tariff Rs.900/-per
b 4.00 1 10 30 3 900 3600
IC Kw

LT tariff
IIA
Steet
3.42 1 10 30 3 900 3078
light Rs.900/-per
c Public Kw
Water 3.42 1 4 30 3 360 918
Supply
LT tariff Rs.540/-per
d 4.87 1 6 30 3 540 1308
II B(1) Kw
LT tariff Rs.540/-per
f 5.56 1 6 30 3 540 1494
II B(2) Kw
LT tariff Rs.540/-per
g 3.17 1 6 30 3 540 850
II C Kw

LT tariff Rs.720/-per
h 2.71 1 8 30 3 720 728
III A(1) Kw

LT tariff Rs.720/-per
i 2.04 1 8 30 3 720 548
III A(2) Kw
LT tariff Rs.720/-per
j 4.92 1 8 30 3 720 1321
III (B) Kw

Rs.900/-per
k LT tariff V 6.76 1 10 30 3 900 1815
Kw

HT services

Total
Energy CCD @
Energy Powe % of Demand Electricity
Sl. Demand Days/ Total units/ charges two
Tariff charges in KVA r utilisati No of Hours charges Charges/
No. charges Month Month / months
Rs/Unit factor on / Month month
Month charges
in Rs.
10 11=10 13=11+
1 2 3 4 5 6 7 8 9 =5*6*7*8 12=4*5 14=13*2
*3 12
*9
HT tariff
a 4.0 300 1 0.9 0.75 8 30 162 648 300 948 1896
I (A)

Other
than HT
b Tariff I(A) 4.5 300 1 0.9 0.75 6 30 122 547 300 847 1694
and HT
Tariff III
HT tariff
c 5.8 300 1 0.9 0.75 8 30 162 940 300 1240 2479
III

Current consumption now proposed for HT Taiiff IA = 1900/KVA


Current consumption now proposed for other than HT Tariff IA and HT Tariff III = 1700/KVA
Current consumption now proposed for HT Taiiff III = 2500/KVA