Client
Consultant
HYDERABAD METROPOLITAN
DEVELOPMENT AUTHORITY
1
Districts
3
Districts
4
Total Length
Percentage of
S.No. Description Length (Km)
total RRR (%)
Bypass / realignment
1 144.452 51
Length
3.75 m
53.633 19
Width
BT Road
2 7.00 m 118.978 42
47.445 17
Width
Four Lane 17.900 6
3 Gravel Road 6.350 2
5
Quadrants
6
North East Quadrant
7
North East Quadrant
Percentage of
S.No Description Length (Km)
total RRR (%)
Bypass /
1 41.875 47
realignment Length
3.75 m
Width
27.700 31
BT Road
2 38.025 43
7.00 m
Width
10.325 12
8
North East Quadrant
Salient Features
•
No. of Villages : 20
•
Terrain & Land use : Plain & Agriculture
•
Average ROW Available :16m
•
Forest : Mulugu – Km. 1.700
9
South East Quadrant
10
South East Quadrant
Percentage of
S.No Description Length (Km)
total RRR (%)
Bypass /
1 52.607 68
realignment Length
3.75 m
Width
18.933 25
BT Road
2 18.933 25
7.00 m
Width
- -
3 Gravel Road - -
11
South East Quadrant
Salient Features
•
No. of Villages : 13
•
Terrain & Land use : Plain & Agriculture
•
Average ROW Available :15m
•
Forest : Kappa Pahad – Km. 2.000
•
No. of Level Crossings : -
12
South East Quadrant
13
South West Quadrant
14
South West Quadrant
Percentage of
S.No. Description Length (Km)
total RRR (%)
Bypass / realignment
1 35.460 53
Length
3.75 m
7.000 10
Width
BT Road 7.00 m
2 1.600 26.500 2 39
Width
3 Gravel Road - -
15
South West Quadrant
Salient Features
•
No. of Villages : 9
•
Terrain & Land use : Plain & Agriculture
•
Average ROW Available :30m(four lane), 20m(single lane)
•
Forest : -
•
No. of Level Crossings : 2
•
Existing Major Bridge : -
•
Four lane work completed from Chevella – Nagulapally which is of
18 km.
16
South West Quadrant
18
North West Quadrant
Percentage of
S.No Description Length (Km)
total RRR (%)
Bypass /
1 14.510 29
realignment Length
3.75 m
Width - -
BT Road
2 35.520 71
7.00 m
Width 35.520 71
3 Gravel Road - -
4 Cart Track - -
19
North West Quadrant
Salient Features
•
No. of Villages : 12
•
Terrain & Land use : Plain & Agriculture
•
Average ROW Available : 27m
•
Forest : Narsapur – Km. 4.300
•
No. of Level Crossings : 1
•
Existing Major Bridge : 1
•
The alignment between Tupran and Ismailkhanpet is of SH – 17
(35 km)
20
Major Junctions
21
Major Junctions
ORR Junction Distance from
S.No. Highway No Section Village Name
Name ORR (Km)
Hyderabad -
1 NH 44 Tupran Kandlakooi 26.2
Nagpur
Hyderabad - Dommarapochamp
2 SH 6 Narsapur 24.3
Medak ally
Hyderabad -
3 NH 65 Koulampet Muttangi 10.3
Pune
Hyderabad -
4 SH 4 Chevella Appa 25.9
Vikarabad
Hyderabad -
5 NH 44 Shadnagar Kishanguda 23.1
Bengaluru
Hyderabad -
6 SH 5 Kothur Chandrayanagutta 12.8
Srisailam
Hyderabad -
7 SH 19 Aghapalli Mangalpalli 15.2
Nagarjunasagar
Hyderabad -
8 NH 65 Malkapur Amberpet 15.7
Vijayawada
Hyderabad -
9 NH 163 Bhongir Pocharam 18
Warangal
22 Hyderabad -
10 SH 1 Mulugu Shamirpet 20.6
Siddipet
Traffic Count Locations
23
Traffic Count Locations
24
AADT on Spinal Roads
26
Traffic Growth Rates
Tractor with
Year 2W 3W Car Car (Y) Goods Buses Tractor Mini Bus
trailer
2010 – 2015 9.8% 8.7% 8.0% 6.5% 6.8% 3.2% 5.6% 7.1% 6.1%
2015 – 2020 9.3% 8.2% 7.5% 6.0% 6.3% 2.7% 5.1% 6.6% 5.6%
2020 – 2025 8.8% 7.7% 7.0% 5.5% 5.8% 2.3% 4.6% 6.1% 5.1%
2025 – 2030 8.3% 7.2% 6.5% 5.0% 5.3% 1.9% 4.1% 5.6% 4.6%
2030 – 2035 7.8% 6.7% 6.0% 4.5% 4.8% 1.7% 3.6% 5.1% 4.1%
Beyond 2035 7.3% 6.2% 5.5% 4.0% 4.3% 1.4% 3.1% 4.6% 3.6%
28
Traffic Capacity
Y ear Attaining four lane
Present Traffic
carriageway With LOS B
S. No. Leg-wise
PCUs Year PCUs Year
29
Toll Revenue Assumptions
●
Passenger vehicles (Car(white), Car (yellow), Bus, Mini Bus, Tata
Magic) and Mini LCV will be travelling into the Hyderabad city and
they will not travel on Regional Ring Road.
●
Only 30% of the commercial vehicles (LCV, 2 Axle, 3 Axle and Multi
Axle) will be using the Regional Ring Road and the rest of the
commercial vehicles will be plying on the Outer Ring Road.
30
Adopted Traffic for Toll Revenue
Legs
Type of Vehicle
Leg-1 Leg-2 Leg-3 Leg-4 Leg-5 Leg-6 Leg-7 Leg-8 Leg-9 Leg-10
Car (White) 0 0 0 0 0 0 0 0 0 0
Bus 0 0 0 0 0 0 0 0 0 0
Mini Bus 0 0 0 0 0 0 0 0 0 0
Tata Magic 0 0 0 0 0 0 0 0 0 0
LCV 372 358 337 196 195 183 252 217 282 282
2 Axle 540 444 423 295 285 252 485 485 445 486
3 Axle 634 590 622 349 332 290 426 384 478 496
M Axle 373 321 341 159 160 162 192 177 253 375
Mini LCV 0 0 0 0 0 0 0 0 0 0
TOTAL 1919 1713 1723 999 972 887 1355 1263 1458 1639
31
Toll Capping Rates
1 Car/Jeep/Van 0.50
3 Bus/Truck 2.00
●
For two lane highway 60% of the above rates shall be considered
32
Toll Capping Rates
1 Car/Jeep/Van 0.50
3 Bus/Truck 2.00
●
For two lane highway 60% of the above rates shall be considered
33
Tolling Length
Toll Plaza Limits (Km)
Design
Toll Plaza
S.No Chainage Village Leg No. Quadrant
Number
(Km)
From To Length
I (NE
2 TP – 2 47.1 Bommalaramaram Leg – 2 22.84 62.15 39.31
Quadrant)
II (SE
5 TP – 5 124.6 Gumadavelli Leg – 5 112.08 137.285 25.205
Quadrant)
Seriguda
6 TP – 6 153.3 Leg – 6 137.285 166.05 28.765
Bhadrapalli
34
Toll Revenue – Two Lane Highway
Leg 1 Leg 2 Leg 3 Leg 4 Leg 5 Leg 6 Leg 7 Leg 8 Leg 9 Leg 10
2015 2016 0.98 1.33 0.93 0.44 0.47 0.5 0.88 0.78 0.72 0.88
2020 2021 1.55 2.12 1.49 0.7 0.75 0.8 1.4 1.26 1.15 1.4
2025 2026 2.65 3.6 2.53 1.19 1.28 1.36 2.38 2.13 1.95 2.38
2030 2031 4.1 5.55 3.9 1.84 1.97 2.1 3.67 3.29 3.01 3.67
2035 2036 6.8 9.26 6.52 3.06 3.29 3.48 6.1 5.49 5.01 6.1
2040 2041 10.16 13.79 9.71 4.57 4.9 5.2 9.09 8.18 7.47 9.09
2045 2046 16.78 22.87 16.1 7.54 8.11 8.6 15.08 13.55 12.4 15.08
35
Toll Revenue – Four Lane Highway
Leg 1 Leg 2 Leg 3 Leg 4 Leg 5 Leg 6 Leg 7 Leg 8 Leg 9 Leg 10
2015 2016 1.63 2.22 1.57 0.73 0.79 0.84 1.47 1.31 1.2 1.43
2020 2021 2.59 3.54 2.49 1.16 1.25 1.33 2.33 2.08 1.91 2.27
2025 2026 4.42 6.02 4.24 1.99 2.13 2.27 3.97 3.56 3.26 3.86
2030 2031 6.82 9.27 6.53 3.06 3.3 3.5 6.12 5.5 5.03 5.95
2035 2036 11.33 15.43 10.83 5.11 5.48 5.81 10.17 9.14 8.36 9.9
2040 2041 16.91 23.01 16.2 7.6 8.16 8.67 15.15 13.67 12.47 14.79
2045 2046 27.96 38.09 26.79 12.59 13.52 14.33 25.1 22.62 20.65 24.51
36
Total Cost
37
Cost – North East Quadrant
4 Land Acquisition 65 65
●
BOT(Toll) Model
●
Hybrid Annuity Model
●
Equated Yearly installments (EYI) model (Priority Quadrants)
42
BOT(Toll) Model
Inputs
•
Civil Cost & Project Length
•
Contingencies : 1%
•
IC & Pre-operative Expenses : 1%
•
Financing Cost on Debt : 1 – 2%
•
Interest During Construction : 12.5%
•
Cost Escalation : 5%
•
Debt:Equity Ratio : 70:30
43
BOT(Toll) Model
2 Lane
S.No Concess 4 Lane
Grant
Quadrant ion
(%) Project Equity Project Equity
Period
FIRR FIRR FIRR FIRR
(%) (%) (%) (%)
North
1 40 30 Years 6.30 - 4.85 -
East
South
2 40 30 Years - - - -
East
South
3 40 30 Years 2.34 - 2.55 -
West
North
4 40 30 Years 4.81 - 2.67 -
West
44
Hybrid Annuity Model
Inputs
●
40% of the Bid Project Cost shall be due and payable to the
Concessionaire in 5 equal installments of 8% each during the
Construction Period.
●
Remaining bid project cost shall be payable in 30 biannual installments
●
Debt:Equity ratio: 70:30
●
Interest : Interest on Bank Rate + 3.5%
●
Financing Cost on Debt : 1 – 2%
●
IC & Pre-operative Expenses : 1.5%
●
Contingencies : 1%
45
Hybrid Annuity Model
2 Lane
4 lane
S.No Quadrant Bid Project Bid Project
O&M Cost O&M Cost IRR
Cost Cost
(Rs. Cr) (Rs. Cr)
(Rs. Cr) (Rs. Cr)
46
Equated Yearly Installment Model
Priority Quadrants
●
South West (Shadnagar – Koulampet)
●
North West (Koulampet - Tupran)
Inputs
●
Upfront Payment : 25%
●
Escalation : 5%
●
Interest during construction : 12.5%
47
Equated Yearly Installment Model
2 Lane 4 lane
48